HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

Similar documents
Euston Community Forum. 11 June Maria Fidelis School

HS2 Environment. Protecting the environment

Draft Eastern District Plan

Neighbourhood Planning Local Green Spaces

HS2 Interchange Station Design

University Park, Worcester Non Technical Summary December 2011

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

Ebbsfleet Development Corporation

Wednesbury to Brierley Hill Extension

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

Great Easton Neighbourhood Plan Statement of Basic Conditions

Longbridge Town Centre Phase 2 Planning Application

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

Taking forward the All London Green Grid

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

3. Neighbourhood Plans and Strategic Environmental Assessment

South District What we heard

BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS

Table of Allocated Housing Sites

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

Western Sydney Parklands Australia s Largest Urban Park

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

Cookham Parish Council s Response to The Draft Local Borough Plan

Kibworth Harcourt. Introduction. Introduction

Scottish Natural Heritage. Better places for people and nature

Land at Fiddington Hill Nursery, Market Lavington

Sustainability Statement. Whitby Business Park Area Action Plan

3 Urban Design and the State Highway Network

The Gwennap Parish Vision Statement

In your area. Ravenfield to Clayton LA13. June Introduction

Local Growth Planning in North Central Green Line Communities

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

8.0 Design and Form of Development 43/

6 Growth Management Challenges and Opportunities

PANSHANGER QUARRY, Hertfordshire

High Speed Rail (London- West Midlands)

Environmental Impact Assessment

Looking Forward. Tuesday 22 nd April 2018

New Century Park Welcome

Development of green infrastructure in EU regions Nature-based solutions delivering multiple benefits

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

Summary of Heritage Input

WOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD)

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Richard Lemon Spatial Project Manager. Biodiversity and Green Infrastructure

DRAFT GREATER SYDNEY REGION PLAN OBJECTIVES, STRATEGIES AND ACTIONS

Cranfield University Masterplan

Land at Rampton Road. Cottenham

Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report

E16: MAINTENANCE OF LANDSCAPED AREAS

Welcome to our exhibition

Grantham Southern Quadrant Link Road Environmental Statement

12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE

Examination of South Cambridgeshire Local Plan

Fixing the Foundations Statement

Western City District What we heard

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Environmental. Non-Technical Summary PHASE ONE

CITY VIEW OBJECTIVES

Implementing sustainable water strategy through development industry engagement

Welcome to the Public Consultation Exhibition

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).

The Hadean-Creation studio.

Garden Bridge Planning Application

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Ipswich Issues and Options for the Ipswich Local Plan Review, August 2017, Public Consultation

Dublin Mountains Project Q & A

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

Chapter 1. Introduction

Summer North West Greenway Network - Information Booklet

Hobart A Strategic Framework

Heritage Action Zone. Explanatory Notes and Guidance

Former North Works, Lickey Road, Longbridge, Birmingham

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report

Local Authority Borough: Pembrokeshire Coast National Park

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation

HAYLE NEIGHBOURHOOD PLAN FUTURE HOUSING EXPANSION VISION DOCUMENT. Prepared for Hayle Neighbourhood Plan Steering Group by AECOM

building with nature - a new benchmark for green infrastructure

LONGDEN VILLAGE DEVELOPMENT STATEMENT

Response by the Wiltshire Archaeological and Natural History Society

The Fairfield Partnership Vision for North-East Elsenham

Green Infrastructure planning must be evidence led, thus the importance of this stage in collating your information and responses.

Transcription:

Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2 scheme. The asks set out by this note reflect those submitted by the Council in response to the recent HS2 Ltd consultations on its Draft HS2 Environmental Statement and Design Refinements. These asks (set out in no particular order) are of the high-level, strategic nature relevant for consideration as part of the Hybrid Bill petitioning process. 1) Socio-economic Benefits UK Central, Skills and Employment To ensure the success of HS2 it is vital that the socio-economic benefits that may be generated both directly and indirectly by HS2 are identified and realised. UK Central has been launched recently by the Council and it sets a direction for managed growth across a wider geographical area than the HS2 Interchange station. Plans for HS2, should therefore be aligned with emerging plans for UK Central (http://www.uk-c.com/ (formerly referred to as the M42 Economic Gateway in Solihull)) so that the economic growth potential associated with HS2 is captured for the benefit of Solihull and the wider region, including the Greater Birmingham and Solihull Local Enterprise Partnership area. There is a need for intervention to ensure that procurement and employment opportunities (and the accessibility of those opportunities) arising from the construction and operational phases of HS2 do not bypass the local economy. This should be implemented via a strategic partnership approach between HS2 Ltd, the Council and its partners including a statement of intent in the Construction Code of Practice, development of a Skills and Employment Strategy and inclusion of Targeted Recruitment and Training clauses in contracts and supply chain engagement and development activities. 2) Balsall Common Tunnel The Draft ES does not propose a deep bore tunnel in the Berkswell / Balsall Common area. It does however consider 3 different tunnel options as scheme alternatives. Whilst each of the tunnel options would have some form of impact, the Draft ES does acknowledge that (relative to the proposed scheme) the implementation of a deep bore tunnel would give rise to environmental and community benefits. However, it concludes that the magnitude of the benefits that would be generated would not be substantial enough to justify the increased cost and construction programme. The Draft ES does not provide evidence of the analysis carried out to support such a conclusion. Summary of SMBC Asks - 1 -

