AGENCIES and OFFICIALS CONTACTED FEDERAL Federal Aviation Administration Federal Emergency Management Agency Natural Resources Conservation Service U.

Similar documents
ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

Regulation Changes for Open Space and Similar Uses

EXHIBIT 5-1 VILLAGE OF WILD ROSE FUNCTIONAL CLASS AND AVERAGE DAILY TRAFFIC VOLUMES 2000 & 2003 DATA

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

Pine Flat Lake Master Plan Update FACT SHEET September 2014

SAWYER RANCH ROAD Pedestrian and Bicycle Improvements

EXHIBIT 6-1 TOWN OF AURORA COMMUNITY FACILITIES. Aurora Municipal Building. Cell Tower (U.S. Cellular) Cell Tower (AAT Communication)

Madison County Data List December 16, 2008

Kick-off Meeting. FM No: ETDM No: 14050

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

Public Information Meeting

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Final Plan Submittal Application Requirements.

Letter of Notification For East Lima Station Expansion Project

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

Balancing Conservation and Development on the Jordan River

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS.

Irvington to Kino 138 kv Transmission Line Project April 2018

ROSEMONT 138kV TRANSMISSION LINE PROJECT. Public Open House Meeting #2 August 27, 2009

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Surrey Ecosystem Management Study

Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016

National Association of Conservation Districts. Kris Hoellen Vice President, Sustainable Programs The Conservation Fund September 19, 2013

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia

Northern Branch Corridor SDEIS March 2017

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

Warren County/Bowling Green Focus 2030 Comprehensive Plan VOLUME 1 INDEX

Conservation Plan. I. Property Information. II. Objectives. Natural Resource Objectives. Sustainability in Practice (SIP) Certified

BLOOMSBURY BOROUGH. Regional Master Plan Overlay Zone Designation. 1 inch = 0.28 miles. Zone. Sub-Zone FRANKLIN TOWNSHIP GREENWICH TOWNSHIP

Rural Land Use Designations Kittitas County December 6, 2007 Draft

HAZARD MITIGATION GOALS AND OBJECTIVES

GENERAL LAND USE PLAN ELEMENT

I-290 Eisenhower Expressway

Town of Washington Master Plan & Regulatory Audit: Interim Results

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

B R I E F A p p e n d i x A : F i g u r e s

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Major Subdivision Sketch Plan Checklist

APPENDIX C Agency Scoping Meeting Materials

Information for File # SEK

Table IX-1 LAND USES IN WASHINGTON COUNTY: 2006

Improve Neighborhood Design and Reduce Non Point Source Water Pollution

Technical Memorandum 5

SOAH DOCKET NO PUC DOCKET NO

Information for File # KDZ

CHAPTER 10 AESTHETICS

A Agricultural Zone.

I. STAFF POLICY RECOMMENDATIONS. The following RMP policy strategies are proposed by staff in support of a Scenic Resource Protection Program:

OFFICIAL COMMUNITY PLANS (OCPs) AND ZONING BYLAWS (ZBs): PLANNING FOR THE FUTURE

Florida Forever Conservation Needs Assessment Overview Maps

Natomas Joint Vision Open Space Plan

SECTION 1 Introduction...1. SECTION 2 Regional Context Criteria for Planning Districts Description of Planning District...

Oakland County s Green Infrastructure Vision. L. Brooks Patterson Oakland County Executive

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

CITY OF CLEVELAND GREEN DESIGN GUIDELINES

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

DRAFT MAP AMENDMENT FLU 04-4

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

CHAPTER 2 GOALS, OBJECTIVES AND POLICIES

STREAM BUFFERS

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

15. Wetlands Chapter Overview Introduction

Green Infrastructure. by Karen Engel, NYS DEC. NYS Department of Environmental Conservation

Intergovermental Coordination

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Map Development 5/15/2012. New Virginia Modeling Tools

NOTICE OF PREPARATION

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A

Riparian Buffer on the Bushkill Creek. Policies

Mendota Heights 2040 Comprehensive Plan Draft Vers

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Greenways as an alternative to traditional infrastructure. Green Infrastructure

Procedures IV. V. Rural Road Design Option

ARTICLE VII OVERLAY DISTRICTS AND AREAS

Westport Master Plan. Town of Westport. Master Plan Master Plan Update Committee. Westport, Massachusetts

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Master Environmental Servicing Plan & Secondary Plan

Sustainable Storm Water Management

Existing Conditions and Environmental Consequences Floodplains

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

What We Heard Public Engagement - Stage 1

WASHINGTON COUNTY OREGON

Public Information Meeting

Appendix E Preliminary Location Hydraulic Study

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

Transcription:

