METAL FILE CABINET METAL FILE CABINET

Similar documents
COMMERICAL SPLIT SYSTEM KITS AND ACCESSORIES /2012 Supersedes

CP CP

Proliphix Thermostat Installation Guide. Release 2.0

East Central College

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

Duct and Rough Service Carbon Monoxide Sensor

ZonexCommander. ZonexCommander(Plus) Installation and Applications Manual. Network All Your HVAC Equipment

Installation, Operation, and Troubleshooting Instructions

BULLETIN. Temperature Controls (VAV) (3/11/2010)

tcu.z Commercial Programmable Thermostat Installation Instructions

DIVISION 26 ELECTRICAL SECTION LIGHTING CONTROL SYSTEM

Installation Manual COPYRIGHT NOTICE

SLATE. Base Module INSTALLATION INSTRUCTIONS R8001A1001

ZonexCommander. ZonexCommander(Plus) Installation and Applications Manual. Network All Your HVAC Equipment

Model 1750A/ 1770A Dehumidifier Installation Instructions

FAN POWERED VAV TERMINALS

v3 360 Dual Technology Low Voltage Occupancy Sensor with Light Level, Isolated Relay and Manual On feature

SECTION LOW VOLTAGE LIGHTING CONTROLS

Model 8191 & 8192 Ventilator with Dehumidification Installation and Operating Instructions

Model 8191 & 8192 Ventilator with Dehumidification Installation and Operating Instructions

BULLETIN. Temperature Controls (10/2013)

Electrical Design Guidelines Table of Contents

Installation Instructions

T-32-TS Touchscreen Thermostat. Installation Manual

SECTION LIGHTING CONTROLS

Installation, Operation & Service Manual

Pipe Freeze Protection Control SCFP-CO-F130 Installation and Operation Manual

CAUTION WARNING INSTALLATION INSTRUCTIONS FOR HEALTHY CLIMATE WHOLE HOME DEHUMIDIFIER MODEL HCWH-065 (Y3013) DEHUMIDIFIERS

VCM-X Controller Technical Guide

Marvel S MICROPROCESSOR CONTROLLER. Installation, Operation and Maintenance Manual Effective October 2018 DISCONTINUED. For Reference Only

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

SECTION 26 NX DISTRIBUTED INTELLIGENCE LIGHTING CONTROL SYSTEM HUBBELL CONTROL SOLUTIONS

Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual

Installation Guide IM 1248

Installation Instructions

MODEL FPT-130 SINGLE POINT FREEZE PROTECTION HEAT TRACE CONTROL

48TF GAS HEATING/ ELECTRIC COOLING UNITS

VAV Thermostat Controller Specification and Installation Instructions. Model TRO24T4XYZ1

Smart Temp. ApolloP/n Installation Manual. Version 1.0

VENSTAR T1070 FAN COIL THERMOSTAT PROGRAMMABLE 2 OR 4 PIPE SYSTEMS OWNER S MANUAL AND INSTALLATION INSTRUCTIONS

Deluxe Programmable Thermostats

Carbon Monoxide Transmitter

Virginia Tech Standards for Building Automation System

FLT93 Installation, Operation and Troubleshooting Guide

Model NT20e Installation Guide

Automatic Temperature Controls, Energy Management Systems and Metering

Installation Instructions

Public Safety DAS Annunciator Panel

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)


T8600D Chronotherm IV Deluxe Programmable Thermostats

L SERIES UNITS 505,191M. 4/2006 Supersedes 504,908M

TDU Series LCD Thermostat For EFCB and EVCB Controllers. Models. Features. Functions. Onboard Sensors. Model # Temp RH CO2 Color.

USERS INFORMATION MANUAL

SECTION : FIRE ALARM & DETECTION SYSTEMS

FAN POWERED VAV TERMINALS

I/O ZONE 560/583 AND OPERATION MANUAL

Digital Programmable

48TM GAS HEATING/ELECTRIC COOLING UNITS

Field Start-Up Sheet Direct Fired Gas Equipment

Predator Controller Hardware Family

T7200D,E Series 2000 Commercial Microelectronic Thermostats

Installation, Operation, and Maintenance Manual

HALOGUARD TM IR MONITOR (OPTIONAL) FOUR or EIGHT POINT SCANNER INSTRUCTION MANUAL

maintenance should only be performed by a trained, qualified person. Consumer service is recommended only for filter replacement.

