Phase Two Redevelopment Project South Park Blocks

Similar documents
REQUEST FOR QUALIFICATIONS

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Request for Proposal

Request for Qualifications For Administration of the 2016 Summer Sprout Program

CITY OF SOCORRO, TEXAS REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL LANDSCAPE DESIGN SERVICES FOR PROPOSED MAURO ROSAS PARK

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

Sewanee Village + Request for Builder/Developer Proposals

Carson Street Streetscape Improvements. Request for Proposals

Request for Qualifications. Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

A. Project Description

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

Request for Proposals: Architectural/Design Guidelines

Grand River Ravines Georgetown Township

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

Policies and Code Intent Sections Related to Town Center

City of Hermosa Beach Administrative Policy #

LANDSCAPE ARCHITECTURAL ASSISTANT, 7931 LANDSCAPE ARCHITECTURAL ASSOCIATE, 7932 LANDSCAPE ARCHITECT, 7929

WOONASQUATUCKET RIVER WATERSHED COUNCIL REQUEST FOR PROPOSALS DESIGN OF GREENWAY PALETTE, SIGNAGE AND AMENITIES

TEMPLE MEDICAL & EDUCATION DISTRICT

Mill Woods Town Centre Proposed Rezoning LDA

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

URBAN DESIGN --DATA SHEET

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

City Council Special Meeting AGENDA ITEM NO. C.

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept

Historic Ottawa Beach Waterfront Walkway Park Township

RFP/RFQ. for Concept & Schematic Design Services. for Outdoor Garden Enhancements. to Cleveland Botanical Garden

Town of Borden-Carleton

City of Redlands Architectural Guidelines for Non-Residential Development

Fall 2017 Construction Update

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017

Foreword to the Third + Edition

City of Ann Arbor Page 1

City of Mequon and Village of Thiensville Community Gateway Features Request for Qualifications

4/8/2015 Item #10D Page 1

REQUEST FOR QUALIFICATIONS

PROCEDURE: FURNITURE, ART, & DÉCOR STANDARDS & REQUESTS

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

REPORT TO COUNCIL City of Sacramento

Winston-Salem State University Campus Master Plan 2016 Update

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

CHAPTER 12 DESIGN GUIDELINES FOR PUBLIC IMPROVEMENTS

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Development Solicitation Request for Qualifications. The Historic Hollering Place Development

MATHEMATICAL SCIENCES BUILDING

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Tim Heron, Design and Historic Resource Reviews ,

MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE. MacPherson Room, 10 am 5 pm

3.0 master plan concept

REQUEST FOR PROPOSAL. Grounds Maintenance

Bethesda Downtown Plan

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

ARIZONA HISTORICAL SOCIETY 949 East Second Street Library and Archives Tucson, AZ (520)

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

MASTER PLANNING: THE CRITICAL ROLE OF ELECTED LEADERS AND THE PLANNING COMMISSION Planning Michigan Conference

S C O P E O F W O R K A P R I L

Terwillegar Community Garden

City of Ashland. Attn: Laura Loucks; Sustainability Intern 601 Main Street West Ashland, WI

ARTICLE 6: Special and Planned Development Districts

University of Denver Land Use Plan Update I. Executive Summary

ART AND ARCHITECTURAL REVIEW BOARD (AARB) Project Data Sheet Revised 2014 (Due two weeks before meeting to:

QUEEN-RIVER SECONDARY PLAN

Jefferson Street Pedestrian Tunnel Mural Project 2018

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Randle Siddeley associates landscape architecture environment urban design

SPECIFIC PLAN Requirements

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION

Purpose of the Master Plan

Chapter Master Planned Communities (MPC) District

DRAFT. October Wheaton. Design Guidelines

CHARLES COUNTY GOVERNMENT RFP NO PORT TOBACCO COURTHOUSE GREEN PRELIMINARY DESIGN

Our Legacy Projects DOWNTOWN JACKSONVILLE MASTER PLAN

Planning Districts INTRODUCTION

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Purpose of the Master Plan

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

DOCUMENT ADVERTISEMENT FOR BIDS

Complete Neighbourhood Guidelines Review Tool

3/22/2011. City Council City Hall Wilmington, North Carolina Dear Mayor and Councilmembers:

Leadership This is currently a multi-disciplinary effort, led by the following students:

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

Annual Fire Systems and Backflow Preventers Testing

implementation r expression in landscape

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Dundas Place Flexible Street Public Information Centre

ARRANMORE HOMEOWNERS ASSOCIATION LANDSCAPE POLICIES PROCEDURES AND REQUIREMENTS. Revised July 2009

December 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

EXISTING CONDITIONS 41. Existing Conditions

A Better City Request for Qualifications

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

Transcription:

