Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Similar documents
A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

SECTION ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS

SECTION FIRE PUMP AND CONTROLS

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

.2 Section Waste Management and Disposal..5 Section Motors, Drives and Guards for Mechanical Systems.

SECTION DOMESTIC WATER PUMPS

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

University of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

Council Bluffs, Iowa Division TOC 1 TABLE OF CONTENTS DIVISION 21 FIRE SUPPRESSION

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

Construction Standards Page

SECTION DRY-PIPE SPRINKLER SYSTEMS

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

A. Section includes wet-pipe sprinkler system, system design, installation, and certification.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

SECTION PUMPS. 6. Section Steam and Condensate Piping and Specialties.

SECTION ELECTRIC WATER HEATERS

SECTION FAN COIL UNITS

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION STEAM CONDENSATE PUMPS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

SECTION WET-PIPE SPRINKLER SYSTEMS

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS

SPRINKLERS TABLE OF CONTENTS

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

WET-PIPE SPRINKLER SYSTEMS

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

A. This Section includes the following domestic water piping specialties:

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

SECTION WET-PIPE SPRINKLER SYSTEMS

A. This section includes design and performance information for fire protection and suppression systems.

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

PROJ. NO SECTION REFRIGERANT PIPING

FIRE SUPPRESSION SPRINKLER SYSTEM

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.

SECTION PLUMBING EQUIPMENT Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections.

B. Related Sections: The following Sections contain requirements that relate to this Section.

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

B. Standard-Pressure Standpipe Piping: Fire-suppression standpipe piping designed to operate at working pressure 175 psig (1200 kpa) maximum.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

1 1/8 Inch Centrifugal Pump Operation and Maintenance Guide

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

North Hanover Township School District North Hanover Township, New Jersey

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

SECTION FIRE PUMPS 1.00 PART 1 & GENERAL Description of Work. A. Provide pumps for fire suppression Section Includes

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

SECTION DOMESTIC WATER HEATERS

SECTION ELECTRIC-DRIVEN, FIRE PUMPS

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION STEAM CONDENSATE PUMPS

WET AUTOMATIC FIRE SPRINKLER SYSTEMS

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION EXHAUST FANS

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.

Dean Pump High Temperature Chemical Process Inline Pumps

SECTION ELECTRIC WATER HEATERS

DIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS

MODEL 652A MODEL 654A MODEL 652A MODEL 653A MODEL 651A AURORA. 650 Series SINGLE STAGE SOLIDS HANDLING PUMPS

DS series STERLING PUMPS. Industrial End Suction Pumps ISO/DP

SECTION FIRE-SUPPRESSION STANDPIPES

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

D. Reference Standards (Utilize latest editions available):

SECTION DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS

Port of St Helens SIA Aircraft Hanger Scappoose, OR

3020/3120 Series DEMING PUMPS. Frame-mounted and close-coupled Enclosded and semi-enclosed impeller Capacities to 4,000 GPM Heads to 780 feet

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

A. This Section includes the following fire-suppression piping inside the building:

C. Samples for Initial Selection: For units with factory-applied color finishes.

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

REFRIGERANT PIPING

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

Transcription:

SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. In-Line fire pumps. 2. Fire-pump accessories and specialties. 1.3 PERFORMANCE REQUIREMENTS A. Pump Equipment, Accessory, and Specialty Pressure Rating: 175 psig minimum unless higher pressure rating is indicated. 1.4 SUBMITTALS A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, performance curves, electrical characteristics, and furnished specialties and accessories. B. Shop Drawings: For fire pumps, motor drivers, and fire-pump accessories and specialties. Include plans, elevations, sections, details, and attachments to other work. 1. Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection. 2. Wiring Diagrams: For power, signal, and control wiring. C. Product Certificates: For each fire pump, from manufacturer. D. Source quality-control reports. E. Field quality-control reports. F. Operation and Maintenance Data: For fire pumps to include in operation and maintenance manuals. G. Approval from the AHJ (Authority Having Jurisdiction). ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS 213113-1

