Errata 1 Landmark Apartments Project Final Environmental Impact Report

Similar documents
Stephanie Eyestone-Jones l President Matrix Environmental l 17 September 2013

Tips on Writing to the Planning Commission

DRAFT ENVIRONMENTAL IMPACT REPORT NORTH HOLLYWOOD-VALLEY VILLAGE COMMUNITY PLAN AREA

City of Los Angeles Department of Public Works

~P'~'~; SAN FRANCISCO

SAN FRANCISCO PLANNING DEPARTMENT

September 20, 2017 ENV EIR

Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University

California Environmental Quality Act (CEQA) Environmental Review Process

FINAL ENVIRONMENTAL IMPACT REPORT

WESTSIDE SUBWAY EXTENSION PROJECT. Addendum to the Visual and Aesthetic Impacts Technical Report

REQUEST FOR CHANGE TO APPROVED AMBASSADOR WEST PROJECT AND VARIANCE #I 1669 FOR 182 SOUTH ORANGE GROVE BOULEVARD (MAYFAIR MANSION)

The principal elements of the NTC Strategic Vision plan are as follows.

A 3: Scoping Meeting Materials

Chapter 22. Alternatives to the Proposed Project

Chapter Master Planned Communities (MPC) District

III. PROJECT DESCRIPTION

PLANNING COMMISSION JUNE 7, 2018 PUBLIC HEARING

IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS 1. VIEWS

City of Los Angeles January FIRE PROTECTION

City of Los Angeles CALIFORNIA NOTICE OF EXTENSION

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

Addendum to Environmental Impact Report

DRAFT. 10% Common Open Space

SAN FRANCISCO. x ~ OT`s 0~5` PLANNING DEPARTMENT. Certificate of Determination COMMUNITY PLAN EVALUATION PROJECT DESCRIPTION CEQA DETERMNATION

Notice of Preparation

Subject: 30 Otis Street, Evaluation of Shadow on Proposed 11th and Natoma Park

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

County of Los Angeles

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

2.0 THE PLATINUM TRIANGLE VISION

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING: VERMONT CORRIDOR PROJECT

Attachment No. 8. SUMMARY OF IVY STATION INITIAL STUDY/MITIGATED NEGATIVE DECLARATION (IS/MND) COMMENTS RECEIVED AND RESPONSES February 2016

ADDENDUM TO THE LOS ANGELES TRADE-TECHNICAL COLLEGE THIRTY YEAR MASTER PLAN EIR (SCH NO )

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

SAN FRANCISCO PLANNING DEPARTMENT ,~} DCfav~ 7_ ~/s' 1s5oM~ss~o~s~. Suite 400 San Francisco, CA

A. INTRODUCTION B. METHODOLOGY

4 January 11, 2012 Public Hearing APPLICANT:

IV. ENVIRONMENTAL IMPACT ANALYSIS I. PUBLIC SERVICES 1. FIRE PROTECTION

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

RECIRCULATED NOTICE OF PREPARATION/NOTICE OF PUBLIC SCOPING MEETING

Prepared by: Casey Kempenaar, Senior Planner

ROCKEFELLER UNIVERSITY

Town Center (part of the Comprehensive Plan)

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

Jordan Harrison, Planner III, San Francisco Recreation and Park Department

ARLINGTON COUNTY, VIRGINIA

DESIGN REVIEW COMMITTEE AGENDA ITEM

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE WEST BROADWAY SPECIFIC PLAN COMMENT PERIOD

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION

REPORT TO PLANNING COMMISSION

Public Hearing April 12, Information as of April 12, 2018

Clairtrell Area Context Plan

MEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/

Millbrae TOD #2 Project Analysis

July 6 th, Re: The Sugarmont Apartments Planned Development. Dear John,

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

IV.B. VISUAL RESOURCES

Certificate of Determination EXEMPTION FROM ENVIRONMENTAL REVIEW

Appendix D Community Impact Assessment

shown on the following page.

SOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016

PLANNING COMMISSION STAFF REPORT

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

MEMORANDUM. California State University Channel Islands Evacuation Planning Analysis

Santa Monica Chamber of Commerce DSP Subcommittee s DSP EIR Scoping Comments and Preliminary Comments on the DSP Framework

4.11 TRAFFIC Existing Conditions Existing Project Site. Existing Street System

Section 4.11 Traffic and Transportation 4.11 TRAFFIC AND TRANSPORTATION

TABLE OF CONTENTS. Tables Table UC Davis Park and Open Space Resources

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

Roy L. Wickland 15 Belvedere Avenue - Belvedere, CA 94920

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

RIVERSIDE, Newton MA June 9, 2011

IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS 1. SHADE/SHADOW

Staff Planner Ashby Moss

November 9, Lew Jones, Director of Facilities Berkeley Unified School District 1720 Oregon Street Berkeley, CA 94703

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

.+-M,.-,.+*,,A,--< ;:--t fi. ;,==: r ) i Q ; ',,(.:,*> 8 I-="' e$ ,; \!!&,,u

ARLINGTON COUNTY, VIRGINIA

SEATTLE PACIFIC UNIVERSITY MIMP Condition Status Matrix: July 1, 2015 June 30, 2016

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

Planning Commission Report

Regarding actual construction when development occurs, the following applicable guidelines are provided to address public safety issues:

ENVIRONMENTAL IMPACT ANALYSIS PUBLIC SERVICES: FIRE PROTECTION 1. INTRODUCTION

SPECIFIC PLAN Requirements

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

STREET DESIGNATIONS AND STANDARD ROADWAY DIMENSIONS

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

Transcription:

Errata 1 Project Final Environmental Impact Report This document addresses proposed refinements to the Project evaluated in the (EIR or Final EIR) prepared in September 2016. Specifically, in response to community input, the Project has been refined to expand the size of the publically accessible open space area as described in further detail below. A. Project Refinements As shown in the attached Refined Site Plan, the Applicant proposes to expand the privately maintained, publicly accessible open space area from approximately 18,000 square feet to approximately 40,544 square feet. The expanded open space area would consist of landscape and hardscape features including seating areas, pedestrian pathways, raised planters, perimeter planters, and shade trees. As set forth in the EIR, all planting areas would be designed with a variety of drought-tolerant, low-maintenance plant species. The open space area would be open to the public from approximately 8:00 A.M. until sunset with controlled access provided via retractable gates. As a result of the expanded open space area, the following refinements to the Project would occur: Open Space With the expanded open space area, approximately 74,112 square feet of private and common open space would be provided as part of the Project. This would include 18,800 square feet of private open space, approximately 14,768 square feet of amenity spaces (e.g., fitness area, a community room, a lounge, a terrace, and a pool deck), and the expanded 40,544 square feet of privately maintained, publically accessible open space area. With the expanded open space area, the Project would exceed the private and open space requirements set forth by the Los Angeles Municipal Code (LAMC) by approximately 25,537 square feet. Pedestrian Access As shown in the Refined Site Plan, pedestrian access to the Project Site would be provided at three locations: (1) along the entry drive from Granville Avenue; (2) at the entry to the expansive open space area at the corner of Wilshire Boulevard and Stoner Avenue; (3) from a gated walkway on Stoner Avenue near the proposed apartment tower; and (4) from a gated Page 1

Errata 1 to the walkway mid-block on Wilshire Boulevard at the northwest corner of the open space area. Vehicular Access A controlled vehicular access gate to the Project Site would be provided at the Granville Avenue entry, with a manned guard house. The controlled access gate previously proposed at the parking area below the pool deck would not be constructed. In addition, the access drive from Stoner Avenue to the plaza (surface) level would be removed. However, fire access from Stoner Avenue would continue to be provided. All vehicular access to the plaza (surface) level would be provided at the Granville Avenue entry. Access to the subterranean parking structure from both Granville Avenue and Stoner Avenue would continue to be provided. Vehicular Parking A total of 1,090 spaces would be provided in accordance with the parking requirements of the LAMC. Twenty-eight of the spaces would be provided at the surface level while the remaining 1,062 parking spaces would be provided in the subterranean garage. This represents a 32 space reduction when compared with the 1,122 parking spaces originally proposed. Bicycle Parking A total of 465 bicycle parking spaces would be provided, which would exceed the bicycle parking requirements of the LAMC. Tree Planting and Removal Under the Refined Site plan, 11 of the 37 existing on-site trees would be removed. In addition, 92 new trees would be provided. No street trees are anticipated to be removed; however, if it becomes necessary to remove such trees, they would be replaced on a two for one basis in accordance with City requirements. Outdoor Terrace Removal Under the Refined Site Plan, the outdoor terrace along the alley lobby has been removed. With the proposed refinements, the overall construction duration, construction equipment mix, depth of excavation and grading assumptions set forth in the EIR would not change. In addition, the overall massing, height, design and use of the proposed residential building would not change. The Project would continue to provide up to 376 residential units. B. Effect of Proposed Refinements As demonstrated by the following discussion, the modifications under the Refined Site Plan would not result in new significant impacts and do not warrant recirculation of the EIR. Page 2

