!!!!!!!!!!!!!!!! INSTALLATION!GUIDELINES!MANUAL! January!2018,!Revision!3.0! Advanced!Revetment!Technology!

Similar documents
GEOMEMBRANE FIELD INSTALLATION

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

SPECIFICATIONS AND TECHNICAL REQUIREMENTS FOR THE MANUFACTURING AND INSTALLATION OF POLYETHYLENE GEOMEMBRANES

AQUAMASTER INSTALLATION GUIDE

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

PVC GEOMEMBRANE FABRICATION AND INSTALLATION SPECIFICATION

E R O S I O N C O N T R O L

SPECIAL SPECIFICATION 3687 Impermeable Liner

Chesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner

Acronyms. TRI TRI Environmental, Inc. Table of Contents. iii

SPECIFICATIONS AND TECHNICAL REQUIREMENTS FOR THE MANUFACTURING AND INSTALLATION OF POLYETHYLENE GEOMEMBRANES

V. EROSION CONTROL. -Drainage swales separation -Under rip-rap protected -Under rip-rap unprotected

INTERNATIONAL ASSOCIATION OF GEOSYNTHETICS INSTALLERS (IAGI) AND FABRICATED GEOMEMBRANE INSTITUTE (FGI)

Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford

NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

INSTALLATION QUALITY-ASSURANCE GUIDE FOR SOLMAX-GSE S CONDUCTIVE LINER

Section Specification for Geotextile Used in Permanent Erosion Control Application

D.P.E. Enviroliner. geotextile protection layer. covering new ground 2016

Leak Location Geosynthetic Materials in Base Liner Systems. NY Federation SWANA. May, 2014

SECTION 02230BP AGGREGATE BASE

Drop-In Specifications INTEGRATED DRAINAGE SYSTEM GEOMEMBRANE

I N D U S T R I A L Y A R D S

Alternative Cover Systems

Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill

GEOMEMBRANE AND DRAINAGE INSTALLATION SPECIFICATION

EROSION & SEDIMENT CONTROL

The use of geosynthetics in the installation of ballast layers

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

Rolled Erosion Control Products (RECPs) General Usage and Installation Guidelines for Slope

SECTION 900 TURF ESTABLISHMENT

HYDRAULIC DESIGN involves several basic

INSTALLATION GUIDELINES. Landfills and mines

We Don t Have No Stinkin Dirt! Coal Ash Pond Closures (Traditional and an Alternative Method)

SKAPS GEOTEXTILE SUBSURFACE DRAINAGE


III.DRAINAGE. This section describes the use of geotextiles in underdrains for two different field conditions:

UNIFIED FACILITIES GUIDE SPECIFICATION

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

SECTION TABLE OF CONTENTS GEOTEXTILE TUBES PARAGRAPH TITLE PAGE NOS.

CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING

APPENDIX A POND LINING TECHNICAL SPECIFICATIONS

Engineering Report: Appendix F Volume 3 Landfill Liner Construction Specifications COWLITZ COUNTY HEADQUARTERS LANDFILL PROJECT COWLITZ COUNTY, WASHIN

GEOWEB slope & shoreline protection OVERVIEW

Guidelines for Installation of: Factory Fabricated Compounded 0.25 to 1.52 mm (10 to 60 mil) Thickness Unsupported Geomembranes

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

Technical Specification Guidelines

Installation Manual May 9/14 No revision

Pondless Waterfall Vault

SECTION AMENDED TOPSOIL

INSTALLATION GUIDELINES. Mirafi FM Filter Geotextiles for Basal Filtration Applications

BEFORE INSTALLATION BEGINS

CLAHS #11 RACR APPENDIX G. SCS Photographic Log, Photographs

CHAPTER 8 SLOPE STABILITY ANALYSIS

PRESTO GEOTERRA GTO FAST DEPLOYMENT CONSTRUCTION MAT SYSTEM SPECIFICATION & INSTALLATION GUIDELINE

Geosynthetics. Work platforms built with geotextile tubes at the Lach Huyen Bridge. GMA TECHLINE Exposed GM? Deformations?

UNIFIED FACILITIES GUIDE SPECIFICATION

INSTALLATION OF GEOTEXTILE TUBES USED FOR COASTAL AND RIVERINE STRUCTURES GLOBAL SYNTHETICS PROTUBE GEOTEXTILE TUBE

SECTION TURF AND GRASSES

SWANA/A&WMA s. Third Annual Landfill Operator s Training Geosynthetics in Landfills. February 13, 2013

Socket Heat Fusion Techniques. A Guide for Instruction and Training in Vanguard Socket Heat Fusion

BEFORE INSTALLATION BEGINS

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Stormwater protection

Paving - 8 easy steps for DIY and professional landscapers

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

YEAR 20 - SEPTEMBER SPECIAL EDITION INDEPENDENT JOURNAL FOR THE GEOART SECTOR

1. Vinyl wall covering. 2. Woven glass-fiber wall covering. 3. Textile wall covering. 4. Wallpaper. 5. Heavy-duty, synthetic, textile wall covering.

Air-channel testing landfill geomembrane seams

SHOREMAX FLEXIBLE TRANSITION MAT INSTALLATION GUIDE

GEOMEMBRANE INSTALLATION GUIDELINES AND SPECIFICATIONS FOR LLDPE 20, 30, AND 40 MIL UNREINFORCED & GEO-SKRIM SERIES REINFORCED LINERS.

