Case Study. Custom Solutions for High Arc Flash Incident Energy and. Interlocked Electrical Enclosures. Overview: iriss.com

Similar documents
Case Study. A Geothermal Energy Generation Facility Embraces Infrared. Polymer Window Inspections. Overview: iriss.com

A Powerful Case for Infrared Windows

White Paper. Reducing Arc Flash Risks with Electrical Maintenance. Safety Devices. Abstract: iriss.com

Reducing Arc Flash Risks with Electrical Maintenance Safety Devices - Part 2

White Paper. NFPA 70E 2018 Edition Changes and Implications for. Personnel Performing Condition Based Maintenance. Abstract: iriss.

CAP Series ,,,,, The Clear Choice. CAP Series Features: Who Says Infrared Windows Have to be Round? Certifications:

INFRARED WINDOW SERIES

Are Electrical Switchgear Surveys Still the Low-Hanging Fruit of Infrared Thermography?

Enhancing Current Maintenance Practices 04. Managing the Risk 06. Constant Monitoring of Electrical Enclosures 08

White Paper. Maintenance Inspection Windows on Transformers. Maintenance Inspection Windows on Transformers. Abstract: iriss.com

infrared inspections efficient solutions. focused results.

Common Misconceptions Relating to Infrared Inspection Ports

White paper. OSHA and NFPA 70 Safer by Design The History of IRISS. Infrared Windows. Abstract: iriss.com

PGR-8800 TECHNICAL FAQ

IR Viewing Windows and Arc Ratings Dispelling the myth of Arc-Resistant IR Viewing Windows

White Paper. OSHA and NFPA 70 Understanding NFPA 70 and its. Implications in Electrical Inspections Abstract: iriss.com

DISTRIBUTION OPERATIONS AND MAINTENANCE

Thermography Report. For: (Client) at: (location)

Predictive Maintenance Training

Infrared Windows and Arc Ratings: Dispelling the Myth of Arc-Resistant IR Windows

Delta T Alert: Wireless Temperature Monitoring of Electrical Enclosures

Electrical Safety Compliance: NFPA 70E

Monitoring of Electrical Equipment Failure Indicators and Alarming

VPFR. cma. Product Brochure. Industrial-Grade Infrared Inspection Viewing Panes

Fluke IR Windows Easier NFPA 70E compliance without compromising on product performance.

Fluke IR Windows Easier NFPA 70E compliance without compromising on product performance. Fluke-Direct.com

NFPA 70B and CSA Z463 Standards for Electrical Maintenance Where Does Airborne Ultrasound Fit In?

SEL Arc-Flash Solutions

A WORLD WITHOUT DOWNTIME

WHY ELECTRICAL PREVENTIVE MAINTENANCE IS ESSENTIAL TO A SAFE AND PRODUCTIVE WORKPLACE

SEL Arc-Flash Solutions

Electrical Preventive Maintenance (EPM) Program

How to reduce exposure to arc flash hazards

RESNET Infrared Inspection Standard and Certification

NECA S System Approach to Electrical Safety for NFPA 70E

Engineering Design & Testing Corp./EDT Engineers, P.C.

NECA S System Approach to Electrical Safety for NFPA 70E

Rutgers Environmental Health and Safety (REHS)

Guidance on Video Smoke Detection Technology (VSD)

Risk Mitigation of Aging Electrical Infrastructure

NFPA 70B and the Importance of Electrical Predictive Maintenance

Electrical Hazards and NFPA-70E: Protecting Your Employees

For Complete Security

Certification of Thermographers

ELECTRIC SERVICE EVALUATIONS ELECTRICAL / BOILER REPLACEMENTS. Clarkstown Central School District. June Arch Proj. #

Industrial fire alarm systems

CONTINUOUS MONITORING IS ON THE RISE:

ARAMARK CLEANROOM SERVICES LOS ANGELES, CALIFORNIA

Infrared Business Tips & Insight

THERMAL DIAGNOSIS OF MV SWITCHBOARDS: A COST-EFFECTIVE, DEPENDABLE SOLUTION BASED ON AN OPTICAL SENSOR

T22 - Arc Flash Hazards and Arc Resistant Equipment- Understanding the Standards

Hunting the Mighty Milliwatt- The next Technology Step

Vaults 5/03/2015. Introduction. Vault Types. Stand alone building Free standing structure VAULTS

