Storage Protection Using Horizontal Barriers and Large K-Factor, Extended Coverage In-Rack Sprinklers

Similar documents
Significant Advancements in Water Based Fire Suppression for Storage Occupancies

Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers

Early Suppression Fast Response Sprinklers and Obstructions

Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT

Warehouse Protection of Exposed Expanded Group-A Plastics with Electronic Sprinkler Technology

NFPA Edition. NFPA 13 (2016 Edition) Hot Topics and NFPA 13 FAQ s. Highlights of 2016 Changes. Storage Commodity Classification 4/29/2014

Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers

Model ESFR K-factor Pendent Sprinkler Early Suppression, Fast Response General Description. Sprinkler Identification Number (SIN)

Today's Topics & Sustainability Themes

TECHNICAL DATA. * Refer the Approval Charts and Design Criteria on pages 3-5 for culus Listing and FM Approval requirements that must be followed.

Storage Sprinkler U.S. Quick Reference Guide

ESFR PENDENT SPRINKLER VK510 (K25.2) TECHNICAL DATA

Plan Submittal Checklist

esfr pendent sprinkler vk510 (k25.2)

Box-in-Box Cold Storage Fire Protection Options

TECHNICAL DATA OBSOLETE. * Refer the Approval Chart on page 121c and Design Criteria on page 121d for FM approval requirements that must be followed.

TECHNICAL DATA. * Refer the Approval Chart on page 120c and Design Criteria on page 120d for culus and FM approval requirements that must be followed.

SFPE Austin/San Antonio Chapter Meeting

Sprinkler Solutions for Storage Applications

Storage Sprinkler. Model LP-46 (SIN) V4603, K25, Standard Response Storage Upright Sprinkler, Patent Pending

The Effect of Large Orifice Sprinklers on High-Challenge Fires

Requirements for the protection of High-Piled Combustible Storage (HPCS) Effective Date: January 2011

esfr pendent sprinkler vk510 (k25.2)

High Ceiling Protection

ESFR PENDENT SPRINKLER VK500 (K14.0) TECHNICAL DATA

Developing a Fire Test Strategy for Storage Protection Under Sloped Ceilings

Model ESFR-25 Early Suppression, Fast Response Pendent Sprinklers 25.2 K-factor General Description

High challenge warehouse case study Summary

TECHNICAL DATA OBSOLETE

Tire Storage. Michigan Fire Inspectors Society Fall Conference

RESEARCH TECHNICAL REPORT. SMART Sprinkler Protection for Highly Challenging Fires - Phase 2: Full-Scale Fire Tests in Rack Storage

Sprinkler Identification Numbers

esfr dry pendent sprinkler Vk502 (k14.0)

TECHNICAL DATA. Refer to the Approval Chart and Design Criteria for UL and FM Listing/Approval requirements that must be followed.

Model JL-14 (SIN RA1812) K14.0 (200 metric) Early Suppression Fast Response Sprinkler

Model ESFR-17 Early Suppression, Fast Response Upright Sprinklers 16.8 K-factor General Description

TECHNICAL DATA NOTICE

Protection of Storage Under Sloped Ceilings Phase 2 Full Scale Test Matrix

Obstructions and ESFR Sprinklers Phase 1

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST HIGH PILED STORAGE

SPRINKLER TECHNOLOGY:

SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL /

esfr dry pendent sprinkler Vk501 (k14.0)

Model ESFR K-factor Dry Type Pendent Sprinklers Early Suppression, Fast Response General Description

FIRE PROTECTION FOR NON-STORAGE OCCUPANCIES WITH HIGH CEILING CLEARANCES

RESIDENTIAL SPRINKLER INSTALLATION GUIDE

Model ESFR-17 Dry Type Pendent Sprinklers Early Suppression Fast Response 16.8 K-factor General Description

STORAGE FIRE PROTECTION SPRINKLERS

Model ESFR K-factor Dry Type Pendent Sprinklers Early Suppression, Fast Response General Description

Impact of a High Volume Low Speed Fan on Sprinkler Performance in Rack Storage Fires

RESIDENTIAL SPRINKLER INSTALLATION GUIDE

Factors Affecting Efficiency of Water Mist Suppression of Solid Combustible Fires in Open Environment

American Society of Safety Engineers Professional Development Conference June 9-12, Fire Protection. Stephen J.

