City of Ingleside Avenue B Outfall Project

Similar documents
NAPA COUNTY PUBLIC WORKS Standards & Specifications

Appendix I. Checklists

March 15, 2017 Project:

A G E N D A Council Update Training Room September 26, :45 p.m.

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Blake C. Kronkosky, PE, Ph.D.

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

Review Zone Application for D&R Canal Commission Decision

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Washington County, Maryland Division of Public Works Policy Manual

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Town of West Point Plan of Development

Title 11 Streets and Sidewalks

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

SITE IMPROVEMENTS TO UAS AREA CP1512R

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

183

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Drexel, Barrell & Co.

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

DEPARTMENT OF PUBLIC WORKS & UTILITIES

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Victoria Bridge Municipal Class EA Civic Works Committee

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

DESIGN CRITERIA PACKAGE

Appendix D - Technical Design Criteria for BMPs

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

PLAN SUBMITTER'S CHECKLIST

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Level 1 Downstream Analysis

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

South Bismarck Watershed Model Update and Stormwater Improvement Project

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Portland International Airport Storm Water Master Plan April 6, 2016

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Concreteville, CT. March 10, 2004

PLANNING COMMISSION Work Session Meeting Agenda

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

County of El Dorado Standard Plans

Plan Review Checklist

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Reconnecting New Haven: Downtown Crossing

Sewer & Storm Drain Systems

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )

STANDARD DETAILS QUICK REFERENCE

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

Town Council Agenda Packet

Project Descriptions for FY 15

City of Los Angeles Department of Public Works

Erosion Control for Home Builders in the. City of Jacksonville

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

University Park Subdivision Street Assessment Report

The Benefits and Challenges Associated with Green Infrastructure Practices

City of Richmond. Engineering Design Specifications

2 ALTERNATIVES AND OPTIONS

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Alternatives Analysis Summary Memorandum

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES

JOB CREATION PROJECTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

STORMWATER - GENERAL NOTES

2016 WORKSHOP LVR Field Trip

North Street Reconstruction & Integrated Stormwater Management System

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Planning and Development Services Public Works. Design and Construction Standards

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

Brigitte A. Berger, Director of Engineering

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

5-Year Street Reconstruction Plan ( )

City of Redlands East Valley Corridor Specific Plan. City Council

Prince William Street Project (Grant Avenue to Wellington Road)

Homeowners Guide to Stormwater BMP Maintenance

TENTATIVE MAP CHECKLIST

Drexel, Barrell & Co.

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

Appendix B Utilities Figures

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission

Chapter 6. Green Streets

Third Ave CSO Integrated Green Infrastructure

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo)

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Construction and Landscaping on Public Property

THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS

Transcription:

City of Ingleside Avenue B Outfall Project June 15, 2017 Dennis Knippa Council Member Place 1 Bill Underbrink Council Member Place 2 Ronnie Parker Council Member Place 3 Luis Lamas Mayor Ben Tucker Council Member Place 4 Oscar Adame Council Member Place 5/Mayor Pro-Tem John F. Schack Council Member Place 6 City of Ingleside Avenue B Outfall Project June 15, 2017 Agenda Introductions Mayor Luis Lamas Project Team and Project Overview City Manager Melissa Byrne Vossmer Project Description Hanson Professional Services Inc. Review of Stormwater Management Master Planning Effort City of Ingleside Hydrology Historical Flood Pictures and Data Proposed Improvements Construction Activities, Traffic Control, and Timeline Opinion of Probable Construction Costs Questions and Comments 1

Project Team Melissa Byrne Vossmer City Manager Donald Paty Director of Public Works Hanson Professional Services John Michael, P.E. Craig Thompson, P.E. Javier Davila, P.E. City of Ingleside Planning Map 1960 s 2

