plan context INTRODUCTION 10 EXISTING SITE CONDITIONS 16 RELATED PLANS & INITIATIVES 10 CONSULTATION 30

Similar documents
APPENDIX L3. Table of Contents. SWP EA Information Sheets

Scarborough Waterfront Project

Foot 132. Bike 23. Other 16. Yes 305 No 35

SECTION 2 : plan context. GUILD PARK & GARDENS horticulture plan

Ashbridges Bay Erosion and Sediment Control Project

APPENDIX K WINDSOR OFFICIAL PLAN

Case Study Presentation of the Downtown Brampton Flood Protection Class EA

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

TRCA Roles and Responsibilities in Planning and Development

Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report

ENVIRONMENTAL ASSESSMENT TERMS OF REFERENCE

The purpose of tonight s PIC is to:

GUILD PARK & GARDENS horticulture plan

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

SCC PRD (2016) COUNTY PARK MASTER PLAN

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

2. Purpose of the Undertaking

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

Long Branch Neighbourhood Character Guidelines Final Report

Historic Yonge Street HCD Plan Community Consultation October 14, 2015

Albion Hills Conservation Area Master Plan. Public Information Session

City of Toronto. Emery Village Transportation Master Plan

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

DESIGN CRITERIA PACKAGE

WELCOME TO OPEN HOUSE TWO November 28, 2018

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

STREAM BUFFERS

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

PORT UNION VILLAGE COMMUNITY SECONDARY PLAN

10.14 ERRATA UPDATE SHEET 3

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #1 SEPTEMBER 28, 2016

Please read the entire document

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

Public Information Centre. Welcome

TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK

DOWNTOWN GEORGETOWN PLANNING STUDY

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

1. Introduction

McKay Road Interchange and Salem / Lockhart Crossing

Highest & Best Use Study Marina Park Lands

Burloak Drive Grade Separation

McCowan Precinct Plan Study Background & Deliverables

49 to 51 Camden St - Zoning Amendment Application - Preliminary Report

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

Mississauga Waterfront. Parks Strategy - Draft

Essential Skills: Reading and Interpreting Maps and Plans

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

4.3 Dudley Area Plan. Introduction. History and Existing Character. Desired Future Character for Dudley

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

Don River Watershed Site Evaluation Predicting Effectiveness of Stormwater Source Controls in Urban Watershed Revitalization

Albion Hills Conservation Area Master Plan: Project Summary

APPENDIX F: EXTERNAL APPROVALS

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga

USF System Campus Master Plan Updates Goals, Objectives and Policies

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

This Review Is Divided Into Two Phases:

Bridge Type Assessment and Evaluation

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

I602. Birdwood Precinct

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

I611. Swanson North Precinct

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura

38 Queen s University Campus Master Plan Part 1

3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN

WELCOME and introduction

Town of Peru Comprehensive Plan Executive Summary

Yorkshire Sculpture Park Historic Landscape Management Plan. Volume I. July 2010

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

BAY AREA PARKS & RECREATION

Director, Community Planning, Toronto and East York District

Canadian Consulting Engineering Awards 2016 Queens Quay West Revitalization. Category B: Transportation

North Shore Trail. Council Meeting June 10, 2002

Slope Stability Evaluation and Determination of Location of Long Term Stable Top of Slope 233 to 245 Dunlop Street West, Barrie, Ontario

01 Welcome! About Ontario Shores

Denton. A. Downtown Task Force

Red Fox Commercial Outline Plan

St. Clair Avenue West Area Transportation Master Plan

Prepared for: East Park Leadership Conservation Center Prepared by: CVM Construction Managers, Inc.

Planning Districts INTRODUCTION

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

37 Interlaken A Vision To The Future

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions.

523, 525 and 525A Adelaide Street West - Zoning Amendment Application - Preliminary Report

Transcription:

plan context INTRODUCTION 10 RELATED PLANS & INITIATIVES 10 Archaeological Study 10 Hydrologic Study Report 10 Clark Centre for the Arts 10 (Building 191) Scarborough Waterfront Project 11 TRCA Ongoing Projects 11 Urban Forestry Ash Removal Plan 11 Dynamic Hospitality & Guild 12 Inn Estate Guild Theatre Group 12 Toronto Bike Plan 12 City of Toronto Counting Report: 14 the Guild Park EXISTING SITE CONDITIONS 16 Trails 18 Signage 20 Fencing & Access 22 Vegetation 24 Views 26 Site Constraints 28 CONSULTATION 30

