Pedestrian Connectivity Facilities. Consultation Digest

Similar documents
Alignment of Options 2 & 3. Lam Tin. Tseung Kwan O Town Centre South. Ocean Shores. Cemetery. Cross Bay Link. Alignment Option 1

Agreement No. CE 57/2013 (TT) Pedestrian Environment Improvement Scheme for Transformation of Kwun Tong Business Area.

Solving urban land use conflict!

Planning for Liveability in Hong Kong

Job Reference of Threaded Rod & Holding Down Bolt

3 Summary of Major Views and Responses

Environmental Permit No. EP-457/2013/C. Central Kowloon Route. Independent Environmental Checker Verification

Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study. PlanD CEDD GPA IRD ArchSD

Task Force on Water-land Interface

Strategic Planning in the Making: Legacy and Vision for Hong Kong. Mr. K. K. LING, JP, FHKIP, RPP Director of Planning

Overview of Land Use Framework for Victoria Harbourfront. Planning Department February 2011

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Task Force on Harbourfront Developments on Hong Kong Island. Hong Kong Island East Harbour-front Study

Design Criteria and Action Checklist on Sustainability and Green Issues for New Capital Projects

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak

Task Force on Kai Tak Harbourfront Development

By & Fax. Creating a Better Pedestrian Environment to Improve Streetscape and Promote Walking

** Different Phases with no other specific names will not be stated separately in the list. New Territories East

Task Force on Kai Tak Harbourfront Development

** Different Phases with no other specific names will not be stated separately in the list. New Territories East

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Alexander [Sandy] M Duggie

BA(Hons)(Town Planning) Glasgow; MPhil(Landscape Architecture) Edinburgh; MSc(Conservation)(Distinction) HKU; PhD HKU

HBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications

Waterfront Promenade adjacent to the Hong Kong Children's Hospital at Kai Tak. Harbourfront Commission Aug 2015

Paradigm Shift: Emergence of Environmental Management and Engineering in the Development of Hong Kong into a World City

Planning Underground in Singapore

Traffic Control and Surveillance System (TCSS) Infrastructure, Challenges and Trends

Task Force on Harbourfront Developments on Hong Kong Island

California Environmental Quality Act (CEQA) Environmental Review Process

New Towns in Hong Kong: Planning for the Next Generation

Hong Kong Collection

Land Use/Transport Integration. Land Use as an end Transport as a means

The Commissioner of Engineering and Public Works recommends that this report be received for information purposes.

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M)

AGINCOURT SECONDARY PLAN

MKS ADVANCE II EXPLAINED

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection gift from Extension Activities Unit Urban Council Public Libraries

2-Day-1-Night. Extra Night Rate

Slough International Freight Exchange Proposals, Colnbrook+

THE AVAILABLE FOR LEASE 2300 BOSWELL ROAD CHULA VISTA, CA TRACY CHARLES CLARK

Table of Content. Dinner Programme. About the Division. Committee Members. Message from Chairman. Message from Guest of Honour. Division Activities

178 Carruthers Properties Inc.

Key Principles. 290 Phasing Principles and Programme

shown on the following page.

Welcome to our public exhibition

Chapter 9 Route window W18 Slough station. Transport for London

URBAN DESIGN STUDY FOR THE WAN CHAI NORTH AND NORTH POINT HARBOURFRONT AREAS FEASIBILITY STUDY

Representing Hong Kong Institution of Engineers. Representing Society for Protection of the Harbour

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

Group Profit Increased by 30% to HK$22 billion

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

Institution Information 2016/2017

Ballston Station Multimodal Study. Stakeholder Meeting October 5, 2010

GREEN WEDGE MANAGEMENT PLAN

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT

history, its physical environment, and also something about family history and lineage record. You have also learnt how to locate your

Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review

A uli Advisory Services Panel Report. Kai Tak and Kowloon East Hong Kong SAR December 2011

Financing Transportation Successes from other Jurisdictions

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report

LONGITUDINAL VENTILATION FOR SMOKE CONTROL IN A TILTED TUNNEL BY SCALE MODELING

ARLESEY CONSULTATION QUESTIONNAIRE

WELCOME. Welcome to the Public Open House

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

1. Welcome. Offering improved shopping choice in Faringdon

EVANSTON GARDENS TRANSPORT INFRASTRUCTURE REVIEW AND STRUCTURE PLAN

Mr Tony HO Chief Geotechnical Engineer Geotechnical Engineering Office Civil Engineering and Development Department Hong Kong, China

Thank you! Events and Entertainment in Northeast False Creek. Tuesday, March 7, 2017

Hong Kong New Town Sustainability Analysis from the Perspective of Low-Carbon Eco-City Taking Tseung Kwan O New Town as an Example

Arlington County. Envision Courthouse Square Planning and Urban Design Study 21 May 2014

INTERNATIONAL COMPETITION: TOWNLAND S RECENT AWARDS TOWNLAND S MAINLAND CHINA AWARDS

Honeywell Portable Air Conditioners. A compact, easy to use portable cooling solution.