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

TEC210x-2 Series Networked Thermostats

FIRE ALARM: BY OTHERS, IF REQUIRED.

Wiring Instructions. High-Capacity Steam Humidifiers

ACCURATE ELECTRONICS INC PO BOX SW HALL BLVD BEAVERTON OR USA FAX

Soltron Sea Shell XXS-35

SCR/SCRF Series Battery Charger

INSTALLATION GUIDE. Guide Version: IG1800DLC-IG-R-T Rev. 2

CommStat 6. Controller for Redundant HVAC Systems PRODUCT DATA SHEET

L. Terminal block Connecting Label:

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS

CARD ACCESS CONTROL SYSTEM

Installation and Maintenance Manual IM

Safety & Installation Instructions

FIRE ALARM: BY OTHERS, IF REQUIRED.

Product Manual SZ1022/SZ1031/SZ1035/

Digi-Zone Model MDP3 Ver.04

FCI500/600/FVI500/FCL/FVL600/FCQ-700 Installation and Maintenance Manual

Product Manual SZ1009

Owner s Manual. Digital Thermostat

L SERIES UNITS 504,908M. 10/2004 Supersedes 9/2004

L CONNECTION NETWORK Commercial Controls

I/O ZONE 560/583 USERS GUIDE

Installation Instructions. PS902 Power Supply. These instructions cover the following parts: PS902 Power Supply Specifi cations:

BCE4 PRODUCT SPECIFICATIONS ENHANCED AIR HANDLER WITH VARIABLE SPEED APPLICATION INSTALLATION CABINET COMPONENTS CONTROLS WARRANTY

Installation Instructions

Installation Manual for Hot Yoga Studio Electric Radiant Heating Version 3.0

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

Networked Access Control Panel. Installation Guide

T8602C Chronotherm IV Deluxe Programmable Thermostats

Installation Manual for Hot Yoga Studio Electric Radiant Heating

Transcription:

DFDF DDD FFF DFDF DFDF DDD FFF DFDF

S METAL FILE CABINET METAL FILE CABINET

EMPLOYEES ONLY EMPLOYEES ONLY

7'-6 1/2"

ALL-GENDER RESTROOM TYP EXIT EXIT FIRE E X T I N G U I S H E R CAUTION Do not block door FIRE E X T I N G U I S H E R CAUTION Do not block door EMERGENCY EXIT ONLY ALARM WILL SOUND EMERGENCY EXIT ONLY ALARM WILL SOUND LADDER MUST BE CHAINED WHEN NOT IN USE EMPLOYEES ONLY EMPLOYEES ONLY FIRE E X T I N G U I S H E R