Model MBEC-14. Extended Coverage Ordinary & Extra Hazard Horizontal Sidewall Sprinklers for Metal Building Applications. Model MBEC-14 (SIN R6932)

First Revision No. 632-NFPA [ Global Input ] Supplemental Information. Submitter Information Verification. Committee Statement

ROLL PAPER STORAGE. Table of Contents

Redlands Fire Department Fire Protection Standard

Series EC-11 and EC-14 Sprinklers, 11.2 K and 14.0 K Upright and Pendent Extended Coverage Light and Ordinary Hazard General Description

MODEL V-BB SPECIFIC APPLICATION TECHNICAL DATA

Fire Prevention Coffee Break Training. May 2017

standard response elo upright and pendent sprinklers (storage-density/area)

Residential Sprinkler For Sloped Ceilings

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

RESEARCH TECHNICAL REPORT. Numerical Simulations of Sprinkler Activations and Spray Transport under Obstructed, Sloped Ceilings

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

Sprinkler Identification Numbers

By: Russell Bainbridge March 18th, 2016 FPE 596

High-Piled Combustible Storage

Vaults 5/03/2015. Introduction. Vault Types. Stand alone building Free standing structure VAULTS

ESCUTCHEON PLATE SEATING SURFACE. 1-11/16" (42,7 mm) CROSS SECTION

RESOLUTION MSC.265(84) (adopted on 9 May 2008) AMENDMENTS TO THE REVISED GUIDELINES FOR APPROVAL OF SPRINKLER SYSTEMS EQUIVALENT TO THAT REFERRED TO

Large-scale fire sprinkler tests with the AutoStore compact storage system

Series EC K-factor Extended Coverage (Light Hazard) Pendent and Recessed Pendent Sprinklers General Description

Model G5 Series Sprinkler Summary. Listings and Approvals. G4/G5 QR Gasket culus QR G4/G5 SR Gasket culus, FM SR G4/G5

HORIZON QUICK RESPONSE FLUSH PENDENT SPRINKLERS TECHNICAL DATA

The Situation. Modeling Storage Occupancies Under Sloped Ceilings. Concerns (Elevation View) The Concerns 4/29/ NFPA Conference & Expo

Series TY-FRL 5.6 and 8.0 K-factor Extended Coverage Horizontal Sidewall Sprinklers Quick & Standard Response (Light Hazard) General Description

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

ATTIC UPRIGHT SPECIFIC APPLICATION SPRINKLER VK696 TECHNICAL DATA

Model/Sprinkler Identification Number JULY, 2011 WARNINGS

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

STANDARD/quick. Sprinkler 42o. August 8, 2011

STORAGE PRODUCT BROCHURE

NFPA 30 FLC-SWC Public Comment Report

ec/qrec ordinary hazard upright and pendent sprinklers vk570 and vk572 (k14.0)

Series EC K-factor Extended Coverage (Light Hazard) Pendent and Recessed Pendent Sprinklers General Description

The Loss prevention Council. Phase 1 report

File Ex643 Project 03NK31930 Project 04NK24425 Project 05NK25712 Project 06NK15719 Project 06NK06003 Project 06NK24531

SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL /

Review of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings

STANDARD/QUICK RESPONSE ECOH ELO FUSIBLE ELEMENT UPRIGHT SPRINKLER VK535 (K11.2) TECHNICAL DATA

The Science Behind Water Mist Protection of Typical Building Hazards

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

Series TY-FRB 2.8, 4.2, 5.6, and 8.0 K-Factor Upright, Pendent, and Recessed Pendent Sprinklers Quick Response, Standard Coverage

Series TY-FRB 2.8, 4.2, 5.6, and 8.0 K-Factor Upright, Pendent, and Recessed Pendent Sprinklers Quick Response, Standard Coverage General Description

Model ESFR-17 Dry Type Pendent Sprinklers Early Suppression Fast Response 16.8 K-factor General Description

How to know if a residential or domestic water mist system is performance compliant to BS 8458:2015?