1.5 CLOSE OUT SUBMITTALS A. Operation and Maintenance Data. 1.6 QUALITY ASSURANCE A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. B. NFPA Compliance: Comply with NFPA 20, "Installation of Stationary Pumps for Fire Protection." 1.7 COORDINATION A. Coordinate sizes and locations of concrete bases with actual equipment provided. PART 2 - PRODUCTS 2.1 GENERAL REQUIREMENTS FOR CENTRIFUGAL FIRE PUMPS A. Description: Factory-assembled and -tested fire-pump and driver unit. B. Finish: Red paint applied to factory-assembled and -tested unit before shipping. C. UL listed and FM approval. D. Pump shall be of capacity and electrical characteristics as scheduled, and capable of delivering not less than 150% of rated flow at not less than 65% rated head, and with shutoff head not more than 120% of rated head. E. The fire pump manufacturer shall align the pump and motor. Pump shall be hydrostatically tested and run tested prior to shipment. Test pressure shall not be less than 150% of shutoff head plus suction head, but in no case less than 250 psi. 2.2 HORIZONTALLY MOUNTED, SINGLE-STAGE, SPLIT-CASE FIRE PUMPS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. A-C Fire Pump Systems; a business of ITT Industries. 2. Patterson Pump Company; a subsidiary of the Gorman-Rupp Company. 3. PACO Pumps; Grundfos Pumps Corporation, U.S.A. 4. Peerless Pump, Inc. 5. Pentair Pump Group; Aurora Pump. 6. S.A. Armstrong Limited. ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS 213113-2

B. Pump: 1. Standard: UL 448, for in-line pumps for fire service. 2. Casing: Radially split case, cast iron with ASME B16.1 pipe-flange connections. 3. Impeller: Cast bronze, statically and dynamically balanced, and keyed to shaft. 4. Wear Rings: Replaceable bronze. 5. Shaft and Sleeve: Steel shaft with bronze sleeve. a. Shaft Bearings: Grease-lubricated ball bearings in cast-iron housing. b. Seals: Stuffing box with minimum of four rings of graphite-impregnated braided yarn and bronze packing gland. 6. Mounting: Pump and driver shafts are vertical, with motor above pump and pump on base. C. Coupling: None or rigid. D. Driver: 1. Standard: UL 1004A. 2. Type: Electric motor; NEMA MG 1, polyphase Design B. E. Capacities and Characteristics: Refer to drawings. 2.3 FIRE-PUMP ACCESSORIES AND SPECIALTIES A. Automatic Air-Release Valves: Comply with NFPA 20 for installation in fire-pump casing. B. Circulation Relief Valves: UL 1478, brass, spring loaded; for installation in pump discharge piping. C. Relief Valves: UL 1478, bronze or cast iron, spring loaded; for installation in fire-suppression water-supply piping. D. Inlet Fitting: Eccentric tapered reducer at pump suction inlet. E. Outlet Fitting: Concentric tapered reducer at pump discharge outlet. F. Discharge Cone: Closed or open type. G. Hose Valve Manifold Assembly: (Exterior Free-Standing Fire Pump Test Header) 1. Standard: Comply with requirements in NFPA 20. 2. Header Pipe: ASTM A 53/A 53M, Schedule 40, ductile iron with ends threaded according to ASME B1.20.1. 3. Header Pipe Fittings: ASME B16.4, galvanized cast-iron threaded fittings. 4. Manifold: a. Test Connections: Comply with UL 405 except provide outlets without clappers instead of inlets. b. Body: Ductile iron, with number of outlets required by NFPA 20. ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS 213113-3