City of Ingleside Planning Map 1979 City of Ingleside Major Drainage Systems 3

City of Ingleside Contour Map City of Ingleside Planning Map 1992 4

May 16, 2016 Rain Event May 16, 2016 Rain Event 2.17 in 7.97 in 9.21 in 11.01 in 8.67 in 8.67 in 12.82 in 11.72 in 2.27 in 11.09 in 11.15 in 10.01 in 12.51 in 5

Mustang Drive Looking East at San Angelo Mustang Drive Looking East at San Angelo 6

Mustang Drive Looking towards City Hall Mustang Drive Looking towards City Hall 7

San Angelo Street Looking East from City Hall San Angelo Street Looking East from City Hall 8

Waco Street Looking South towards softball field Waco Street Looking South towards softball field 9

Waco Street Looking West from El Paso Ave Intersection Waco Street Looking West from El Paso Ave Intersection 10

Avenue B Looking South at Crossing 2 Avenue B Looking South at Crossing 2 11

Drainage Sub-Basins Avenue B Outfall Hydrology Hydraulics 7 2 1 3 4 6 5 Ave B 1 Crossing/Driveway 12

Hydraulics Profile 25-Year Existing and Proposed Water Surface 5-Year Existing and Proposed Water Surface Proposed Profile (Bottom) 7 2 3 5 4 1 6 Existing Channel Profile (Bottom) Ave B Proposed Improvements Culvert (Add Alt No. 4) Under Mustang Regrade Channel (Add. Alt. No. 3) 6 x3 Underground Culvert 7 4 1 Ave B 2 6 3 (Add. Alt. No. 1) 5 (Add. Alt. No. 2) 1 Crossing/Driveway 13

Proposed Improvements Regrade Channel (Add. Alt. No. 3) Culvert (Add Alt No. 4) Under Mustang 6 x3 Underground Culvert 2,3 1 (Add. Alt. No. 1) (Add. Alt. No. 2) Avenue B Crossing 1 Looking East At Outfall (3) 48 Reinforced Concrete Pipe (RCP) Under Avenue B 14

Avenue B Crossing Looking North Existing Conditions 2 (3) 48 RCP Under Avenue B Avenue B Crossing Looking North Proposed Improvements 2 Concrete Channel (Base Bid) (2) 10 x6 Reinforced Concrete Box Culvert Under Avenue B 15

Avenue B Channel Looking North Existing Conditions 3 Underground 72 corrugated metal pipe to be removed Concrete junction box to be removed Avenue B Channel Looking North Proposed Improvements 3 16

Proposed Improvements Along Avenue B 2 20 TYP 3 Metal beam guard fence Seal Coat Avenue B Centerline Avenue B Existing fences to be replaced 1 1 5 6 Concrete Plating Full depth pavement spot repairs in rutted areas along edge TYPICAL SECTION ALONG AVENUE B Proposed Improvements Regrade Channel (Add. Alt. No. 3) Culvert (Add Alt No. 4) Under Mustang 6 x3 Underground Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) 17

Avenue B Channel Looking North Near Crossing 2 Existing Conditions 5 x7 box culvert to be removed 72 corrugated metal pipe to be removed Avenue B Channel Looking North Near Crossing 2 Proposed Conditions 10 x5 Reinforced Concrete Box Culvert Under New Driveway 10 x6 Reinforced Concrete Box Culvert Under New Driveway 18

Proposed Improvements Regrade Channel (Add. Alt. No. 3) Culvert (Add Alt No. 4) Under Mustang 6 x3 Underground Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Avenue B Channel Looking North Near 8th Street Existing Conditions 5 x7 box culvert to be removed 19

Avenue B Channel Looking North Near 8 th Street Proposed Conditions Trees and shrubs to be removed 10 x5 Reinforced Concrete Box Culvert Under New Driveway Avenue B Channel Looking North Near 8 th Street Proposed Conditions 10 x5 Reinforced Concrete Box Culvert Under New Driveway (Add. Alt. No. 1) 20

