PROCEDURES FOR VACUUM MODLING FILTER SAMPLES Chan CHECKLIST OF OPERATION. 1. Checklist for preparation of filter media (glass fiber only)

Similar documents
Test Tube Rack. Test Tube

Operator s Manual. Rev 3/14/ O Neil Rd, Macedon NY Telephone: (315) Fax: (315)

OPERATING INSTRUCTIONS FOR THE TP18SX-HP

Labels for PET - Wash Water Evaluation

State of Nevada Department of Transportation Materials Division METHOD OF TEST FOR EVALUATING CLEANNESS OF COARSE AGGREGATE

Handling the Condensate. Trap Requirements

State of Nevada Department of Transportation Materials Division METHOD OF TEST FOR EVALUATING CLEANNESS OF COARSE AGGREGATE

Tornado Operations & Maintenance Manual

Solids, Total Filterable (Total Dissolved)

1. Plug electric cord to appropriate 110V 220V electrical outlet. Push the off/on switch to fill position.

Proposed ASTM Standard Method

Operator s Manual. Rev 3/14/ O Neil Rd, Macedon NY Telephone: (315) Fax: (315)

Safety Lab Goggles are required! Apron is optional!

Faculty of Technology. B. Tech. Plastic Technology. SEMESTER III(R 2013) PL6311 Polymer Chemistry Lab Requirements for a batch of 30 students

Hoshizaki America, Inc.

EDICT ± OF GOVERNMENT

TONGLI. TL Electro-spinning & Spray Unit TL-01 TONG LI TECH CO LTD

General Characteristics.3. S.M.A.R.T System Set-up...5. Start-up Procedures.6. Shut-down Procedures 8. General Maintenance..8

Switching on the pump. Measuring of PH. Aspiration of PH Down or PH up. Injection of the product. PH adjusted

LITTLE BLASTER LARRY HESS AND ASSOCIATES, INC. BLAST-IT-ALL P.O. BOX 1615 SALISBURY, NC WITH DUST COLLECTOR

STANDARD OPERATING PROCEDURE FOR VARIOUS INSTRUMENTS

D Dissolution Units Mixing Training Course P/N Rev. C

Mixing Training Course P/N Rev. D

Amerimade RCA Wet Bench SOP Page 1 of 13 Rev /22/2014

Freeze drying and alternative technologies for drying of biopharmaceutical products

TCPSeries Installation Operation & Maintenance

USED OIL RE-REFINING UNIT PRESENTATION. Manufactured by GADGIL & COMPANY PUNE

Buehler Cast N Vac 1000 Embedding System

Mixer and Blender Options for. Vacuum Drying Requirements

Setup. Important. Texture Spraying (material supplied from unit)

Medi-Vac Suction and Fluid Collection Products Catalog

AIR OPERATED CLUTCH & BRAKE BLEEDING KIT. MODEL NO: CHT637 Part No: OPERATING & MAINTENANCE INSTRUCTIONS GC01/12

Stem Propagation of Phalaenopsis Orchids

Hoshizaki America, Inc.

SAFETY PRECAUTIONS. 2) Before operating machine: - Make sure all safety devices are in place and operate properly.

English Manual for Jewelry Casting and Investing The professional choice

Saturn Booster PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE USE AND KEEP THEM FOR FUTURE REFERENCE

ACORE Filtration Co.,Ltd provides engineering,

The PURO GRAND Condensate Cleaner Installation instructions: Maintenance instructions:

GFD POWDER SYSTEMS LIMITED

HOSTA MULTIPLICATION KIT

PDS 2010 Parylene Coater SOP

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule.

HF345 S9 Operators Manual

CALIBRATION KIT #

Standard Laboratory Test Practice For Efficacy Evaluation of Interim. Carpet Maintenance Systems

As part of the V.I.P. family, you are entitled to the best protection by one of the most comprehensive warranties in the industry.

Oil TRIANCO. EuroStar Range BURNER DETAILS TRIANCO - OIL BURNER. To be retained by householder

Bottom Entry mixers. Bottom Entry mixers can also be used by themselves on low viscosity products and to wet out powders.