Geotextile Separation Interlayer Guide Specification

South Fraser Perimeter Road (SFPR)

Boise Municipal Code. Chapter 9-04 EXCAVATIONS

A Collection and Removal System for Water in the Final Cover Drainage Layer

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. Contractor shall provide product data for each type of product indicated.

SECTION EARTHWORK

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

METROPOLITAN Construction Standard No: UTILITIES DISTRICT

field note Culvert foundation improvement design concepts The challenge of low-cost culvert foundations

Qualification Procedures for making PE 3408 Extra High Molecular Weight Polyethylene Heat Fusion Joints

Geosynthetics for the Management, Containment and Closure of Coal Combustion Residual Disposal Facilities

Silva Cell 2 Installation Guidelines

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

RevETMax TM INSTALLATION GUIDE

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

GRI White Paper #8. - on - Construction Quality Assurance-Inspectors Certification Program (CQA-ICP)

Pozidrain. A guide to the selection and specification of Pozidrain drainage geocomposite

Turfgrass Sod General

AASHTO M Subsurface Drainage

Aquaculture Lining Systems

Nondestructive Testing of Geomembranes

Model ESFR-17 Dry Type Pendent Sprinklers Early Suppression Fast Response 16.8 K-factor General Description

Butyl Products Ltd. Pond Guide

Exposed Geomembrane Cover Systems for Coal Ash Facilities

815 NE 172 nd Avenue Vancouver, WA Installation Manual

Capping waste rock at a Superfund site An innovative design tackles pollution at a mining operation s waste repository.

Transcription:

INSTALLATIONGUIDELINESMANUAL January2018,Revision3.0 Beforeutilizingthisdocumentas aninstallationtool,installers shoulddownloadthelatestversion oftheinstallationguidelines Manualfromthetechnical downloadssectionofourwebsite atwww.watershedgeo.com. AdvancedRevetmentTechnology

TABLEOFCONTENTS 1.0INTRODUCTION...3 2.0LIMITATIONS...5 3.0SUBGRADEPREPARATION(HYDROTURF CSANDZ)...5 4.0GEOMEMBRANELINERCOMPONENT(HYDROTURF CSONLY)...6 4.1GeomembranePanelDeployment...6 4.2GeomembraneFieldSeaming/Welding...7 4.3Defects...8 5.0ENGINEEREDTURFCOMPONENT(HYDROTURF CSANDZ)...8 5.1SurfacePreparation(HydroTurf CS)...8 5.2EngineeredTurfDeployment(HydroTurf CSandZ)...9 5.3EngineeredTurfSeaming[FusionSeamingMethod(HydroTurf CSandHydroTurf Z)...9 5.4EquipmentonEngineeredTurf(HydroTurf CSandZ)...11 6.0HYDROBINDER INFILL(HYDROTURF CSANDZ)...11 6.1PlacementofHydroBinderInfill(HydroTurfCSandZ)...12 6.2BrushingoftheHydroBinderInfill(HydroTurf CSandZ)...12 6.3HydrationoftheHydroBinder Infill(HydroTurf CSandZ)...13 6.4ColdWeatherPlacementandCuringoftheHydroBinder Infill(HydroTurf CSandZ)...13 6.5PenetratingColloidalConcreteTreatmentfortheHydroBinder Infill(OptionalforHydroTurf CSandZ)...14 7.0BACKFILLINGOFTHEANCHORTRENCHES(HYDROTURF CSANDZ)...15 2

1.0Introduction HydroTurf AdvancedRevetmentTechnologyisapatentedsystemwhichisusedasahardened armoring for protection against erosion from hydraulic forces. There are three HydroTurf Systems.Thesesystemsareasfollows: HydroTurf CSwithaStructuredGeomembraneisshowninFigure1.Thecomponentsofthis systemareasfollows: StructuredGeomembraneLiner(50HmilHDPEAgruSuperGripnet Geomembrane) EngineeredSyntheticTurf HydroBinder Infill Penetrating Colloidal Concrete Treatment (PCCT) H Optional for Freeze / Thaw Protection Figure1 SectionofHydroTurf CSwithStructuredGeomembrane HydroTurf CSwithaTexturedGeomembraneisshowninFigure2.Thecomponentsofthis systemareasfollows: TexturedGeomembraneLiner(40HmilHDPEAgruMicroSpike Geomembrane) EngineeredSyntheticTurf HydroBinder Infill Penetrating Colloidal Concrete Treatment (PCCT) H Optional for Freeze / Thaw Protection 3

Figure2 SectionofHydroTurf CSwithTexturedGeomembrane HydroTurf ZisshowninFigure3.Thecomponentsofthissystemareasfollows: EngineeredSyntheticTurfwithIntegratedPolyethyleneFilmBacking HydroBinder Infill Penetrating Colloidal Concrete Treatment (PCCT) H Optional for Freeze / Thaw Protection Figure3 SectionofHydroTurf Z 4

