Montageanleitung RLO (Original) Mounting Instructions RLO (Translation of the original)

Similar documents
Operating Instruction Centrifugal fans without scroll (Translation of the Original) BA-RLE-AC /2014 RLE RLA

RLM 56. Operating Instructions, ATEX Centrifugal fans without scroll, direct driven (Plug fans) (Translation of the original) II 2G c IIB T4

Operating instructions Plug Fans Direct driven with asynchronous or PM synchronous motor (Translation of the Original)

Operating Instructions ATEX - Plug fans (Translation of the original) II 2G c IIB(+H2) T4 BA-CFD-RLM-ATEX /2015 RLM E6 RLM E3 RLM G6

IEC- Direct-driven radial fans with IEC-Standardmotor

Mechanical seals external, single or double, to DIN EN 12756

Operating Instructions Roof extract fans (Translation of the original)

REF. NO Clamp Assembly 8 1 set Gasket (4 per set) S.S. Lock-washer 3/8 x 1/ Brass Impeller 3.

Removal. CAUTION: Do not let tensioner arm snap back to the freearm position, sever damage may occur to the tensioner.

ultra quiet fan USER MANUAL INSTALLATION OPERATION MAINTENANCE

Owners Manual. SM-HP A SM-HP8-10 Meter. Manual D

English CNA-CNB. Centrifugal fans Installation and maintenance

PLEASE READ INSTRUCTIONS IN CONJUNCTION WITH THE ILLUSTRATIONS. PLEASE SAVE THESE INSTRUCTIONS

KITCHEN EXHAUST FAN GLEC-6 INSTALLATION AND MAINTENANCE

CENTAFLEX Series A Assembly and operating instructions CF-AR M EN Rev. 2

ISOLATED DIRECT DRIVE PLENUM FAN (IDDP)

INSTALLATION MANUAL FOR ROTARY TWIN LOBE (ROOTS) BLOWERS / COMPRESSORS

ACN SMOKE INSTALLATION AND MAINTENANCE

Marley Ultra Quiet Fan

STORAGE, ERECTION, OPERATION AND MAINTENANCE MANUAL FOR CENTRIFUGAL FANS MODEL - MXE

Installation and Maintenance Novax Smoke Exhaust Fan Type ACN Smoke

Centrifugal Fans maintenance manual

Multistage Centrifugal Pumps with Shaft Sealing Type HZ / HZA / HZAR

Operating instructions

Mechanical Seal RG-4 stationary, double, liquid sealed

Grain crusher Universal. Purpose: This machine is designed for the crushing of grain in agricultural operation.

Installation of Glass Lined Equipment

Use and Maintenance Manual. WPA-E-N/Ex. II 2 G c Ex e II T3. ATEX marking: Explosion proof stand fans WPA-E-N/Ex

CENTRIFUGAL FAN IN SCROLL CASING. Helix S-Vent OPERATION MANUAL

HTM Circulation Pumps acc. to DIN EN 733 Type NKX

OPERATION AND MONTAGE MANUAL ROOF FANS

GESTRA Steam Systems DK 45. English. Installation Instructions Steam Trap DK 45

AZN ATEX INSTALLATION AND MAINTENANCE

Design and manufacture of agitators since INSTALLATION MANUAL Start-up and maintenance. Top-entry agitators

Horizontal Split Case Pumps Type U

Warranty Details page 2. Pump Description & Technical page 3 Specifications. Transportation, Storage & Installation page 4. Pump Maintenance page 5

INSTALLATION, OPERATION & MAINTENANCE MANUAL

OK, OKA, OKAF; ELD; ELDM; ELH; OKC; SC; SCA; SCAF; OK-LN; OKA-LN; OKAF-LN.