Portland State University PDXScholar Portland City Archives Oregon Sustainable Community Digital Library 1-13-1986 Phase Two Redevelopment Project South Park Blocks Portland (Or.). Development Commission Let us know how access to this document benefits you. Follow this and additional works at: http://pdxscholar.library.pdx.edu/oscdl_cityarchives Part of the Urban Studies Commons, and the Urban Studies and Planning Commons Recommended Citation Portland (Or.). Development Commission, "Phase Two Redevelopment Project South Park Blocks" (1986). Portland City Archives. Paper 38. http://pdxscholar.library.pdx.edu/oscdl_cityarchives/38 This Memo is brought to you for free and open access. It has been accepted for inclusion in Portland City Archives by an authorized administrator of PDXScholar. For more information, please contact pdxscholar@pdx.edu.

January 13, 1986 PORTLAND DEVELOPMENT COMMISSION Patrick L. LaCrosse Executive Director 1120 SW. Fifth Avenue Portland, Oregon 97204 (503) 796-5300 Telex 705132 POKTDEV PTL UD TO: FROM: SUBJECT: Interested Consultants Lawrence L. Dully, Director of Portland Development Commission Request for Qualifications for Design Services for th'e South Park Blocks The Portland Development Commission, in conjunction with the Bureau of Parks and Recreation, invites you to submit your qualifications for design services for the redevelopment of three South Park Blocks. All applicants responding to this request must submit their qualifications no later than Monday, January 27, 1986, 12:00 p.m. Five copies are required at that time. Information pertaining to submittal requirements is contained in the attached document. If you have any questions regarding the project, please call Marlene Salon at 796-5120. LLD:bls Attachment

January 13, 1986 PORTLAND DEVELOPMENT COMMISSION Patrick L. LaCrosse Executive Director 1120 SW Fifth Avenue Pbrtland, Oregon 97204 (503) 796-5300 Telex 705132 PORTDEV PTL UD TO: FROM: SUBJECT: Interested Consultants Lawrence L. Dully, Director of Portland Development Commission Request for Qualifications for Design Services for trfe South Park Blocks The Portland Development Commission, in conjunction with the Bureau of Parks and Recreation, invites you to submit your qualifications for design services for the redevelopment of three South Park Blocks. All applicants responding to this request must submit their qualifications no later than Monday, January 27, 1986, 12:00 p.m. Five copies are required at that time. Information pertaining to submittal requirements is contained in the attached document. If you have any questions regarding the project, please call Marlene Salon at 796-5120. LLD:bls Attachment

REQUEST FOR QUALIFICATIONS FOR THE SOUTH PARK BLOCKS PHASE TWO REDEVELOPMENT PROJECT INTRODUCTION The Portland Development Commission and the Bureau of Parks and Recreation are jointly managing the redevelopment of the three South Park Blocks between SW Salmon and SW Jefferson in downtown Portland. This project is an element of the Development Commission's South Park Block Urban Renewal Plan and will be paid for from tax increment proceeds. The City is seeking professional landscape architectural/urban design services for the detailed design of specific park improvements for these three blocks. Interested consultants should be prepared to begin work on the project in early January, 1986. Construction is planned for 1986-87. This project is intended as a continuation of the South Park Blocks Phase One Redevelopment Project completed by the Bureau of Parks and Recreation in 1984. The recently completed renovation of the three blocks betweensw Jefferson and SW Market provides a basic structure and materials palette that should be continued in the design of the remaining blocks. The goals and recommended improvements contained in the 1980 SOUTH PARK BLOCKS FRAMEWORK MASTER PLAN will guide the redevelopment process. The SOUTH PARK BLOCKS FRAMEWORK MASTER PLAN outlines a concept that emphasizes the formal structure and pedestrian function of the South Park Blocks. It proposes the coordinated renovation of the Park Blocks, improvements to enhance the relationship between the park and adjacent properties, a de-emphasis of SW Park and SW Ninth as traffic streets, and the creation of an environment which can attract and maintain residential and cultural uses. The improvements constructed in 1984 on the three blocks betweensw Jefferson and SW Market are consistent with the above stated guidelines and historic evolution of the Park Blocks. The "soft" landscaped character of the Park Blocks was strengthened by a substantial widening of the turf area which accomplished added protection for the established trees on the park's perimeter as well as a de-emphasis of the adjacent rights-of-way as traffic streets. A double promenade with mid-block plazas and mid-block walkways forms the basic structure of the design. Ample lighting illuminates both the interior of the blocks and adjacent rights-of-way. SOUTH PARK BLOCKS HISTORY AND DESCRIPTION The South Park Blocks occupy a prominent position in downtown Portland, Oregon. Located along SW Park and SW Ninth between SW Salmon andsw Jackson Streets, these blocks provide the only open space within the City's RX zone. The RX zone is the area of downtown designated for high density residential development. The Park Blocks were dedicated for park use in 1852 by Daniel Lownsdale, a local businessman. Lownsdale's donation had been prompted by a tour he made of European cities where he had witnessed the practice of creating urban open spaces, plazas and landscaped promenades. Impressed with the impact these parks had upon the image and economic value of a community and