The Council considers that the implementation of a tunnel in the Balsall Common area will avoid the problems associated with crossing the West Coast Mainline and mitigate the enormous environmental impact on the local area. Serious reconsideration should therefore be given to running HS2 in a deep bore tunnel at this location. Furthermore, more detailed Cost-Benefit Analysis information is required, and has already been formally requested, in order for the Council to better understand the HS2 Ltd decision making processes carried out to date. 3) Hampton in Arden Realignment / Tunnelling The Draft ES does not propose realignment and / or tunnelling for the section of HS2 that runs to the east of Hampton in Arden. In its meeting with the Secretary of State, the Council requested consideration of the realignment of HS2, and / or tunnelling where possible, to minimise impacts on Hampton in Arden. The Draft ES does not refer to options having been considered for realignment or tunnelling adjacent to Hampton in Arden. Clarification on this matter is therefore required. 4) Heath Park, Chelmsley Wood In the vicinity of Chelmsley Wood, the alignment of HS2 has been shifted to the east, relative to that announced in January 2012. The impact of HS2 on the Bluebell Recreation Ground and the Chelmsley Wood area is therefore reduced. However, there remains an impact on Heath Park, over which HS2 is proposed to pass on a viaduct there will be both a temporary and permanent loss of greenspace and significant visual and noise impacts on local residents. Clarification is required on how the noise and visual impact of the viaduct over Heath Park will be mitigated, as well as the provision of like-for-like facilities to cater for the loss of greenspace; simply compensating financially is considered unacceptable. Options for mitigation should be developed through consultation with the Council and local communities. 5) Wider Landscape Enhancement Extent of Assessment Corridor The Draft ES sets out a range of mitigation (and, potentially, enhancement) measures within a finite corridor extending along the route of HS2. There appears to have been little consideration given towards providing mitigation measures and enhancements in more remote locations away from the railway. Opportunities should be explored to provide improvements of, and enhancement to, the wider area surrounding HS2. Landscape, ecological, heritage and green infrastructure enhancements could go some way towards offsetting the localised impacts of the railway (for communities and eco-systems etc.) as well as enhancing views from HS2 for its users. Early investment in these measures is important to ensure that the associated benefits are realised and established in advance of the opening of HS2. 6) Community Fund In its response to the Government / HS2 Ltd consultation on Property Compensation, the Council raised its concern regarding the impacts of both the construction and operation of HS2. The response suggested the establishment of a Community Fund to provide a form of mitigation of / compensation for the effects of HS2 on local communities. Summary of SMBC Asks - 2 -

It is understood that a 'Countryside Initiative' was set up in association with HS1 to provide enhancement of landscape, biodiversity and heritage in areas affected by the railway through the provision of grants, advice, support and advocacy. A similar initiative should be set up in association with HS2, perhaps within the context of delivering enhancements to the wider landscape surrounding the railway. Any Community Fund arrangement that is set up should be done so on a local area basis. Funding should be apportioned to each area to enable local improvements to be delivered in those areas. Establishment of a single pot fund, to which all local areas could bid and compete for funds, would be considered inappropriate. HS2 Ltd should engage with the Council throughout the development and administration of any form of Community Fund scheme. 7) Noise Impact and Design Speed The Draft ES includes a series of noise contour maps, which provide an indication of the noise levels generated by HS2 through the borough. Whilst useful, the mapping is difficult for residents and communities to interpret as it does not demonstrate the increase in noise levels that they will be subject to relative to those currently experienced. This is due to baseline noise assessment remaining ongoing. Furthermore, the noise mapping released refers only to average noise levels; it does not provide an indication of the peak levels of noise that will be generated by HS2. The impact of peak noise is considered especially important for members of the local community as it is likely that the peak level of noise generated by HS2 will be most intrusive form of noise, for example in disrupting sleep. In order to fully understand the impact of noise generated by HS2, the Formal ES should include an assessment of the impact of peak noise and should demonstrate the increase in average noise levels that will be experienced throughout areas affected by HS2. The Formal ES should also consider the environmental benefits that may be brought about through a reduction in design speed of the railway in the Solihull area it is likely that the impact of noise will be decreased in association with a reduction in design speed. Furthermore, a lower design speed will enable tighter turning radii to be achieved, which could enable the railway to be realigned such that it passes further away from local communities, thereby further reducing impacts on those communities. 8) Construction Haul Routes, Enforcement, Engagement, Management and Funding. The Draft ES highlights roads that will be used as haul routes to serve HS2 construction sites, and provides an indication as to the potential usage of these roads. The Council s view is that, where possible, construction sites should be accessed directly from A roads to minimise impacts on communities and ensure that roads of a suitable construction standard and width are used. A number of the roads identified by HS2 Ltd as being used to serve construction compounds are considered unsuitable; for example Truggist Lane and Lavender Hall Lane in Balsall Common; Diddington Lane, Hampton in Arden; Water Orton Road, Castle Bromwich and Middle Bickenhill Lane, Bickenhill. Summary of SMBC Asks - 3 -

