DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

Similar documents
DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION 605 PLANTING

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

Town of Fuquay-Varina

Section 815. LANDSCAPING

SECTION TREES, PLANTS AND GROUND COVERS

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball:

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

DIVISION II PLANTING SECTION 02950

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

SECTION TREE TRANSPLANTING

EXTERIOR PLANTS

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

Planting Containerized Trees

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

OVERALL LANDSCAPE PLAN

ACTIVITY: Trees, Shrubs and Vines ES 10

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

SIUE LANDSCAPE UPGRADE

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

University of Delaware

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

WMU Tree Care Plan and Policies

2-B-18-UR. Revised: 3/27/2018

A. Surface parking areas shall be constructed of bituminous paving.

These tools may be useful when constructing the rain garden. Power tools can make the work easier, but are not essential. n Stakes or marking flags

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties

A. Contractor shall provide product data for each type of product indicated.

SECTION TREES, SHRUBS AND GROUNDCOVERS

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

Construction Specification for Planting

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

SECTION LANDSCAPING

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS

Cooperative Extension

Selecting Quality Trees from the Nursery. Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida)

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

SECTION TREES, SHRUBS, AND GROUNDCOVER

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Section 9 Landscaping and Street Trees

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

L0.1 E BROADWAY TREE MANAGEMENT LEGEND. TREE MANAGEMENT PLAN Scale: 1:100. Vancouver, BC September 2018

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

Guelph Humane Society Section PLANTING Page 1

Tree Pits Construction Guide

SECTION 910 LANDSCAPING

SECTION LANDSCAPE

Don t Put a $100 Tree in a $10 Hole

SECTION 900 TURF ESTABLISHMENT

Punch-list Item Punch-list Photo Remedy for Signoff. Burlap and Wire Basket Visible (top 2/3 must be removed)

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

HALIFAX REGIONAL MUNICIPALITY

I. DEFINITIONS For the purpose of this policy the following terms, phrases, words and their derivations shall have the meaning given herein.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Parks & Recreation Tree Board - Tree Ordinance Angola, Indiana

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

PREPARING THE PLANTING HOLE

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

University of New Hampshire Scholars' Repository

OVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

ORDINANCE NO /


SECTION TURF AND GRASSES

Subsurface Infiltration Bed

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

ACADEMY OF MONTESSORI EXPANSION CONSTRUCTION PLANS

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

39 N. B Street San Mateo, California Construction Tree Protection Plan

VICINITY MAP 1" = 1000'

SECTION TREE AND PLANT PROTECTION

Appendix G. Detailed Design

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Orchard Establishment

February 20, :30 a.m. 3 p.m.

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

The following general requirements will be met for all planter box installations:

2.1.4 Roof Downspout Rain Gardens

Planting and Establishment

STREAM ALTERATION PRACTICES

Appendix D - Technical Design Criteria for BMPs

Transcription:

PART 1 - GENERAL 1.01 SCOPE A. Work covered by this section includes all of the planning, compliance, design, installation, and warranty elements for new landscaping using trees. Contractor shall furnish all materials, equipment, supervision and labor necessary for site preparation, installation/application, fertilizing, mulching, watering and protection needed for complete installation of trees. Scope shall include coordination of work with all other trades. B. References: 1. ANSI A300, American National Standard for Tree Care Operations 2. Best Management Practices: Tree Planting, by G. Watson and E.B. Himelick, Printec Press, Champaign, IL, 2005. 1.02 DESIGN CONSIDERATIONS A. Tree Location and Orientation: Designer shall specify how to excavate planting pit and place trees, by type, both on level ground and on slopes as found on project site. This should include orientation of main stem, elevation of root flair, orientation of root ball on uphill and downhill sides, and orientation and depth of backfill and rain basin relative to root flair and root ball. Provide planting detail graphics that represent actual site conditions, not simply generic graphics. B. Visibility: Trees shall not inhibit area lighting and visibility or provide hiding places. Design Consultant shall consider visibility requirements at vehicular traffic and pedestrian sight lines. Vehicular traffic sightlines shall not be inhibited by existing or future tree growth. C. Preventing Root Damage to Pavements and Underground Utilities: 1. In selecting species for placement near constructed surfaces or underground utilities (particularly water and sewer lines), ensure that tree roots will not eventually cause damage. As needed, use vertical root barriers to minimize root growth beneath surfaces. Ensure roots will not become pedestrian hazards as trees mature. 2. Tree Placement: Plant trees a minimum of 1 1/2 times their mature radius of dripline, or 10 feet (whichever is greater) away from any constructed vehicular surface or underground utility. Large trees shall be sited away from buildings a minimum of 1 3/4 times their mature radius of dripline. Exceptions require approval from the WSU PM and Landscape Architecture Staff where physical