Infrared Inspection Reference Letters Commercial & Residential

Surface Acoustic Wave Technology based Temperature Monitoring of High Voltage and High Current Switchgear Boxes

Changes to NFPA 70E. - The Role of PdM &Safe PdM Work Practices. Tim Rohrer Exiscan LLC

SUMMARY: Policy Title: Electrical Safety Work Practice Program. Policy Number: UNIV-EHS 430 Policy Approved: January 2014

NFPA 70E Arc Flash Considerations for MV Equipment. By: Dominik Pieniazek, P.E. HV Engineering, LLC

Crime Central Station Burglary Alarm Systems

LASER SAFETY. Class 2 and 2a - low power, low risk Class 2 and 2a lasers have low power and emit visible light. They will cause harm if viewed

Liebert Fin/Tube Condenser Warranty Inspection Check Sheet

Property risk solutions

Networked Access Control Panel. Installation Guide

The safe way to verify the absence of voltage.

Implementing an Energized Electrical Work Program. SESHA Hill Country Chapter. Brett Jay Davis, PE Zephyr Environmental Corporation

VeriSafe Absence of Voltage Tester The safe way to verify the absence of voltage

Centennial Energized Electrical Work Permit Instructions

Winston-Salem State University Campus Master Plan 2016 Update

Electrical Design Guidelines Table of Contents

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

Standards for MV switchgear rated for arc flash protection

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Power Isolation Solutions. Arc Flash Prevention Starts Here

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection

C-NRPP Quality Assurance Guidance for Radon Test Devices

Heat Transfer and Your Electric Bill

Why are infrared cameras indispensable for building inspections?

Optimal control for superior lighting performance

NFPA 70E Electrical Safety & Arc Flash Training

Managing technical risks

HESNI ANNUAL CONFERENCE May 3, 2012 Aramark Conference Center, Downers Grove

TAPPI PEERS Working Towards a Safer

NECA & Salisbury Assessment Solutions Partnership

PROTECTING AGAINST ARC FLASH HAZARDS

Advantage Services Capabilities

University of Maryland Baltimore. Radiation Safety Procedure

2017 NEC: Impact to Electrical System Designs

Summary of Comments (Washington Revisions November 7, 2000) Update November 27, 2000

Lloyd s Register Type Approval System Test Specification Number 3

Black Body Calibration Source User Manual

Utilizing Finite Element Analysis (FEA) for Flexible Heater Designs

Safety Meeting Topic #37 NFPA 70E What is it?

SAVE: Self-organizing Air VEnt System

TIAMA recognizing critical defects immediately at the hot-end thanks to the Tiama HOT eye

Arc Flash Codes & Compliance: What You Need to Know to Deliver Both Protection and Performance

6/23/ National Electrical Contractors Association and Intec, Inc.

25 TEXAS ADMINISTRATIVE CODE Radiation Safety Requirements for Analytical and Other Industrial Radiation Machines

KTX 1, KTX 2, KTX 3, KTX 4. User Manual Electric Heating KTX 1, KTX 2, KTX 3, KTX 4.

Industrial Radiography (IR) General overview. R. Berden

WHAT TO EXPECT DURING A FIRE DOOR INSPECTION

Transcription:

Custom Solutions for High Arc Flash Incident Energy and Interlocked Electrical Enclosures By Mark Bowling, Level II Thermographer, IRISS Inc. & Rick Miner, Level III Thermographer, Thermal Techniques Overview: Many facilities have embraced the safety requirements of NFPA 70E and the safetyby-design features now available from most electrical switchgear manufacturers. Many times in the past, however, failure to initially design for maintenance safety has made infrared inspections impossible for many critical and valuable distribution assets. Rightfully, safety has become the priority but that does not mean we have to compromise infrared imaging and electrical maintenance best practices.

