OCFA Planning and Development Section Fees Effective September 28, 2015

Similar documents
FONTANA FIRE PREVENTION DISTRICT USER FEE LIST 2015 DEVELOPMENT SERVICES FEES PLANNING APPLICATION FEES Administrative Site Plan 516 Conditional Use

ENGINEERING/PLAN REVIEW - FEE SCHEDULE Exhibit A

Building Permit Type & Sub-Type Definitions

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

CITY OF PETALUMA FIRE DEPARTMENT. FIRE PERMIT AND HAZARDOUS MATERIALS (CUPA) FEE SCHEDULE (September 2002)

City of Santa Monica Fee Schedule Effective July 1, 2012

Fire Department Fee Schedule

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

Brighton Fire Rescue District

2006 INTERNATIONAL FIRE CODE WITH PHOENIX AMENDMENTS

7/1/2018-6/31/2019 PROTECTION AND PLANNING FEE SCHEDULE

Residential-based Care Facility R-4 Guideline

ROSELAND FEE SCHEDULE Fees Effective: July 1, 2016

RESOLUTION NUMBER RESOLUTION SETTING SERVICE FEES FOR OF FIRE & LIFE SAFETY ACTIVITIES.

Oklahoma. 265: Incorporated national codes and standards The following national codes and standards are incorporated by reference:


Requirements for the protection of High-Piled Combustible Storage (HPCS) Effective Date: January 2011

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

Large Family Daycare Guideline

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

California Fire Code (CFC) Part III contains requirements. Building and Equipment Design Features PART. Chapters 5 through 19

APPENDIX A FEES SECTION FC A01 CERTIFICATES A01.1

ATTACHMENT B FIRE CODE REQUIREMENTS FOR EXHIBITS AND SPECIAL EVENTS

Sprinkler Permit Applications

VILLAGE OF LOMBARD COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION PERMIT FEES. VILLAGE OF LOMBARD 255 E. Wilson Avenue Lombard, IL 60148

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

ORDINANCE NO NOW, THEREFORE, BE IT ENACTED BY THE CITY COUNCIL OF THE CITY OF FAIRBANKS, ALASKA, as follows:

WELLINGTON FIRE PROTECTION DISTRICT RESOLUTION #

Meeks Bay Fire Protection District

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

FIRE DEPARTMENT DESCRIPTION OF SERVICE UNIT FEE I. INSPECTION FEE

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

Fire Suppression Introduction Contact Information

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

Fire Department HEADQUARTERS Cathedral Oaks Road Santa Barbara, CA (805) FAX: (805) CODE SUMMARY

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

PLAN REVIEW CHECKLIST

*HB0217* H.B. 217 H.B STATE FIRE CODE ACT AMENDMENTS. LEGISLATIVE GENERAL COUNSEL 6 Approved for Filing: C.R. Gilbert :11 PM 6

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

SOMERSWORTH CODE FIRE PREVENTION AND LIFE SAFETY CHAPTER 21

FIRE PROTECTION SYSTEMS

Level I Chapter 1 Worksheet

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

ST. LUCIE COUNTY FIRE DISTRICT FIRE PREVENTION CODE

CLOVERDALE FIRE PROTECTION DISTRICT FEE SCHEDULE

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

To expedite the plan review and inspection processes, please refer to the information below.

Item Referenced and Amendments Building 1 Building 2 Analysis, Review and Remarks. Page 1 of 15

GENERIC PROJECT PLAN REVIEW SEQUENCE

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

September 30, Dear Fire Suppression System Contractor/Designer:

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE, 2000 EDITION SECTIONS

Plan Submittal Checklist

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

TABLE OF CONTENTS. Part I Administrative

Fire Department Fees.

