Chapter 1. Introduction

Similar documents
Route Window Environmental Topic Summary of Significant Residual Impacts

Crossrail. Supplementary Environmental Statement 3. Mapping

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Crossrail. Supplementary Environmental Statement 2. Utilities Assessment Additional Information

12. Environmental baseline and assessment of impacts: Southeastern section

20. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2

Environmental Statement AP2 33

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

14. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 20

Crossrail Line 1 Assessment of Lighting Impacts: Technical Report

Crossrail Assessment of Impacts on Heritage and Landscape. Technical Report Volume 6 of 6 February E0316-G0E

Crossrail. Amendment of Provisions Environmental Statement AP4. May 2007

Chapter 24 Route Window SE5 Arsenal Way shaft. Transport for London

Chapter 5. Route Window C5: Tottenham Court Road Station

08 Baseline and Environmental Impacts: Blackwall Way to Abbey Wood

21. GREENWICH ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2

Chapter 9 Route window W18 Slough station. Transport for London

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

LOCAL PLANNING POLICY BERKSHIRE & BUCKINGHAMSHIRE ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Plumstead Temporary Railway Sidings and Associated Permanent Works

Learning legacy Document

Chapter 10. Route Window C5: Tottenham Court Road East

9. WESTMINSTER SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF

06 Baseline and Environmental Impacts: Westbourne Park to Pudding Mill Lane

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

Environmental Statement Review for Infrastructure

Euston Community Forum. 11 June Maria Fidelis School

Chapter 5. Planning policy context

Crossrail Assessment of Impacts on Heritage and Landscape. Technical Report Volume 1 of 6 February 2005

Counters Creek Flood Alleviation Scheme

Learning Legacy Document

Welcome to the Public Consultation Exhibition

Learning Legacy Document

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

17A. Wind Microclimate

05 Baseline and Environmental Impacts: Maidenhead to Westbourne Park

XSW11, Plumstead Portal worksites, Interim Statement for NLBH. 1 Introduction Site Methodology and fieldwork objectives...4

8. Environmental baseline and assessment of impacts: Western section

Environmental Memorandum

Armourers Court, Woolwich

SILVERTOWN WAY COMMUNITY FORUM 16 JUNE 2015

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Non-Technical Summary

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

Environmental Statement Non-Technical Summary

Emergency 24 Hour Reliable Family Run (Husband & Wife Formed)

OUR AREA SECTION 02 I NEXT PAGE. 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline

In Title Your Area 5: Amersham to Great Missenden

Planning Statement. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001

LIST OF LIVE AND DETERMINED PLANNING APPLICATIONS RELATING TO THE WIDER BRENT CROSS CRICKLEWOOD REGENERATION SCHEME

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010

Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 22 Submission of Legacy Corporation Local Plan

Start of works exhibition

Brent Cross Cricklewood Regeneration Area, London, NW2

07 Baseline and Environmental Impacts: Stratford to Shenfield

SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY Waterman Energy, Environment & Design

Northern Branch Corridor SDEIS March 2017

Key development locations along the route of the scheme are identified in Chapter 4.

Garden Bridge Planning Application

10. East Dulwich East Dulwich Area Vision

14 Introduction 14.2 Study area 14.3 Impact assessment methodology Magnitude Significance 14.4 Impact assessment 14.4.

Table 5.1 Assessment of Significant Community Impacts for the West (Maidenhead to Westbourne Park)

7.5 Impacts on the Section 4(f) Properties

Downtown Redevelopment Project Update

SH20 Manukau Harbour Crossing Project Notice of Requirement Auckland City Council

A. INTRODUCTION B. PROJECT LOCATION

E16: MAINTENANCE OF LANDSCAPED AREAS

How we chose our preferred sites

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

Planning Statement. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001

Local Plan Background Paper: Transport and Connectivity. August 2014

A16 Ecology: Application 2 - LBHF

Sheffield Victoria Station Development Prospectus January 2014

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

Proposed Student Accommodation Development

Chapter 8. Visualizations

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

6 BRIDGES. 6.1 Design philosophy. Proposed bridges

heuston gateway: sections heuston gateway: regeneration strategy and development framework plan