2.0Limitations This manual is meant as a installation guideline only. Watershed Geosynthetics LLC cannot anticipatethemanywaysthisproductmaybeappliedeitherindesignorinstallation.varyingsite conditionswillrequireclosecoordinationbetweentheengineerandtheinstallertoaccountfor siteconditionsandadjustaccordingly.whenrequiredbystateand/orlocalregulations,alicensed professionalengineerorarchitectwillberequired. HydroTurf is a U.S. registered trademark which designates a product from Watershed GeosyntheticsLLC.ThisproductisthesubjectofissuedU.S.andforeignpatentsand/orpending U.S. and foreign patent applications. All information, recommendations and suggestions appearinginthisliteratureconcerningtheuseofourproductsarebasedupontestsanddata believedtobereliable_however,thisinformationshouldnotbeusedorrelieduponforanyspecific application without independent professional examination and verification of its accuracy, suitabilityandapplicability.sincetheactualusebyothersisbeyondourcontrol,noguaranteeor warrantyofanykind,expressedorimplied,ismadebywatershedgeosyntheticsllcastothe effectsofsuchuseortheresultstobeobtained,nordoeswatershedgeosyntheticsllcassume anyliabilityinconnectionherewith.anystatementmadehereinmaynotbeabsolutelycomplete since additional information may be necessary ordesirablewhen particular or exceptional conditions or circumstances exist or because of applicable laws or government regulations.nothinghereinistobeconstruedaspermissionorasarecommendationtoinfringe anypatent. 3.0SubgradePreparation(HydroTurf CSandZ) PriortoHydroTurf systeminstallation,thesoilsubgradeshallbeinspectedbytheengineerand geosyntheticscontractor.thefollowingshallbeobserved: The soil subgrade shall be compacted to the requirements as specified by the engineer.thesubgradeshallbefirmandunyielding. The soil subgrade shall be smooth and uniform, and shall be substantially free of surfaceirregularitiesandprotrusions. Thesoilsurfaceshallbefreeofforeignandorganicmaterial,sharpobjects,particles orotherdeleteriousmaterial,andshallnotcontainstonesorotherobjectsthatcould damageanyofthehydroturf components. Maximumparticlesize(e.g.stones)shallbespecifiedbythedesignandsiteHspecific specifications. Theanchortrenchesshallbepreparedasfollows: - Anchortrenchesshallbeexcavatedtothegradesanddimensionsasspecifiedon theconstructionplans.thegradesanddimensionsshallbeconfirmedbysurvey. - Anchortrenchesshallbestraightanduniformwithnoroughedges. - Theinsideedgeoftheanchortrenchshallberoundedandsmooth. - Anchortrenchesshallbefreeofsharpobjectsandotherdeleteriousmaterial. Constructionstakesandhubshavebeenremovedandtheresultantholeshavebeen backfilled. Finalgradesontheslopesaswellasbenchesdimensionsandgradesconformtothe designgrades. Survey shots and ashbuilt drawings shall be carefully reviewed and evaluated to ensurethesurfacegradeswilldrainasintendedinthedesigndrawings. 5

4.0GeomembraneLinerComponent(HydroTurf CSonly) InstallationoftheGeomembraneHDPELinermustbecompletedbyanapprovedgeosynthetics contractorwhocandemonstratesignificantexperiencewithinstallationofgeomembranes.each componentofthehydroturf systemwillrequirespecifictestingandsubmittalsbefore,duringor afterinstallationofthecomponent.itistheresponsibilityofthecontractortoensurethateach priorcomponentinstallationhasbeenapprovedbytheowner srepresentativebeforecontinuing withinstallationofthenexthydroturf component. 4.1GeomembranePanelDeployment EngineershallensurethatallPreHInstallationprocedureshavebeenfollowedbeforeproceeding withdeploymentofgeomembrane.asgeomembranecomponentpaneldeploymentproceeds, theengineerandthegeosyntheticscontractorshall: Ensure the geomembrane component is placed in direct and uniform contact with underlyingprotectivecoversoilorsubgradesoil. Observethegeomembranesurfaceasitisdeployedandrecordpaneldefectsand repairofthedefects(e.g. panel rejected, patch installed,etc.) onthe repair sheet. Repairsmustbemadeinaccordancewiththetechnicalspecificationsandlocatedon arepairdrawing. Supportequipmentisnotallowedonthegeomembranecomponentduringhandling unlessapprovedbydesignengineer. Confirmthatthesurfacebeneaththegeomembranecomponenthasnotdeteriorated sincepreviousacceptance. Confirmthattherearenostones,constructiondebris,soilclogsorotherdeleterious itemsonthesubgradethatcouldcausedamagetothegeomembranecomponent. The geomembrane component shall not be dragged across a surface that could damage the material. If the geomembrane component is dragged across an unprotectedsurface,it mustbeinspectedfordamage andrepairedorrejected,as necessary. The geomembrane component shall not be deployed during inclement weather conditionsasdefinedintheprojectspecificspecifications. Personnel working on the geomembrane component shall not smoke, wear boots/shoes that could damage the HydroTurf system components, or engage in activitiesthatcoulddamagethehydroturf systemcomponents. Themethodusedtodeploythegeomembraneshallminimizeripplesandeliminate wrinkles but does not cause bridging, and that the geomembrane is anchored to preventliftingormovementbythewind(geosyntheticscontractorisresponsiblefor any damage to or from windblown geomembrane). A wrinkle is a portion of the geomembrane that does not lay relatively flat and is not the result of a subgrade irregularity.awrinkleislargeenoughthatitcanbefoldedover.arippleistheresult of manufacturing or thermal expansion. It is smaller in nature than a wrinkle and cannotbefoldedover. The geomembrane component shall acclimate to the ambient temperature prior to welding. The ambient temperature is defined as the temperature of previously deployed and welded geomembrane panels. Additional acclimation time will be required when temperatures drop below 50 degrees Fahrenheit and when solar heatingisreduced. 6