CAMP VERDE FIRE DISTRICT

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Tents and Temporary Membrane Structures Packet

DOUGLAS L. BARRY FIRE CHIEF

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

COMMUNITY RISK REDUCTION BUREAU MANUAL TABLE OF CONTENTS EFFECTIVE: APRIL 1, 2016 AUTHORIZED: R. Pearce

Building & Safety PERMIT APPLICATION

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

Above Ground Fuel Tank Requirements

ERRATA TO THE 2000 INTERNATIONAL FIRE CODE. Fourth Printing, January 2002 Updated March 29, 2002

Bold items are particular to the City of Euless

2. Building Code Permits and Related Fees 2018

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

FIRE PREVENTION CODE

PLAN REVIEW SUBMITTAL GUIDE

NFPA 45 NFPA 211 NFPA 1600

Tents and Temporary Membrane Structures Permit Procedure

SOUTH METRO/CUNNINGHAM FIRE RESCUE AUTHORITY A RESOLUTION ADOPTING A FEE SCHEDULE

Fire Permit Application

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2016, EDITION

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2012 EDITION

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

TENTS AND TEMPORARY MEMBRANE STRUCTURES PERMIT PROCEDURE

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

REQUIREMENTS FOR TENTS, CANOPIES & MEMBRANE STRUCTURES

FIRE DEPARTMENT Impact Analysis Report

Fire Flow Requirements Standard

Minimum Information Required to Process your Special Occasion Application. Parking area Access to site

Narrative Reports As Regulated by 780 CMR, Section 903.0

Osceola County Department of Fire Rescue and Emergency Medical Services

Winnipeg Fire Department Fire Prevention Branch

2016 California Building Code Adoption OC amendments Summary Title/Subject Justification/Comments Action

4/13/2015. Everything a firefighter wants to tell a design professional or building code official, in one hour.

NOTICE TO PROSPECTIVE BUSINESSES STATEMENT OF INTENDED USE

Denver Fire Department Fire Prevention Division

FIRE DEPARTMENT SYSTEM PERMIT APPLICATION

PINETOP FIRE DEPARTMENT TIMBER MESA FIRE AND MEDICAL DISTRICT

2012 International Fire Code Errata (Portions of text and tables not shown are unaffected by the errata)

The definitions provided in , C.R.S., shall apply to these rules and regulations. The following additional definitions shall also apply:

Transcription:

Description (IFP) PLANNING & SITE DEVELOPMENT PR0 PR4 PR5 California Environmental Quality Act (CEQA), Environmental Impact Report (EIR), Notice of Preparation (NOP), Advance Planning requests for information or documentation on CEQA projects Small Project CUP: Single Family Residence, Commercial Remodel, New Commercial Building without on-site access Development Plan / Site Review (PCPM, PCPU, PMP) $ 417.00 $ 41.70 $ 458.70 N/A $ 175.00 $ 17.50 $ 192.50 $ 417.00 $ 41.70 $ 458.70 PR1 PR115 Map Review (A Map): Tentative Tract Map/Screen Check (PTT, PTP) Final Map Review (B Map) and/or Clearance for Print of Linen: (Engineering) $ 417.00 $ 41.70 $ 458.70 $ 241.00 $ 24. $ 265. PR120 Conceptual Fuel Modification (inspection not included) $ 951.00 $ - $ 951.00 PR124 PR145 PR146 PR150 PR155 PR160 Precise Fuel Modification (includes vegetation clearance inspection for lumber drop, final and HOA turnover inspections) Fire Master Plan Emergency access and fire hydrant location, fire lane markings or vehicle gates across emergency access drives Fire Protection Plan an alternative to CBC Chapter 7A construction requirements for development in a fire hazard severity zone Fire Master Plan public school: emergency access roads, hydrant location, fire lane markings, or vehicle gates across emergency access without inspection Temporary Fire Master Plan proposed emergency access and fire hydrant location. These roads will not remain once project is complete Residential Site Review for single family dwelling consisting of one or two units $ 990.00 $ - $ 990.00 $ 707.00 $ - $ 707.00 $ 667.00 $ - $ 667.00 EXEMPT $ - $ $ 435.00 $ - $ 435.00 $ 511.00 $ - $ 511.00 PR172 Methane Findings & Recommendations $ 460.00 $ - $ 460.00 PR174 Methane Mitigation Plan $ 386.00 $ - $ 386.00 PR180 Vehicle or Pedestrian Gates across emergency access roads $ 430.00 $ - $ 430.00 5/OTC PR182 Unenclosed Accessory Structure/Outdoor Fireplace/Fire Pit in special fire areas. Inspection not required EXEMPT $ - $ - PR184 Speed Hump review and Drive Test $ 979.00 $ - $ 979.00 30 PR186 Operations Pre-Planning Automation ( waived if criteria on handout are satisfied) $ 727.00 $ - $ 727.00 N/A PR192 Addressing Layout Developments - Commercial/Residential $ - $ - Page 1 of 5