WELCOME TO OPEN HOUSE TWO November 28, 2018

Crossrail Bulletin. First tunnel portal completed early ISSUE. Crossing the Capital Connecting the UK

`Code 2 - Accepted with comments

TRANSPORT ARCHITECTURE. JOHN McASLAN + PARTNERS

CONSTRUCTION COST ESTIMATE. MANAGEMENT PLAN at VAUXHALL PARK, LAMBETH for LAMBETH PARKS MARCH 2006

In Title Your Area 10: Lower Boddington to Southam & Offchurch

Longbridge Town Centre Phase 2 Planning Application

The King s Cross Fire Disaster

Part G: Assessment of Effects on the Environment. 11 Environmental Effects Assessment

HS2 Environment. Protecting the environment

Response by the Wiltshire Archaeological and Natural History Society

We're THAMES WATER APPROVED plumber. We are GAS SAFE REGISTERED plumbing, heating, gas engineers

Golden Mile Transport Group THE GOLDEN MILE A BRIGHT FUTURE

1. Introduction. Site Boundary

20 Saltram Crescent Queen s Park, London W9 3HW

Transcription:

Chapter 1 Introduction

2 Crossrail Amendment of Provisions 1 Introduction 1.1.1 The Crossrail Bill was submitted to Parliament together with an Environmental Statement (ES) (hereafter referred to as the main ES ) and an Addendum in February 2005. A Supplementary ES providing additional information on the works and environmental impacts relating to certain aspects of the Crossrail project in addition to those reported in the main ES was published in May 2005. A second Supplementary ES (SES2) was published in January 2006 providing additional information and environmental impacts related to utilities works. 1.1.2 Since the Bill s deposit, a number of revisions to the original Bill proposals have been identified as being necessary. In some cases these revisions involve the acquisition or use of land outside of the current limits of the Bill, additional access rights, or other extensions of the powers conferred by the Bill making it necessary to submit Amendment of Provisions to the Bill ( 1 ). These Amendment of Provisions (AP) are submitted to Parliament and are subject to a petitioning period in the same way as the Bill itself. 1.1.3 An Environmental Impact Assessment of the first tranche of AP has been undertaken and an ES (referred to as the AP ES) was published in January 2006. This AP ES covered Additional Provisions at Paddington station, Tottenham Court Road, Whitechapel station, Lowell Street Shaft, Isle of Dogs station, Stockley flyover, Hayes and Harlington station, Romford depot and Limmo Peninsula. 1.1.4 A second tranche of AP has now been assessed. It is the purpose of this ES (hereafter referred to as the AP2 ES ) to provide an assessment of the environmental impacts arising from the revised proposals to which the second tranche of Amendments relate. The Amendments that require assessment are summarised in Table 1.1. Specifically, this AP2 ES describes the permanent and temporary works and/or requirements for the use of land arising from the revised proposals, and any consequent changes to the environmental baseline and assessment of significant environmental impacts from those reported in the main ES. 1.1.5 The measures that will be used to mitigate impacts during Crossrail s construction are described in Appendix B1 of the main ES. Implementation of these measures has been assumed in this AP2 ES. The impacts reported in this AP2 ES are residual impacts, ie the significant impacts that will remain after the application of generic or specific measures to reduce or control them. 1.1.6 This AP2 ES is presented by route window, as in the main ES. ( 1 ) This is the term used to describe an Amendment to the Bill to which the Private Business Standing Orders of Parliament are applicable.