Much has been written about the need and use of infrared windows in high arc flash and interlocked electrical cabinets. Proper selection and retrofit placement of infrared viewing windows can result in finding thermal issues that could have gone undetected until sudden equipment failure resulted in loss of power or an even more catastrophic thermal event. The NFPA estimates that 25% of fires in businesses and institutions are linked to a malfunction of electrical equipment, wiring, or both. Recognizing this, many fire insurance providers are now making annual infrared inspection of their client s electrical infrastructure mandatory. Many of these insurer s employ infrared surveying specialists to perform this work. Recently, an insurance company advised their client, a large US based bank s main data center facility, that they were unable to perform their mandatory infrared inspection on the thirty (30) medium voltage (12,470 V) main electrical enclosures and that a thorough thermographic inspection was therefore not possible to complete. The insurance company recommended that infrared windows and ultrasonic ports be installed to detect possible overheating and identify partial discharge issues. The facilities engineering and maintenance department were given the task of implementing a solution to become compliant with the insurer s requirements. It seemed simple enough. Just knock out a few round holes and install some infrared viewing ports. However, further thinking and investigation revealed that this was not going to be quite so simple. A power outage would need to be scheduled. Shutting down the entire facility was not an option and data center operation could not be impacted. Only ten of the medium voltage switchgear sections could be deenergized at one time. Installation had to be simple, quick and efficient to minimize the shut down time. Panels and doors would likely need to be removed from the equipment enclosures and window holes cut in a remote area to avoid contaminating the equipment with metal filings that could cause secondary issues. To accurately view all of the infrared targets (lugs, disconnect points and fuse attachments), placement of the infrared windows needed to be precise. The installation must look professional and not impact structural integrity of the equipment with excessive holes and penetrations. Suppliers of infrared windows were contacted for pricing and suggestions. Thermal Techniques of Charlotte, North Carolina, an experience certified Level III thermographer and distributor of IRISS Inc. infrared windows, volunteered to visit the site and discuss the application in more detail. The facility had a spare switch that was not in service. The interlocked door could be opened and the entire switch was examined to determine the best location of the new windows based on window field of view and distance to targets.

The existing switches had a large Plexiglass viewport (See Figure 1) in the upper portion of the cabinet and arc flash barriers between the fuses at the bottom of the cabinet. The Plexiglass window provided a direct line of site of incoming lugs, disconnect switch, and the top of the fuses. Figure 1 existing plexiglass window Plexiglass material does not allow infrared radiation to pass through it and be seen with a thermal imaging camera. The Plexiglass window was held in place by eight (8) easily removable mounting bolts. Measurements of the opening and bolt hole locations were made. This data was provided to IRISS who made a template of the opening. The template was made and sent to the site. The opening and bolt hole locations were fine-tuned so that an exact Flex IR custom replacement could be installed using the same mounting as the original Plexiglass (See Figure 2). Figure 2 Flex IR custom designed IRISS 24 high x 8 wide polymer infrared window replacement The arc flash shields between the fuses limited the available field of view for the fuse clips. By placing 4 round windows centered on the arc shields it was possible to view the top and bottom of two of the phases at one time for good comparison. Two 4 round windows were required to view all of the fuses.

By installing a polymer window to replace the Plexiglas window and two 4 round window for the fuses all components within the cabinets could be inspected with a thermal camera. The installation of an ultrasound port enabled the site to comply with the request of the insurance carrier. Figure 3 All the goals of the project were met: High voltage switch gear was de-energized IR windows were installed and returned to service without incident All electrical components can now be viewed during the scheduled annual infrared testing, while equipment is energized. The switches can be inspected at any time in compliance of NFPA 70E and safety standards. Installation was accomplished in 8 hours, well within the allocated maintenance time. The finished product is professional looking and well-engineered (Figure 3) Shortly after completion of the installation a complete infrared inspection was performed. For the first time since the building was placed in service, the medium voltage interlocked cabinets could accurately be inspected. One of the fuse clip holders was identified as operating at an elevated temperature with a high resistance connection, and repairs were subsequently scheduled. (See Figure 4)

Figure 4 The expertise of Thermal Techniques and Flex IR custom retrofit solutions from IRISS Inc. reflects the state-of-the-art in Maintenance Inspection Solutions available. Contact us today for help implementing a safer way to perform Condition Based Maintenance tasks at your facility.