Errata 1 to the CEQA Guidelines Section 15088.5 requires that an EIR that has been made available for public review, but not yet certified, be recirculated only if significant new information has been added to the EIR. Pursuant to CEQA Guidelines section 15088.5(c), the entire document need not be circulated if revisions are limited to specific portions of the document. The relevant portions of CEQA Guidelines section 15088.5 read as follows: (a) A lead agency is required to recirculate an EIR when significant new information is added to the EIR after public notice is given of the availability of the draft EIR for public review under Section 15087 but before certification. As used in this section, the term information can include changes in the project or environmental setting as well as additional data or other information. New information added to an EIR is not significant unless the EIR is changed in a way that deprives the public of a meaningful opportunity to comment upon a substantial adverse environmental effect of the project or a feasible way to mitigate or avoid such an effect (including a feasible project alternative) that the project s proponents have declined to implement. Significant new information requiring recirculation include, for example, a disclosure showing that: (1) A new significant environmental impact would result from the project or from a new mitigation measure proposed to be implemented. (2) A substantial increase in the severity of an environmental impact would result unless mitigation measures are adopted that reduce the impact to a level of insignificance. (3) A feasible project alternative or mitigation measure considerably different from others previously analyzed would clearly lessen the environmental impacts of the project, but the project s proponents decline to adopt it. (4) The draft EIR was so fundamentally and basically inadequate and conclusory in nature that meaningful public review and comment were precluded. (b) Recirculation is not required where the new information added to the EIR merely clarifies or amplifies or makes insignificant modifications in an adequate EIR. Page 3

Errata 1 to the The information contained in this Errata makes insignificant changes to the information that has already been presented in the EIR. In addition, the proposed refinements to the site plan are not significant because the EIR is not changed in a way that deprives the public of a meaningful opportunity to comment upon a substantial adverse environmental effect of the Project. As described below, the Refined Site Plan would not result in any new significant impacts or a substantial increase in the severity of any impact already identified in the Draft EIR or Final EIR. Thus, none of the conditions in Section 15088.5 of the CEQA Guidelines are met, and recirculation is not required. Aesthetics/Visual Quality, Views, Light/Glare, and Shading As set forth above, the Project has been refined to expand the public open space area within the Project Site. The expanded open space area would consist of landscape and hardscape features, including seating areas, pedestrian pathways, raised planters, perimeter planters, and shade trees. Use of the open space area would conclude by sunset. The height, design and overall massing of the residential building would not change. Thus, the Refined Site Plan would improve the aesthetic quality of the Project Site and would not result in any new impacts associated with light, glare or shading. Air Quality and Greenhouse Gas Emissions Construction activities under the Refined Site Plan would be similar to those set forth in the EIR. As such, construction under the Refined Site Plan would not result in an increase in air quality or greenhouse gas emissions. With regard to operations, the size of the building and residential unit count would not change. Thus, no new air quality or greenhouse gas impacts would result from implementation of the Refined Site Plan. Cultural Resources and Geology/Soils The Refined Site Plan would not result in increases in depth of excavation or overall grading quantities. In addition, the foot print of the residential building would not change. As such, the Refined Site Plan would not result in new impacts associated with archaeological, paleontological or tribal resources or geology/soils. Hazards and Hazardous Materials The Refined Site Plan would not change the types of uses proposed or area to be developed. Thus, no new impacts with regard to hazards and use of hazardous materials would occur. Page 4