Proposed Improvements Regrade Channel (Add. Alt. No. 3) Culvert (Add Alt No. 4) Under Mustang 6 x3 Underground Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Avenue B Channel Looking West Near AEP Substation Existing Conditions/Proposed Conditions Trees and shrubs to be removed (Add. Alt. No. 2) 21

Proposed Improvements Culvert (Add Alt No. 4) Under Mustang Regrade Channel (Add. Alt. No. 3) Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Channel Regrading Looking South from Texas Avenue Existing Conditions/Proposed Conditions Regrade Channel (Add. Alt. No. 3) 22

Proposed Improvements Culvert (Add Alt No. 4) Under Mustang Regrade Channel (Add. Alt. No. 3) Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Underground Drainage Looking North from Texas Avenue Existing Conditions/Proposed Conditions Culvert 23

Proposed Improvements Culvert (Add Alt No. 4) Under Mustang Regrade Channel (Add. Alt. No. 3) Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Underground Drainage Looking North from Texas Avenue Existing Conditions/Proposed Conditions Culvert (Add Alt No. 4) Under Mustang 24

Traffic Control/Access South of 8th Street EMAS Marine Base Residential Property Private Driveways Heavy Road Access to S. Main (FM 1069) American Tower Corporation Koch Pipeline Driveway City Yard Avenue B Access Traffic Control/Access South of 8th Street EMAS Marine Base Residential Property Private Driveways Heavy Road Access to S. Main (FM 1069) Koch Pipeline Driveway 1-Lane, 2-Way Traffic (Flaggers) 25

Traffic Control/Access South of 8th Street Temporary Construction Easement EMAS Marine Base Avenue B Buffer Channel Residential Improvements Property Private Driveways Heavy Road Access to S. Main (FM 1069) TYPICAL SECTION 10 1-Lane, 2-Way Traffic (Flaggers) Koch Pipeline Driveway 1-Lane, 2-Way Traffic (Flaggers) WORKING HOURS (8 am to 5 pm typically) SOUTH OF 8TH STREET Traffic Control/Access South of 8th Street Temporary Construction Easement EMAS Marine Base Channel Residential Improvements Property Private Driveways 10 Koch Pipeline Driveway 10 2-Lane 2-Way Traffic 1-Lane, 2-Way Traffic NON-WORKING (Flaggers) HOURS SOUTH OF 8TH STREET (EDGE CONDITIONS PERMITTING) Heavy Road Access to S. TYPICAL SECTION Main (FM 1069) 26

Traffic Control/Access North of 8 th Street AEP Driveways Residential Driveways Traffic Control/Access North of 8 th Street 1-Way Only Traffic 27

Traffic Control/Access North of 8th Street Temporary Construction Easement EMAS Marine Base Avenue B Buffer Channel Residential Improvements Property Private Driveways Heavy Road Access to S. Main (FM 1069) Koch Pipeline Driveway 10 1-Way Only Traffic 1-Lane, 2-Way Traffic (Flaggers) TYPICAL SECTION ALL HOURS NORTH OF 8TH STREET Traffic Control/Access Oklahoma Alley Limited Access from Avenue B 28

Traffic Control/Access San Angelo Alley Alley to Be Closed Temporary Street Parking Costs and Timeframe Culvert (Add Alt No. 4) Under Mustang Timeframe: 6 to 9 Months Opinion of Probable Construction Costs Regrade Channel (Add. Alt. No. 3) $ 2,969,711.60 Base Bid: Add Alt. No. 1: $ 518,607.60 Add Alt. No. 2: $ 28,500.00 Add Alt. No. 3: $ 34,585.00 Add Alt. No. 4: $118,270.00 TOTAL: $ 3,669,674.20 Construction Budget: $ 3,712,375.00 Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) 29

Culvert (Add Alt No. 4) Under Mustang Questions and Comments Regrade Channel (Add. Alt. No. 3) Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) 30