NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Similar documents
4. CONCEPT PLAN DEVELOPMENT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Planning, Design, and Construction of Green Infrastructure.

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Green Infrastructure in the Greater Lansing Area

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Green Infrastructure and Low-Impact Development Technologies

Selecting Appropriate Stormwater Control Measures for Your Development Project

Green Infrastructure Overview

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Types and Basic Design of Post-Construction BMPs

West Virginia Stormwater Management Manual: Methods.

A Property Management Model for Green Infrastructure Site Maintenance. #ProjectCleanLake

Third Ave CSO Integrated Green Infrastructure

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

RESIDENTIAL STORM WATER PERMIT & CREDIT APPLICATION WORKSHEET AND CHECKLIST

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Attachment 2: Permeable Pavement Design Guidelines

Case Study: Dallas Green Infrastructure for Stormwater

Appendix E: Illustrative Green Infrastructure Examples

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Green Infrastructure & Low Impact Development

Regional Stormwater Management Program

Appendix D - Technical Design Criteria for BMPs

Can Urban Redevelopment Restore Aquatic Resources

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Sustainable Stormwater Retrofit Best Practices

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Time Value of Money and Optimization Process

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

LID. Low Impact Development: Protecting Oregon s waters as we grow

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

An Integrated Green Infrastructure Plan to Address Combined Sewer Overflow, Stormwater and Nutrient Reductions in Lancaster City, PA

City of Petersburg, Virginia Stormwater Utility Program Residential Fee Credit Manual (Revised March 2014)

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Stormwater Fee Credit Manual

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Retrofitting Sacramento State Campus with Low Impact Development Stormwater Control Measures: A Local Project with Regional Intent

Melissa Bernardo Hess, PE, CFM February 18, 2016

Green Infrastructure Recommendations For Parks and Public Spaces

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

Going Green with the NYS Stormwater Design Standards

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015

Huntington Stormwater Utility

U.S. EPA National Stormwater Calculator

Stormwater Control Plan: Small (Tier 1) Land Development Project

Monitoring Stormwater Control Measures. OWEA Watershed Workshop November 12, 2015 Rob Darner, USGS Michigan-Ohio Water Science Center

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Structural Stormwater Best Management Practices

Sustainable Storm Water Management

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

Green City, Clean Waters

New Development Stormwater Guidelines

Post-Construction BMPs

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Building Green: An Update on Atlanta's Green Infrastructure Approach

Green Infrastructure and the Urban Forest: Thinking Outside the Planter Box

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

GREEN INFRASTRUCTURE FEASIBILITY STUDY HARRISON

2012 Saginaw Bay Watershed Conference

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

New Tools/Resources for

Concept Plan Report: Lafayette Neighborhood RiverSmart Low Impact Development and Green Infrastructure Development Project.

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach

Kittson Parkway / Watershed Park Parking Lot

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)

FACT SHEET: Pervious Pavement with Infiltration

Low Impact Development Site Design

WEFTEC.06. ** City of Caldwell, Idaho

Homeowners Guide to Stormwater BMP Maintenance

2016 WORKSHOP LVR Field Trip

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

Village of Forest Park. July 27, Sewer Separation Evaluation

A P P E N D I X D. Project Stormwater Plan Worksheets

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Monitoring Performance and Effectiveness of Urban Stormwater Best Management Practices. Jim Duncker, USGS Kuldip Kumar, MWRDGC David Leopold, CDOT

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

Integrating Stormwater Management into Municipal Programs: A Cost Effective Method for Achieving Clean Water Goals

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Transcription:

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

2019 NEORSD GIG Eligibility and Technical Requirements

Project must be located in the Sewer District s combined sewer area Location

Applicant Applicant must represent: Member community Governmental entity Non-profit 501(c)(3) Business working in partnership with their community

Site Control Applicant must be able to demonstrate permanent control of the project site Western Reserve Historical Society University Circle

Sewer District Bills Applicant and the property associated with the proposed project must be current and in good standing with all Sewer District bills

Use of Green Infrastructure Project must demonstrate on-site stormwater control measures using green infrastructure Arch Park - Slavic Village Striebinger Block Living Wall - Hingetown

Completion Date Project must be completed by November 30, 2019

Green Infrastructure Successful green infrastructure proposals can quantifiably demonstrate a reduction in the stormwater runoff volume. US EPA Stormwater Calculator Watershed Stewardship Center West Creek Reservation

NEORSD GIG Program Title IV & Stormwater Calculator

Above and Beyond Title IV Applicants are subject to the requirements of Title IV of the Sewer District s Code of Regulations Refer to Submittal Requirements for Connections to the Combined Sewer System.