Errata 1 to the Hydrology, Surface Water Quality, and Groundwater The expanded open space area would be located above the existing subterranean parking garage. As such, the overall surface flows within the Project Site would be similar to those under the Project as originally proposed. In addition, since the depth of excavation would be similar to that set forth in the EIR, no new impacts associated with groundwater would occur. With regard to surface water quality, the types of uses within the Project would not change and thus no new impacts associated with surface water quality would occur. Land Use The Refined Site Plan would not change the types of uses or locations of buildings when compared with the Project as evaluated in the EIR. Rather, the expanded open space area would provide a needed use in the community. As such, the overall impacts of the Project with regard to consistency with applicable policies and impacts associated with land use compatibility would not change and would continue to be less than significant. Noise As discussed above, construction activities for the Refined Site Plan would be similar to those set forth and evaluated in the EIR. Thus, no new construction-related noise impacts would result from implementation of the Refined Site Plan. With regard to operational noise, the open space area would be expanded and would accommodate additional persons. Thus, the noise levels from people gathering within the open space would increase as compared to the original project. With the Refined Site Plan, the noise level from people gathering within the expanded open space would be approximately 64.9 dba L eq, at the nearest off-site sensitive receptor (the multi-family residential use on the east side of Stoner Avenue, R4), which is similar to the measured daytime ambient noise level of 63.8 dba. Therefore, given the existing ambient noise levels in the Project vicinity, and the closure of the open space area by sunset, the noise levels from the expanded open space would not increase the existing ambient noise levels at the off-site sensitive receptors by 5 dba or more. As such, noise levels from the expanded open space area would not result in new significant operational noise impacts. Public Services Police Protection, Fire Protection, Schools, and Libraries As discussed above, the types of uses within the Project Site would not change and the Project would continue to provide up to 376 residential units. As such, the on-site Page 5

Errata 1 to the population would not change. In addition, the Project would continue to implement the security and fire protection features set forth in the EIR. With regard to fire access, the fire lane access to the Project remains essentially the same as was proposed under the original plan included in the EIR. There would be full access immediately adjacent to the new residential building along the alley to the south, same as under the original plan. There would also be full straight-through access via the Stoner fire lane and Granville driveway on the north, also the same as the original plan and as today. Under the Refined Site Plan, the new plaza would serve as a hammerhead for repositioning of vehicles closer to the new building if necessary. The fire lanes under the Refined Site Plan fire lane meet or exceed LAFD standards, and would be subject to final LAFD review and signoff during the normal building permit process Based on the above, implementation of the Refined Site Plan would not result in new impacts associated with police protection, fire protection, schools or libraries. Furthermore, the expanded open space area would reduce the demand for parks within the Project vicinity. Traffic and Parking As set forth in the attached memorandum prepared by Gibson Transportation (Traffic Memo), implementation of the Refined Site Plan would not change the residential unit count. The expanded open space area is anticipated to be accessible by pedestrians and bicycles, serving patrons in the surrounding commercial and residential areas, and thus, would not generate vehicle trips during the morning and afternoon commuter peak hours. Thus, the trip generation would not change as a result of the Refined Site Plan. As discussed above, under the Refined Site Plan access to the pick-up and drop-off area and plaza level would be modified such that vehicular access would be provided via Granville Avenue only. However, the primary vehicular access to the parking structure, which supplies the majority of the parking for both the residential and office building, would continue to be provided via driveways on both Stoner Avenue and Granville Avenue. The EIR anticipated vehicular access to the parking structure, which provides the majority of the parking supply, would be provided via both Stoner Avenue and Granville Avenue. As such, implementation of the Refined Site Plan would not change the distribution of trips to the Project Site or into any intersections surrounding the Project Site. Therefore, no new traffic impacts would be generated by implementation of the Refined Site Plan. As set forth in Table IV.J-8 of the Draft EIR, based on the residential parking requirements set forth in Section 12.22.A25d(1) of the Los Angeles Municipal Code (LAMC) and the office parking requirements set forth in Section 12.21.A4 of the LAMC, the Page 6