well-being of its citizens, he dedicated the South Park Blocks at a time when the City of Portland contained only 1,000 people clustered along the banks of the Willamette River. During the 1870's, the area adjacent to the South Park Blocks developed into a residential neighborhood. It was also during this time period that several educational and religious institutions were attracted to the perimeter of the park. In 1885, the City appointed its first "park keeper", and the South Park Blocks began to develop as a formal promenade. Early park improvements included the removal of tree stumps, planting of formal rows of elm trees, and seeding of the open space with grass. During the 1880's and 1890's, many of the adjacent blocks were subdivided for modest priced residential homes. A decade later, apartment development began adjacent to the South Park Blocks. The formal park landscape was augmented over the years with pathways, lighting, park furniture and sculpture. In the 1920's and 1930's, additional institutional buildings were constructed adjacent to the South Park Blocks. The Masonic Temple was completed in 1927, and the Portland Art Museum opened its first wing in 1932. In 1952, Portland State University established its campus around the SW Market to SW Jackson Streets segment of the South Park Blocks. These six blocks were redeveloped by the University in the 1970's into a traffic-free campus mall. In the I960 1 s, the Oregon Historical Society constructed its main headquarters across from the Portland Art Museum. The most recent addition to the South Park Blocks is the Portland Center For The Performing Arts along the southeast boundary of the park. Additional public and private improvements are currently being planned and promoted as part of the Portland Development Commission's 1985 South Park Block Urban Renewal Plan. Programmed activities in the South Park Blocks currently include: 1. Art Quake, Portland's annual end-of-summer arts festival. 2. Park Block Revels, an annual mid-winter fair sponsored by the adjacent cultural and religious institutions. 3. Concerts, sponsored by the Park Bureau and adjacent institutions. PROJECT GOAL: This project addresses the need for rehabilitation of a historic park that is a significant community asset. The proposed improvements are intended to provide for a vastly improved open space resource that will reflect the community's recreational, cultural, and housing objectives for the South Park Blocks area as well as reduce the City's park maintenance and operations costs. The completed project is intended to help identify the institutions adjacent to the park as a cultural district of regional significance. To the degree compatible with the South Park Blocks Framework Master Plan and the 1984 South Park Block improvements, the project is intended to retain the maximum number of on-street parking spaces to serve the institutions in the area.

SCOPE OF THE PROJECT: The project site is defined as SW Jefferson on the south, SW Salmon on the north, SW Ninth on the east, and SW Park on the west. Specific improvements will include, but are not limited to: 1. Demolition of existing concrete and asphalt paving and miscellaneous site furnishings. 2. Reconstruction of the pathway system. 3. Provision of a paved central activity area in each block. 4. Installation of an automatic irrigation system. 5. Installation of new lighting and site furnishings. 6. Realignment of the curbs on the east and west sides of the park. 7. Restoration of the Shemansky Fountain. Detailed design of the improvements listed above should be based on the design and program goals outlined in the SOUTH PARK BLOCKS FRAMEWORK MASTER PLAN as well as a current assessment of the needs of existing and future user groups. It is assumed that the general block layout and materials palette used in the Phase One Project will be repeated to create a harmonious, unified design statement. WORK PROGRAM FOR SCOPE OF SERVICES PHASE ONE -- Data Collection, Assessment, Program Development I. TASKS: A. Hire a licensed civil engineer to develop a detailed topographic survey of the project area. Confirm survey requirements with the permit section of the Bureau of Transportation Engineering. Review surveyor's scope of work with Park Bureau prior to commencement of fieldwork. B. Inventory existing physical and visual conditions. C. Develop Design Program. 1. Collect and review all data from various City agencies relevant to the project. This task includes, but is not limited to collection and review of the following: a. South Park Blocks Framework Master Plan 1980. b. Specs and drawings of the 1983-84 Phase One Redevelopment Project.