Above and Beyond Title IV

Above and Beyond Title IV NEORSD has the authority to: control combined sewer overflows (CSOs) from the combined sewer system control peak flows from local combined sewer systems at the point of connection into sewers owned by NEORSD or a member community. Applicable to any development activity in the combined sewer area, which includes separated sewer areas tributary to the combined system.

Above and Beyond Title IV No increases in wetweather flow at combined sewer overflow (CSO) locations.

Above and Beyond Title IV Post-development peak flows shall not exceed existing condition peak flows.

Above and Beyond Title IV Existing condition The current land use and impervious area on the subject property at the time of submission to NEORSD.

Above and Beyond Title IV Post-development peak flows shall not result in an increase to CSO volumes and/or typical year activations.

Above and Beyond Title IV Minimum Standards Postdevelopment peak flows Existing condition peak flows Post-development peak flows will not create increases in flow at CSO locations.

Above and Beyond Title IV Preferred Release Rate Storm events up to the 5-year, 24- hour event: Postdevelopment peak flows Existing condition 6- month, 24- hour peak flow

Above and Beyond Title IV For separated storm connections to a CSO pipe or receiving water stormwater control measures must provide water quality treatment for 100% of the project area (New or Redevelopment).

Above and Beyond Title IV

Above and Beyond Title IV

Above and Beyond Title IV

Above and Beyond Title IV

Above and Beyond Title IV

Above and Beyond Title IV

EPA National Stormwater Calculator

EPA National Stormwater Calculator

EPA National Stormwater Calculator Low Impact Development (LID) Controls

EPA National Stormwater Calculator LID Controls

EPA National Stormwater Calculator LID Controls - Disconnection The Capture Ratio is the ratio of the pervious area receiving the runoff (such as a lawn area) to the impervious area that generates the runoff. For example, if 5,000 sq. ft. of roof area is directed onto 3,000 sq. ft. of lawn area then the Capture Ratio would be 3,000 / 5,000 or 60%.

EPA National Stormwater Calculator LID Controls Rain Harvesting The harvesting system is assumed to consist of a given number of fixedsized cisterns per 1000 square feet of rooftop area captured. The water from each cistern is withdrawn at a constant rate and is assumed to be consumed or infiltrated entirely on-site.

EPA National Stormwater Calculator LID Controls Rain Garden The Capture Ratio is the ratio of the rain garden's area to the impervious area that drains onto it. For example, if 1,000 sq. ft. of roof area is directed onto 300 sq. ft. of rain garden area then the Capture Ratio would be 300 / 1,000 or 30%.

EPA National Stormwater Calculator LID Controls Green Roof The thickness used for the growing medium typically ranges from 3 to 6 inches.

EPA National Stormwater Calculator LID Controls Street Planter The walls of a planter extend 3 to 12 inches above the soil bed to allow for ponding within the unit. The thickness of the soil growing medium ranges from 6 to 24 inches while gravel beds are 6 to 18 inches in depth. The planter's Capture Ratio is the ratio of its area to the impervious area whose runoff it captures.

EPA National Stormwater Calculator LID Controls Infiltration Basin The basin's Capture Ratio is the area of the basin relative to the impervious area whose runoff it captures. For example, if 50,000 sq. ft. of roof area is directed into 5,000 sq. ft. of infiltration basin area then the Capture Ratio would be 5,000 / 50,000 or 10%.

EPA National Stormwater Calculator LID Controls Permeable Pavement Normally all rainfall will immediately pass through the pavement into the gravel storage layer below it where it can infiltrate at natural rates into the site's native soil. Pavement layers are usually 4 to 6 inches in height while the gravel storage layer is typically 6 to 18 inches high. The Capture Ratio is the percent of the treated area (street or parking lot) that is replaced with permeable pavement.

EPA National Stormwater Calculator Modules

EPA National Stormwater Calculator Modules - Location

EPA National Stormwater Calculator Modules - Soil Type Urban soils (e.g., Udorthents) = HSG D unless soil boring information verifies otherwise

EPA National Stormwater Calculator Modules - Soil Type

EPA National Stormwater Calculator Modules - Soil Drainage Hydrologic Soil Group Default Values (inches/hr): A 4.00 B 0.40 C 0.04 D 0.01 Use site-specific soil infiltration rates (e.g., via soil borings). Otherwise use model s default value as determined by HSG of on-site soils (A-D).