Environmental Statement AP2 3 Table 1.1 Main Elements of the Amendment of Provisions Royal Oak Portal Westbourne Park Sidings C1 The original scheme comprised the creation of 235 m long sidings for a reinstated concrete batching plant at Westbourne Park. The revised scheme comprises an extension of the sidings to the east so that they are 350 m long to enable a reinstated plant to continue to operate at its current capacity. Additional land is required to do this which was outside the limits of the Bill, the railway retaining wall will be moved to the north, and Westbourne Park Passage footbridge will be extended to span the new sidings. City of Westminster and RB of Kensington and Chelsea Farringdon Station and Liverpool Street Station (Amendment 1 Farringdon Crossover) C6 and C7 The original scheme consisted of the construction of a rail crossover between Farringdon and Liverpool Street stations, beneath the Barbican. The provision of the crossover was to ensure that Crossrail services can continue to run during emergencies and disrupted services. The crossover would have been constructed from a worksite in Aldersgate Street. The crossover has been moved to a different location beneath the Barbican and will be constructed using a different method. Finsbury Circus worksite will be used as the main worksite for construction, removing the need for the Farringdon crossover worksite in Aldersgate Street. City of London

4 Crossrail Amendment of Provisions (Amendment 2 Finsbury Circus Gardens) C7 The original scheme involved the use of the Finsbury Circus worksite for construction of the new Crossrail station at Liverpool Street, and as proposed, would have resulted in a loss of trees in the gardens. The access point to the Finsbury Circus worksite has been amended (which requires an additional area of worksite) in order to reduce the impact on the trees. City of London (Amendment 3 Moorgate Station Sewer) C7 A sewer that runs through the middle of Moorgate station was to have been diverted southwards to connect into an existing sewer in Fore Street. These works would have required a worksite in Fore Street Avenue. An alternative route for the diversion of the sewer was developed through the existing Moorgate worksite in order to avoid diversion of a major telecommunications duct route in Fore Street Avenue. City of London Mile End Park and Eleanor Street Shafts C12 The Eleanor Street shaft is to be built in the eastern end of what is currently a gypsy and travellers site (hereafter known as a travellers site) in an area known as the Bow Triangle located to the south of Bow Road and bounded by the District line and mainline railway viaducts. The travellers site was to be relocated offsite and would not have been reinstated following the construction phase. The travellers site has been reconfigured to enable its residents to stay within the Bow Triangle during construction and operation. Additional land area is required to accommodate the travellers; the laundry building and units 1 3 of Bow Triangle Business Centre will be demolished. LB of Tower Hamlets

Environmental Statement AP2 5 Pudding Mill Lane Portal and Abbey Mills Hackney to Abbey Mills (HAM) and Wick Lane (WL) sewer diversions C13 and C13A To facilitate the development of Pudding Mill Lane portal, a number of enabling works were proposed, including the diversion of the HAM and WL sewers. The sewer was to be diverted to the east towards Abbey Mills pumping station. This required a new pumping station. An alternative gravity-fed route has been identified, running in a north-south direction to the west of the Blackwall Way Northern Approach Road. The revised route will avoid conflicts with large piled foundations which would cause problems for the proposed tunnelling of the new sewer. LB of Tower Hamlets and LB of Newham Dog Kennel Bridge Chequer Bridge W15 A new bridge was to be constructed over Hollow Hill Lane to carry a new single relief line track, using piled abutments and plinths. This work would have required the diversion of three high pressure gas mains and two oil pipelines located in the vicinity of the eastern supports of the new bridge. An amended construction method was developed which will extend Chequer Bridge on the north side of the railway as a concrete box structure, thereby avoiding the need for piled foundations and the diversion of the gas mains and oil pipelines. Hollow Hill Lane to the north of the railway will be realigned. Slough BC

6 Custom House Station SE2 The Bill made provision for access for construction traffic along Western Gateway and Seagull Lane, private roads off Tidal Basin Road. The section of Seagull Lane aligned north south, over which the Bill provided access rights for construction, has been realigned to the north and west; consequently it is proposed to include the realigned Seagull Lane within the limits of land to be acquired or used for construction access. LB of Newham Plumstead Portal SE6 An area of land to the south of Nathan Way was to be used as part of the worksite to construct the Plumstead portal and handle excavated material. The worksite location has been moved to the east to avoid limiting the use of a London Borough of Greenwich-backed proposed redevelopment site. LB of Greenwich