Spray sprinkler system

Sprinkler System Installer Level 2

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

Transcription:

Storage Protection Using Horizontal Barriers and Large K-Factor, Extended Coverage In-Rack Sprinklers Michael Billstroem Director of International Technical Services The Reliable Automatic Sprinkler Co., Inc.

As an Industry, we have spent the last 30 years trying to eliminate in-rack sprinklers. Are they coming back? Current Trends & Developments: Higher buildings using Automated Storage and Retrieval Systems (ASRS). More exposed plastic storage Lower water demands by using horizontal in-rack barriers. Using N252 EC as in-rack sprinklers.

Why is Storage Different?

NFPA Fire Protection Research Foundation work forms the basis of our new approach. Initial Project to improve on methods of storing EEP and allowing for retrofit. Save water.

Performance Based Design Equivalency NFPA 13 1.5 Nothing in this standard is intended to prevent the use of systems, methods or devices of equivalent or superior quality, strength, fire resistance, effectiveness, durability, and safety over those prescribed by this standard. NFPA 13 1.5.1 Technical documentation shall be submitted to the AHJ to demonstrate equivalency NFPA 13 1.5.2 The system, method, or device shall be approved for the intended purpose by the AHJ. New Technology NFPA 13 1.6.1 Nothing in this standard shall be intended to restrict new technologies or alternate arrangements, provided the level of safety prescribed by this standard is not lowered.

NFPA Group A Plastics & Rubber Choose appropriate path

Testing carried out at Underwriters Laboratories (UL) Standard fuel package for EEP tests using polystyrene meat trays.

Test Parameters. Commodity: Exposed, Expanded Class A Plastics Ceiling Height:12.2m Storage Height: 10.7m Horizontal Barrier: 10mm Plywood at 6.1m (as per FM 8-9 and NFPA 13) Ceiling Sprinklers: K=16.8 ESFR Sprinklers 100 C @ 3.4bar In-rack sprinklers: N252EC K=360 Extended Coverage Pendent Sprinklers 100 C @ 2.07bar

Reliable Model N252-EC Extended Coverage Pendent Sprinkler K=360 UL Listed, FM approved as a ceiling application sprinkler 100 C version was used for all testing The Model N252 EC Pendent Sprinkler is a component of the N-Rack-EC Fire Protection System Patent Pending

100mm clearance above commodity 50mm deflector distance below beam 1200mm aisle width Target Array Spray Pattern @ 2.07bar

Installation Method. N252-EC Sprinklers Centred in Longitudinal Flue and Centred Between Rack Uprights = 2,515mm on centre.

The horizontal barrier was left open at the rack uprights and no sprinklers are installed in the transverse flue or at the face of the racks.

Exposed Expanded Class A Plastics Fire Test.

Results. Opened one (1) sprinkler at the ceiling @ 1 minute/2 seconds 3.4bar and 450 lpm Opened two (2) sprinklers in the rack @ 49 seconds and 52 seconds 2.07bar and 522 lpm each or 1044 lpm total

After N-252 EC with Horizontal Barrier

Ceiling Proposed Design Temp(C) Bar LPM/spr No. of sprs. calculated System Demand in LPM K-16.8 ESFR 100 3.4 450 12 5,405+ In-Rack N-252 EC Pendent 100 2.07 522 3 1,567+ For comparison: Actual water demands will be higher based upon hydraulic calculations. The in-rack sprinkler demand would not be added to the ceiling demand because of the horizontal barrier. The total system demand would be the ceiling demand at 5,405+ LPM

Existing Ceiling Sprinkler Design (FM) for Exposed Expanded Plastics stored in Open Racks with 12.2m Ceiling and 10.7m storage. Proposed K-16.8 ESFR & N252 In Rack Bar LPM/spr No. of sprs. calculated Hose Stream in LPM System Demand in LPM 3.4 450 12 946 5,405+ FM DS 8-9 K-25 ESFR Pendent 5.17 829 20 1,893 18,473+ For comparison: Actual water demands will be higher based upon hydraulic calculations. Also note current 8-9 system has 2 hour water demand. On this basis total water saving would be +/- 1,875,000 litres

