Adaptation of the former Royal Naval College buildings to meet the functional and technical requirements of a modern university

Similar documents
NHS DUMFRIES & GALLOWAY - NITHBANK

UPDATE ON ESTATES AND FACILITIES PROJECTS APRIL Projects Completed within last 24 months. 1. Richmond and Workshop Cladding ( 6.

Fire Enforcement Report

History at Kensington Palace

COUNCIL HEALTH, SAFETY AND WELLBEING COMMITTEE. Projects Update

Sir Christopher Hatton Academy A Member of Hatton Academies Trust

Riverside References

2bPlanning Scheme. Appendix. Conservation - Removal of Structures. Grangegorman

SAVE OUR STRAND. Image Landsat Image 2015 The GeoInformation Group Data SIO, NOAA, U.S. Navy, GEBCO

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

PROJECT PORTFOLIO 2010

The 20 Bedford Way Masterplan

Role of Universities in city renovation process and in shaping it s international brand.

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

Design Guidelines Fire Safety in New and Refurbished Buildings

6. Bermondsey 6.1. Bermondsey Area Vision

FIRE SAFETY POLICY Revised March 2013

Energy Conservation Procedures

SPECIAL EDUCATIONAL NEEDS

Fire Procedures. April 2016

FIRE SAFETY POLICY April 2011

OTHER STATUTORY AND NON-STATUTORY BODIES

EMERGENCY EVACUATION PROCEDURE Temporary Instructions w.e.f 5 th September 2018

EMERGENCY EVACUATION PLAN

Archaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

Fire safety policy. Contents. This policy was approved by the Trustees on 3 September 2015 and will be reviewed not later than every 3 years.

University of London

EXCELLENCE AS STANDARD

Friends of Callan Park THE FUTURE OF CALLAN PARK: A SUGGESTED VISION AND WAY FORWARD

Highland Council Allotment Policy

Inspiring places for critical thinking. Buildings/ Post-secondary education

Carbon monoxide (CO) is a colorless, odorless gas that is the product of incomplete combustion of carbon-based fuels.

Refurbishment of 36 Fenian Street, Dublin 2

PLATTEVILLE MIDDLE SCHOOL

r.i.s.e demonstration center

DOWNTOWN FACADE GUIDELINES COMMUNITY DEVELOPMENT DEPARTMENT

Contractors Site Induction

TOWN AND COUNTRY PLANNING ACT SECTION 79 AND TOWN AND COUNTRY PLANNING (INQUIRIES PROCEDURE) (ENGLAND) RULES 2000 STATEMENT OF CASE OF

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

Proposals for the regeneration of Standard Quay, Faversham, Kent

Electronic Safety and Security

APPENDIX 9 HERITAGE CHARACTER

Delivering on Education. Spotlight on Sir Isaac Newton

2. Closed circuit television, design and installation.

REVIEW OF ENVIRONMENTAL FACTORS HUDSON LIBRARY FIT OUT FOR MERIDEN SCHOOL, STRATHFIELD NSW

NOTTINGHAM CITY HOMES

Group Executive Liveability and Natural Assets

CITY OF HELSINKI ACCESSIBILITY GUIDELINES

242 neighborhoods NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY)

Michigan State University s Marshall-Adams Hall Undergoes $6 Million Historic Rehabilitation

Bush House buildings. Contractor Site induction

UNITED KINGDOM. Maritime Greenwich. 1. Introduction. 2. Statement of Significance. State of Conservation of World Heritage Properties in Europe

Millfield Schools Fire Risk Prevention Policy

RIBA response to the second phase of the Independent Review of Building Regulations and Fire Safety

Higher Uppacott: A Dartmoor Longhouse

ENERGY EFFICIENCY IN HOSPITALS- A CASE STUDY

Fire protection documentation. CFPA-E Guideline No 13:2015 F

04Design. Methodology. Future of Jacksons Hill Identifying Potential Uses Building Typology and Adaptability Community Engagement

Fire Safety Policy. Contents. This policy was approved by the Trustees on 6 September 2018 and will be reviewed not later than every 5 years.

WILLASTON MEMORIAL HALL REGISTERED CHARITY NUMBER FIRE RISK ASSESSMENT

Annemount School Fire Safety Policy This Policy is for the whole school including the EYFS

DISABILITY SERVICES FIRE & LIFE SAFETY AUDIT MARCH 13, 2013

Alterations to a Designated Heritage Property and Authority to Amend a Heritage Easement Agreement Queen's Park

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

EDINBURGH URBAN DESIGN PANEL The Old Royal High School

FIRE SAFETY POLICY. Executive Management Team. Health, Safety and Fire Steering Group.