p Permanent magnet water cooled motors Additional manual

SIHI LPH-X - Liquid Ring Vacuum Pump One Stage

OPERATION AND MONTAGE MANUAL ROOF FANS

HEATING AND AIR CONDITIONING

SMHA Hatch High temperature fan HT-fan Installation and Maintenance

DA-9270 TWIN NEEDLE (THREE NEEDLE) FEED OFF THE ARM DOUBLE CHAIN STITCHER. English

USER S MANUAL. VCU/VCUN Series CENTRIFUGAL FAN IN SCROLL CASING

SIHI LPH-X - Liquid Ring Vacuum Pump One Stage

1 1/8 Inch Centrifugal Pump Operation and Maintenance Guide

Installation, operating and maintenance instructions

VERSAFLOW VORTEX Supplementary instructions

Operating instructions

GLEB Kitchen exhaust fan

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

Flameproof Manual Call Points

AXPR Wall Mounted Axial Panel Fans

Marley X7 Fan USER MANUAL DESIGNED FOR INDUCED-DRAFT COOLING TOWER APPLICATIONS

568X, 587X, 588X Series

Vertical Ring-section Pump WKTB. Type Series Booklet

Installation and Operating Instructions

Patterson/AMT Inline Circulator Pump Refer to pump manual for General Operating and Safety Instructions.

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Model: 1200 Model: 1200-G Model: 1200-N Float-Controlled Condensate Trap, PN 40

TD E. OPERATION MANUAL CMVeco Plastic industrial fan

MODEL 652A MODEL 654A MODEL 652A MODEL 653A MODEL 651A AURORA. 650 Series SINGLE STAGE SOLIDS HANDLING PUMPS

Proweld Equipment Owner & Maintenance Manual Maxiplast (Widos Shop 6)

380 Series Multi-Stage Centrifugal Pumps

380 Series Multi-Stage Centrifugal Pumps

3020/3120 Series DEMING PUMPS. Frame-mounted and close-coupled Enclosded and semi-enclosed impeller Capacities to 4,000 GPM Heads to 780 feet

Centrifugal Pumps acc. to DIN EN ISO 2858 with Shaft Sealing Type NCL

SuperKlean Washdown Products

AXUS - SC Short Cased Axial Flow Fans Installation and Maintenance

SWP. (Models SWP08 through SWP20) IMPORTANT! Read before proceeding! OPERATION & MAINTENANCE MANUAL

INSTALLATION AND SERVICE MANUAL FOR THE TAC1000-P FAN SERIES (PNEUMATIC CONTROL) TAC1000-H FAN SERIES (HYDRAULIC CONTROL)

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

Flow switch. Operating Manual. English manual page Page 1 of 15 Fax:

Vertical Inline Models

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

INLINE CENTRIFUGAL FAN. Centro-M OPERATION MANUAL

Operating manual 1 SAFETY REGULATIONS AND INFORMATION. Original operating manual INDEX. RG CPAP 24 V mit Powermodul 24V sensorless

1. Description INSTRUCTION FOR AIR BLAST COOLER TYPE COOL 450

Model: 1100 Float-Controlled Condensate Trap, PN 25

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

INLET DAMPER WALL FAN UNIT

Installation guide 864 MTT Multi Thermo sensor Thermometer

Please read this manual before using the machine. Please keep this manual within easy reach for quick reference.

AC6 & AC8 HORIZONTAL SERIES Sealed Metallic Centrifugal Pumps Installation and Maintenance Instructions

MECHANICAL SEAL REPLACEMENT UNPACKING MAINTENANCE. Figure 1 & 2 - Mechanical Seal Replacement

INSTALLATION AND SERVICE MANUAL FOR THE SERIES 2000 & SERIES 3000 FAN SERIES GEN 2

VERTICAL GLANDLESS PUMP

Enviro KES INSTALLATON MANUAL

Installation and assembly instructions. for standard configuration radial blowers

FOR ENGCON STONE AND SCRAP HANDLING GRAB SK05ST-SK30ST THE WIDEST RANGE ON THE MARKET

Full-line Product Overview

MNEFDD54 & MNBCDD54 GALVANIZED WALL FANS Installation, Operation, and Maintenance Instructions

MCF 500 CENTRIFUGAL FAN FOR AIR, FOR BIOGAS, LANDFILL AND NATURAL GAS

INSTALLATION AND SERVICE MANUAL FOR THE SERIES 2000 & SERIES 3000 FAN SERIES GEN 1

CombiBloc Close-coupled centrifugal pumps

INSTALLATION AND SERVICE MANUAL FOR THE SERIES 1000-P FAN SERIES (PNEUMATIC CONTROL) SERIES 1000-H FAN SERIES (HYDRAULIC CONTROL) GEN 2