PR200 PR204 PR208 PR212 ARCHITECTUAL Description (IFP) Total Due All A Occupancy: >,000 sq. ft. aggregate $ 1,914.00 $ 191.40 $ 2,5.40 All A Occupancy: > 1500 sq. ft.,000 sq. ft. aggregate area $ 1,353.00 $ 135.30 $ 1,488.30 All A Occupancy: 1500 sq. ft. $ 1,001.00 $ 0. $ 1,1. E: Educational other than Day Care $ 1,212.00 $ 121.20 $ 1,133.20 PR216 E: (Day Care) or I-4 Portable or Re-locatable < 00 sq. ft. aggregate E: (Day Care) or I-4 (see PR212 for any combination PR220 of E occupancies sharing common egress) $ 790.00 $ 79.00 $ 869.00 $ 1,089.00 $ 8.90 $ 1,197.90 PR224 B,F,M,S Occupancies when required by Building Official $ 1,247.00 $ 124.70 $ 1,371.70 PR232 H-1, H-2, H-3, H-4 or L: S-1: Motor Vehicle Repair Garages PR236 (Chemical classification fee included for above ground hazardous materials PR240 S-1: Aircraft Repair Hanger H-5 Occupancy PR244 PR248 I-1, I-2, I-2.1; R-2.1 Occupancies: Structures with nonambulatory or incapacitated occupants $ 1,909.00 $ 190.90 $ 2,099.90 $ 1,028.00 $ 2.80 $ 1,130.80 $ 19.50 $ 214.50 $ 19.50 $ 214.50 $ 19.50 $ 214.50 PR256 I-3: Structures with restrained occupants < 3 cells $ 628.00 $ 62.80 $ 690.80 PR260 I-3: Structures with restrained occupants > 3 cells $ 2,831.00 $ 283. $ 3,114. PR264 R-1 or R-2: Hotels, motels, apartments, condominiums with 50 dwelling units per building PR268 R-1 or R-2: Hotels, motels, apartments, condominiums with 51-150 dwelling units per building. $ 480.50 $ 48.50 $ 533.50 $ 921.00 $ 92. $ 1,013. PR272 R-1 or R-2: Hotels, motels, apartments, condominiums with >150 dwelling units per building. $ 19.50 $ 214.50 PR276 R-4: Licensed residential care/ assisted living facilities and similar uses serving 7-19 clients. Facilities serving 6 or less clients, submit only to PFS PR280 R-4: Licensed residential care/assisted living facilities and similar uses serving 20 clients. PR285 Hi-Rise: Structures that are 55 ft. or higher measured from lowest point of fire department access $ 19.50 $ 214.50 $ 19.50 $ 214.50 $ 3,304.00 $ 330.40 $ 3,634.40 Page 2 of 5