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

CYS National Annex to CYS EN :2002

UNIVERSITY OF TORONTO FACULTY OF LAW

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

12 th Pacific Science Inter Congress HEALTH AND SAFETY INFORMATION BOOKLET FOR PARTICIPANTS

Contractor Site Induction. Hampstead Residence London NW3 7ST

CYNGOR SIR POWYS COUNTY COUNCIL

PDA SUBMISSION: Queen s Wharf, Brisbane (DEV2017/846)

Singapore International School (Hong Kong) Secondary School Campus

Technical Report Three

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

Gillingham Hall Norfolk

Contractors Site Induction

Fire and Emergency Evacuation Procedure

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

Guidance for writing a Personal Emergency Evacuation Plan (PEEP)

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

r.i.s.e demonstration center washington, dc project category: architecture

HERITAGE COUNTS 2017 East of England

Durrington. Roll of Honour

A guide to landlords duties: Gas Safety (Installation and Use) Regulations What type of property is covered?

BUILDING MANAGEMENT SYSTEMS. Introduction to Building Management Systems

HISTORICAL AND SOCIAL SIGNIFICANCE PHOTOGRAPH: M.VAIR-PIOVA, 2014

Telephone:

SWLP 42: Worcester City Centre

Health and Safety Services. Safety Guide 5. Fire drills

UNIVERSITY OF OXFORD FIRE RISK ASSESSMENT

RFP Addendum 2 March 31, 2016

Washington Irving Elementary School

The Garden Museum is situated in the medieval and Victorian church of St-Mary-at-

Welcome to Nola Electrical

Transcription:

Dannatt, Johnson Architects LLP Adaptation of the former Royal Naval College buildings to meet the functional and technical requirements of a modern university Presented by: Jonathan Parry

Founding of the site The freeholder of the site is Greenwich Hospital, a crown Charity established in 1694 under the names of King William and Queen Mary. For The reliffe and support of Seamen serving on board the Shipps and vessells belonging to the Navy Royall..who by reason of Age, Wounds or other disabilities shall be uncapable of further service..and be unable to maintain themselves.

Housing of Navy Veterans 1696-1751: The buildings were constructed on the site of the Tudor Palace of Placentia in four phases

1764-1768: The dedicated infirmary by James Athenian Stewart constructed to the west of the main buildings.

Buildings met their purpose of housing veterans of the Royal Navy until 1869

The Royal Naval College From 1873 the buildings were occupied by the Royal Naval College which transferred to Greenwich from Portsmouth. Buildings were converted to suit the new functions, living accommodation was maintained in Queen Mary along with the riverside apartments for senior officers in Charles and Anne. The open wards in Anne housed the Naval museum.

Alterations for original Naval College use Many of the spaces were partitioned to provide class rooms and accommodation. The spine walls to the north side of the west range of Anne were cut away to establish lecture theatres.

1870: The Infirmary was taken over by the Seaman's Hospital Society dedicated to the medical care and welfare of merchant seamen And renamed the Dreadnought Seamen s hospital after the medical hulks used previously for the purpose and moored in the Thames.

War 1939-44 Serious damage to the Infirmary and Queen Mary building in 1940 by enemy action: The roofs and face of Queen Anne and King William also damaged later in the war.

Post-War Naval use Buildings continued to be adapted for use by the Navy, under crown immunity from the planning system. Adaptations included the installation of nuclear reactor in William, in the South East range, removal of contra flowing stairs in Queen Mary to install lift to all floors and general servicing. 1983: Buildings served as Joint Defence College.

End of Government control. 1986 : The Infirmary by James Athenian Stewart was closed and left un-occupied, lack of use and maintenance led to it being entered on the English Heritage At Risk Register. 1995 : The main part of the Naval college site was determined to be inadequate for the activities of the Joint Services Defence College and the Secretaries of State for defence and national heritage issued invitations for expressions of interest from organisations able to propose appropriate uses for the buildings.

As part of vacation of the buildings the Ministry of Defence embarked on a series of works to begin to meet requirements of regulations including addition of some escape stairs, decommissioning and removal of the training reactor and decontamination of the affected areas of the King William Building.

University interest in the site. Greenwich University were already looking looking for a presence in Greenwich, at the Dreadnought Seamen s Hospital, when the potential for the acquisition of the main Royal Naval College buildings was announced. Dannatt Johnson assisted the University with strategic master-planning advice that helped inform their bids for the reuse of the historic buildings.