function of trees requires closer placement. (i.e., placement of trees to create shade area in a parking lot.) PART 2 - PRODUCTS AND MATERIALS 2.01 SILVA CELLS A. Design and install in accordance with manufacturer s specifications. Select products based on site conditions, intended functions (tree rooting, water retention, runoff collection and storage, etc.) and product characteristics. Coordinate design of Silva cells with Mechanical and Electrical designers. 2.02 : A. Trees shall have a caliper of 2 inches, or less. If physical function in design or species characteristics requires larger planting stocks, variance requires approval from the WSU PM and Landscape Architecture Staff or Grounds Staff. B. Write specifications for each species used as outlined in ANSI Z60.1. Do not use blanket statements such as..in accordance with ANSI Z60.1. It is incumbent on the Landscape Architect Designer to specify standards for trees based on site, design and physical function. PART 3 - EXECUTION 3.01 EXISTING SITE A. Protection of Trees Intended To Remain On and Near Site 1. WSU has inventoried the majority of Pullman campus trees. Upon request, WSU can provide the location, description, and an assessment value for existing trees. The LA Designer shall request this as part of Inventory and Analysis, early in the design phase. 2. Prior to the beginning of construction, the WSU Tree Committee shall evaluate the condition of trees that are to be protected. 3. See protection and replacement requirements in Section 32 90 00 Landscaping and the WSU Tree Removal and Replacement Policy (Appendix A of this section). B. Valuation of Trees Intended for Removal by Design: 1. The value of all new trees and plantings installed by the project shall meet or exceed the total value of trees scheduled for removal.

2. When the value of new trees and plantings is less than the value of trees scheduled for removal, the project shall reimburse the difference to the WSU Tree Replacement Fund. C. Valuation of Trees to be Salvaged and Relocated: If a tree has been identified for relocation, either within the project boundaries or elsewhere on campus, the project shall fund salvage and removal by a third party agency. The WSU PM will coordinate through the WSU Tree Committee. Any such salvage and relocation of trees by WSU shall be accomplished prior to the Contractor s Notice to Proceed. 3.02 PRIOR TO CONSTRUCTION A. Pruning: Removal of Interfering Branches and Trimmings: 1. No pruning shall be done until approved by the WSU CM and LA Staff or Grounds Staff, and shall be supervised by the CM or Grounds Staff. B. Trenching: 1. Do not route open trenches within the dripline of trees that are to be preserved. Trenching within driplines (when necessary) requires specific approval from the WSU CM and WSU Grounds Staff. i. When specifically approved by the WSU Construction Manager and WSU Grounds staff, Contractor shall minimize damage by careful placement of trenches to avoid large roots, or by tunneling around roots. ii. As a last resort, roots shall be cleanly cut using Best Management Practices. Immediately after cutting, cover ends of cut roots with wet burlap, tie in place, keep burlap wet during exposure, and remove burlap as trench is backfilled. iii. Cutting roots does not relieve the Contractor from responsibility if the tree suffers significant damage due to construction-related activities within the two-year Warranty Period. 3.03 TREE PLANTING A. General: Designer shall specify Best Management Practices for installation of trees. Specifications shall be appropriate to plant type, location, season and root-ball handling/shipping mode (bare-root, containerized, or B&B stocks). See general guidelines for all landscape materials planting in Section 32 90 00 Landscaping.