c. Nipples: ASTM A 53/A 53M, Schedule 40, galvanized-steel pipe with ends threaded according to ASME B1.20.1. d. Adapters and Caps with Chain: Bronze, with outlet threaded according to NFPA 1963 and matching local fire-department threads. e. Escutcheon Plate: Bronze; rectangular. f. Hose Valves: UL 668, bronze, with outlet threaded according to NFPA 1963 and matching local fire-department threads. g. Exposed Parts Finish: Rough brass. h. Escutcheon Plate Marking: Equivalent to "FIRE PUMP TEST." 2.4 GROUT A. Standard: ASTM C 1107, Grade B, post-hardening and volume-adjusting, dry, hydrauliccement grout. B. Characteristics: Nonshrink and recommended for interior and exterior applications. C. Design Mix: 5000-psi, 28-day compressive strength. D. Packaging: Premixed and factory packaged. 2.5 SOURCE QUALITY CONTROL A. Testing: Test and inspect fire pumps according to UL 448 requirements for "Operation Test" and "Manufacturing and Production Tests." 1. Verification of Performance: Rate fire pumps according to UL 448. B. Fire pumps will be considered defective if they do not pass tests and inspections. C. Prepare test and inspection reports. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine equipment bases and anchorage provisions, with Installer present, for compliance with requirements and for conditions affecting performance of fire pumps. B. Examine roughing-in for fire-suppression piping systems to verify actual locations of piping connections before fire-pump installation. C. Proceed with installation only after unsatisfactory conditions have been corrected. ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS 213113-4

3.2 INSTALLATION A. Fire-Pump Installation Standard: Comply with NFPA 20 for installation of fire pumps, relief valves, and related components. B. Equipment Mounting: Install fire pumps on concrete bases. Comply with requirements for concrete bases specified in Division 03 Section "Cast-in-Place Concrete." C. Install fire-pump suction and discharge piping equal to or larger than sizes required by NFPA 20. D. Support piping and pumps separately so weight of piping does not rest on pumps. E. Install valves that are same size as connecting piping. Comply with requirements for fireprotection valves specified in Division 21 Section "Wet-Pipe Sprinkler Systems." F. Install listed OS&Y gate valves in the suction pipe. Install listed indicating gate valves in the pump discharge and in bypass line. G. Install pressure gages on fire-pump suction and discharge flange pressure-gage tappings. H. Install piping hangers and supports, anchors, valves, gages, and equipment supports according to NFPA 20. I. Electrical Wiring: Install electrical devices furnished by equipment manufacturers but not factory mounted. Furnish copies of manufacturers' wiring diagram submittals to electrical Installer. J. Wiring Method: Conceal conductors and cables in accessible ceilings, walls, and floors where possible. K. Start Up Services: Performed by a factory-authorized service representative. 3.3 ALIGNMENT A. Align end-suction and split-case pump and driver shafts after complete unit has been leveled on concrete base, grout has set, and anchor bolts have been tightened. B. After alignment is correct, tighten anchor bolts evenly. Fill baseplate completely with grout, with metal blocks and shims or wedges in place. Tighten anchor bolts after grout has hardened. Check alignment and make required corrections. C. Align piping connections. D. Align pump and driver shafts for angular and parallel alignment according to HI 1.4 and to tolerances specified by manufacturer. 3.4 CONNECTIONS A. Comply with requirements for piping and valves specified in Division 21 Section "Wet-Pipe Sprinkler Systems." Drawings indicate general arrangement of piping, fittings, and specialties. ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS 213113-5

B. Install piping adjacent to pumps and equipment to allow service and maintenance. C. Connect relief-valve discharge to drainage piping or point of discharge. D. Connect flowmeter-system meters, sensors, and valves to tubing. E. Connect fire pumps to their controllers. 3.5 IDENTIFICATION A. Identify system components. Comply with requirements for fire-pump marking according to NFPA 20. 3.6 FIELD QUALITY CONTROL A. Test each fire pump with its controller as a unit. Comply with requirements for electric-motordriver fire-pump controllers specified in Division 21 Section "Controllers for Fire-Pump Drivers." B. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. C. Tests and Inspections: 1. After installing components, assemblies, and equipment including controller, test for compliance with requirements. 2. Test according to NFPA 20 for acceptance and performance testing. 3. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist. 4. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation. 5. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. D. Components, assemblies, and equipment will be considered defective if they do not pass tests and inspections. E. Prepare test and inspection reports. F. Furnish fire hoses in number, size, and length required to reach storm drain or other acceptable location to dispose of fire-pump test water. Hoses are for tests only and do not convey to Owner. 3.7 DEMONSTRATION A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain fire pumps. END OF SECTION 213113 ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS 213113-6