c. "As-Builts" from the Mt. Tabor Yard record drawings file. d. Arboriculturist's evaluation of the trees provided by the Park Bureau. e. Street improvement plans and architectural plans for the Performing Arts Center. f. Information provided by the Portland Development Commission including the South Park Blocks Urban Renewal Plan. 2. Meet with PDC staff and Park Bureau staff in planning, maintenance and cultural programming to identify design issues, park needs and maintenance considerations and capabilities. 3. Review and refine a design program provided by the City's Project Manager. 4. Based on recommendations in the 1980 Framework Master Plan and current user needs, assess the suitability of the current locations of the Shemansky Fountain and Lincoln Statue within the South Park Blocks. (It is anticipated that these features will remain part of the South Park Blocks but may be relocated within the project area.) 5. Assess the cost of restoring the Shemansky Fountain using a qualified sub-consultant. 6. Meet with representatives of City agencies as necessary to discuss design issues as they arise. D. Schematic Design: 1. Prepare alternate designs with preliminary cost estimates for the project. 2. Review with City's Project Manager, PDC, Park Bureau and other City staff. 3. Present recommended schematic design(s) to Design Review Commission staff at a pre-application meeting. Present to other City commissions, bureaus and agencies as necessary. II. PRODUCTS: A. Written and graphic inventory of existing physical conditions highlighting opportunities and constraints. B. Written program statement identifying design opportunities for the interiors of the blocks. C. Schematic design plans, sketches, and preliminary cost estimates. PHASETWO -- Design Development I. TASKS: A. Refine design solution based on reviews and prepare a final design solution. B. Review with City's Project Manager, PDC, Park Bureau and other City staff.

C. Prepare an application for formal Design Review Commission review and assist the City's Project Manager in presenting the proposed plan to the Commission and City Council as necessary. D. Finalize the design solution. II. PRODUCTS: A. Design development plans, sections, elevation, and cost estimates. B. Materials for Design Review application and presentation. C. Design Review approval. PHASE THREE -- Construction Documents I. TASKS: A. Prepare final technical specifications, plans and final cost estimates. Specifications to include state-of-the-art tree protection measures for during and after construction. B. Review progress of work at regular intervals with the City's Project Manager. C. Assist the City's Project Manager in applying for the necessary right-of-way and building permits. II. PRODUCTS: A. Eight sets of construction documents and four sets of final cost estimates for Park Bureau and PDC review and approval. PHASE FOUR Bidding I. TASKS: A. Attend prebid conference. B. Prepare addenda, if necessary, for PDC to issue 5 days before bid opening. C. Review and advise on substitution requests. D. Revise plans and specifications if bids received are above and beyond the available construction budget. E. (PDC will be responsible for soliciting bids and awarding the construction contract.)

PHASE FIVE -- Construction PROJECT I. TASKS: Administration A. Assist the Portland Development Commission in carrying out its administrative responsibilities during construction. (PDC will provide administration of the construction contracts.) This includes periodic site visits, review of submittals, preparation of documents to support change orders, preparation of punchlists, review of construction methods and materials, and interpretations of the construction documents. MANAGEMENT: The selected consultant will enter into a contract with the Portland Development Commission. The project will be jointly managed by the Portland Development Commission and the Portland Park Bureau. Daily management of all aspects of the planning, detailed design and construction document phases of the project will be coordinated by the Park Bureau's representative, Marlene Salon. PDC project coordinator for the South Park Blocks Urban Renewal Area Plan, Larry Brown, will monitor the project budget and handle all procedural matters requiring Commission approval. The public approval process will be jointly managed by Park Bureau and PDC staff. PDC staff will be responsible for bidding, awarding the construction contract, and daily administration of the construction contract. During the construction phase of the project, responsibility for direct communication with the design consultants will shift from the Park Bureau to PDC staff. SUBMITTAL INFORMATION: Five copies of each firms qualifications must be received no later than 12:00 p.m., January 27th, 1986. All submittals should be labelled THE SOUTH PARK BLOCKS and addressed or delivered to the Portland Development Commission, Downtown Development, (Attn: Marlene Salon), 1120 SW Fifth Ave., 11th Floor, Portland, Oregon 97204. The submittal should contain the following information: 1. A letter of transmittal stating the firm's interest in being considered for the project. 2. A statement of qualifications indicating the firm's past experience on similar projects. The names, qualifications and examples of work for both the firm and personnel that will be working on the project. Identify the role of individuals to be assigned to the project. Clearly indicate previous clients for similar projects and the name and telephone number of a reference for each project.

INFORMATION: All questions regarding this project should be directed to Marlene Salon, at the Park Bureau, 1120 SW Fifth Ave., Room 502, Portland, Oregon, 97204-1976, 796-5120. Copies of the SOUTH PARK BLOCKS FRAMEWORK MASTER PLAN are available at the Park Bureau and copies of SOUTH PARK BLOCKS URBAN RENEWAL AREA PLAN are available at the Portland Development Commission. MS:jke 1/6/86