EPA National Stormwater Calculator Modules - Topography

EPA National Stormwater Calculator Modules - Precipitation

EPA National Stormwater Calculator Modules - Evaporation

EPA National Stormwater Calculator Modules - Climate Change

EPA National Stormwater Calculator Modules - Land Cover

EPA National Stormwater Calculator Modules - LID Controls

EPA National Stormwater Calculator Modules - Results

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator - Existing Conditions

EPA National Stormwater Calculator Baseline Scenario (Meeting Minimum Title IV Requirements)

EPA National Stormwater Calculator Baseline Scenario (Meeting Minimum Title IV Requirements)

EPA National Stormwater Calculator Baseline Scenario (Meeting Minimum Title IV Requirements)

EPA National Stormwater Calculator with Green Infrastructure

EPA National Stormwater Calculator with Green Infrastructure

EPA National Stormwater Calculator with Green Infrastructure (75% of Impervious Area to Street Planters)

EPA National Stormwater Calculator with Green Infrastructure (Multiple LID Controls)

EPA National Stormwater Calculator with Green Infrastructure (Multiple LID Controls)

EPA National Stormwater Calculator Existing Conditions Minimum Title IV Requirements (Baseline Scenario) 75% of Impervious Area to Street Planters Multiple Lid Controls

EPA National Stormwater Calculator Helpful Hints Project Limits The outermost boundary that results when you overlay your parcel boundary with the boundary of the drainage areas to proposed LID Controls. + = Project limits should be the same for all model runs (i.e., existing conditions, baseline & results scenarios) some exceptions.

EPA National Stormwater Calculator Helpful Hints Baseline Scenario Existing conditions (pre-development) Proposed conditions that meet the minimum NEORSD Title IV requirements (this will serve as your Baseline Scenario) Proposed conditions with all LID Controls accounted for

EPA National Stormwater Calculator Helpful Hints Treatment Trains The SWC doesn t model treatment trains beyond the SWC s capabilities Use Stormwater Management Model (SWMM) Be creative justify your assumptions

EPA National Stormwater Calculator Helpful Hints Treatment Train Example 20,000 SF roof to Disconnection, then to Permeable Pavement Disconnection = 20% runoff reduction Model 16,000 SF of roof to Permeable Pavement = add l 35% runoff reduction Total of 55% runoff reduction

EPA National Stormwater Calculator Helpful Hints Multiple LID Controls Two step process: 1) Run each LID Control separately and then add the runoff reduction results to arrive at a total runoff reduction value. 2) Run the model once and account for all the LID Controls at the same time. Use most favorable outcome.

EPA National Stormwater Calculator Helpful Hints Underdrains Unless ideal soil conditions exist, underdrains are a necessary design feature for street planters and permeable pavement. Proposed standard underdrains will not negatively affect your grant application. Encouraged to alter the design of your underdrains to maximize infiltration potential (e.g., adding an upturned elbow).

EPA National Stormwater Calculator Helpful Hints Upturned Elbow

EPA National Stormwater Calculator Helpful Hints Runoff Rate Control Practices There is no way to account for runoff rate control practices in the stormwater calculator (e.g., detention facilities), so they should not be considered in your calculations related to runoff reduction.

EPA National Stormwater Calculator Helpful Hints Unique Control Practices If a proposed practice does not fit the mold of any of the calculator s options, use best professional judgement to select one or more of the seven LID Controls, and provide a brief narrative to justify selection.

EPA National Stormwater Calculator Helpful Hints Land Cover Module Footprints of permeable pavement and green roofs = Impervious Footprints of rain gardens, street planters and infiltration basins = Meadow or Lawn.

EPA National Stormwater Calculator Helpful Hints LID Controls Module Bioretention cells & infiltration trenches = Street Planters Footprints of permeable pavement and green roofs = Impervious Footprints of rain gardens, street planters and infiltration basins = Meadow or Lawn

NEORSD GIG Program Contract (https://www.neorsd.org/stormwater-2/green-infrastructure-grant-program)

NEORSD GIG Program Evaluation Criteria

Evaluation Criteria Expected Benefits of Project (30 pts.) Anticipated volume of stormwater controlled and/or removed from combined sewer system

Evaluation Criteria Project Feasibility (25 pts.) Constructability and implementation demonstrated through design Anticipated completion date

Evaluation Criteria Programmatic Capacity to Maintain Stormwater Controls (25 pts.) Ability to fund maintenance for life expectancy of stormwater control

Evaluation Criteria Visibility and Community Benefits (20 pts.) Design Completion (10 extra pts.)