Afterthepanelhasacclimatedandbeforeseamingoperationsbegin,wrinkleswillbe worked toward the toe of slope. Excess material can be worked out either by manpowerorutilizationwithequipmenttopullexcessslackoutofthepanel. Thegeosyntheticscontractorshallapplytensiontechniquestopulloutexcessmaterial /slackpriortoseaming. The horizontal or cross seams on the side slopes shall be staggered so that long horizontalseamsacrosstheslopearenotproduced. 4.2GeomembraneFieldSeaming/Welding Geomembranefieldseamingandweldingoperationsshallbeperformedasfollows: Wedgeweldingmachinesshallbealowprofilemachinewithaverticalheighttonot exceed3inchestothehighestpointofthewedge.installershalldemonstratethat eachwedgeweldingmachinemeetsthisrequirement. Thegeosyntheticscontractorshallhavethenumberofweldingapparatusesandspare partsnecessarytoperformthework. EquipmentusedforweldingwillnotdamageanyHydroTurf systemcomponents. The extrusion welding machine is purged prior to beginning a weld until the heat degradedextrudateisremoved. Theambienttemperature,measured6inchesabovethegeomembranesurface,is between 35 F and 104 F, or geomembrane manufacturer s recommended temperaturelimitsiftheyaremorestringent. Thecontactsurfacesofthesheetsareclean,freeofdust,grease,dirt,debris,and moisturepriortowelding. Theweldissubstantiallyfreeofdust,soil/mud,rocks,andotherdebris. The seams are overlapped a minimum of 3 inches for extrusion and hot wedge welding, or in accordance with geomembrane manufacturer's recommendations, whicheverismorestringent. Panelsshallbeoverlapped(shingled)inthedowngradedirection. Nosolventsoradhesivesarepresentintheseamarea. The procedure used to temporarily hold the panels together does not damage the panelsanddoesnotprecludecqatesting. The panels are being welded in accordance with the plans and site specific specifications. Thereisnoobviousfreemoistureintheweldarea. Observethatattheendofeachdayorinstallationsegment,unseamededgesare anchoredwithsandbagsorotherapprovedanchoringdevice. Penetrationanchorsshallnotbeusedtosecurethegeomembrane. Becauseofwedgewelding, ridges or tenting oftheseamsmayoccur.aprocess called snapping must be employed to remove the excess slack caused by the weldingprocess. Oncetwopanelshavebeenseamedtogetherorattheapprox.1/3seamingprocess aseam snapping processshouldbeappliedbeforetheseamcoolsdown.this methodisperformedwithmanuallaborbyutilizing3h4techniciansontheopenside ofthepanelapplyingapullingpressuretosnapoutthetentedweldedseam. 7

Normally,thistechniquerequiresseveralpeoplelinedupalongtheopenseamatthe edgeofthegeomembraneandapplyingclampstotheedge.thepanelisthen snapped intopositionandwhenappliedproperly,theexcessslackisremoved. Thesnappingtechniquewillbeappliedwhiletheweldingseamisstillwarm. Sandbagsalongthewedgeweldedseamwillreducereboundtenting. The snapping requirementisimportantinthatitallowstheengineeredturf componenttoliemoreevenlyoverthegeomembranecomponent. 4.3Defects Anyportionofthegeomembranewithadetectedflaw,mustberepairedinaccordancewiththe projectspecifications(e.g.,materialrequirements,installation,testing,etc.). 5.0EngineeredTurfComponent(HydroTurf CSandZ) The installation of HydroTurf engineered turf consists of the placement and seaming of the engineeredturfcomponentoverthestructuredgeomembraneliner(hydroturf CS)oroverthe soilsubgrade(hydroturf Z). Boxtruckswilldeliverupto27rollsengineeredturfpertruck.Nine(9)rollswillbestrapped togetherallowingequipment(i.e.pickhuptruck,skidsteer)topullthestrappedrollstothefrontof thetruck.rollscanbemovedtoadesignatedareabyusingacarpetstingerorliftedbystraps. During unloading, the contractor and / or CQA personnel shall confirm that the following is practicedandperformed: Theengineeredturfiswrappedinrollswithprotectivecovering. Therollsarenotstackedmorethan3high. Therollsarenotdamagedduringunloading. Protect the engineered turf from damage (i.e., mud, soil, dirt, dust, debris, cutting, impactforces,etc.). Eachrollmustbemarkedortaggedwithproperidentification. Rollsthathavebeenrejectedduetodamagearetoberemovedfromthesiteorstored atalocationseparatefromacceptedrolls,designatedbytheowner/operator. 5.1SurfacePreparation(HydroTurf CS) PriortoinstallationofEngineeredTurf,thefollowingshallbecompleted: ThegeomembranecomponentoftheHydroTurf CShasbeeninstalledinaccordance withthesitespecificspecifications. The required geomembrane installation documentation has been completed and approvedbytheengineerpriortoinstallationoftheengineeredturf. Thesurfaceofthegeomembranedoesnotcontainsoil/mud,stones,debrisorlarge scrapsleftoverfromtheinstallationprocess. 8