Errata 1 to the Project would be required to provide 1,090 parking spaces, including 447 residential parking spaces and 643 office parking spaces. With the Refined Site the Project would provide a total of 1,090 spaces, which meets the applicable parking requirements of the LAMC. In addition, as set forth in Table IV.J-8 of the Draft EIR, the Project would be required to provide 414 bicycle parking spaces for the new residential use. In total, the Refined Site Plan includes a total of 465 bicycle parking spaces, which exceeds the bicycle parking space requirements. Therefore, the Refined Site Plan would not result in any new impacts associated with parking. Utilities Water Supply, Wastewater, and Solid Waste.As set forth in the Draft EIR, the Project would result in a net increase in the Project Site s average daily water demand of approximately 51,418 gallons per day (gpd). With the Refined Site Plan, the open space area would be expanded, resulting in an incremental water demand of 351 gpd based on demand calculations provided by KPFF Engineers. This small increase in water demand would be inconsequential when compared with the projected available water supplies documented by LADWP s Urban Water Management Plan. In addition, the water conservation features set forth in the EIR would continue to be implemented. Thus, the nominal increase in water demand under the Refined Site Plan would not result in new impacts associated with water supply. Furthermore, as water infrastructure capacity is generally determined by fire flow requirements and not domestic water demand, the Refined Site Plan would not result in significant impacts associated with water infrastructure. The expanded open space area would result in a nominal increase in wastewater generation that would be accommodated by existing infrastructure. Thus, no new impacts associated with wastewater generation would occur. With regard to solid waste, the expanded open space area would generate a nominal increase in solid waste. In addition, the Project would continue to incorporate waste reduction and recycling features. Thus, no new impacts associated with solid waste would occur. C. Conclusion Based on the above, the Project would not result in any new significant impacts or a substantial increase in the severity of any impact already identified in the EIR. Thus, recirculation of the EIR is not required. Page 7

5-0 WILSHIRE BOULEVARD 1 12-0 6-0 A F 2 5-0 3 4 Existing Ficus Tree (6) STONER AVENUE 13 7 24-0 8-0 B C 6 8 9 15 16 KEYNOTE LEGEND 1. WILSHIRE/STONER GATEWAY 2. THE FOREST 3. STAGE WITH CANOPY ABOVE 4. THE GLADE 5. PARK PLAZA 6. THE SPRING 7. STONER AVE. ENTRY 8. GARDEN TERRACE 9. THE PROMENADE 10. AUTO COURT WITH DROP OFF 11. GARAGE ENTRY 12. GRANVILLE ENTRY 13. FIRE LANE WITH SLIDING GATE 14. BIKE PARKING 15. LOADING DECK 16. RESIDENTIAL BUILDING SER- VICE ENTRY 17. RESIDENTIAL BUILDING PEDES- TRIAN ENTRY 18. PROPOSED POOL DECK 5 10 17 A METAL FENCE LOCATION AS SHOWN SWING GATE AT STONER AVE. & WILSHIRE BLVD. 14 11 B SLIDING GATE AT STONER AVE. C PEDESTRIAN GATE AT STONER AVE. D SLIDING GATE AT GRANVILLE AVE. Existing Ficus Tree (5) 6-0 34-0 D E 12 18 E F NOTES PEDESTRIAN GATE AT GRANVILLE AVE. PEDESTRIAN GATE AT WILSHIRE BLVD. Existing Sweetgum Tree (11) GRANVILLE AVENUE Existing Ficus Tree (4) 1. ALL STREET TREES SHALL REMAIN. 2. EXISTING TREES: 15 FICUS TREES ALONG STREETS AND 11 SWEETGUMS AT THE CORNER OF WILSHIRE AND GRAN- VILLE SHALL REMAIN; 8 JACARANDAS AND 3 CAJEPUT TREES SHALL BE REMOVED. 3. 92 NEW TREES MINIMUM SIZE OF 24 - BOX ARE PROPOSED. OPEN SPACE PROVIDED PRIVATE OPEN SPACE NEW AT-GRADE OPEN SPACE TOTAL PRIVATE AND COMMON SPACE ADDITIONAL OPEN SPACE LANDSCAPE OPEN SPACE

