Smoothflow Student Fume Cupboard Installation Instructions

Similar documents
CARVER CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER

FLANGED CORR/GUARD CORR/GUARD INSTALLATION INSTRUCTIONS

DWYER INSTRUMENTS, INC. P.O. BOX 373 MICHIGAN CITY, INDIANA 46360, U.S.A. Series 670 Hood Monitor. Bulletin AV-670

APM110 LOW AIR VELOCITY ALARM

Rota- Spray Instructions (Mega Part & )

FLUEBOOST. flueboost 350 gas fire model

FLAME115 INFRARED HEATER SERVICE MANUAL INDEX FIRE 115 WARNING

PARTS & ACCESSORIES INSTALLATION AND SAFETY INSTRCUTIONS ITEM NO.:60006PC SAFETY PRECAUTION. Canopy. Downrod. Housing. Blade. Transmitter CR2032/3V

ROTA-SPRAY PROCESSOR MODEL 1210 (ROTARY-JET) INSTRUCTIONS MEGA PART NO: &

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

PARTS & ACCESSORIES INSTALLATION AND SAFETY INSTRCUTIONS ITEM NO.:60010BZGTGLD SAFETY PRECAUTION. Canopy. Downrod. Housing. Transmitter CR2032/3V

Rota- Station and Plus Instructions

Rota- Station and Plus Instructions (Mega Part & )

Installation & Calibration Guide

HOTPLATE COUNTERTOP AND OVEN RANGE

CROWN SERVICE MANUAL ELECTRIC COUNTERTOP STEAMERS MODELS: PX-3 PX-5

Installation and Maintenance

MULTIPOINT FF Room Sealed Fan-Assisted Water Heater

Installation Manual PS-200 & PS-201

n/a ROTARY JET ETCH/DEVELOPER TANK (RE)

Installation instructions for vented tumble dryer DOMESTIC. Dear Customer,

PROPER WALL MOUNTING OF THE SUITMATE

Installation Instructions 30 French Door Built-in Wall Ovens

3MAVR60XX Series Fan. Owner s Guide and Installation Manual. UL Model NO. : 3MAVR60XX

Single stage operation oil burner

Model: DC-159. Instruction Manual

Installation Manual PS-225 & PS-275

FOOD WASTE DISPOSER INSTALLATION AND USE MANUAL

INSTALL AN ELECTRIC SHOWER

Built-In Dishwasher. Installation Instructions. BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT The dishwasher MUST be

Installation Instructions

Model: AC-108. Instruction Manual

Model: EF34. Owner's Guide & Installation Manual

Static Pressure Alarm For Hazardous Location Fume Hoods

Installation and Maintenance

Silverware Pre-washing System INSTALLATION

24 VAC SYSTEM CONTROL KIT

SMALL DIAMETER CORR/GUARD & SLEEVED CORR/GUARD

Hodge Clemco Ltd. MJC Mini Cartridge Filters Owners Manual. TSOM 556 Date of issue 13/07/04. Hodge Clemco Ltd

Installation Instructions

Inspect bath carefully and report any damage or faults before installation. No claims can be entered in to after installation.

SCC 61 E Valid as of E61SE0404 up to E61SE... SCC 61 E

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION

LEAKSTOPPER RANGE Multizone water leak detection systems

INSTALLATION INSTRUCTION for ceiling fan

Level 3 NVQ Diploma in Domestic Plumbing and Heating ( /025)

Installation and Maintenance


Heater-Controller Package manual

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

LC3000 Level Controller Installation and Maintenance Instructions

Installation and Maintenance

User Instruction Manual

Single stage operation oil burner

Lo-Carbon T-series Window & Roof Models

Colorado SCR. Electric Towel Radiator Operating and Installation Instructions. (Read these instructions carefully and retain for future reference)