REMOVE AND INSTALL AIR CLEANER ASSEMBLY

DS series STERLING PUMPS. Industrial End Suction Pumps ISO/DP

Transcription:

Montageanleitung (Original) (Translation of the original) DE MA_ 1.0 06/2014 Taperlock Clamping-bush system _0 _1 Fixed hub Inlet nozzle with IMV

1. Revision index Revision Date MA_ 1.0 06/2014 2. Safety notes (Radial Laufrad Ohne Motor) (Radial Impeller Without a Motor) are not ready-touse products but are designed as components for air conditioning, aeration and ventilation systems. The impellers with hub are prebalanced; the balancing status must be checked on the whole unit. They may only be operated when they have been installed according to their provisions and the safety level has been secured through use of safety equipment according to DIN ISO 13857 (DIN ISO 12 100) or other constructional safety measures. These mounting instructions are an integral part of the product and should be put, accessible, into safe keeping as such. The impellers are only designed to transport air or mixtures similar to air. Use in areas subject to explosions for transporting gas, mist, vapours or their mixtures is not permitted. Transport of solids or solid matter content in the conveying media is not permitted. The permitted temperature range lies between -20 C and +60 C. Only operate the impeller for its intended use and only up to the maximum permitted operating rpm according to information provided on the impeller type plate. Exceeding the max. permitted operating rpm leads to risky situations due to the high centrifugal forces generated. The impeller can burst danger to life! The max. permitted operating data shown on the type plate apply for an air density of ρ = 1.2 kg/m 3. One should ensure through rpm controlling by means of a frequency converter that the max. permissible rpm is not exceeded through a malfunction of the frequency converter. Assembly must only be performed by skilled personnel while observing instructions in the operating manual as well as valid regulations. Before performing any work on the fan or on the motor, pull out the power plug for the power supply; to replace the motor unclamp the cable on the motor terminal box. Protective equipment, which was removed for assembly work, should be attached again immediately after assembly (and before connecting to the electrical power source). Mount impellers and accessories in such a way that their stability is achieved at all times during operation. -2/8

3. Transport / Storage Check the delivery for completeness and transport damage. Radial impellers are usually delivered on Euro pallets and can be transported using a fork low lift truck. When transporting with hoisting equipment: Lay a lifting belt with an adequate load carrying capacity around a impeller blade. Only use a lifting belt which is suitable for carrying sharp-edged loads. Avoids knocks and impacts. Inform the freight forwarder if damage is found. Store the impellers in a dry, dust and vibration free environment. 4. Impeller installation with the Taperlock clamping sleeve hub The impeller is connected by means of clamping sleeves with the end of the shaft of the drive motor. 4.1 Installation Picture 4-1: Taperlock clamping sleeve 1. Clean and degrease all blank surfaces (fitting surfaces for the clamping sleeves and motor shaft or drive shaft). 2. Insert the clamping sleeve (1) into the hub (2) and bring the bores to the cover. 3. Lightly oil the threaded pins (3) and screw them in not fully tightened yet. 4. Push the impeller with the clamping sleeve unloaded onto the shaft (for a respective impeller weight with the aid of hoisting equipment), align in an axial position and tighten down the threaded pins cross-wise and evenly. Observe the tightening torque conforming to Table 4-1. Fill empty bores with grease to avoid ingress of foreign bodies. 5. Check the tightening torque on the screw connection after a operating time of about 1 hour using the required tightening torque. When using open feather key grooves, first place the feather key in the middle in the shaft groove. The feather key must take weight over its whole length. -3/8

Picture 4-2: Position of the feather key Position of the feather key: Correct: Wrong: 4.2 Disassembly Picture 4-3: Taperlock clamping sleeve 1. Loosen all threaded pins (3) and completely remove one or two threaded pins dependent on the sleeve size, lubricate and screw into the disassembly bores (4). 2. Tighten one or both threaded pins evenly until the clamping sleeve (1) is released from the hub (2). 3. The impeller can be removed. 4.3 Technical data Table 4-1: Torque table Sleeve size 1008 1108 1210 1610 1615 2012 2517 3020 3030 3525 3535 4030 4040 4535 4545 5040 5050 Screw tightening torque (Nm) 5.6 5.6 20 20 20 30 50 90 90 115 115 170 170 190 190 270 270 5. Installation of an impeller for impellers with a fixed hub 5.1 Installation Picture 5-1: Fixed hub -4/8