1997 : The Greenwich Foundation for the Royal Naval College - a charitable trust was established in and given responsibility for the site Three of the primary buildings are leased to the University of Greenwich with the forth being leased to Trinity College of Music.

Master-planning Greenwich University buildings The proposed uses within the buildings were very much a function of the types of spaces available and the order in which the buildings were to be vacated by the Joint Defence College. Large wards and compromised spaces could contain classrooms and Lecture theatres. Cellular residential accommodation could provide suitable spaces for offices. Vertical communications could be located in areas already compromised with services risers and inserted staircases.

Phase 1 Queen Anne & Dreadnought Vacated first, provided the offices for the senior management and academic base along with teaching facilities. At the same time the Dreadnought was restored and provided the new campus with its learning resource centre and computing facilities.

Phase 2 Queen Mary The Officers accommodation block was initially considered to be re used for the same purpose during initial discussions, however due to the cellular nature of most of the spaces was converted to provide offices and school administration accommodation. The under provision of power required for the University was also addressed by the construction of a new subterranean transformer chamber beside the east gate lodge.

Phase 3 King William Additional Lecture Theatres, Teaching Spaces and computing facilities Queen Mary: Fourth floor Computing suite.

Adapting the buildings. The tight time scale for occupation required a design and build approach to procurement of the services installation for the contractor. This required considerable time and input was invested at concept stage to achieve a well-engineered and maintainable services installation with appropriate routes and specific and generic interventions agreed with the monument inspectors. The contractor had some flexibility in the final installation on the basis that only existing services routes could be used and any deviation required the specific agreement of the Design Team and an application for scheduled monument consent.

Buildings incorporate a completely new backbone of services. including: IT infrastructure, electrical distribution, sophisticated audio visual systems and radio fire and intruder alarm systems The buildings are linked via fibre optic cables to the site wide Building Management System (BMS), providing energy efficient control of lighting and mechanical plant.

Queen Anne. The initial challenge was to remove the inappropriate accretions of the last 300 years where the Navy had adapted the building to changing requirements, adaptation of the ward spaces, to their larger forms to provide teaching rooms and breakout spaces.

With the services engineers we reviewed all existing and potential services routes through the building with a view to reducing the numbers of vertical service risers and keeping horizontal pipe lengths to a minimum.

Queen Mary The tendency of the Navy was to compartmentalise and sub divide. This process was reversed by the University that reopened the clerestory lighting into the corridors reducing the reliance on artificial light.

Number of service risers locations in the building reduced by 50%.

Existing Services routes reused.. New service routes to be reversible and require minimal alteration to the existing fabric.

King William The adaptations during occupation by the Royal Naval College Department of Nuclear Science made it one of the most compromised of the buildings and the open spaces were suitable for a number of high capacity lecture theatres and computer rooms.

The building has been completely re-serviced, including provision of several plant rooms and a new boiler room in the roof.

The resultant need for mechanical ventilation and air conditioning services to be integrated as part of the refurbishment to the satisfaction of English Heritage.

No new openings could be formed within the external fabric, so all existing dormers and roof openings have been adapted, and the South Range chimneys rebuilt without internal divisions to form new air handling intakes and exhausts. A recessed well for cooling condensers has been formed above internal laylights, where at one time there was roof glazing.

Flues were checked for continuity, some were used as routes for ductwork, others left to provide spaces with natural ventilation.

The Dreadnought Many of the internal walls between wards, and those on to the corridor, were removed over the life of the Hospital to create larger wards and other medical requirements, such as operating theatres, in the early 20th century. The renovation just completed has retained many of these more open areas, as well as the surviving four-bed wards

Future strategies for carbon reduction at the Maritime Greenwich Campus. The University has initiated a carbon reduction program across its organization. Target 30% reduction on 2009 levels by 2015 40% reduction on 2009 levels by 2020

Changes to the current installation at the Royal Naval College to meet their overall targets include: Engineering: Thermostatic controls to all heaters Improve on the existing zoned control on the BMS and provide a link to the lighting Variable speed drives on the heating system Improve on ventilation requirements and performance, possibly removing some of the existing units Considering removal of server rooms from site to new purpose built installation off site Improve lighting controls from PIR to microwave sensing units Boiler replacement program commencing in 4-5 years, with possible early replacement of burners for more efficient units.

Training and software improvements: Raise staff awareness of issues and improve training Software to PCs to enable switch off remotely controlled via signal across university network Fabric improvements: (Largely outside the control of the University as facades, windows and roof are the responsibility of the foundation) Minimal areas where the University can apply insulations within the roof void

Thermal elements considered weak that the University would address if there were no obstacles Windows: via either secondary glazing or improvement of seals