INTRODUCTION This plan is meant to be considered in conjunction with the Guild Parks and Gardens Management Plan (2014), and the Guild Park and Gardens Horticulture Plan (2018), as well as any forthcoming detailed design or construction documents. The following review of other related plans and initiatives expands upon the planning review conducted and presented as part of the Management Plan. All plans, initiatives, and studies included as part of this plan context review have been developed or have come into effect since the adoption of the Management Plan in 2014. As such, for a complete overview of the planning framework that the site is subject to, please consult both the Management Plan and the Trails Master Plan. RELATED PLANS & INITIATIVES Archaeological Study In 2005 the Guild Inn property, including the structures on site, gardens, and undeveloped parkland, underwent an archaeological assessment. The assessment divided the site into two phases. Phase 1 Hotel Precinct Lands focused on the Bickford House and its associated facilities. Phase 2 Undeveloped Parkland, Culture Precinct, Sculpture Garden and Other Lands, included the bulk of the site s landscape. An existing structure on site, the Guild Log Cabin, was previously registered, and is designated under the Ontario Heritage Act. Additionally, an archaeological survey conducted in 1996 recovered over 8500 artifacts in the vicinity of the cabin, most of which are of twentieth century origin. The study concluded that given the property s location and settlement history, the site exhibits significant archaeological potential. No significant artifacts were recovered during this assessment though. The potential for the discovery of significant artifacts is in part contingent on the degree to which the lands have been disturbed by development activities since its original settlement. The study recommends that the site be considered free from further archaeological concern, and that future site works be conducted in such a way at to eliminate risk to the existing cultural features on the property. Hydrologic Study Report A hydrological study was undertaken to assess the site s wetland system and drainage patterns, as well as the areas of erosion along the bluff s edge. The study found that the top of the bluffs exhibited evidence of ongoing erosion resulting from surface runoff, and that in two locations the slope has eroded past the location of an existing informal Natural Surface Trail. Additional sites of erosion were identified along the southeast parking lot within the site. All the erosion sites are accessible via the trail network, however, some areas will require reinforcement to bear the load of maintenance or construction equipment. All the identified erosion sites pose a hazard risk to the public, as well as the sensitive vegetation communities located near and on the bluff slopes, and are likely to worsen over time. Drainage modeling of the site has determined that the central portion of the site, containing the Guild Inn Estate buildings and parking, drain into catchments which connect to the municipal storm sewer. The bulk of the rest of the site drains south towards the bluffs. Recommended approaches to mitigating further erosion include minor grading to redirect surface drainage, mechanically stabilizing the slope, installing soil anchors or nails, introducing bio-engineering measures, and installing geowebbing. Clark Centre for the Arts (Building 191) Building 191, a two-storey concrete and steel structure clad in architectural relics, was built designed by architect J.H.W. Bradfield and built by the Clarks in 1963 to house office spaces and storage. As part of the works on the Guild Inn Estate, Building 191 is set to undergo significant rehabilitation and renovation to transform it into a community arts and culture facility. Following an extensive community consultation process, the team from Taylor Hazell Architects developed a plan for the restoration and expansion of Building 191. The proposed design incorporates a three-storey rear addition, and a renovated interior that includes studio, gallery, and event space. The addition lobby is to be clad in glass and is intended to provide light into the interior spaces, while the majority of the existing façade is to be preserved. The project is expected to be finished in 20. Management Plan for Guild Park & Gardens (2014) Building 191 10

Scarborough Waterfront Project The Scarborough Waterfront Project Environmental Assessment (EA) was undertaken to evaluate and address existing risk to public safety and infrastructure due to erosion, as well as to provide direction on the means of achieving the Scarborough Waterfront Project s vision of creating a connected system of publicly accessible greenspaces along the Lake Ontario shoreline which respects and protects the significant natural and cultural features of the Scarborough Bluffs. The EA s study area includes a 11 km stretch of shoreline, beginning at Bluffer s Park and extending east to East Point Park/Highland Creek. Guild Park and Gardens is located in the Central Segment Area. The southern portion of the construction access route that slopes down to the shorefront was found to relatively steep (approximately 13%), with portions exhibiting steep side slopes. Regrading was not feasible, and a solution that incorporates level rest areas will be explored in the detailed design phase of the Project. TRCA Ongoing Projects The Toronto and Region Conservation Authority (TRCA) has been involved in several ongoing projects within Guild Park and Gardens. These projects include: Guild Inn Shoreline Restoration Project; Scarborough Waterfront Project; Terrestrial and aquatic habitat enhancement; and, Maintenance of existing construction access route. Urban Forestry Ash Removal Plan The City of Toronto Urban Forestry department has been involved in the ongoing monitoring and maintenance of ash trees on the Guild Park and Gardens property. As part of this maintenance effort, Urban Forestry has reviewed and inoculated ash trees throughout the property, as well as removed hazard trees. These efforts are expected to continue. To guide future efforts, Urban Forestry is preparing an Ash Removal and Emerald Ash Borer Maintenance Plan. This plan should be referenced prior to undertaking any detailed design or on site construction. The Central Segment has experienced previous shoreline protection works, and the EA found the Bluffs along this Segment to be at varying stages of reaching their long term stabilized slope. The existing construction access route within Guild Park and Gardens functions as an informal access to the waterfront for pedestrians and cyclists, as well as the main stormwater outfall into Lake Ontario. The EA found that the construction access route running along the bottom of the Bluffs at Guild Park and Gardens lies too close to the toe of the slope of the Bluffs, and as such lies within the risk zone and poses a danger to the public. Potential solutions include relocating the access route within the existing land base to be farther from the toe of the slope, lake-ward. Guild Park portion of the Waterfront Project - image from the report Guild Park shoreline Felled ash trees affected by Emerald Ash Borer GUILD PARK & GARDENS trails master plan : April 13, 2018 / 11