1. The impeller is connected by means of the fixed hub with the end of the shaft of the drive motor. 2. Slightly grease all blank surfaces (end of the shaft, hub bore). Pull the impeller with hub (1) onto the shaft shoulder (2) (transition fit). For an appropriate weight secure the weight using hoisting equipment. Provide for axial shaft securing using a bolt 3), washer (4) and lock washer (5). Observe the tightening torque conforming to Table 5-1. 5.2 Disassembly 1. Loosen the axial bolt and pull off the impeller with a hub using a suitable extraction device. 2. For an appropriate weight secure the weight using hoisting equipment. 5.3 Technical data Table 5-1: Torque table FK 8.8 M4 M5 M6 M8 M10 M12 Screw tightening torque (Nm) 2.8 5.5 9.5 23 45 79 6. Setting up equipment Wear safety shoes and safety gloves when working! Observe the safety instructions Ensure there are adequate distances from the suction and the pressure side. Performing one s own changes / modifications on the product is not permitted. A safety risk! Disassembly or attachment of components to the impeller leads to annulment of the warranty! 7. Operating conditions Do not use the impeller in an explosive atmosphere there is a hazard from spark formation. Explosion hazard! Exceeding the max. permitted operating rpm (see impeller type plate) is not permitted See safety instructions. For operation with a frequency converter ensure that there is no increase in the resonance vibration from the function Overmodulation on the frequency converter. The overmodulation function must be switched off. Avoid any dynamic stress on the impeller; no frequent load changes! -5/8

8. Initial start-up Remove any assembly residues and foreign bodies from the area around the impeller and the suction removal area. Check the direction of rotation (the direction of the rotation arrow on the impeller base disk). During initial start-up the whole unit must be checked for mechanical vibrations. Rebalancing must be undertaken if necessary. Ensure quiet low vibration running. Determine the resonance area of the whole unit. If the resonance area lies within the operating area, adjust the frequency converter in such a way that the unit can run through the resonance area quickly. Strong vibrations through rough running (unbalance; overmodulation of the frequency converter) for example due to transport damage, inappropriate handling or operation in the resonance area, can lead to product failure. 9. Maintenance and upkeep Depending on the area of use and the conveying medium, the impeller is subject to natural wear. Sediments accumulating on the impeller can lead to unbalance and therefore to damage (risk of a fatigue fracture). Check the impeller, in particular welding seams, for possible crack formation. Check the total unit regularly for mechanical vibrations. We recommend a maximum oscillation speed in a radial direction on the bearings or on the bearing shield of the motor of not more than 4.5 mm/s. If the permissible vibration values are exceeded, it is essential to rebalance the whole rotating unit according to DIN ISO 1940-1. During impeller assembly and reassembly the whole unit must be checked for mechanical vibrations. Rebalancing must be undertaken if necessary. 10 Cleaning Regular inspection, if necessary with cleaning, is necessary to avoid unbalance through contamination. Cleaning intervals are according to the degree of contamination of the impeller. The complete product must be cleaned using a moist cloth. One should not use aggressive, paint removing cleaning agents while cleaning. -6/8

11 Mounting the measuring nipple Picture 11-1: Mounting the measuring nipple Put on the measuring nipple (2) from inside through the nozzle (1) and fasten in place using a toothed washer (3) and an hexagonal nut (for ATEX made out of copper) (4). Tighten by hand, about 7.5 Nm. Ensure that the key surface of the nut is parallel to the nozzle edge (picture on the right). 12 Nozzle overlapping, gap sizes and clearances Picture 12-1: Nozzle overlapping The nozzle overlapping (ü) should be 0.5% to 2,5% of the inlet diameter (Ed). Align the impeller (1) and nozzle (2) in such a way that the gap(s) is almost even all the way around. The clearance (a) should be at least 1.0% of the inlet diameter (Ed). -7/8

Nicotra Gebhardt GmbH Gebhardtstrasse 19-25 74638 Waldenburg, Germany Tel +49 (0)7942 1010 Telefax +49 (0)7942 101170 Email: info@nicotra-gebhardt.com www.nicotra-gebhardt.com -8/8