BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

Similar documents

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

Wisconsin Contractors Institute Continuing Education

Information for File # JTF

Request for an Exception to the Napa County Road and Street Standards

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

HILCORP ALASKA, LLC KALOTSA PAD

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

E R O S I O N C O N T R O L

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

PS12 CITY OF TERRE HAUTE VIGO COUNTY, INDIANA DRAWING NO. EXISTING AND NEW STRUCTURE DATA TABLE JW, CM. No. DATE DESCRIPTION REVISED BY JLH ACS

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Analyzing the Bioretention Construction Sequence

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

EROSION & SEDIMENT CONTROL

Structural Storm Water Best Management Practices (BMPs)

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

Single most pervasive problem: Polluted runoff from watershed development

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

WQ-07 INFILTRATION TRENCH

Chagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440)

V. EROSION CONTROL. -Drainage swales separation -Under rip-rap protected -Under rip-rap unprotected

Case Study 6. Fitzpatrick Creek Cable Concrete Block Mat Ford

Florence County Small Commercial Land Disturbance Permit Application

PROPOSED DRAINAGE PATTERNS

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

River Corridor Overlay Zone (RCOZ) Article 5

Appendix E Preliminary Design

Appendix N. Preliminary Design

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

SECTION EARTHWORK

Rolled Erosion Control Products (RECPs) General Usage and Installation Guidelines for Slope

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

Section Specification for Geotextile Used in Permanent Erosion Control Application

5000 Acres Initiative at PCC Sylvania in Portland OR

Guidance on Preparation of Construction and Maintenance Costs

EROSION & SEDIMENT CONTROL

NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

FEB 2016 COUNTY MAP NTS

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

Technical Specification Guidelines

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

Bio-Engineering Techniques to Revegetate Streambanks

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

A DIVISION OF L & M SUPPLY EROSION CONTROL BLANKETS, WATTLES AND LOGS

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils

Soil Reclamation and Site Reinstatement

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

Information for File # ARC

CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING

RECOMMENDED BEST MANAGEMENT PRACTICES FOR RESTORATION OF WETLANDS AFTER TEMPORARY IMPACTS

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

Erosion Control for Home Builders in the. City of Jacksonville

STANDARD DETAILS QUICK REFERENCE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Table 4.7.1: Swales Potential Application and Storm Water Regulation

CONSTRUCTION DRAWINGS MODULE 6 LINER SYSTEM MONTEREY PENINSULA LANDFILL

SHEET L-5 SHEET L-4 SHEET L-7

Vegetated Filter Strips and Buffers

South Fraser Perimeter Road (SFPR)

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

Case Study Bioretention Installation and Maintenance

I N D U S T R I A L Y A R D S

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Structural Stormwater Best Management Practices

Operations and Maintenance Plan

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

Deb Grube, Sr. Zoning Officer

Low Density Projects. Design Objective

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

REMOVE 20' OF STONE WALL C.C.B. REBUILD 20' OF R=1,000.00' L=130.00' CONSTRUCTION STONE WALL ENTRANCE PER DETAIL R=1,000.00' L=65.09' DMH U.P. HYD.

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Stormwater Drainage Assessment For Single Family Residence

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

Bioretention and Permeable Pavement Maintenance


III.DRAINAGE. This section describes the use of geotextiles in underdrains for two different field conditions:

B511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511

Chesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323

Nick Sigmund, Sr. Zoning Officer

Transcription:

OKANOGAN RIVER PROJECT LOCATION SR53 COLUMBIA RIVER SR73 METHOW RIVER PATEROS SR7 SR7 BRIDGEPORT VICINITY MAP NEAR: VICINITY 2

GEBBERS FARMS INC APN 302570024 STATE HWY 7 DOUGLAS CO. PUD NO. APN 302570037 DOUGLAS CO. PUD NO. APN 302560026 DOUGLAS CO. PUD NO. APN 302570034 DOUGLAS CO. PUD NO. APN 302570036 PROJECT LOCATION DOUGLAS CO. PUD NO. APN 2400000 DOUGLAS CO. PUD NO. APN 30256400 OKANOGAN RIVER DOUGLAS CO. PUD NO. APN 302570008 DOUGLAS CO. PUD NO. APN 302572005 AREA AND ADJACENT OWNERS MAP DOUGLAS CO. PUD NO. APN 30257200 NEAR: AREA 2050253.0000 DOUGLAS CO. PUD NO. APN 302563004 2 2

75 EXISTING GRAVEL ROAD 75' WETLAND BUFFER 50' RIPARIAN SETBACK 200' SHORELINE ZONE ORDINARY HIGH WATER OKANOGAN RIVER 0 50 00 WETLAND BOUNDARY PER GRETTE ASSOCIATES 775 SCALE IN FEET EXISTING CONDITIONS NEAR: EX-COND 2050253.0000 3 2