Proposed Design (NFPA13-2016) for Exposed Expanded Plastics stored in Open Racks with 12.2m Ceiling and 10.7m storage using Vertical Barriers at 5m Intervals. Proposed K-16.8 ESFR & N252 In Rack Bar LPM/spr No. of sprs. calculated Hose Stream in LPM System Demand in LPM 3.4 450 12 946 5,405+ NFPA 13 K-25 ESFR Pendent 4.14 738 15 946 12,016+ For comparison: Actual water demands will be higher based upon hydraulic calculations. On this basis total water saving would be +/- 396,660 litres

After K25 ESFR with Vertical Barrier

After N-252 EC with Horizontal Barrier

Second Phase of Testing Cartoned Unexpanded, Group A Plastics Primary Goals: To reduce the number of in-rack sprinklers when compared to standard in-rack schemes and to reduce water demands. To have a significant reduction of water demand for buildings up to 14.63m (48 ) high that can currently be protected by ceiling-only sprinklers. Protect buildings higher than 14.63m (48 ) with low water demands. Retrofit existing facilities, where the storage commodities or methods of storage have changed, without changing the existing sprinklers and/or increasing water flows or pressures.

Objective: Test 2 with Cartoned Unexpanded Plastics By using a horizontal barrier at 9.1m, the total water demand and pressure would be lower than existing ceiling-only sprinkler designs. Protect buildings higher than 14.63 with one level of in-rack sprinklers. Test 2 Ceiling Height 14.63m Storage Height Horizontal Barrier Ignition Point 13.11m on double row racks 1 at the 9.1m level At upright- face (aisle) Ceiling Sprinklers N 252 EC 100 C pendent @ 18.2m2 and 2.07bar In-Rack Sprinklers Ceiling Spr. Operated N 252 EC 100 C pendent @ 2.07bar 1 @ 3.01 minutes In-Rack Spr. Operated 2-1 st @ 2.53 last @ 2:59 Peak Steel Temp Ceil. 67 C

After N-252 EC with Horizontal Barrier

Proposed Design for Cartoned Unexpanded Plastics Stored in Racks up to and potentially over 14.63m with Horizontal Barriers at the 9.1m level Ceiling Bar LPM/spr No. of sprs. calculated System Demand in LPM N-252 EC Pendent @ 18.2m²/spr 2.07 522 6 3,132+ The ceiling sprinkler design is based upon NFPA 13 and FM Global requirements for 9.1m high ceilings and ceiling-only sprinkler protection. In-Rack N-252 EC Pendent 2.07 522 3 1,566+ For comparison: Actual water demands will be higher based upon hydraulic calculations. The in-rack sprinkler demand would not be added to the ceiling demand because of the horizontal barrier. The total system demand would be the ceiling demand at 3,132+ LPM

N-Rack-EC System Vs. Current Approved Systems Current UL Listings / FM Approvals for 13.7m High Buildings-Class 4/Group A Plastics K22/K 25 ESFR @ 9.3m² Proposed Design - N252 EC @ 18.2m² Sprinkler demand UL 6,435+ lpm / 7,237+ lpm 3,132+ lpm FM 7,177+ lpm / 8,088+ lpm Hose stream demand 946 lpm 946 lpm Total demand 7,381+ lpm / 8,183+ lpm 4,078+ lpm FM 8,123+ lpm / 9,034+ lpm Current UL Listings for 14.63m High Buildings-Class 4/Group A Plastics K22/K 25 ESFR @ 9.3m² Proposed Design - N252 EC @ 18.2m² Sprinkler demand 7,544 lpm / 8,093 lpm 3,132+ lpm Hose stream demand 946 lpm 946 lpm Total demand 8,490+ lpm / 9,039+ lpm 4,078+ lpm

Potential Benefits Up to 18.3m high buildings with 16.7m Storage using a single row of in-rack sprinklers? Future Protection for 48 + High Buildings- Class 4/Group A Plastics K22/K 25 ESFR Proposed Design - N252 EC @ 18.2m² Sprinkler demand NA 3,132+ lpm Hose stream demand NA 946 lpm Total demand NA 4,078+ lpm