4 1 2 3 #

COM 3 COM 4 POWER FAULT I/O STATUS COM 5 COM 6 COM 7 COM 8 CLASS 2 OUTPUT 4 CLASS 2 OUTPUT 1 LAN 2 LAN 1 STATUS BEAT 5 5 5 5 1 1 1 1 9 9 9 9 UPDATED 06/29/16 1 2 3 4 5 6 7 8 Novar - ENERGY MANAGEMENT SYSTEM (EMS): Installation Scope of Work I. GENERAL CONTRACTOR'S RESPONSIBILITIES: a. Read Dollar Tree Documentation Package (this document) and distribute to mechanical and electrical contractors. b. Arrange for the electrical and mechanical contractors to be present during the entire remote commissioning for a two-hour period, via telephone, for a complete commissioning of the EMS as deemed by Novar Systems Commissioning Agent. c. Remote EMS commissioning shall be scheduled 24 hours prior to requested commissioning date. Contact Novar Programming: i. Ops.Checkout@novar.com d. Confirm that the mechanical and electrical contractors have completed the Novar Survey form. FAX Survey form (pages 1 and 2 above): i. Dollar Tree Survey Form Fax: 216-803-6772 e. For Project Support (non-programming issues), contact Novar Project Manager: i. Richard Doncaster, Novar PM: 216-682-1321; richard.doncaster@novar.com f. If contacts above cannot be reached, please call Novar at: i. Novar General Number: 216-682-1600 II. ELECTRICAL CONTRACTOR'S RESPONSIBILITIES: a. Provide labor and installation material, as required, for a complete and operational Novar EMS for this Dollar Tree Stores location. b. Receive and store all Novar material in a safe and secure place until the EMS installation has been completed. c. The following equipment will be supplied by Novar, and installed by the Electrical Contractor: i. 1 Outdoor Light and Temperature Sensor Assembly (OSA) ii. 1 Integrated Controller/ Contactor Panel (RCP Panel) iii. 1 Manager Timed Override Panel or Remote LCD iv. 1 Seven Foot Ethernet Patch Cable (CAT5) d. Review the entire set of site plans, perform a job site survey and inventory the Novar equipment to ensure the proper equipment has been ordered and received for a complete and operational Novar EMS. e. If any material is missing or additional equipment (e.g. lighting contactors) required, immediately call Novar PM to request an order. f. Electrical Contractor shall verify number of rooftop units and number of controlled lighting circuits against the design and report discrepancies that cannot be resolved in the field, to the Novar Project Manager. g. All EMS cables are to be installed per National and Local codes. It is the Electrical Contractor's responsibility to determine if national and local codes permit class 2 cables to be installed exposed within the building structure or if a full conduit system is required. h. EMT connectors and bushings are to be installed at the top of every conduit sleeve to protect EMS cables from abrasions. All cables are to be clearly and distinctly labeled at both ends. i. Perform all work in accordance with all national, state, or local codes for this project. j. Coordinate the EMS installation with the Mechanical Contractor to avoid any interference that may delay progress during construction. k. Furnish and install all required conduit, boxes, wire ways, fittings, straps, hangers and wiring for a complete and operational EMS as required. l. Coordinate with the Mechanical Contractor for locations when running communication and sensor wires. m. Contractor shall install an Ethernet cable run from the Integrated controller/contactor panel to the (HUB) under Cash Register #1.Contractor will terminate both ends of the cable, test cable for proper wiring, plug one end of the Ethernet cable into the (HUB) and terminate the other end of the Ethernet Cable into the NOVAR XCM20R executive controller LAN1 (PRI) RJ-45 jack. n. Furnish and install a dedicated 120 VAC circuit for the RCP Panel. i. Label: DO NOT TURN OFF / RCP EMS ii. Confirm wiring is completed as per Documentation Package before applying power. Improper wiring will cause damage to equipment. o. Furnish and install a 3-pole, 20 amp breaker/disconnect at the main distribution panel (MDP) for phase loss monitor power. i. Label: DO NOT TURN OFF / PHASE FAILURE ii. Confirm wiring is completed as per Documentation Package before applying power. Improper wiring will cause damage to equipment. p. Mount the Remote Override Panel (ROP) or Remote LCD in Manager's Office Area, see EMS drawings for details. q. Connect the Ethernet patch cord provided from the XCM20R Controller to the RJ-45 Ethernet jack. If the Ethernet jack is not yet in place, connect one end of the patch cord to the XCM20R System Controller, coil and tape the other end of the cord to the conduit for future connection. r. Mount the integrated controller/contactor panel adjacent to the electrical panels. Install the lighting circuit home runs from the fixtures straight to the load side of the contactors. Install the circuits from the line side of the contactors to each breaker as follows: III. NOVAR RESPONSIBILITIES: a. If any end unit (e.g. lighting, roof top unit, supply air fan) cannot be operated for mechanical or electrical reasons, Novar will verify the proper operation of the control devices (e.g. contactors, discrete I/O) leading up to the unit. b. Timed operation of lighting loads - employee, customer, exterior signage, and security. c. Outside light level control of lighting loads - exterior signage and security. d. Operation of HVAC unit heating stages, as indoor environment allows. e. Operation of HVAC cooling stages, as indoor and outdoor environments allow. f. Verification of HVAC unit sensor readings - space and supply temperatures. g. Timed override operation of lighting loads. h. Operation of phase loss monitor HVAC load lockout. i. CO2 level on Sales Floor j. The following services will be supplied by Novar : i. Equipment shipping to the job ii. Pre-programming and downloading of Novar equipment. iii. Telephone