User s Manual. For the SHORE POWER CONNECTION MONITOR MODEL 9151

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

AFA 500 FUME HOOD ALARMS

AQUA PREMIER ELECTRONIC ELECTRIC SHOWER. Installation and User Guide

L A signature series TA T N E RE O, A L L A T S IN

CLe-series Dishwashers

MJC Cartridge Filter Unit Operation & Maintenance

3MAVR60XXD Series Fan. Owner s Guide and Installation Manual. CUL Model NO. : 3MAVR60XXD

Built-in Gas Hob CZ55554 CZ55571

Forced draught gas burner

12W Round LED Wall/Ceiling Light with Microwave Sensor

Installation Instructions

Parts List. Modular Flaker F-1501MAH(-C) F-1501MWH(-C) F-1501MRH(-C) hoshizakiamerica.com

18 INCH HIGH VELOCITY FLOOR FAN

LEAKSTOPPER 1 Single zone water leak detection system

SCS SCS

INTEGRA PLUS ABC. 230V~ 50Hz. Stock Ref. N. Installation and Wiring Instructions IPX2

T-SERIES. Window & Roof Models. Installation, Set-up and Operating Instructions. 230V/1/50Hz

LV100 Standard LV100PC Pull Cord LV100T Timer LV100H Humidistat LV100HP Humidistat and Pull Cord LV100PIR

Grant Spira 6-26kW and 9-36kW Wood Pellet Boilers

SCC 201E Valid as of E21SE0404 up to E21SE... SCC 201E

Door Release Power Supply

PLEASE TAKE TIME TO READ THIS MANUAL

POWER SHOWERS Models 4500M 5002M 4500T 5002T

OWNERS INSTRUCTION MANUAL

Corr/Guard PRESSURE RATED VENTING SYSTEM IMPORTANT: DO NOT INSTALL WITHOUT FIRST READING THESE INSTRUCTIONS VERY CAREFULLY.

STONE TROUGH CONSOLE SINK

DMWD 1 to 4 Zone Water Detection Alarm with Distance to Leak Measurement Installation and Operation Manual

Centair CMEV.4 / CMEV.4e / CMEV.4eHT Mechanical Extract Ventilation (MEV) System Installation Instructions

Arctica Solar 1500 Series Heater Installation Manual

Water Leak Detector - Four Zone with open/short-circuit detection. Product overview

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

MASTER PRESSRE MAINTANENCE CONTROLLER. Models PMCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

SEMPEO SQA Unit Code H02H 04 Wiring electrical equipment and circuits

900 Quadrant Steam Shower Cabin with 6 Body Jets

User, Installation and Servicing Instructions. Panther Static Hot Cupboards G1, G2 and G3 IS86 ECN1881

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

SAVE THESE INSTRUCTIONS

Orrin. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

RS Chimney Fan For Gas & Oil Applications. Installation & Operating Manual USA CAN

Electrisaver User and Installation Instructions

INSTRUCTION MANUAL. UBES60SS2 60cm 4 Solid plate electric hob

USER MANUAL LEEC CLASSIC INCUBATOR. C100, C157 and C330

Transcription:

Calibre Solutions Ltd 37 Manurere Rise, RD1 Matakohe 0593 Freephone: 0800 422 542 Phone: +64 21 684 273 Fax: +64 9 813 1319 Smoothflow Student Fume Cupboard Installation Instructions Refer Numbered Installation Drawing on the next page. 1. Place Student fume cupboard on bench unit. 2. If there is a solid bench top, mark out for service penetrations in the fume cupboard such as drip cup, water & gas spouts, including wire for gas solenoid. When fitted, this wire is rebated into the underside of the fume cupboard near the front right corner. Move the fume cupboard and cut out penetrations in bench top. 3. Replace fume cupboard in position. 4. Plumb up for duct from top of fume cupboard to ceiling. Mark and cut 260mm dia hole through ceiling and roof. 5. Measure height H from fume cupboard to high side of roof penetration. Length of duct is H +350mm. Cut duct to length. Plain ends are required top and bottom to fit into fume cupboard and fan. Ensure ends are cut square and neat. De-burr edges. 6. Lower the duct through the roof. Fit the ceiling flange over the bottom end of the duct, and insert the duct into the fume cupboard outlet. Slide the flange up to the ceiling and fix neatly. 7. Fit the Aquaseal flashing over the top end of the duct, shape to the roof profile, and fix to the roof with sealant and screws or rivets. We recommend urethane sealants. 8. The acoustic insert is a 600mm long tube with a perforated liner. Slide the acoustic insert down inside the duct, all the way until the lip flange rests on the top edge of the duct. 9. Fit the fan inlet socket over the top of the duct. Screw fix to the duct. 10. Cut a 2.1m long duct for the stack. Plain ends are required top and bottom. Ensure ends are cut square and neat. De-burr edges. Fit the stack into the fan outlet. Align vertically plumb and fix with screws. Apply (urethane) sealant around the stack at the top edge of the fan. 11. Fit the guy collar to the stack (see guy wire instructions, p3 ) and fix the guy wires securely to the building structure. 12. Make plumbing connections to fume cupboard (see Plumbing instructions) 13. Make electrical connections to fume cupboard and fan (see Electrical instructions, p5,6) 14. To commission the fume cupboard, test face velocity as commissioning instructions on page 9. Adjust the fan speed to achieve average velocity between 0.52 and 0.55m/sec with the sash open, and set the airflow alarm switch.

3 piece s/s clamp M8 nut gripple wire M8 bolt Installing Guy Ropes Assemble the three piece duct clamp with the bolts provided. During assembly, fit the loop end of a guy wire over each bolt, securely between the flanges, as shown above Fit the duct clamp around the stack, about 2m above the roof penetration, and tighten the bolts evenly. Attach the guy wires to secure points on the building structure using the loop fittings and adjustable wire grips as shown below. Adjust the wire tension and tighten the clamp.

Calibre Solutions Ltd 37 Manurere Rise, RD1 Matakohe 0593 Freephone: 0800 422 542 Phone: +64 21 684 273 Fax: +64 9 813 1319 Fume Cupboard Microprocessor Safety Sequence Controller Electrical Connections, Single Phase The control box is a grey plastic enclosure located on top of the fume chamber. Refer the diagram attached. The control box contains a local mains isolator, a circuit breaker for the fan, an RCD circuit breaker for the power socket coloured strip connectors for Neutral and Earth a printed circuit board with a row of relays along the (left) side a pressure switch (in the lid) FAN The fan is usually located above the roof. The fan has a single phase 230V motor with a 3core cable about 1.2m long. Provide a weatherproof isolating switch beside the fan. Terminate the motor cable at the switch. Provide and terminate a 1mm 2 T+E 3 core cable from the fan isolating switch to the fume cupboard controller. The fume cupboard controller has a cable entry at the front right. Terminate the fan Neutral conductor at the blue terminal block Terminate the fan Earth conductor at the yellow/green terminal block Terminate the fan Active conductor at the FAN relay (see diagram) POWER Required supply is 230V 50Hz Provide and terminate a 2.5mm 2 T+E 3 core cable from the mains distribution board to the fume cupboard controller. This circuit should be fused at 20A. The fume cupboard controller has a cable entry at the front right. Terminate the fan Neutral conductor at the blue terminal block Terminate the fan Earth conductor at the yellow/green terminal block Terminate the fan Active conductor at the local isolator switch(see diagram) GAS SOLENOID The gas solenoid is an optional accessory. A 3 core cable to operate the solenoid is provided under the fume cupboard. below the right front corner. A junction box is also provided. Fix the junction box under the fume cupboard, and terminate the cable. The solenoid has a cable about 1m long. When the valve is plumbed into the gas supply under the bench, terminate it in the junction box. CHECK Check that all screw terminals are tight Check the air pressure pilot tube is inserted in the duct outlet. Check that installation of the duct and fan is complete Turn on the fan isolating switch Read the operating instructions before livening the control box.