5.2EngineeredTurfDeployment(HydroTurf CSandZ) EngineeredTurfshallbedeployedasfollows: Observetheengineeredturfasitisdeployedandrecorddefectsanddispositionofthe defects(panelrejected,patchinstalled,etc.).repairsaretobemadeinaccordance withthespecifications. Equipmentusedshallnotdamagetheengineeredturf,underlyinggeomembraneor subgradebyhandling,trafficking,leakageofhydrocarbons,orbyothermeans. Panelsshallbedeployedsuchthattheseamoverlapsareshingledwiththeflowof water.thepanelontheuphflow/upstreamsideshallhavetheoverlapplacedontop ofthedownhflow/downstreampanel. Thepanelsshallbedeployedinamannertoensurethattheturffilamentsare pointingupslopeandinthesamedirectionastheadjacentpanel. Theturfshallbeballastedontheopenendstopreventmovementbythewindorother means (the contractor is responsible for any resulting damage from insufficient ballast). Theturfshallremainfreeofcontaminantssuchassoil/mud,debris,grease,fuel,etc. Theturfshallbelaidsmoothandsubstantiallyfreeoftension(butnotloose),stress, folds,ripples/wrinkles,orcreases.thegeomembrane(forhydroturf CS)ortheturf (forhydroturf Z)shallbeinintimatecontactwiththeunderlyingsubgrade Onslopes,theturfshallbesecuredwithsandbaganchoringatthetopoftheslope andthenrolleddowntheslope. OnsmallersizedHydroTurfZprojects.Anchoringcanbetemporarilyperformed usinglandscapespikes(typically,galvanized3/8 diameterby8to10hinlength)and leftinplacethentheanchortrenchesbackfilled. 5.3 Engineered Turf Seaming H Fusion Seaming Method (HydroTurf CS and HydroTurf Z) SeamingoftheengineeredturfcomponentofHydroTurf CSandZmaybeperformedbyfusion (heathbond)welding.thisisdescribedasfollows: EngineeredTurffusionseamingdeviceshallbeaDemTech4Hinch,singleHwedge welderonly(modelno.vmh20/4/aprohwedgewelder120v,vm20outfittedwith 100HKIT/4S/VC/A.2WeldingKit,4Hin,220V,S.S.). Fusionseamsrequireaminimumof5inchesofoverlap. Priortostartingtheproductionfusionseaming,trialseamsmustbeperformedas outlinedinsection5.3.2.1below. Demonstratethepreparationmethodsandequipmentutilizedforremovalofthe salvagefromtheoutsideedgeoftherollsofturf(i.e.trimming&cuttingdevices). Mechanicaltrimmingandcuttingdeviceswillbeutilizedforsalvagetrimming.Box bladesandknivesshallnotbeutilizedforsalvagepreparations.frayingofgeotextile strandswhenperformingtheremovalofsalvageisnotacceptable. Frayedorlooseedgesand/orgeotextilestrandswillbecutofforremoved. Productionfieldseamsshallbeperformedinthesamemannerastrialseams. 9

Anydamageand/orburnoutsthatoccurduetoproductionseamingwillberepaired asoutlinedin5.3.2.2. Anydamageoftheengineeredturfshallbepatchedasoutlinedin5.3.2.2. Allseamsnotpassingthevisualinspectionshallberepairedasoutlinedin5.3.2.2. 5.3.1FusionSeamingMethodTrialSeamRequirements SincethetemperatureandspeedcontrolsoftheDemTechVMH20machinearevariable andcanbeincreased/decreaseddependingonweatherandenvironmentconditions,the temperatureandspeedshallbeconfirmedwithatrialseam.thistrialseamshallbefield tested.trialseamsshallbeperformedatthebeingofeachdayandduringthedaywhen theweather(i.e.,temperature)conditionschange. 1. Priortoturfcomponentwelding,CQApersonnelshallobserveanddocumentthe following: a. Turfweldingapparatusaretested_ i. atdailystarthup_and ii. immediatelyafteranybreak_or iii. anytimethemachineisturnedoffformorethan30minutes. 2. Procedures: a. Theturftrialweldwillbecompletedunderconditionslikethoseunderthe panelsthatwillbewelded. b. Ifatanytime,theCQAPersonnelbelievethatanoperatororfusionwelding apparatus is not functioning properly, a Field Trial Seam Test shall be performed. c. Anydisputeconcerningproperinstallationtechniquesortheproperfunctionof fusion welding equipment will be resolved by the OWNER S REPRESENTATIVE. d. Thetrialweldmustbeallowedtocooltoambienttemperaturebeforeseam snappingorpaneladjustmentsareapplied. 3. TrialSampleTestResults: a. Trialweldsamplesmustcomplywith VISUALPASSINGCRITERIA Visual passingcriteriaisverifiedwhenamanualpeel/pulltestisperformedandthe topturfpaneltuftstransfertothebottomturfpanel.thetransferofapprox. 75%ofthetuftsconstitutesapassingtrialweld.Also,thetrialseamshallbe continuouswithnogaps. 4. ProductionFieldSeamTestFailure: a. Lessthanapprox.75%ofthetopturfpaneltuftsdonottransfertothebottom turfpanel. b. Productionfieldseamsshallbeobservedtobecontinuouswithnogaps. 5. AdditionalTrialSampleTestingRequirements: a. Twoconsecutivetrialweldsmeetthevisualpassingcriteria. b. Thetrialweldsamplemustbeaminimumof3feetlongand12incheswide, withtheseamcenteredlengthwise. c. Ifaweldingapparatusexceeds5hoursinthesecondhalfoftheday,another trialseammustbeperformed. 6. CQAdocumentationoftrialseamprocedureswillincludethefollowing: a. Thenamesoftheseamingpersonnel_ b. Thenameofthefusionseamingtechnician_ 10