technical support at (216) 682-1600. iv. Remote system checkout with installing contractor IV. MECHANICAL CONTRACTOR'S RESPONSIBILITIES: a. Provide labor and installation material, as required, for a complete and operational Novar EMS for this Dollar Tree Stores tenant space. b. Mechanical Contractor shall verify number and type of roof top units against the design and report discrepancies that cannot be resolved in the field to the Novar Project Manager @ (216) 682-1330 for further instruction. c. The following equipment will be supplied by Novar and installed by the Mechanical Contractor: i. Remote Duct Temperature Sensors (As Required) ii. Remote Space Temperature Sensors (As Required) i. Please refer to Down Rod installation instructions for correct placement of Remote Space Temperature Sensors. iii. 1 CO2 Sensor d. Amended stores only, provide credit back to Dollar Tree Stores Inc. for any equipment and/or labor that has been omitted from the original bid as a result of the EMS installation, i.e.; contactors, relays, thermostats, etc. e. Perform all work in accordance with all national, state, or local codes for this project. Coordinate the EMS installation with Electrical Contractor to avoid any interference that may delay progress during construction. f. Install 18/9 cable (MC Supplied) between the UCM controller and rooftop unit. Terminate R, G, Y1, Y2, W1, and W2 for control of fan, cooling and heating. Secure the communications cables to the UCM Controller as shown. Provide 24VAC power to the UCM controller from the roof top unit transformer. Power to the controller must be off while terminations are made. g. Mount the remote supply duct temperature sensor of each roof top unit. The remote supply duct temperature sensor should be mounted no closer than six feet from the roof top unit penetration measured along the duct. Install and secure the supply duct temperature sensor wire (18/2 Shielded, MC Supplied) to the UCM Controller location and terminate, as shown. h. Provide a technician for an approximate 2-hour remote telephone checkout with Novar. i. If extra equipment exists after installation (e.g. sensors), inform the Novar personnel at checkout to arrange for RMA # to return the material j. Coordinate with the Electrical Contractor to verify proper HVAC control during the Novar remote telephone checkout. Provide Electrical Contractor with roof plan layout, showing location of RTUs on the roof. k. Mount the CO2 sensor per Dollar Tree Stores location criteria, i.e. one sensor in Sales Floor area. Install and terminate sensor's signal wires and power wires as shown on EM-2. DO NOT CALIBRATE CO2 SENSOR! FIELD CALIBRATION WILL CAUSE SENSOR FAILURE. l. Install and terminate DCV wires to economizer section of RTUs as shown on EM-3. If RTUs do not have economizer section, DCV wires do not need to be installed, but CO2 sensor should still be installed in space. m. Set address and configuration DIP switches on the UCM Controller, as shown on the face of the controller. Lighting load RCP Contactor(s) Where ckts identified on DT construction dwgs Employee C1A/C1B Electrical Panel Schedule (E3) Customer C2A/C2B Electrical Panel Schedule (E3) Exterior/Signs C3 Electrical Panel Schedule (E3) Pre Sales C4 (As Required) Electrical Panel Schedule (E3) Lighting load LHP Contactor(s) Where ckts identified on DT construction dwgs Light Harvesting C1 (As Required) Lighting Plan (E2) T3 T3 T3 T3 s. Mount the Outdoor Sensor Assembly (OSA) on the roof top unit that resides closest to the XCM20R System Controller. Mount the device on a 1" rigid riser and 'LB' to back of Assembly, 3 feet above the roof top unit, facing north, away from the combustion heat blower and condenser fan. n. When applicable, install indoor light sensor as directed per EM-4. o. Amended stores only, provide credit back to Dollar Tree Stores Inc. for any equipment that has been omitted from the original bid as a result of the EMS installation, i.e.; time clocks, contactors, switches, etc. p. Upon completion of the installation, the Electrical Contractor will fill in the information below, coordinate with Mechanical Contractor to be present and contact Novar to schedule a remote checkout at Ops.Checkout@novar.com. If both Electrical Contractor and Mechanical Contractor are not present, the checkout can not be scheduled. q. Provide a technician for an approximate 2-hour remote telephone checkout with Novar r. Coordinate with the Mechanical Contractor to verify HVAC control during the Novar remote telephone checkout. s. If extra equipment exists after installation, the Electrical Contractor will inform Novar personnel at checkout to arrange for RMA # to return the material. 6060 Rockside Woods Blvd. Cleveland, OH 44131 216.682.1600 www.novar.com ENERGY MANAGEMENT SYSTEM SINGLE LINE DIAGRAM. POWER AC FAULT CLASS 2 OUTPUT 3 CLASS 2 OUTPUT 2 RS-232 COM 1 R 4 R 3 R 2 R 1 13 14 13 14 13 14 13 14 EMS REMOTE TESTING CHECKLIST PERMANENT POWER APPLIED TO BUILDING. ALL INTERIOR LIGHTING AND LIGHTING CONTACTORS WIRED AND OPERATIONAL. 120 VAC CONTROL CIRCUIT INSTALLED AND WIRED TO EMS-IFP. 240/480 VAC 3 PHASE CIRCUIT INSTALLED AND WIRED TO EMS PHASE LOSS RELAY. ALL EMS CABLE AND WIRING INSTALLED AND TERMINATED AS PER THE DRAWINGS AND MANUFACTURERS INSTRUCTIONS. ALL EMS COMPONENTS INSTALLED AND OPERATIONAL AS PER DRAWINGS AND MANUFACTURER'S INSTRUCTIONS. NATURAL GAS UTILITY SERVICE APPLIED TO BUILDING (IF APPLICABLE). HIGH-SPEED INTERNET/INTRANET SERVICE APPLIED TO BUILDING. RJ-45 ETHERNET CABLING INSTALLED AND OPERATIONAL FOR REMOTE COMMUNICATIONS. ALL HVAC COMPLETE AND OPERATIONAL. ELECTRICAL CONTRACTOR HAS QUALIFIED TECHNICIAN SCHEDULED FOR REMOTE SYSTEM TESTING. MECHANICAL CONTRACTOR HAS QUALIFIED TECHNICIAN SCHEDULED FOR REMOTE SYSTEM TESTING. Energy Management Plan R. James CR GN 11/13/2014 U- Single Line Diagram N.T.S. EM-1