gas solenoid

STUDENT RED GREEN FUME CUPBOARD EMERGENCY ISOLATOR PRE-PURGE POST-PURGE AIRFLOW TEMPERATURE SCRUBBER YELLOW READY POWER & GAS SPRAY BAR OPERATING THE FUME CUPBOARD Start up Pre-purge Ready Active Press the green button The fan and light turn on The TEMPERATURE LED will be green The controller waits 7 seconds for airflow The AIRFLOW LED turns green The PRE-PURGE LED will be amber for 50 seconds then flash for another 10 seconds, then go out The READY LED turns green Four beeps sound Press the yellow button The POWER & GAS LED turns green The fume cupboard is now operational - power & gas can be used Isolate / Ready Press the red button Power & Gas turn off automatically The POWER & GAS LED goes out The READY LED turns green Press the yellow button to re-activate, or Shut down Post-purge Re-start Press the red button again The fan and light continue to operate The POST-PURGE LED will be amber for 4 minutes then flash for another 1 minute, then go out. The light and fan turn off automatically Press the green button to return from post-purge to pre-purge

FAULT ALARMS If the Power is cut, an alarm will sound a slow beep The READY LED will flash red Press the red button to mute the alarm A long beep will sound as the controller shuts down. When the Power is restored, The fan will automatically turn on for 20 minutes then turn off; An alarm will sound for 30 seconds, then turn off The LED's will keep flashing. Press the red button to reset the controller and stop the fan. Press the green button for normal start up. If the Airflow gets low An alarm will sound, and the AIRFLOW LED will flash Press the red button to mute the alarm The fume cupboard will go into normal post-purge, but the AIRFLOW LED will be red Check out what caused the alarm. Get it fixed before using the fume cupboard again. If the Temperature inside the fume cupboard gets high The TEMPERATURE LED will flash green as a warning Turn down the heat inside the fume cupboard If the temperature inside the fume cupboard gets higher An alarm will sound, and the TEMPERATURE LED will flash Press the red button to mute the alarm The fume cupboard will go into normal post-purge, but the TEMPERATURE LED will be red Check out what caused the alarm. Get it fixed before using the fume cupboard again. The temperature sensor works even when the fume cupboard is turned off. Press the red button to mute the alarm TECHNICAL SUPPORT FREEPHONE 0800-422-542

COMMISSIONING Refer the operating instructions Turn the power on and reset the controller. Start the fume cupboard controller. If the airflow alarm goes off, mute the alarm. Measure the airflow Raise the sash to the maximum operating position (sash stop) Measure the air velocity in the plane of the sash at six (6) positions 100mm 100+ + +100 100+ + +100 100mm The average velocity should be more than 0.5m/sec Record the velocity measurements in a commissioning report. Adjust fan speed as below. Conduct a smoke test (AS 2243.8) and record the observations. Adjust the fan speed (Fumeflow TD250 fan): The Fumeflow TD250 fan is usually installed above the roof. There is a speed regulator in a plastic box beside the fan motor. Adjust the speed regulator clockwise to increase speed, or anti-clockwise to reduce speed. When the correct speed is set for fume cupboard face velocity, apply a bead of silicone sealant to the speed regulator shaft Adjust the airflow alarm sensor (pressure switch): The pressure switch is mounted in the lid of the fume cupboard controller. Adjust the white plastic cross-head screw clockwise to raise the set point (more sensitive) or anticlockwise to reduce the set point (less sensitive). A practical guide: 1. Turn the set point up until the Airflow alarm sounds 2. Press the red button to mute the alarm. 3. The Airflow LED should still be red. 4. Turn the set-screw down until the LED turns green. To check the alarm, pull the clear PVC pilot tube out of the duct. The alarm should sound after 2-3 seconds. Ensure the pilot tube is re-fitted in the duct.