ASRS - The Future of Storage Protection Tests 3, 4, & 5 24.4m/36.4m 18.3m/27.3m 12.2m/18.2m 6.1m/9.1m

Objective: Test 3 with Cartoned Unexpanded Plastics By using multiple horizontal barriers at 6.1m intervals, high bay buildings may be protected with fewer in-rack sprinklers. No face sprinklers and no sprinklers in transverse flues. Barrier open at transverse flue. Test 3 Ceiling Height 14.63m Storage Height Horizontal Barrier Ignition Point Ceiling Sprinklers In-Rack Sprinklers 13.11m on double row racks 2 6.1m level & 12.2m level Offset in Transverse Flue N 252 EC pendent @ 18.2m2 and 0 bar N 252 EC 100 C pendent @ 2.07bar Ceiling Spr. Operated 3 1 st @ 20.40 last @ 21.15 In-Rack Spr. Operated 5-1 st @ 1.13 in 6.1m level. 1 st in 12.2m level @ 13.40 Peak Steel Temp Ceil. 232 C

Testing with a Continuous Barrier Across the Uprights Tests 1, 2, & 3 Tests 4 & 5

Test 4 with Cartoned Unexpanded Plastics Objective: By using multiple continuous horizontal barriers at 6.1m intervals, high bay buildings may be protected with fewer in-rack sprinklers. No face sprinklers and no sprinklers in transverse flues. Fires may be contained and suppressed between barriers. Test 4 Ceiling Height 14.63m Storage Height Horizontal Barrier Ignition Point Ceiling Sprinklers In-Rack Sprinklers Ceiling Spr. Operated 13.11m on double row racks 2 6.1m level & 12.2m level Offset in Transverse Flue N 252 EC pendent @ 18.2m2 and 0 bar N 252 EC 100 C pendent @ 2.07bar None In-Rack Spr. Operated 4 in 6.1m level only - 1 st @ 1.26 4th @ 1.36 Peak Steel Temp Ceil. 28 C

Test 5 with Cartoned Unexpanded Plastics Objective: By using multiple continuous horizontal barriers at 9.1m intervals, high bay buildings may be protected with fewer in-rack sprinklers. No face sprinklers and no sprinklers in transverse flues. Fires may be contained and suppressed between barriers. Test 5 Ceiling Height 14.63m Storage Height Horizontal Barrier Ignition Point Ceiling Sprinklers In-Rack Sprinklers Ceiling Spr. Operated 13.11m on double row racks 1 9.1m level Offset in Transverse Flue N 252 EC pendent @ 18.2m2 and 0 bar N 252 EC 100 C pendent @ 2.07bar None In-Rack Spr. Operated 3 in 9.1m level only - 1 st @ 1.14 3rd @ 1.15 Peak Steel Temp Ceil. 28 C

Fixed Camera at 9.1m Barrier Level

In Conclusion: For storage of Exposed Expanded Class A Plastics in double row, open framed racks: By installing a horizontal barrier at the 6.1m level with the Model N252 EC Pendent, used as in-rack sprinklers, buildings up to 12.2m high will have significantly lower water demands than using ceiling-only sprinkler protection.

For storage of Cartoned Unexpanded Plastics in double row, open framed racks: By installing a horizontal barrier at the 9.1m level with the Model N252 EC Pendent, used as in-rack sprinklers, buildings up to 14.63m high will have lower water demands than using ceiling-only sprinkler protection. Retrofit applications where storage commodities or methods of storage have changed, adding a horizontal barrier or barriers with the Model N252 EC Pendent, used as in-rack sprinklers, may eliminate changing ceiling sprinklers or water supplies.

For storage of Cartoned Unexpanded Plastics in double row, open framed racks: By installing continuous horizontal barriers at 6.1m to 9.1m levels with the Model N252 EC Pendent, used as in-rack sprinklers, buildings over 14.63m high may be protected while reducing the number of sprinklers required by current in-rack schemes. Fires may be contained and suppressed between barriers. Retrofit applications of high bay buildings where storage commodities or methods of storage have changed, adding continuous horizontal barriers with the Model N252 EC Pendent, used as in-rack sprinklers, may eliminate changing ceiling sprinklers or water supplies while greatly reducing the quantity of in-rack sprinklers.