Dynamic Hospitality & Guild Inn Estate In 2013 Dynamic Hospitality and Entertainment Group began work on the revitalization of the Guild Inn Estate. The redevelopment transformed the Guild Inn Estate into a restaurant and banquet / events centre. The redevelopment included two new extensions, including the Gazebo, a sheltered event space. Dynamic Hospitality remains involved as the property manager of the Guild Inn Estate. Guild Theatre Group The Guild Festival Theatre is a professional theatre group responsible for developing, organizing, and performing live theatre in Guild Park and Gardens. The primary venue for the live performances is the cultural heritage artifact commonly referred to as the Greek Theatre. Preliminary Geotechnical Feasibility In 2018 Terraprobe Inc. was retained by the TRCA to prepare the Preliminary Geotechnical Feasibility study for the proposed lookouts. The report provides geotechnical engineering design advice and recommendations regarding slope stability. The study reviewed two potential locations along the top of bluffs. 2016 LIDAR data, provided by the TRCA, was referenced to determine existing slope conditions, while the soil properties were assessed by using data obtained from local boreholes during the Scarborough Waterfront Project. The slope analysis demonstrates that further erosion of the slopes is expected. As such, the study recommends that any lookout structures be designed with the Long Term Stable Slope Crest (LTSSC) in mind. Structural supports (caisson foundations, spread footing foundations, micropiles, etc.), should be designed to bear at least 1.2m below the stable slope profiles for each location. Lookout Structural Feasibility Study Entuitive was retained by the TRCA to undertake a structural feasibility study and develop a series of design options for the potential lookouts. The feasibility study was based on the findings of the Preliminary Geotechnical Feasibility study prepared by Terraprobe Inc. The three concepts developed take into account the projected future condition of the bluff slope, which is expected to recede further before arriving at the Long Term Stable Slope Crest (LTSSC). The concepts aim to provide a safe viewing platform that minimally impacts the surrounding environment. Each of the concepts restricts heavy construction loads from occurring within 6m of the current top of bluffs line, to ensure safe working conditions. The first, and most economical, concept proposes a raised viewing platform located at the future LTSSC. The second concept introduces a cantilevered option, that allows for access to the edge of bluffs in their current condition, and a dramatic projection over the slope in it s LTSSC condition. The final concept, and most costly, is an elaborate cable suspended structure that projects over the current and future top of bluffs line. Each concept is associated with specific advantages, disadvantages, and costs. Toronto Bike Plan In 2001 the City of Toronto released the Toronto Bike Plan, and later, in 2016, the Toronto Cycling Network Plan. The goal of the bike plans is to create a safe and connected cycling infrastructure network through adding new routes and enhancing existing ones. The 2001 Bike Plan proposes a 2.1 km signed bike route be established along Guildwood Parkway. The 2016 Toronto Cycling Network Plan established a Quiet Street Route along Livingston Road and Guildwood Parkway, as well as a Bike Trail through the park. The 2018 Toronto Cycling Network Plan retains the Quiet Street Route identified in the 2016 Plan, which will offer cyclists an on-street route around the site. The trails throughout the Guild will be marked with pedestrian-only signage. Cyclists are encouraged to walk bikes on the site, or make use of ample bike parking that will be provided. This will allow guests to enjoy the park, minimizing pedestrian/cyclist conflicts in a site that features frequent programming and permitted events. The Study Area Existing Bear sculpture. Guild Park cycling Quiet Street Route and Trail - image from the 2016 report 12

GUILD PARK & GARDENS trails master plan : April 13, 2018 / 13