SPECIAL EQUIPMENT & SYSTEMS Description (IFP) PR300 Above-ground Storage Tank: including equipment (AST) $ 980.00 $ 98.00 $ 1,078.00 PR305 PR3 PR315 PR318 PR320 PR322 PR324 PR326 PR328 Dispensing from Underground Storage Tank: New Installation (Single fee for all tanks at a single location) [Above-ground safety/components only] $ 777.00 $ 77.70 $ 854.70 Dispensing from Underground Storage Tank: Repair, alteration, $ Abandonment (Above-ground safety/components only) 465.00 $ 46.50 $ 511.50 Hazardous Material Process/Storage for Non - H Occupancies: (Must use with PR318-PR328) Also for outdoor LPG exchange stations; separate chemical $ 699.00 $ 69.90 $ 768.90 classification review not required. 1-5 chemicals $ 197.00 $ 19.70 $ 216.70 6-15 chemicals $ 460.00 $ 46.00 $ 506.00 16-50 chemicals $ 592.00 $ 59.20 $ 651.20 51-0 chemicals $ 724.00 $ 72.40 $ 796.40 > 0 chemicals Unusual chemicals/quantities $ 1,164.00 $ 116.40 $ 1,280.40 $ 19.50 $ 214.50 PR330 High-Piled Storage: code/commodity compliance $ 1,296.00 $ 129.60 $ 1,425.60 PR335 PR340 PR345 PR350 PR355 PR360 Commercial Cooking Hood and Duct System (per system) Suppression System ONLY Refrigeration Unit and System: having a refrigerant circuit containing more than 220 pounds of Group A1 or 30 pounds of any other refrigerant Spray Booth/Spraying Area: mechanically ventilated appliance provided to enclose or accommodate a spraying operation (Spraying room see H2) Gas Systems: medical gas, industrial gas (including piping and manifolds) Dry Cleaning: (includes cleaning solution) Quantity must exceed 330 or 660 gals Special Equipment: industrial ovens, vapor recovery, dust collection $ 435.00 $ - $ 435.00 5/OTC $ 1,095.00 $ 9.50 $ 1,204.50 $ 752.00 $ 75.20 $ 827.20 $ 1,252.00 $ 125.20 $ 1,377.20 $ 777.00 $ 77.00 $ 854.70 $ 611.00 $ 61. $ 672. PR362 Photovoltaic System Residential $ 204.00 $ 20.40 $ 224.40 PR363 Large Solar System Commercial $ 463.00 $ 46.30 $ 509.30 PR365 PR375 Special Extinguishing System: dry chemical, CO2, FM 200, foam liquid systems, inert gas (Halon, Inergen, etc.) Battery Systems, Stationary Storage and Cell Sites: (chemical quantities > 50 gallons) $ 483.00 $ 48.30 $ 531.30 $ 716.00 $ 71.60 $ 787.60 PR380 Smoke Control Systems: review of rational analysis $ 1,564.00 $ - $ 1,564.00 PR382 Smoke Control Systems: design/testing includes 1 submittal meeting with customer $ 3,397.00 $ - $ 3,397.00 Page 3 of 5