AGENCIES and OFFICIALS CONTACTED FEDERAL Federal Aviation Administration Federal Emergency Management Agency Natural Resources Conservation Service U.S. Army Corps of Engineers U.S. Environmental Protection Agency U.S. Fish & Wildlife Service U.S. National Parks Service U.S. Senators and Congressional Representatives STATE Railroad Commission of Texas Texas Commission on Environmental Quality Texas Department of Transportation Aviation Division Environmental Affairs Division Planning and Programming Texas General Land Office Texas Historical Commission Texas Parks & Wildlife Department Texas Water Development Board State Senators and Representatives LOCAL County Officials (Blanco, Gillespie, and Kendall) City Officials (Fredericksburg) School ISDs (Blanco, Comfort, Fredericksburg, and Johnson City) Blanco, Gillespie, and Kendall Counties Economic Development Corporation Blanco, Gillespie, and Kendall Counties Historical Commission Alamo Area Council of Governments Capitol Area Council of Governments Fredericksburg Chamber of Commerce Stonewall Chamber of Commerce Utilities

ENVIRONMENTAL AND LAND USE CRITERIA FOR TRANSMISSION LINE EVALUATION Land Use Length of alternative route Number of habitable structures¹ within 300 feet of the right-of-way (ROW) centerline Number of newly affected habitable structures¹ within 300 feet of ROW centerline Length of ROW using existing transmission line ROW Length of ROW parallel to existing transmission line ROW Length of ROW parallel to other existing ROW (roadways, pipelines, railway, etc.) Length of ROW parallel to apparent property lines² Length of ROW through parks/recreational areas³ Number of additional parks/recreational areas³ within 1,000 feet of the ROW centerline Length of ROW through cropland Length of ROW through pasture/rangeland Length of ROW through land irrigated by traveling systems (rolling or pivot type) Number of pipeline crossings Number of transmission line crossings Number of U.S. and state highway crossings Number of farm-to-market road (FM) crossings Number of cemeteries within 1,000 feet of the ROW centerline Number of FAA registered airports with at least one runway more than 3,200 feet in length located within 20,000 feet of the ROW centerline Number of FAA registered airports having no runway more than 3,200 feet in length located within 10,000 feet of the ROW centerline Number of private airstrips within 10,000 feet of the ROW centerline Number of heliports within 5,000 feet of the ROW centerline Number of commercial AM radio transmitters within 10,000 feet of the ROW centerline Number of FM radio transmitters, microwave towers, and other electronic installations within 2,000 feet of the ROW centerline Aesthetics Estimated length of ROW within foreground visual zone of U.S. and state highways Estimated length of ROW within foreground visual zone of FM roads Estimated length of ROW within foreground visual zone of park/recreational areas³ Ecology Length of ROW through upland woodlands/brushland Length of ROW through bottomland/riparian woodlands Length of ROW across National Wetlands Inventory mapped wetlands Length of ROW across known habitat of federally listed endangered or threatened species Length of ROW through modeled potentially suitable habitat for Golden-cheeked Warbler Length of ROW across open water (lakes, ponds) Number of stream crossings Number of river crossings Length of ROW parallel (within 100 feet) to streams or rivers Length of ROW across 100-year floodplains Area of ROW across Edwards Aquifer drainage zone (acres) Cultural Resources Number of recorded historic or prehistoric sites crossed by ROW Number of additional recorded historic or prehistoric sites within 1,000 feet of ROW centerline Number of National Register listed or determined eligible sites crossed by ROW Number of additional National Register listed or determined eligible sites within 1,000 feet of ROW centerline Length of ROW through areas of high archaeological/historic site potential ¹ Single-family and multi-family dwellings, mobile homes, apartment buildings, commercial structures, industrial structures, business structures, churches, hospitals, nursing homes, and schools or other structures normally inhabited by humans or intended to be inhabited by humans on a daily or regular basis within 300 feet of the centerline of a transmission project of 230-kV or less. ² Property lines created by existing roads, highway, or railroad ROW are not double-counted in the length of ROW parallel to property lines criteria. ³ Defined as parks and recreational areas owned by a governmental body or an organized group, club, or church located within 1,000 feet of the centerline of the project. 4 One-half mile, unobstructed. Lengths of ROW within the visual foreground zone of Interstates, U.S. and State Highways criteria are not double-counted in the length of ROW within the visual foreground zone of FM Roads criteria. One-half mile, unobstructed. Lengths of ROW within the visual foreground zone of parks/recreational areas may overlap with the total length of ROW within the visual foreground zone of Interstates, U.S. and State Highways criteria and/or with the total length of ROW within the visual foreground zone of FM Roads criteria.