B. Soil Percolation Tests: 1. Contractor shall flood all planting pits and ensure that local infiltration allows drainage of water from pit within 24 hours. If one or more pits do not drain within 24 hours, do not plant in the affected locations and immediately notify the WSU CM to determine alternatives. 2. Protect trees at all times during planting operations. Prevent roots from drying out. Schedule and complete percolation tests before removing plants from shipping materials. 3. Contractor shall not remove trees from containers by pulling on the main stem. 4. Contractor shall handle B&B stocks using only the basket or binding. 5. Contractor shall not break containers or remove shipping materials until tree is at site of placement. C. Excavation of Planting Pit: 1. Excavations: Planting pit diameter shall be at least twice that of the root ball; pit depth shall be equal to the root ball depth. If pit location will not permit root ball to be placed on clean subgrade soils that support vigorous plant growth, do not plant in the affected locations; immediately notify the WSU CM to determine alternatives. 2. Contractor shall roughen sides of each planting pit to eliminate 'glazed' surfaces that are difficult for roots to penetrate. 3. Contractor shall remove all foreign material excavated from planting holes and shall be legally disposed off-campus. D. Placement: Contractor shall set trees in the center of planting pits in a natural position. Place in accordance with planting details for each plant type and location. E. Removal of Shipping Materials 1. Contractor shall remove all shipping materials from tree, root ball and pit, including burlap and twine, wires, wire baskets, wooden boxes, tags, flags, and pots. Remove shipping materials so as not to disturb the root ball. 2. Contractor shall legally dispose debris off campus.

F. Root Flair 1. Contractor shall place trees so that root flair is at, or slightly above, finish grade. After backfill, topsoil shall meet finish grade and extend at this elevation to a diameter of at least twice the diameter of the root ball. Topsoil shall be in firm contact with entire top outer edge of root ball. 2. If placed on a slope, place backfill and rain basin in accordance with planting details. Ensure down slope berm fully surrounds and covers downhill portion of root ball at elevation of root flair, extending laterally to a distance of at least twice the diameter of the root ball. Compact fill and place rain basin on top of berm so as to ensure that rain basin will hold water without washout, or otherwise failing. Slope downhill sides of berm to meet grade without becoming unstable. G. Backfill: Topsoil taken from the planting pits shall be used as backfill for the plant material. Backfill in 6 inch lifts using firm manual tamping and watering of each lift to eliminate air voids. H. Temporary Basin: Provide trees a temporary rain basin consisting of a ridge or berm of topsoil 3 to 4 inches high and slightly smaller than the diameter of the planting pit. Immediately fill each basin with water. Continue watering until all backfill is saturated. Water additionally as needed to keep soil moist without flooding. Maintain basin structures to assure they do not wash out or otherwise fail to retain water. Coordinate with CM when rain basins are to be removed and site leveled to finish grade. I. Support for Trees Over 6 Feet in Height 1. Contractor shall use an approved commercial support system appropriate to the conditions and manufacturer s recommendations. 2. If staking is chosen as a support system, then the following shall apply: i. At planting, stake all trees over 6 feet in height, in accordance with the specifications of ANSI A300 (unless otherwise specified). ii. At the beginning of the second warranty growing season, tree stakes shall become the responsibility of WSU. J. Wrapping Trees: Designer shall specify which trees are to be wrapped based on site, susceptibility, species characteristics and time of planting. Consult WSU LA Professional Staff.

3.04 WARRANTY A. See Warranty references in Section 32 90 00 Landscaping. END OF SECTION