Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1

Similar documents
BULLETIN. Temperature Controls (10/2013)

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

BULLETIN. Temperature Controls (VAV) (3/11/2010)

BULLETIN. Temperature Controls (Chilled / Hot Water)

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

Exhibit J. Subcontract Agreement No.

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL

Subcontract Agreement No.

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Virginia Tech Standards for Building Automation System

BULLETIN. Permitting Tips (11/10)

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS

SPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE CHEETAH Xi 50 CONTROL PANEL SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE SHP PRO CONTROL PANEL SYSTEM

Fire alarm system specification for multiple tenant retail buildings

Bold items are particular to the City of Euless

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPULSE VALVE, FK AGENT & CHEETAH Xi 50 CONTROL PANEL

BID PROPOSAL-REVISED

CxA to Answer this Section

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

SECTION FIRE DETECTION AND ALARM

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPULSE VALVE, FK AGENT & CHEETAH Xi CONTROL PANEL

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPUSLE VALVE, Fike FK AGENT & SHP PRO CONTROL PANEL

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

SECTION SECURITY TESTING AND COMMISSIONING

DACC Health Sciences Building Air Handler Assessment/Study

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

DONALD H. BERG, ARCHITECT

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

SUBJECT: Effective Date: Procedure Number:

Engineering and Design of Fire Alarm Systems

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

BID FORM CITY OF BEVERLY HILLS. The undersigned, having carefully examined the site conditions and the Contract Documents for

Florida Department of Transportation

NOTICE TO ALL FIRMS. Bid RFI Questions and Answers

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

Commercial Remodel/ Add On Rules and Regulations

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

Brighton Area Fire Authority

FEATURES AND BENEFITS

University of Houston Master Construction Specifications Insert Project Name

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

SECTION INTRUSION DETECTION

CONTENTS AUTOMATIC TRANSFER SWITCHES

The following information shall become and form part of the contract documents.

Technical Assignment 3 11/15/04. Executive Summary

SECTION INSPECTION AND TESTING OF WORK

DOCUMENT ADVERTISEMENT FOR BIDS

Safety & Installation Instructions

Building Automation System (BAS) Design Criteria

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

Job Name Control Systems Description Date

CARD ACCESS CONTROL SYSTEM

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET

Valuation: # of Plans Submitted: # of pages: Type of Work (select one): New Addition Existing System/Modification Project Name: Scope of Work:

September 30, Dear Fire Suppression System Contractor/Designer:

Fire Alarm, Water Flow Alarm & Signaling Systems

Commercial Rules and Regulations

FIRE & LIFE SAFTEY STANDARD

SECTION INTEGRATED AUTOMATION COMMISSIONING

Safety & Installation Instructions

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Contact Phone Number: (609) Fax: (609)

Instrumentation and Control for HVAC

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

15900 HVAC INSTRUMENTATION AND CONTROLS

A. Section Instrumentation and Control Devices for HVAC. B. Section Building Automation Systems(BAS) for HVAC

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

City of Duluth Festival Center 04/25

FIRE SUPPRESSION SPRINKLER SYSTEM

CALIFORNIA DEPARTMENT of FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL UL 300

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

CHENNAI METRO RAIL LIMITED ADDENDUM-1. for

Transcription:

12/4/2017 Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1 This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant Responsibility: 1. The Tenant will be providing their own heat pump unit(s). 2. Unit power is by tenant. Tenant to provide permanent power prior to Roth Bros. commissioning. a. A power whip (wires enclosed in some form of flexible protection) from the units disconnect or a dedicated circuit from the tenant s breaker panel must be in place prior to installation. 3. Tenant shall provide a 2 x 4 junction box mounted vertical with conduit stubbed to ceiling space for each temperature sensor (installed by division 16). The location of this box must be the same as the location indicated of the final approved construction drawings. If relocation is necessary then this must be approved by the landlord and a change order issued by the tenant before the sensor will be moved. 4. Tenant shall have ceiling, walls, ductwork and electrical equipment powered to HVAC equipment completed and ready for installation. 5. Tenant will manually open condenser water valves 100% before performing final system flushing. 6. CA/Tenant shall provide 72 hour written notice by tenant s contractor to Roth Bros., Inc. when tenant space is ready for temperature controls installation. 7. Tenant shall provide the following information for equipment purchase: a. Tenant name and space number b. Number Heat Pumps units. c. Heat Pump Submittals for units to be installed d. Estimated start time. e. Estimated completion date. f. General contractor name and phone number g. Mechanical contractor name and phone number. 8. Fax copy of all completed items to Roth at 330-799-3369 or email to krowley@rothbros.com. 9. Submit complete payment to Roth Bros to initiate equipment order and schedule work. Fax 330-799-3369 or email krowley@rothbros.com. 10. A check is to be issued for the Total Price before Roth proceeds with parts order. 11. The payment must be in the form of a certified check or company check (no personal checks). Please send checks attention - Laura Fonce 12. All low voltage step-down transformers will be factory mounted and ordered by the tenant. A 75va transformer is required with terminations provided for EMS 24vac power. 13. Provide installation labor after Tenant Electrical and Mechanical Rough in. See below Appendix I and III. 14. Tie-in of junction box to Landlord s system. Note: If Roth Bros. or their subcontractor responds to tenant s request for temperature control installation and the above requirements are not complete or requires partial installation of the control system or any problems are created by other contractors the applicable fees will be billed. See Appendix IV.