Clarification is required in more detail as to the intended use of these roads, and whether alternative options for construction site access are available (for, example through the construction of new, temporary roads and / or through use of the land upon which HS2 will be built). The Council is aware that the HS2 Hybrid Bill may not affect the general permitted development and works privileges afforded to Statutory Undertakers. It is important that works undertaken by Statutory Undertakers are well coordinated with those associated with the construction of HS2 such that disruption to the operation of the local highway network is minimised; clarity is required as to how this will be achieved. Clarity is required on the role of the Council in enforcing all construction activities (not just limited to haul routes) that do not comply with the requirements of the CoCP and / or any other agreements that may be established. Appropriate funding should be provided for Council resources in association with enforcing upon HS2-construction related activities. It is also important that engagement with local communities is continued throughout the construction process to enable a two-way flow of information and discussion with those directly affected by construction activities. The Draft CoCP makes reference to the development of a Stakeholder Engagement Framework; clarity is therefore required as to how HS2 Ltd and its construction contractors intend to engage with local communities throughout the construction of HS2. Communities should have a clear and effective link to HS2 to ensure any concerns are dealt with effectively and quickly. 9) Viaduct Design The Draft ES includes photomontages of proposed viaducts. The photomontages illustrate that a relatively bland and imposing concrete structure will form the basis of the proposed viaducts. It is understood that the photomontages are, at this stage, purely indicative of the type of material that will be used in viaduct construction. It is therefore vital that HS2 Ltd works with the Council, and local communities, to develop viaduct design proposals that are iconic, attractive and complement and showcase the character of the area in which they are proposed. Similar principles should be applied to the design and development of the proposed people mover link between the Interchange Station and the NEC, Birmingham International Station and Birmingham Airport. 10) Kenilworth Greenway The Draft ES indicates that a section of the Kenilworth Greenway will be used as a haul route during the construction of HS2, and that a temporary diversion route will be provided to cater for this loss. Part of the temporary footpath is proposed to run through a flood plain, which is known to flood from time to time. It is important that the temporary measures are provided to an equivalent standard to that of the Greenway and that appropriate measures are put in place to prevent and / or mitigate any flooding issues that may arise. Following construction of HS2, the Draft ES suggests that the Greenway will be reinstated to its current standard. Given the impact on the Greenway (and the surrounding area) associated with the operation of HS2, the Council considers that opportunities to enhance the Greenway substantially should be captured in association with its reinstatement. Summary of SMBC Asks - 4 -

Furthermore, the opportunity should be explored to deliver, in association with HS2, an effective link between the northern end of the Greenway and Balsall Common village centre. 11) Lack of background information, evidence and analysis The Draft ES has been released to show the current thinking of HS2 Ltd and to gauge opinion on some of the mitigation measures that are currently proposed. It therefore includes statements on the significance of HS2-generated effects for a number of potential impacts, e.g. the effects of noise on people, the effect of road closures, the effect on cultural heritage assets etc. However, due to a number of assessments remaining on-going, there is a lack of evidence supplied in support of those statements. It is therefore difficult to form an informed decision as to whether or not the statements put forward by Draft ES are valid. Furthermore, not all potential environmental impacts appear to have been addressed by the Draft ES. For example, no information appears to have been provided in relation to either the potential electromagnetic interference or the potential for light pollution that may be generated by the scheme. In order for the Council to fully understand the impacts of HS2, it is important that the Formal ES includes all the analysis and evidence relied upon in drawing its conclusions. The analysis should be provided in relation to all effects generated by HS2, not solely those identified as being significant. Summary of SMBC Asks - 5 -