VEHICLE TURNAROUND PRECAST VAULT RESTROOM 75 O O 200' SHORELINE ZONE 2 SILT FENCE O O PICNIC TABLE WETLAND BOUNDARY PER GRETTE ASSOCIATES 50' RIPARIAN SETBACK NON-MOTORIZED BOAT LANDING 0 40 80 SCALE IN FEET 75' WETLAND BUFFER SITE PLAN - EROSION CONTROL NEAR: ORDINARY HIGH WATER DEBRIS BOOM PLAN- OKANOGAN RIVER 2050253.0000 4 2

0 TENT PAD 75 0+00 +00 PICNIC TABLE 5+7 5+00 200' SHORELINE ZONE TRAIL 0 TENT PAD 2+00 2 0 3+00 TRAIL TENT PAD PICNIC TABLE 4+00 0+00 COVERED SHELTER TRAIL 2 3 4 +00 WETLAND BOUNDARY PER GRETTE ASSOCIATES PICNIC TABLE 0 TENT PAD PICNIC TABLE 5 +35 0 SCALE IN FEET 40 80 SITE PLAN 75' WETLAND BUFFER NEAR: ORDINARY HIGH WATER 50' RIPARIAN SETBACK PLAN-2 OKANOGAN RIVER 5 2

830 830 820 80-2.5% PVI STA 0+66.0 PVI EL 73.85' K 5. BVC 0+5.0 EL 74.2' 30' VC EVC 0+8.0 EL 72.66' BVC +60.36 EL 786.35' PVI STA +85.36 PVI EL 784.36' K 5.57 50' VC EVC 2+0.36 EL 784.6' GRADE BREAK STA:3+06.00 EL.60' GRADE BREAK STA:3+6.00 EL.28' 820 80 GRADE BREAK STA:0+27.06 EL 75.00' -7.6%.03% -0.50% -.5% 770 770 760 EG 74.4 FG EG 74.8 FG EG 74. FG 74.32 EG 72.4 FG 73. EG 78.2 FG 7.5 EG 787.5 FG 78.6 EG.6 FG 787.7 EG 784.8 FG.37 EG 784.4 FG 784.60 EG 784.3 FG 784.76 EG 784.8 FG.02 EG.0 FG.28 EG.4 FG.53 EG.5 FG.50 EG.3 FG.38 EG.2 FG. EG 784.8 FG 784.8 760 0+00 0+50 +00 +50 2+00 2+50 3+00 3+50 4+00 PRILE TRAIL PRILE STA 0+00 to 4+00 H "=50', V "=20' NEAR: PR 6 2

830 820 80 GRADE BREAK STA:4+26.00 EL 784.42' GRADE BREAK STA:4+8.47 EL 784.2' 830 820 80 840 830 820 80 GRADE BREAK STA:0+42.87 EL 786.65' GRADE BREAK STA:0+8.6 EL 786.24' GRADE BREAK STA:+.6 EL 778.5' GRADE BREAK STA:+2.6 EL 778.44' 840 830 820 80-0.55% 2.3% 4.6% -.05% -.50% GRADE BREAK STA:0+8.56 EL 786. -.50% 770 770 770 770 ORDINARY HIGH WATER 760 760 760 EG 784.8 FG 784.8 4+00 EG 784.3 FG 784.44 EG 784.3 FG 784.2 4+50 EG 784.2 FG 784.5 EG 784.5 FG 784.55 EG 784. FG 784.4 760 5+005+6.87 750 EG 784.3 FG 0+00 EG. FG.58 EG 786.4 FG 786.52 EG 786. FG 786.47 EG 786.8 FG 786.26 EG.3 FG 783.52 +00 EG.2 FG 778.5 EG 777.8 FG 750 +34.3 TRAIL PRILE STA: 4+00 to END H "=50', V "=20' TRAIL 2 PRILE H "=50', V "=20' PRILE NEAR: PR2 7 2

OKANOGAN RIVER 200' SHORELINE ZONE ORDINARY HIGH WATER 75' WETLAND BUFFER MITIGATION SITE 50' RIPARIAN SETBACK WETLAND BOUNDARY PER GRETTE ASSOCIATES 0 00 200 MITIGATION PLAN NEAR: SCALE IN FEET MITIGATION 8 2