UPDATED 06/29/16 RS-232 COM 1 COM 3 COM 4 COM 5 COM 6 COM 7 COM 8 5 1 R 4 13 14 9 5 1 R 3 13 14 9 5 1 R 2 13 14 9 LAN 2 LAN 1 STATUS BEAT 5 1 R 1 13 14 9 POWER AC FAULT POWER FAULT I/O STATUS CLASS 2 OUTPUT 4 CLASS 2 OUTPUT 3 CLASS 2 OUTPUT 2 CLASS 2 OUTPUT 1 NORM SHELL MODE JUMPER CONFIG. SHELL POWER RATINGS: 24 VAC, 40 VA CLASS 2 SERIAL # LAN 2 (SEC) LAN 1 (PRI) USB R RCP PANEL - NOVAR OPUS XCM20R WIRING DIAGRAM 6060 Rockside Woods Blvd. Cleveland, OH 44131 216.682.1600 www.novar.com 1 2 3 4 Energy Management Plan WARNING: DEVICE POWER IS POLARITY SENSITIVE. REVERSING POLARITY WILL DAMAGE DEVICE. 5 7 6 8 NOTE: INSTALL CO2 SENSOR AT 7' AFF ON COLUMN IN THE SALES AREA TO CONTROL THE SALES AREA RTU'S. OSA - OUTDOOR SENSOR ASSEMBLY CO2 SENSOR OVERRIDE #1: EMPLOYEE LIGHTS OVERRIDE #2: EXTERIOR LIGHTS OVERRIDE #3: PRE-SALES LIGHTS (AS REQUIRED) OVERRIDE #4: LIGHT HARVEST (AS REQUIRED) INSTALLATION NOTES: 1) OVERRIDE PANEL NOT REQUIRED ON SITES WITH REMOTE LCD DISPLAYS. 2) PRE-SALES OVERRIDE NOT REQUIRED ON SITES WITH KEYED SWITCH. ROP - REMOTE OVERRIDE PANEL (AS REQUIRED) REMOTE LCD DISPLAY (AS REQUIRED) R. James CR GN 11/13/2014 U- Interface Panel & XCM Wiring Details N.T.S. EM-2