c. theweldingapparatusnumber,time,date_ d. ambientairtemperature_and e. weldingapparatustemperature&speedsetting. 5.3.2RepairsandTieHInsProceduresforEngineeredTurf(HydroTurf CSandZ) WhenRepairs,capsandtieHinsofengineeredturfareneeded,thefollowingshallbeperformed: Repairstoengineeredturfshallbecompletedbyusinga4HinoverlappedheatHbonded seam. AlltieHinseamsalongflatterslope(i.e.15%orless)withlengthgreaterthan25feet shallusethedemtechvmh20singlewedgewelder(outfittedwiththesyntheticturf weldingkit)soacontinuous,consistentpressureisachievedthroughouttheseam. AhandHheldheatgun(i.e.Leister)withhandpressureshouldbeusedinshorteror smallerconcentratedareas(i.e.,buttseams,capsorpatches). Handleisteringshallbefieldtestedwithatrialseamtoconfirmproperseamingprior toproductionseaming.trialseamingshallbeperformedinaccordancewithsection 5.3.2.1. 5.4EquipmentonEngineeredTurf(HydroTurf CSandZ) Duringconstruction,ATVtypevehiclesand/orrubbertrackedskidsteermachineswillbeallowed onflatterslopesforinfillplacementiftheirgroundpressureislessthan5psi.noequipmentshall beallowedonslopesexceeding15%withoutinfillinplace.equipmentoperatorsshallinspect equipmentrubbertiresortracksforsharpprotrusionsfromforeignmatterortire/trackdamage, embedded rocks, or other foreign materials protruding from tires/track prior to driving on the syntheticturf.equipmenttravelpathsdrivenonsyntheticturfshallbeasstraightaspossiblewith no sharp turns, sudden stops or quick starts. Damage caused by having equipment on the engineeredsyntheticturf(i.e.,tears,rips,punctures,wrinkles,ripples,movement,etc.)shallbe theresponsibilityoftheinstallertorepair. Onceconstructionofthesystemiscomplete.NoequipmentshallbealloweduntilHydroBinder Infillisinplaceandfullycuredfor28days.Postconstructionandafter28daysofcuringofthe HydroBinder, drivability tire (ground) pressures on slopes greater than 10% should be limited systemtolessthan35psi.allowablerubbertireortrack(ground)pressuresonflatterareasmay increasetoasmuchas60psiaslongassustainedtrafficloadisnotexpected.drivingshouldbe limitedtoareaswherethesubgradeunderthehydroturf iswellhcompacted,firmandunyielding. Hightrafficareasshallbedesignedtohandletheexpectedloads. 6.0HydroBinder Infill(HydroTurf CSandZ) HydroBinder Infill is a dry, highhstrength cementitious mix. It is provided by Watershed GeosyntheticswiththeHydroTurfsystem.TheHydroBinder infillisplaceddry,groomedinto theengineeredsyntheticturfandhydratedafterplacement. WhentheHydroTurfsystemisinstalledandHydroBinder infillisplacedandhydrated,itcreates ahardenedrevetmentarmoringthatcanresisttheforcesfromhighhydraulicflowvelocities. 11

6.1PlacementofHydroBinderInfill(HydroTurfCSandZ) HydroBinder Infillshallbeplacedasfollows: HydroBinder isdeliveredtothejobsiteonpalletsineither3000#bulkbags(1per pallet)or80#bags(42perpallet).itisdeliveredonaflatbedwith16pallets(typical) pertruckload. TheHydroBinder shallbeinstalledintotheturfwhileitisinadrystate. PriortoplacingtheHydroBinder,theengineeredturfshallbedry.Iftheturfiswet fromrainordew,theinstallershallwaituntilitisdry.theinstallermayattemptto speedupthedryingprocessbyusingablower(i.e.,leafblower,industrialblower,etc.). HydroBindershallnotbeinstalledininclement,wetorrainyweather,orthethreatof inclement weather. Also, the HydroBinder shall not be installed in freezing temperatures. TheHydroBinder infillshallbeplacedataminimumthicknessof¾hin.thisthickness isachievedbyplacingapproximately6to7lbs/sfofthedryhydrobinder overthe engineeredturf. Theinfillistobeplaced/spreadusingamanualdropspreader,topHdresserand/or dropspreaderattachedtolowgroundpressureequipmentwithadequatedustcontrol. Manualhandspreadingisacceptablewhenequipmentisnotpractical. If weep holes are required for draining the internal drainage layer through the engineeredturf(hydroturf CS),removetheHydroBinder intheareasoftheweep holespriortohydrationorblocktheweepholelocationspriortoinfilling.blocksmay consistofpipe,dowels,etc.weepholesaretypically½to¾hindiameterandare locatedatthetoeofslopeon2hftcenters. 6.2BrushingoftheHydroBinderInfill(HydroTurf CSandZ) TheHydroBinder infillwillneedtobeworkedintothetuftedfibersoftheengineeredturfsuch thattheturffibersareinanuprightposition.thiscanbeachievedasfollows: Theinfillshallbeworkedintothetuftfibers,sothetuftfibersareinanuprightposition withtheinfillatameasurable7/8hinchminimumdrythicknessanda¾hinchminimum finishedthicknessafterhydrationandcuring.typically,thisisachievedwithcommon mechanicalturfbroom,powerbroom,shopbroom,yardrakes,and/orgreensgroomer rakes. Brushing of the HydroBinder infill shall be performed such that the fibers of the engineeredturfareuprightandtrappedfibersareminimal.thisshallbeconfirmedby visualinspection.multiplebrushingpassesinmultipledirectionsmayberequiredto achievethis. Depending on the turf tufted pile height and style (monofilament or slithtape). The HydroBinder mayneedtobeplacedin2to4liftswithbrushinginbetweenliftsto effectivelyworkthematerialintothetuftstoachievefibersthatareupright. ThicknessmeasurementsoftheHydroBinder infillshallbetakenusingacaliperor equivalent device. Measurements shall be taken at a minimum frequency of 5 measurementsper1,000sf(forsmallerprojects)or20measurementsperacre(for largerprojects)ofinstalledarea. The desired HydroBinder infill thickness shall be achieved prior to the hydration process. 12