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

SMOKE AND FIRE CURTAINS

FITTING OUT SOLUTION + INTERACTIVE SOLUTION

Link Union Station (Link US) Project Open House September 26, 2018

Fostering a Quality and Sustainable Built Environment in HK. A presentation by Robert Lam Fellow HKIA

Toll Brothers at Amalfi Hills - Positano Collection

DWYER AROUND THE GLOBE CONTACT INFORMATION DWYER INSTRUMENTS, INC. P.O. Box 373. Michigan City, IN Return Service Requested

Reviewing to Section 1

Task Force on Kai Tak Harbourfront Development. Update on Implementation of Public Creatives in Kai Tak Development

Transportation Committee

Union Station Master Plan Task 2 Briefing

Site 5 Development Brief

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising

Figure 1- Site Plan Concept

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Fossumdumpa Stovner, Oslo

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Brighton Marina Neighbourhood Forum AGM. City Plan Part Two - Draft Plan

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

Diversity Impact Assessment

TO: Denver Planning Board FROM: Analiese Hock, Senior City Planner DATE: March 13, 2018 RE:

SH1 link to Matakana Road

Glen Road Pedestrian Bridge Environmental Assessment

Emmer Green, Reading. Site Location Plan

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

South Davis County COMMUNITY SPOTLIGHT

Transcription:

Connectivity Consultation Digest December 2014

Project j Information Anderson Road Quarry is located at the southwestern ridge of Tai Sheung Tok Hill in East Kowloon. The development platform covers an area of about 40ha. It will provide land for residential housing development, commercial uses, supporting community facilities, a quarry park, open spaces and amenity areas, starting from 2019/2010. Project Scope j p Clear Water Bay Cl W B Road R d Road Improvement Works Junction improvement at Clear Water Bay Road/On Sau Road Road Improvement Works Site Formation & Infrastructural Work Widening of New Clear Water Bay Road Shun On Jordan Valley Tai Sheung Tok nt me op rson vel De Ande AR) at ad (D Ro Shun Tin Anderson Road Quarry () Ngau Tau Kok North Po Tat South Road Improvement Works Junction Improvement at Lin Tak Road/ Ping Road and Proposed Bus-bus Interchange at Toll Plaza TKO Tunnel Toll Plaza Connectivity Construction of footbridges, escalators and esca es cala ca lato la tors to rs a nd llifts ifts if ts Purpose of Consultation This consultation digest aims to introduce the pedestrian connectivity facilities linking development area, those housing estates in the vicinity and Town Centre. 1

Objectives and Benefits of Connectivity We target to enhance the pedestrian connectivity among Development Area, those housing estates and community services facilities in the vicinity by Constructing footbridges, lifts or escalators to enable residents to travel conveniently among the Development Area,, Kwun Tong Town Centre and MTR Station; Connecting existing pedestrian routes in the district for the convenience nce of residents; Providing access to the bus-bus interchange station at Tseung Kwan O Tunnel Toll Plaza being proposed under this development project, and Aiming thereby to reduce the demand for short vehicular trips to relieve the pressure on the existing road network. Proposed Routes for Connectivity Connectivity Route 1 Proposed Anderson Road Quarry Hiu Lai Court Shopping Centre Connectivity Route 2 Development at Anderson Road Connectivity Route 3 Po Tat TKO Tunnel Toll Plaza MTR Station North South South Tseung Kwan n O Road Connectivity Route 4 Hong Wah Court Proposed Bus-bus Interchange at Toll Plaza 2

Proposed Connectivity Route 1 & 2 Road Ping Shopping Centre Hiu Lai Court Proposed Lift with Footbridge and Subway Memorial Park Road Tsui Yeung House Bus Terminus North Tsui To House (Wet Market) MTR Station Proposed School Recreational Community Centre 3

Proposed Connectivity Route 3 Sau Ming House Proposed School Recreational Community Centre Hiu Yuk Path Please refer to P.5 Near Tsui Yung House Bus Terminus Shopping Centre Road Ping Po Tat Sau Ming House Hiu Kwong Street Hiu Hiu Ming Ming Street Street t Ping (South) North Tsui Yung House Existing Footbridge (South) Proposed o Escalators ato s Existing Footbridge Road MTR Station 4

Proposed Connectivity Route 4 Proposed Proposed Lift, Escalators, Footbridge and Subway Po Lam Road Proposed Bus-bus Interchange Po Tat Road Po Tat Ping Road Slip Road Sau Ma Mau Ping Roa Road TKO Tunnel Toll Plaza Ping Road Ping Road Footpath along Tseung Kwan O Tunnel Toll Plaza Footpath along Tseung Kwan O Tunnel Toll Plaza Public Consultation and Your Views We welcome your views and suggestions on our proposed Connectivity for the development of in the public consultation conducted from mid-december 2014 to January 2015. We shall undertake to refine and optimize our pedestrian connectivity design with the benefits of your views. Please forward your written comments by 31 January 2015 to: New Territories East Development Office Civil Engineering and Development Department Suite 1213 Chinachem Golden Plaza 77 Mody Road, Tsim Sha Tsui Kowloon; or By Fax at 2739 0076 By Email at lmchan@cedd.gov.hk For enquiry, please feel free to call at 2301 1374. 5