NEORSD GIG Program Reimbursement Process

Green Infrastructure Grant Reimbursement Request A complete Reimbursement Request submission will include: Reimbursement Request Cover Sheet Reimbursement Request Deliverable Expense Worksheet w/supporting documentation Progress Report

Green Infrastructure Grant Reimbursement Request

Green Infrastructure Grant Reimbursement Request

Green Infrastructure Grant Reimbursement Request Summarize progress and/or accomplishments since the last report Difficulties and/or delays encountered during the reporting period Describe progress towards Project tasks

NEORSD GIG Program Funded Projects

Green Infrastructure Grant Program Funding Round 2014 GREEN INFRASTRUCTURE GRANTS PROGRAM Award Recommendations Runoff Reduction gallons/year TOTAL $1,746,274 7,138,890 2016 GREEN INFRASTRUCTURE GRANTS PROGRAM TOTAL $1,999,949 9,930,368 2018 GREEN INFRASTRUCTURE GRANTS PROGRAM TOTAL $1,037,382 2,572,676 2019 GREEN INFRASTRUCTURE GRANTS PROGRAM TOTAL $2,000,000 TBD GRAND TOTAL $6,783,605 19,641,934

Seeing Green Infrastructure through a Storymap Green Infrastructure is a way to view the land around us to see how it best contributes to our needs for water, ecological soundness, scenic environments, and healthy surroundings.

Examples of Recently Completed Projects

Smart Stormwater Utilization @ Family Ministry Center Green Infrastructure 2014 Project Awarded GI Technology: Rainwater Harvesting, Cisterns & Grass Pavers Drainage Area: 1.22 acres GI Feature Area: 0.99 acres Stormwater Capture: 476,724 gal/yr. Total Project Cost: $207,470 Grant Awarded: $189,870 Installed Cisterns Opportunities & Benefits: 33,000-gallon underground stormwater harvesting and irrigation system Automated smart system to dewater cisterns in nonpeak times Divert & collect rainwater from the roof for irrigation reuse Installation of 7,500 sq. ft. of pervious grass-pavers Challenges & Constraints: Bi-annual removal of sediment debris in stormwater cisterns Weekly inspection of the subsurface drip irrigation system Monitoring the storage system for back-ups and overflow After

MLK/Carnegie RTA Cedar University Rapid & Bus Station Green Infrastructure 2016 Project Awarded GI Technology: Bioretention and Reduced Impervious Surface Drainage Area: 0.40 acres GI Feature Area: 0.23 acres Stormwater Capture: 70,160 gal/yr. Total Project Cost: $273,900 Grant Awarded: $127,900 Opportunities & Benefits: Demonstration project at a highly visible location Curb bump out bioretention reduces impervious area at the intersection by 4,350 square feet and provides stormwater treatment Traffic calming at pedestrian crosswalk and RTA bus stop at high traffic MLK Jr. Drive-Carnegie Avenue intersection After Challenges & Constraints: Road salt impacts to plant material Weekly trash collection maintenance After

St. Casimir Green Infrastructure Project Green Infrastructure 2016 Project Awarded GI Technology: Bioretention Exfiltration Catch Basin & Permeable Pavers Drainage Area: 2.07 acres GI Feature Area: 0.56 acres Stormwater Capture: 472,000 gal/yr. Total Project Cost: $168,800 Grant Awarded: $168,800 Opportunities & Benefits: Project serves as a model for other churches in the combined sewer area. Permeable pavers, exfiltrating catch basin and bioretention enable significant volumes of stormwater to be infiltrated into existing sandy soils reducing discharge to combined sewer Educational outreach to adjacent elementary school Challenges & Constraints: Regular maintenance activities During Construction After

Arch Park Slavic Village Green Infrastructure 2016 Project Awarded GI Technology: Curb Cuts, Bioretention Drainage Area: 0.80 acres GI Feature Area: 0.37 acres Stormwater Capture: 305,866 gal/yr. Total Project Cost: $217,472 Grant Awarded: $191,160 Opportunities & Benefits: Project represents an outstanding, high visibility, commercially vacant lot retrofit Bioretention treatment of street stormwater runoff, off-loaded from combined sewer system via infiltrating vertical dry well After Challenges & Constraints: Former gas station property Essential that the mouth of the flume and connection to the trench drain remain free of accumulated sediments, trash and debris

Questions Thank you for coming!