6.3HydrationoftheHydroBinder Infill(HydroTurf CSandZ) TheHydroBinder infillshallbehydratedinplaceasfollows: The hydration process shall occur on the same day as the HydroBinder infill placement. Theinfillshallbehydratedthoroughlywithalightandconsistentsprayofwaterto avoiddisplacementofthenonhhydratedinfill.estimatedapplicationrateisbetween 0.12and0.20gallonspersquarefootofarea.Hydrationratesmayvarydependingon thegeographicallocation(i.e.lowhumidareas,dessertairclimates,etc.),timeofyear (i.e.,fall,winter,springorsummer),and/ortemperatureandclimate. Theinstallershallnotoverhydratetheinfillsothatwaterbeginstorunoffandcause lossofcementinfillduringtheprocess.thegeneralobjectiveistosoaktheareato startthehydrationprocessbutnottoinundatewithwaterbeyondsaturationoftheinfill. Visual verification can be performed that the HydroBinder infill has been fully hydrated,andnotoverhydrated.visuallyobservethatthetopofthehydrobinderhas awetsheen(denotingsaturation)butthatwaterisnotpondingontop.also,excavate (withfingerorsmalltool)intothehydrobinder toconfirmfullhydrationofthesection hasbeenachieved. Toimprovecuring,thehydratedareamaybecoveredwithplasticsheeting. The HydroBinder infill shall harden within 24 hours following hydration, and shall reach its maximum compressive strength at 28 days. If the HydroBinder has not hardenedin24hours,itmayneedtoberehhydratedoritmayneedtoberemovedand replaced. Personnel access on the HydroTurf shall be prohibited for 24Hhr following the hydrationofthehydrobinder. OncehydrationiscompletedandtheHydroBinder hassetup,backfillandcompaction oftheanchortrenchesmaybeperformed. 6.4ColdWeatherPlacementandCuringoftheHydroBinder Infill(HydroTurf CS andz) ColdweatherplacementandcuringtechniquesforHydroBinder shallbeconsistentwithindustry standard techniques used for concrete and cement products. The following guidelines are suggested: Follow the procedures in American Concrete Institute (ACI) 306 Guide to Cold WeatherConcreting. Coldweatherexistswhentheairtemperaturehasfallento,orisexpectedtofallbelow 40degreesFduringtheprotectionperiod. Theprotectionperiodisdefinedasthetimerequiredtopreventconcretefrombeing affectedbyexposuretocoldweather.protectionperiodforhydrobinderis72hours fromhydration. Ensurethatfrostorfrozensurfacesarethawedwithnostandingwater.Atthetimeof HydroBinderplacement,thesubgradeandsurfaceoftheengineeredturfshallbeata temperatureofatleast36degreesfandrising. Heatedtarpsand/orinsulatedblanketsarerequiredtomaintainthetemperatureofthe HydroBinderabove55degreesFfortheprotectionperiod. 13

HeatedtarpsmaydryouttheHydroBinder.Donotallowittodryout.Youmayneed toaddmoistureanduseimpermeablecovers. Theprojectdesignengineerand/orresidentengineershallprovidetechnicalspecificationsand guidance for cold weather concreting based upon your specific project particulars (i.e., geographicallocation,weather,andtimeofyear),andtheengineershouldreviewandapprove allproposedinstallationmethods. 6.5PenetratingColloidalConcreteTreatmentfortheHydroBinder Infill(Optional forhydroturf CSandZ) Penetratingcolloidalconcretetreatment(PCCT)isanoptionalliquidapplicationandtreatmentfor thefreeze/thawprotectionofthehydrobinder infill.itshouldbeappliedtothehydrobinder whenspecified.thepcctshallbeappliedasfollows: PCCTshallideallybestoredinalocationthatisdryandbetween35 Fto100 F(2 Cto 38 C)ambienttemperature.Optimalstorageisatthemiddleofthetemperaturerange. ProtectthePCCTfromfreezing. ThefollowingshallbefollowedwhenapplyingthePCCT: - ThePCCTproductandtheHydroBinder surfaceshallbeattemperatureofat least36degf(2degc)andrising. - Donotapplyonfrozensubstrateorwhentemperaturecanfallbelow32 F within24hoursofapplication. - Ensurethatfrostorfrozensurfacesarethawedwithnostandingwater. - Areasofstandingwatershallberemovedpriortoapplication. - Donotapplyunprotectedduringperiodsofhighwinds. - PCCTshallnotbeappliedininclement,wetorrainyweather,orthethreatof inclementweather. - Donotapplywhensubstrateis90 F(32 C)orhigher.Ifsurfacetemperature ishigherthan90 F(32 C)thenpreHwettingwithwaterisrequired.Besureto removeanypuddlesbeforeapplyingofscp. - Whenhottemperatureanddirectsunlightconditionsexist,applyafinemist sprayofwateronthesurfaceafterapplicationofpcct. Apply PCCT as soon as the HydroBinder infill is hard enough to walk on without damagetothesurface. Usea1,500Hpsi(10.5MPa)airlesssprayersetatapressurethatwillnotdamagethe surface[i.e.,approximately400to900psi(2.5to6.5mpa)].forsmallprojects,a pumpsprayermaybeused. HoldwandandspraythePCCT6inches(15cm)fromthesurfaceoftheHydroBinder ata90ºangle. PCCTmustbeappliedusinganoverlappingspraypatternof50%onthepreviousrun. Anyareathatabsorbsproductfasterthan10minuteswillneedtobereapplieduntil theproductnolongerabsorbsfasterthan15minutes. IfPCCThasabsorbedthoroughlyinthemajorityofthearea,butthereispoolinginthe lowareas,useabroomtospreadadditionalpcctintotheareasalreadypenetrated. DonotallowPCCTtodryinpools.RemoveexcessPCCTwithadampmop.Applyat a rate of approximately 140 ft 2 per gallon of PCCT. If necessary, spray a second applicationofpcct. 14