12/4/2017 Roth Bros. Responsibility: 1. Provide Andover controller per unit. 2. Provide space temperature sensor per unit. 3. Provide Supply Air Temperature Sensor per unit. 4. Provide Mixed Air Temperature Sensor per unit. 5. Provide control transformer. 6. Provide all control cable. 7. All programming. 8. System commissioning. Simon Responsibility: 1. Facilitate work between tenant contractor and Roth Bros. EXCLUSIONS: 1. The following items are not included: 2. Installation labor by tenant mechanical/electrical contractor. If required, Roth will quote installation labor on a per tenant basis. 3. Heat Pump Unit supplied by Tenant 4. Waterside Economizer valve. 5. Smoke detectors or the installation and/or interlock wiring of smoke detectors 6. Fire Alarm tie-in 7. Installation of Fan Coil Unit 8. Air and water balance (by Tenant contractor) 9. Disconnect/Starter for unit 10. After hours labor (All after hours labor will not commence until a signed purchase order has been sent to Roth Bros., Inc.) 11. Any scope deviations from the final bid set of Tenant Drawings provided to Roth by Tenant Architect or Engineers.

12/4/2017 Appendix I Typical Unit Layout Note: Units waterside economize valve to be furnished with unit, and sequenced by manufactures internal controls. Tenants design team is responsible to determine economizer requirements to comply with the city of Fort Worth s adaption of IECC 2009 IECC See Appendix III for installation and supplier responsibilities.

Appendix II EMS Equipment Specification and Cost Breakdown Notes: 1. Tenant may purchase from other vendor. 2. If infinet communication cable is not purchased through Roth Bros., Inc., contractor must follow cable specification (Great Lakes Wire P/N: D-73601SG-OR). Please have Roth Bros., approve cable prior to purchase. 3. Item supplied by Roth Bros., Inc. No Exception Roth Bros, Inc. contact and pricing information: Kristina Rowley 3821 Crum Road Youngstown, Ohio 44515 Office: 330-270-4905 Fax: 330-799-3369 krowley@rothbros.com

Appendix 3 Responsibility Matrix Task Description Tenant Mech. Furnish Tenant Mech. Install Roth DDC Furnish Tenant Elect. Furnish HVAC Controls Hardware (Control Panels) x x Conduits and back box for T-Stat/Sensor x x BAS Communication cabling x x Tempered Water Isolation Valve x x 120v/240v/277v/480v to Control Panel x x AHUs x x Duct Heater x x x Minimum OA Damper provided x x All Other Control Dampers or VAV/FPB's x x Control Valves and OA Damper Actuator x x Tenant Elect. Install Starters and or Contactors x x x Test and Balance x Terminal Boxes VAV / FPB x x DDC Controller Flow Transmitter Flow Cross x x 120v/240v/277v/480v to Control Panel x x Conduits and back box for T-Stat/Sensor x x Test and Balance x x Heat Pump Units Heat Pump Unit(s) x x Conduits and back box for T-Stat/Sensor x x 120v/240v/277v/480v to Control Panel x x Test and Balance x x Fire Alarm System / Smoke Detectors Hardware - Smoke Duct Detectors x x Addressable equipment shut down relays x x Power / Shutdown Cabling x x Remote Reset x x x x Commissioning x x x x x

Appendix 4 Potential construction change order items Description of problem Transformer replaced due to Tenant improper Power Wiring Replace Andover Microprocessors Controllers Rewire units contactors Rewire Unit Factory Controls due to Tenant altering Remobilization to site after the Initial Installation Checkout * Replace the Rewired Damage Cabling (Comm or other) Rework Factory Mounted Dampers not to Simon Spec Power Control Box (Item #1 Bulletin #2 of Simon TC Doc.) Adding Space Sensor if initial rough in was not performed Premium Labor Lift charge if not provided by Tenant G.C. Cost/event Please Contact Kristina Rowley for pricing Note: Note a per unit charge See Change Order below

Appendix V Sequence of Events 1. Elec. rough-in temperature sensor conduits prior to sheetrock and stub-out above ceiling. 2. Mechanical rough-in of ductwork 3. Control rough-in of communication and stat wiring 4. Mechanical equipment installation 5. Mechanical complete piping, ductwork, smoke detectors, & drain pan. 6. Control power installed adjacent to controller location, unit and duct heater power completed and smoke detectors wired to unit for shutdown. 7. Prior to ceiling grid, the control panel, unit sensors should all be installed. 8. Complete mechanical start-up fan rotation, etc. are completed by unit manufacturer or certified mechanical contractor. I have read this bulletin and understand all of its contents General Contractor: Representative: Mechanical Contractor: Representative: Electrical Contractor: Representative:

3847 Crum Rd. Youngstown, Ohio 44515 Phone: (330) 793-5571 Fax: (330) 799-3369 CHANGE ORDER Request No Page No. 1 of 1 Pages C.O. Request Submitted To: Phone: Date: Street: Job Name: City, State and Zip Code: Job Location: Contact: Date of Plans: Job Phone: We hereby propose the furnished material and labor necessary for the completion of: Total $0.00 QTY. Unit Cost Tax inc. Shipping (Overnight) inc. Total $0.00 WE PROPOSE hereby the furnished material and labor - complete in accordance with above specifications, for the sum of: Payments to be made as follows: All material is guaranteed to be completed in a substantial workmanlike manner according to specifications submitted, per standard practices. Any alterations or deviations from above specifications involving extra cost will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance. Authorized Signature James H. Fitzgerald Note: This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF CHANGE ORDER The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payments will be made as outlined above. Date of Acceptance: Signature Signature