MEMORANDUM TO: CC: FROM: Stephanie Eyestone-Jones, Eyestone Environmental Dale Goldsmith, Armbruster Goldsmith & Delvac LLP Sarah M. Drobis, P.E. DATE: October 26, 2016 RE: Review of Final Site Plans for the Landmark Project Los Angeles, California Ref: J1254 Gibson Transportation Consulting, Inc. ( GTC ) reviewed the final site plan for the Landmark Project ( Project ), which includes minor refinements to the site plan. GTC compared the latest site plan to the traffic and parking analysis included in the April 2016 Draft Environmental Impact Report and September 2016 (collectively referred to as EIR ). The review focuses on the trip generation forecast, site access and circulation, and resulting traffic impacts of the revisions, as well as the Project s proposed parking supply. This memorandum summarizes the results of our review. The minor changes to the Project include removing the existing surface parking spaces just north of the proposed residential building along Stoner Avenue, to allow for the previously proposed privately maintained, publicly accessible open space area of approximately 18,000 square feet (sf) to be expanded to provide approximately 40,500 sf. With the refined site plan, vehicular access to the plaza level will be provided via the driveway off of Granville Avenue. Vehicular access to the plaza level from Stoner Avenue will be closed with the expanded park area. The previously proposed circular driveway would remain in the central portion of the Project Site to provide vehicular drop-off and pick-up for the residential building and access to the surface parking level below the pool deck. The access points from Stoner Avenue and Granville Avenue, respectively, to the subterranean parking garage would remain the same. All other aspects of the Project (e.g., number of dwelling units, vehicular access points to the parking garage, bicycle access, etc.) remain the same. Consistent with the EIR and related traffic analyses, the Project would consist of the construction of a residential building containing up to 376 multi-family dwelling units. The existing office building on the site would be maintained. The site plan of the modified Project is shown in Figure 1. 523 W. 6th Street,Suite 1234 Los Angeles,CA 90014 p. 213.683.0088 f. 213.683.0033

Ms. Stephanie Eyestone-Jones October 26, 2016 Page 2 TRAFFIC ANALYSIS The minor modification to the site plan does not change the square footage or number of residential units proposed. The expanded open space area is anticipated to be accessible by pedestrians and bicycles, serving patrons in the surrounding commercial and residential areas, and thus, would not generate vehicle trips during the morning and afternoon commuter peak hours. Therefore, the trip generation forecast for the Project is the same as that identified in the EIR, which indicated that the Project is estimated to result in a net reduction of 507 daily vehicle trips, including a net increase of 75 during the morning peak hour and a net reduction of 111 trips during the afternoon peak hour. It should be noted that the site plan revisions do not result in changes to the analyses assumptions, methodologies, and conclusions presented in the traffic analyses outlined in the EIR. The primary vehicular access to the parking structure, which supplies the majority of the parking for both the residential and office building, will continue to be provided via driveways on both Stoner Avenue and Granville Avenue. As shown in Figure 1, one of the secondary driveways along Stoner Avenue that previously provided access to the plaza level will be closed to allow for the expanded open space area. Access to the pick-up and drop-off area and plaza level would be provided via Granville Avenue. The traffic analyses and EIR anticipated vehicular access to the parking structure, which provides the majority of the parking supply, would be provided via both Stoner Avenue and Granville Avenue. This is consistent with the refined site plan shown in Figure 1. As such, the minor modification does not change the distribution of trips to the Project Site or into any intersections surrounding the Project Site. Therefore, traffic impacts associated with the Project are within the trip generation envelope and impacts addressed in the EIR. As such, the trips generated by the modified Project would be the same as those disclosed in the EIR and would not result in any additional impact or cause a substantial increase in the severity of the traffic impacts beyond those already identified in the EIR, including, but not limited to, under the Existing with Project conditions scenario. PARKING As shown in Table IV.J-8, based on the residential parking requirements set forth in Section 12.22.A25d(1) of the Los Angeles Municipal Code (LAMC) and the office parking requirements set forth in Section 12.21.A4 of the LAMC, the Project would be required to provide 1,090 parking spaces, including 447 residential parking spaces and 643 office parking spaces. With the refined site plan shown in Figure 1, the Project proposed to provide a total of 1,090 spaces, which meets the applicable parking requirements of the LAMC. Consistent with Table IV.J-8, the Project would be required to provide 414 bicycle parking spaces for the new residential use. In total, the refined site plan includes a total of 465 bicycle parking spaces, which exceeds the bicycle parking space requirements. Therefore, consistent with the EIR, impacts related to automobile and bicycle parking would be less than significant, and no mitigation is required.

Ms. Stephanie Eyestone-Jones October 26, 2016 Page 3 CONCLUSION Based on the review outlined above, the proposed refinements to the Project as encompassed in the refined site plan would not change the findings of the traffic, access, and parking impact analyses in the EIR. Specifically, the proposed refinements would not result in any new or substantially increased significant impacts on the intersections and street segments serving the site as compared with the previously proposed plan. Overall the assumptions related to the site access and circulation system with the refined site plan are consistent with the EIR. In addition, the parking supply would continue to meet the parking requirements. Thus, no new or substantially increased significant traffic, access, or parking impacts would result from the refined site plan beyond those identified in the EIR.