Forslopedapplications,workfromlowesttohighestelevation.Verylightandrepeated spraypassesshouldbemadeonthesameareauntiltheconcretesurfacenolonger acceptspcct.moveontonextareaafterachieving pointofrejection. 7.0BackfillingoftheAnchorTrenches(HydroTurf CSandZ) HydroTurf reliesontheanchortrenchestoserveasaterminationpoint.topanchortrenches shouldbebackfilledasquicklyaspracticalafterengineeredturfcomponentisinstalled(priorto HydroBinderinfillplacement). Verticalanchortrenchesaswellasanchortrenchesalongthetoeshouldnotbebackfilleduntil the HydroBinder infill is in place. However, backfilling the vertical and toes anchor trench backfillingmayberequireddependingonsitespecificneeds.anchortrenchdimensionswillbe showninthedesigndrawings. Backfillingand/orsandbagloadingthebottomandsideanchortrenchesshallbeperformedto reducethermalexpansionandcontraction. When utilizing HDPE geomembrane, daily permanent and/or temporary anchoring should be considered due to the nature of HDPE contracting with overnight temperature changes and thermalenergyconditionschangingtoprotectthewrinklemanagementtechniquesappliedfrom contraction. Sand bags should also be utilized at the bottom perimeter ditch and benches to manage contractinggeomembraneseams.theamountofsandbagswillbedependentontemperatures BackfillingoftheanchortrenchesfortheHydroTurf CSshallbeperformedasfollows: Thegeomembranecomponentshallbeinintimatecontactwiththeanchortrenchinside wallandbottom.wrinkles,ripples,fishmouths,and/orbunchingshallberemovedand properlypatched. Thegeomembraneshallnotextenduptheoutsidewalloftheanchortrench.Itshallbe trimmedshortoftheoutsidewallandshallextendaminimumof¾ofthewidthofthe anchortrench. The engineered synthetic turf component shall be in intimate contact with the geomembrane. Wrinkles, ripples, fish mouths, and/or bunching shall be removed and properlypatched. Theengineeredsyntheticturfshallbetrimmedsothatitdoesnotextendontothebottom of the anchor trench. It shall be trimmed just short of the bottom and shall extend a minimumof¾ofthedepthoftheanchortrench. Duringfillingoftheanchortrenchwithcompactedsoilorconcretebackfill,thecontractor shallmaintainthatthegeomembraneisinintimatecontactwiththetrenchwallandbottom andthattheengineeredsyntheticturfisinintimatecontactwiththegeomembrane. Soilbackfillshallbecompactedinaccordancewiththespecificationsforengineeredfill. VibrationoftheConcretebackfillshouldbeconsideredandinaccordancewithstandard industrytechniques. BackfillingoftheanchortrenchesfortheHydroTurf Zshallbeperformedasfollows: 15

The engineered synthetic turf component shall be in intimate contact with the anchor trenchinsidewallandbottom.wrinkles,ripples,fishmouths,and/orbunchingshallbe removedandproperlypatched. Theengineeredsyntheticturfshallnotextenduptheoutsidewalloftheanchortrench.It shallbetrimmedshortoftheoutsidewallandshallextendaminimumof¾ofthewidthof theanchortrench. Duringfillingoftheanchortrenchwithcompactedsoilorconcretebackfill,thecontractor shallmaintainthatthegeomembraneisinintimatecontactwiththetrenchwallandbottom and that the engineered synthetic turf is in intimate contact with the structured geomembrane. Soilbackfillshallbecompactedinaccordancewiththespecificationsforengineeredfill. Concrete backfill shall be vibrated in place in accordance with standard industry techniques. 16

770.777.0386 www.watershedgeo.com HYDROTURF is a U.S. registered trademark which designates a product from Watershed Geosynthetics, LLC. This product is the subject of issued U.S. and foreign patents and/or pending U.S. and foreign patent applications. All information, recommendations, and suggestions appearing in this literature concerning the use of our products are based upon tests and data believed to be reliable; however, this information should not be used or relied upon for any specific application without independent professional examination and verification of its accuracy, suitability and applicability. Since the actual use by others is beyond our control, no guarantee or warranty of any kind, expressed or implied, is made by Watershed Geosynthetics LLC as to the effects of such use or the results to be obtained, nor does Watershed Geosynthetics LLC assume any liability in connection herewith. Any statement made herein may not be absolutely complete since additional information may be necessary or desirable when particular or exceptional conditions or circumstances exist or because of applicable laws or government regulations. Nothing herein is to be construed as permission or as a recommendation to infringe any patent.