RUVIN BROS. ARTISANS and TRADES, INC. CHANGE ORDER Change Order: 3 Date: 4/17/2018 Job Code: WDA TO: Ruvin Bros. Artisans and Trades, Inc: You are hereby directed to change the Plans, Specifications, and/or Contract (the "Construction Documents") as directed below. We agree to pay the total amount shown within ten (10) days of acceptance. 1. Delete all previous Appliance schedules. Replace with attached Appliance schedule dated 4/3/2018, showing deletion of LL dishwasher and addition of dishdrawer. 2. Delete all previous Plumbing schedules. Replace with attached Plumbing schedule dated 3/27/2018, reflecting Owner's selections. Reconcile Plumbing Fixture allowance. Page 1 of 1 1025 W. Glen Oaks Lane, (414) 354-4220 Voice (414) 354-5385 FAX
Category: Appliances This list must be completed and returned to Ruvin Bros. Artisans & Trades CUSTOMER: WDA no later than: REVISED 4-3-18 Job Address: 310 West Bonness Lane Customer Sign-off: Date: Room/Area Appliance Type Manufacturer Model Number Color Supplier Notes Lower Level Dishwasher Deleted from Scope Deleted from Scope Deleted from Scope Beverage Refrigerator Frigidaire Beverage Center FFFBC4622QS SS with glass door To have some wine storage Utility Room Full size freezer By Owner By Owner By Owner All freezer Washer Whirlpool front load WWFW85HEFC Chrome Shadow Dryer Whirlpool gas dryer WWGD85HEFC Chrome Shadow Gas Pedistals (2) Whirlpool WXHPC155YC Chrome Shadow Kitchen 48" Dual Fuel Range Viking VVDR5486GBK Black/SS Range Hood Decorative N/A N/A N/A Range Hood Liner Vent-A-Hood VBH246PSLDSS N/A KitchenAid 36" Refrigerator french door KKRFC302EPA To be paneled French door wall oven Viking VVSOF730BK Black/SS Microwave Viking VVMOD5240SS SS To be Dishwasher Bosch Built-in BSHV865WG3N paneled To be Dishwasher Fisher & Paykel DD24ST19 paneled Refrigerator/Freezer To be stacked with microwave. Oven on top To be stacked with wall oven. Microwave on bottom Page 1 of 1
Add dishwasher drawer per appliance selection sheet date 4/3/18 Delete dishwasher from drybar Appliance Selection Specifications: 06-520 Cabinetry -Additional costs or credits will be addressed on a future Change Order when this allowance is reconciled. 06-710 Finish Carpentry -Additional costs if any will be addressed on a future Change Order when this allowance is reconciled. 09-410 Interior Finishing -Additional costs will be addressed on a future Change Order when this allowance is reconciled. 11-105 Appliances -Supply and install appliance per Appliance schedule dated 4/3/18 11-420 Cabinet Hardware -Additional costs or credits will be addressed on a future Change Order when this allowance is reconciled. 15-110 Plumbing -Supply additional water line and drain for added dishwasher in Kitchen (plumb for air gap to be under counter) -Delete water line and drain for existing dishwasher in Lower Level (deleted from scope) 16-110 Electrical -Verify no additional electrical charges are required per Appliance schedule dated 4-3-18 -Delete electrical outlet for dishwasher at lower level Dry Bar area -Add electrical outlet for specified additional dishwasher at Kitchen