Cleaning unit for coolant. :_decftez`_>r_fr] Book No.: V2

TRUE INDUCTION DOUBLE BURNER MINI DUO COOKTOP MANUAL

Steam and Gas Power Systems Prof Ravi Kumar Department of Mechanical and Industrial Engineering Indian Institute of Technology - Roorkee

The Liquid Manufacturing Plants are ideal tools for the pharmaceutical industry and food industry for the production of Oral Liquids.

CBT LW MAINTENANCE GUIDE

Leica EM CPD030 Order List Version 10/2008

Mitocell: Instructions for Use

European PET Bottle Platform

MODEL 7000 SUCTION UNIT

64 Beverage dispensing

HELIATOS Bottom Feed Connector Installation Instructions Introduction. Step 1

Hoshizaki America, Inc.

TRUE INDUCTION DOUBLE BURNER TI-2C PORTABLE INDUCTION COOKTOP MANUAL

INSTRUCTIONS CertoClav EL

TECHNICAL INFORMATION Physical Developer Catalog Nos. LPD100, LPD101

CONTENTS

Water Circulator (Chiller) & Cold Trap

Rules for Safe Operation

MICRO CLEANER. OPERATOR MANUAL Advance MODEL /10 Rev E Document Number

ETP Series - Self Priming Pumps

Hoshizaki America, Inc.

220V 3200 WATT COMMERCIAL SINGLE INDUCTION COOKTOP OPERATION MANUAL

457LAVEXDM15 DUAL MOTOR HEPA UPRIGHT VACUUM CLEANER

INSTALLATION AND OPERATING GUIDE Model: EZ 1010-HB High Pressure Garden Hose & Drip Feeder 1 Gallon Liquid / 8LB Dry Capacity

CAUTION UM120W (RIGHT TANK) FOR WATER BORNE PAINTS ONLY UM120W (RIGHT TANK) SECTION IS NOT DESIGNED FOR USE WITH SOLVENT BASED PAINT

INSTRUCTION MANUAL W-400

kemutec MIXERS AND BLENDERS kemutec POWDER MIXING TECHNOLGOY FOR THE FOOD, PHARMACEUTICAL AND CHEMICAL INDUSTRIES

BICO DULIN ROTAREX SEPARATORS

General System Layout Sketch

Vacuum Homogenizing Emulsification Machine. Instruction Manual

Installation Manual PS-225 & PS-275

Operator s Manual. Model # PS Arch Chemicals, Inc Lower River Road P.O. Box Box 800 Charleston, TN PULSAR

AirTMSteerable ULTRA LITE

Using the Lely Robot Sampler CanWest DHI Robot Manual

GB National food safety standard Determination of benzoic and sorbic acid in milk and milk products

Record your serial number here: Read all safety instructions for safe and effective use. Warranty included.

SELF-CONTAINED FLAKER

Policy # MI_WASH Department of Microbiology. Page Quality Manual TABLE OF CONTENTS APPENDIX I STERILIZATION AND GLASS WASHING TECHNICAL MANUAL...

Hoshizaki America, Inc.

Hoshizaki America, Inc.

SERVICE/INSTALLATION MANUAL ICE ONLY DISPENSERS MODELS-IOD150, IOD200 AND IOD250

Custom Products for Research. Kugelrohr Short Path Distillation

Glass Wool Production Line

Endoscope Reprocessor Installation Instructions Endoscope Reprocessing System

CEM Mars 5 Microwave Accelerated Reaction System

DOUBLE BURNER TI-2BN INDUCTION COOKTOP MANUAL

SUPERIOR PERFORMANCE

Weighing Balances. Hot Plate. Laboratory Oven. Muffle Furnace. Loss On Heating Oven COMMERCIAL EQUIPMENTS. General / Special Purpose Equipment

Thermo Scientific Round Top Hotplate Stirrers. Make safety and accuracy part of your routine

Laboratory Equipment. Use of equipment

MEC SHOT. [An ISO 9001:2000 Certified Company] BLAST CLEANING & FINISHING SYSTEM

Transcription:

PROCEDURES FOR VACUUM MODLING FILTER SAMPLES 10.08.2002 Chan CHECKLIST OF OPERATION 1. Checklist for preparation of filter media (glass fiber only) 1) Take 6 lit. of water in container. 2) Add dilute solution of 10% H 2 SO 4 in water. Adjust the ph of solution between 2.5 and 3.0. 3) Mount the stirrer and check it s operation in both directions. 4) Weigh the required amount of fiber for cake preparation. 5) Disperse the fibers uniformly in the container. 6) Start the stirrer. Increase the speed gradually. After every 10 minutes reverse the direction of rotation of stirrer. To reverse the direction of rotation of stirrer, reduce the speed first. Switch off the power. Change the direction of stirrer. Restart. 7) Continue stirring for about 30 minutes. Confirm uniform dispersion of fiber visually. Do manual stirring if required. 8) Assemble fiber media holder. Put the wire mesh between two disks. Tighten the screws. Put cellophane tape on the periphery to minimize air ingress. 9) Make sure that the vacuum vessel is empty. Close the lid and tighten the nuts on the periphery. Make connections to vacuum pump. Also connect fiber media holder. 10) Stop the stirrer after fibers are uniformly dispersed.

11) Add the calculated amount of Carboset 560 to the slurry. Stir to uniformly disperse the binder. Allow the slurry to settle for 24 hours. 12) Stir the slurry to a uniform dispersion after 24 hours. 13) Start the vacuum pump. Wait for some time to remove air from vacuum vessel and associated piping. (see procedures for vacuum tank operation below). 14) Dip the holder in the container. Gradually lower the holder as water level goes down. Manual stirring is required at this stage. 15) Continue till all water is removed from the container and cake is formed in the holder. 16) Take the holder out from the container. Keep the vacuum pump running for some time to remove the water in piping. Remove the holder. Stop vacuum pump. 17) Dissemble the holder. Remove the filter media in the watch glass. 18) Dry the cake in oven at 150 0 C for 30 minutes (The temperature selected is based on the binder. Check periodically to confirm that the binder does not decompose at that temperature.) 19) Remove the cake from oven after is dried completely.

Vacuum Collection Tank Operation 1. Make sure collection tank is empty. Make sure amount of fluid to be collected does not exceed the capacity of the collection tank (do not suck liquid into the vacuum pump). Close all valves. 2. Connect vacuum hose H2 to mold. 3. Turn on vacuum pump. Crack open vent valve [V1] to control pressure in collection tank to about 2 psi. 4. Open valve V2 to pull vacuum on mold. 5. After mold is filled, close valve V2. Turn off vacuum pump. 6. Remove hose from mold. Be careful to not spill the acidic water. 7. Place hose end in floor drain. 8. Turn on sink water (valves V4 and V6, close V5) to dilute the acid solution that drains from the collection tank. 9. Open valve V2 to drain the collection tank. Open valve V1 to vent the collection tank. 10. When the tank is drained, close all valves. V4 V6 V5 V1 H1 H3 Sink Mold Collection Tank Vacuum Pump H2 Floor Drain V2 V3

2. Checklist for production of nanofiber filter media ( Sparge pipe method) 1) Prepare the slurry of glass fibers as described previously (steps 1 12). 2) Setup the electrospinning apparatus. Connect the air pipe to the tank. 3) Connect the power supply. Properly ground the system. 4) Pour the slurry in the tank and start the air supply. 5) Take the polymer solution in the pipette upto the graduated mark. 6) Arrange the pipette such that the nanofibers will fall on the surface of the slurry. 7) Put one electrode in the pipette. Make sure the wire touches the surface of the polymer. 8) Start the voltage supply. Adjust the voltage to 20 KV. 9) Observe the nanofibers forming and falling on the slurry free surface. 10) Continue till the desired amount of polymer is consumed. 11) Switch off the voltage supply. 12) Switch off the air supply after 2-3 minutes. 13) Transfer the slurry in the vacuum media-forming container. 14) Follow steps 13 19 as described previously for vacuum forming the media.

3. Checklist for production of nanofiber filter media (Combined Mixing and vacuuming method in the mixing tank). 1) Prepare the slurry as suggested in the previous method. 2) Setup the electrospinning apparatus. Connect the air system and the mold to the bottom of the mixing tank. 3) Ground the system and connect the electrode to the bottom of the tank. 4) Take the polymer solution in the pipette and make sure to connect the other electrode to the solution in the pipette. 5) Adjust the voltage supply to 20 KV. 6) The nanofibers fall on the surface of the slurry and get mixed well with the glass fibers. 7) Continue till all the polymer solution has been spun into the slurry 8) Let the air agitate the slurry. Open the valve letting the vacuuming take place. 9) Once all the vacuuming has been done, switch off the air supply and remove the filter media.