Description (IFP) FIRE SPRINKLER AND UNDERGROUND SYSTEMS PR400 One or two family dwelling - Custom Home (single lot) PR401 One or two family dwelling - Existing (single lot) TI to NFPA 13D Fire Sprinkler System: PR402 < 25 heads w/out calculations. One or two family dwelling - Existing (tract or custom) PR405 PR406 PR4 PR415 PR420 PR425 PR430 PR435 One or two family dwelling - within new tract developments NFPA 13D Multi-Purpose Fire Sprinkler System: (tract, custom or existing home) (FOR INTERNAL TRACKING PURPOSE) NFPA 13R Fire Sprinkler System: Multi-family dwellings 3 to 16 units per building NFPA 13R Fire Sprinkler System: > 16 units New NFPA 13 Fire Sprinkler System: 0 heads with 1 riser New NFPA 13 Fire Sprinkler System: > 0 fire sprinkler heads with 1 riser 25 heads without calculations 26-99 heads without calculations PR440 0 heads OR other TIs requiring calculation review Pre-Action Fire Sprinkler System: PR445 Includes the fire alarm system when submitted together $ 655.00 $ - $ 655.00 $ 624.00 $ - $ 624.00 $ 400.00 $ - $ 400.00 5/OTC $ 439.00 $ - $ 439.00 $ - $ - $ - $ 1,0.00 $ - $ 1,0.00 $ 1,121.00 $ - $ 1,121.00 $ 668.00 $ - $ 668.00 $ 1,037.00 $ - $ 1,037.00 $ 387.00 $ - $ 387.00 5/OTC $ 620.00 $ - $ 620.00 $ 874.00 $ - $ 874.00 $ 638.00 $ - $ 638.00 PR450 New or TI to NFPA 13 In-Rack Fire Sprinkler System $ 1,120.00 $ - $ 1,120.00 PR455 NFPA 13 Small Hose Stations $ 439.00 $ - $ 439.00 NFPA 14 Class I, II or III standpipes PR460 $ 830.00 $ - $ 830.00 (includes all standpipes within a single building) PR465 Fire Pump Installation $ 1,208.00 $ - $ 1,208.00 Underground Fire Protection System: PR470 single hydrant OR single riser connection $ 466.00 $ - $ 466.00 PR475 Underground Fire Protection: Underground Fire Protection System: for each additional connection for $ hydrants/risers - use with PR470 189.00 $ - $ 189.00 PR480 Underground Repair $ 492.00 $ - $ 492.00 5/OTC Page 4 of 5

Description (IFP) FIRE ALARM SYSTEMS Fire Sprinkler and Fire Alarm Monitoring system up to 5 initiating PR500 devices/or up to 20 notificaton devices Fire Alarm System: 6-15 initiating devices and/or 21-40 PR5 notification devices PR520 Fire Alarm System: 16-30 initiating and/or > 41-80 notification devices PR530 Fire Alarm System: > 30 initiating devices and/or > 80 notification devices $ 334.00 $ - $ 334.00 5/OTC $ 599.00 $ - $ 599.00 $ 879.00 $ - $ 879.00 $ 1,213.00 $ - $ 1,213.00 PR6 Field Review/Inspection Underground Repair $ 397.00 $ - $ 397.00 N/A ADMINISTRATIVE ACTIVITIES Coordination/Pre-submittal Meetings: (Initial 2 hours) PR900 see PR928 for hourly fee after initial 2 hrs. $ 553.00 $ - $ 553.00 N/A PR905 Written Response to Inquiry $ 454.00 $ - $ 454.00 PR9 Alternate Method and Material Request PR920 PR922 PR924 PR926 PR928 PR940i PR942i Plan Resubmittal: charged on 3rd and each subsequent submittal Plan Revision (% Only Applies When Routed by City) Re-Stamp of Plans with wet stamp when submitted with approved plans Accelerated Plan Review (fee is in addition to base fee assessed for plan review) Plan Review Time and Materials fee: Charged for miscellaneous applications such as unusual time intensive projects, research, travel time, etc. See PR900 for meetings. (% Only Applies When Routed by City) Inspection Time and Materials fee: Charged for miscellaneous applications such as Time Intensive projects, research, travel time, etc. $ 383.00 $ - $ 383.00 $ $ - $ 19.50 $ 214.50 $ $ - 5 $ - $ - $ 19.50 $ 214.50 N/A $ $ - Re-Inspection fee: Charged when project is not completed or cannot be approved during regular inspection $ 208.00 $ - $ 208.00 N/A PR943 PR944i Penalty for Failure to Cancel Scheduled Inspection (Inspection must be cancelled prior to 1:00 pm the business day before scheduled inspection) Special Inspection request: after-hours, weekend, or overtime inspections **All hourly rates at 1 hour minimum with 1 hour increments thereafter Inspection $ - $ - N/A $ - $ - N/A 2015/2016 is $195/hr OTC = Plan may qualify for "Over The Counter Review". This service only provided at Headquarters. Rev 09/23/15 JT Page 5 of 5