Category: Plumbing This list must be completed and returned to Ruvin Bros Artisans and Trades CUSTOMER: WDA no later than: REVISED 3-27-18 Job Address: 310 West Bonness Lane Customer Sign-off: Date: Room/Area Fixture Type Manufacturer Model Number Color Notes Lower Level Mechanical Room Utility Sink M15G, Include molded mounting block FPLTBLK Mustee White Utility Sink Faucet Pro Flo PF244 Chrome Lower Level Bathroom Toilet Kohler Wellworth K4199-0, K4467-0 White Cover Kohler soft close K4636-0 White Supply Per Plumber Per Plumber Chrome Vanity Sink By Owner By Owner By Owner Sink to be located in LL Mechanical Room adjacent to water treatment equipment along South wall Vanity Faucet American Standard A7722101002 Chrome To include drain assembly Lower Level Bar Sink By Owner By Owner By Owner To include drain assembly Faucet Pfister Marielle PGT72M1YY Tuscan Utility Room Sink Blanco Liven B401926 Truffle Basket Strainer Pro Flo PF1432SS Stainless Steel Faucet Moen Brantford M5985 Stainless Steel Kitchen Sink Blanco America Performa B441313 Café Brown Double bowl, under mount Basket Strainer Blanco Decorative Basket Strainer B441094 Café Brown Waste Flange Blanco B441099 Café Brown Faucet Newport Brass Metropole N1200-5103/10B Satin To include drain assembly Air Gap To be located under counter Per Plumber N/A Garbage Disposal Insinkerator Septic Assist ISEPTICASSIST N/A Page 1 of 3
Category: Plumbing Room/Area Fixture Type Manufacturer Model Number Color Notes Air Activated Dispenser Switch Newport Brass N111/10B Satin Powder Room Toilet Kohler Tresham K4899-0, K4799-0 White Cover Kohler Glenbury K4733-0 White Trip Lever Kohler K9375-2BZ Supply Per Plumber Per Plumber Native Trails, Morro Vanity Sink vessel sink NNSL1705S Slate Push Up Drain Native Trails NDR130ORB RA1477XMTCB2 Acqui wall mount Tuscan Brass with cross handles Vanity Faucet Rohl Master Bathroom Toilet Kohler Tresham K4899-0, K4799-0 White Cover Kohler Glenbury K4733-0 White Trip Lever Kohler K9375-2BZ Supply Per Plumber Per Plumber Vanity Sinks (2) Kohler Archer K2355-0 White Vanity Faucets (2) Kohler Margaux K16232-4-SN Polished Nickel To include drain assembly Soaking Tub Hydrosystems HSBRE6636ATOWHI, Breanne White 66" x 36" Soaking Tub Faucet Kohler Margaux K-T97331-4-SN, with 97339-NA Polished Nickel Shower Drain Kohler K9135-SN Polished Nickel Shower Valve Kohler KP8304-K-NA N/A Shower Trim Kohler Margaux KTS16234-4-SN Polished Nickel Transfer Valve Kohler K728-K-NA N/A Transfer Valve Trim Kohler Margaux KT16242-4-SN Polished Nickel 30" Hand Shower Slide Bar Kohler K8524-SN Polished Nickel To include drain assembly and stack supply Page 2 of 3
Category: Plumbing Room/Area Fixture Type Manufacturer Model Number Color Notes Slide bar escutcheon trim Kohler K14790-SN Polished Nickel Hand Shower Hansgrohe H28548831 Polished Nickel 60" Hose Kohler K9514-SN Polished Nickel Supply Elbow Kohler K355-SN Polished Nickel Vaccuum Breaker Kohler K9660-SN Polished Nickel 2nd Floor Bathroom Toilet Kohler Wellworth K4199-0, K4467-0 White Cover Kohler soft close K4636-0 White Supply Per Plumber Per Plumber Chrome Vanity Sink By Owner By Owner By Owner Vanity Faucet Valve Moen M69000 N/A Vanity Faucet Moen, Dartmoor MT2183 Chrome Tub-Shower Unit Mirabelle MIRBDS6032RWH White Drain Pro Flo PFW0350 Chrome Tub-Shower Valve Moen M62320 N/A Tub-Shower Trim Moen, Dartmoor MT2183 Chrome Jack and Jill Bathroom Toilet Kohler Wellworth K4199-0, K4467-0 White Cover Kohler soft close K4636-0 White Supply Per Plumber Per Plumber Chrome Vanity Sinks (2) Kohler, Archer K2355-0 White Vanity Faucets (2) Moen Brantford MOE6600 Chrome Shower Drain Pro Flo PF42801 Chrome Shower Valve Moen M62320 N/A Shower Trim Moen, Brantford MT2152 Chrome To include drain assembly, NO Escutcheon To include shower arm, head, hand held and valve trim Page 3 of 3