3: MAX 3: MAX 2" 3% C L 2" 3: MAX 3: MAX 8" TYPE I RIP-RAP 3: MAX 6" 0% C L 6" 3: MAX 0.5' CSTC (MINIMUM COMPACTED DEPTH) COMPACTED SUBGRADE FIRM AND NON-YIELDING COMMERCIAL WEED CONTROL GEOTEXTILE *EXCAVATE AS REQUIRED TO ACCOMMODATE SECTION 2" COMPACTED DEPTH CSBC TRAIL SECTION NOT TO SCALE 6" PRECAST STONE BLOCK GEOTEXTILE FABRIC 4 TRAIL SECTION PRECAST CONCRETE STONE STAIRWAY NOT TO SCALE 3: MAX 2" C L 3% 2" 3: MAX 3: MAX 3: MAX COMMERCIAL WEED CONTROL GEOTEXTILE 0.5' CSTC (MINIMUM COMPACTED DEPTH) COMPACTED SUBGRADE FIRM AND NON-YIELDING *EXCAVATE AS REQUIRED TO ACCOMMODATE SECTION 2 TRAIL SECTION NOT TO SCALE 3: MAX 6" 0% C L 6" 3: MAX 8" TYPE I RIP-RAP 3: MAX 2" C L 0% 2" 3: MAX 3: MAX 3: MAX 2" COMPACTED DEPTH CSBC COMMERCIAL WEED CONTROL GEOTEXTILE *EXCAVATE AS REQUIRED TO ACCOMMODATE SECTION 0.5' CSTC (MINIMUM COMPACTED DEPTH) COMPACTED SUBGRADE FIRM AND NON-YIELDING 6" PRECAST STONE BLOCK GEOTEXTILE FABRIC 5 TRAIL SECTION PRECAST CONCRETE STONE LANDING NOT TO SCALE 3 TRAIL SECTION NOT TO SCALE DETAILS NEAR: DETAILS 2

4" X 4" PRESSURE TREATED TIMBER ANCHOR IN PLACE W/ 24" LONG NO. 4 REBAR AT 2' O.C. (SET /4" BELOW TOP 4" X 4" CONNECT CORNERS W/ (2) 3/8" X 8" SS LAG BOLTS, COUNTERSINK BOLT HEADS BACKFILL TENT PAD W/ 3/8" PEA GRAVEL T0 " BELOW TOP EDGING TABLE ANCHOR BLOCK 2 DETAILS TABLE NEAR: 3 TYP CAMP SITE SCALE "=0' 0.5' CSTC (MINIMUM COMPACTED DEPTH) OVER LANDSCAPE WEED BARRIER FABRIC 0 SCALE IN FEET DETAILS (2) 0 20 NOTE: SCALE BAR IS ESTABLISHED FOR FULL SIZE WITH SCALE BAR EQUAL TO 2" 0 2

FLOTATION 6' 3/8" CHAIN, POLY COATED, GRADE 30 2" MIN. FREEBOARD MIN 4' LENGTH, EXTEND AS NECESSARY FOR CONTAINMENT IMPERVIOUS DEBRIS BARRIER BOLT CHAIN TO GALV. ANCHOR BOLT /2" X 8" LONG 36" BALLAST POCKET TEMP. EROSION CONTROL DEBRIS BOOM N.T. S 2" DIA CONC CYLINDER 2" 2 TABLE ANCHOR BLOCK N.T. S 4" X 4" PT TIMBER OR PRECAST CONCRETE BORDER 3" (MIN) 3/8" PEA GRAVEL 3" (MIN) /4" MINUS CRUSHED SCREENINGS 3 CAMP SITE SECTION N.T. S LANDSCAPE WEED BARRIER FABRIC DETAILS NEAR: DETAILS (3) 2

POST ~ SEE STD. SPEC. 8-0.3()A FASTEN GEOTEXTILE TO POST EVERY 6" (IN.) O.C. POST ~ WOOD OR STEEL (TYPICAL) GEOTEXTILE BACKFILLED & COMPACTED NATIVE SOIL 2' - 0" MIN. FASTEN TO POST EVERY 6" O.C FLOW SELF-LOCKING TIE~NYLON 6/6 (MIN. GRADE), 20# MIN. TENSILE STRENGTH, UV STABILIZED FABRIC (GEOTEXTILE) (TYPICAL) ~~ 4" NOTES BURY GEOTEXTILE IN TRENCH ~ 4" 2' - 0" MIN.. INSTALL THE ENDS THE SILT FENCE TO POINT SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM FLOWING AROUND THE ENDS THE FENCE. 2. PERFORM MAINTENANCE IN ACCORDANCE WIT STANDARD SPECIFICATIONS 8-0.3()A AND 8-0.3(5). 3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN LOW OR SUMP AREA, THE FENCE MAY NEED TO BE REINSTALLED UNLESS THE PROJECT ENGINEER APPROVES THE INSTALLATION. SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE FENCE AT THE OVERLAP. SPLICE DETAIL (WOOD POSTS SHOWN) NOTE DURING EXCAVATION, MINIMIZE DISTURBING THE GROUND AROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTH SURFACE FOLLOWING EXCAVATION TO AVOID CONCENT- RATING FLOWS. COMPACTION MUST BE ADEQUATE TO PREVENT UNDERCUTTING FLOWS. 4. INSTALL SILT FENCING PARALLEL TO MAPPED CONTOUR LINES. SILT FENCE NOT TO SCALE WSDOT STD PLAN I-30.5-02 DETAILS NEAR: DETAILS (4) 2 2