UPDATED 06/29/16 SPACE TEMPERATURE SENSOR PLACEMENT INSTRUCTIONS For the systems with concentric diffusers, sensors shall be placed: A minimum of 15'-0" from diffusers (10 ton systems or smaller) A minimum of 20'-0" from diffusers (systems larger than 10 ton) See general instructions. For the systems with ducted returns, sensors shall be placed: as close to return air grille as possible. See general instructions. DEMAND CONTROL VENTILATION (DCV) - SETUP & CHECKOUT PROCEDURE The Mechanical Contractor and Air Balancer will need to use this procedure to establish test conditions to adjust the Minimum OA damper position, the DCV Maximum damper position, and the DCV Setpoint potentiometers. This checkout procedure is intended for use with the following pieces of equipment, Carrier rooftop unit, with W7212 Economizer controller (HH63AW001). The equipment required to complete this test are five jumper wires, 9 volt battery, multi-meter and small common screwdriver. NOTE: PROVIDE 15 FEET OF EXCESS SENSOR WIRE NEATLY COILED ABOVE CEILING TO ACCOMODATE SENSOR RELOCATION. NOTE: SENSOR TO BE MOUNTED DIRECTLY ABOVE GONDOLA. DO NOT MOUNT ABOVE AISLE WAY. For the systems with non-ducted (plenum) returns, sensors shall be placed: Place at least one egg crate return grille over from each sensor location. See general instructions. General Instructions: On new construction jobs, install sensors on drop-poles per detail. Locate sensors fully within the zone of the rooftop unit it controls. Do not place a sensors on an outside wall or tenant common wall. Do not place sensors near doors, windows, or other sources of heat, cold, or drafts. If a sensor is placed on an architectural or structural surface (Columns, etc..) it must be insulated from the finished surface and wire penetrations must be made airtight. DO NOT place sensor higher than 7'-0" AFF. Conduct sensor location test: Run all units in fan mode. Test all sensors locations to determine if any are getting hit by air from a supply diffuser (tissue, balloon, or smoke test). If so. relocate sensor (preferred) or offending diffuser. Stockroom sensor placement shall be over stockroom door within stockroom area. This test procedure verifies that the rooftop unit outside air damper will modulate between the reduced & standard minimum outside air CFM quantity based on CO2 sensor 0-10vdc signal. Basically, whenever the Space CO2 level is below setpoint (1000 ppm), the RTU will maintain the Minimum OA cfm value of 200 cfm. When the Space CO2 level exceeds setpoint, the RTU will increase to the MAX DCV cfm value of 800 cfm until the space CO2 level drops below setpoint. Step#1 - Preliminary Setup & Checkout of the Carrier Economizer controller CO2/DCV system operation 1. Disconnect power to the rooftop unit. 2. Locate the Carrier Economizer controller (HH63AW001) and complete the following steps: 2.1. If the outside air temperature is below 55 F, install a jumper between terminals T & T1. 2.2. Set the Min Pos and DCV Setpoint potentiometers fully counterclockwise (CCW). 2.3. Set the DCV Maximum Position potentiometer fully clockwise (CW). 2.4. Set the enthalpy potentiometer to D. 2.5. Before removing any existing CO2 sensor wires located on terminals AQ & AQ1, please record the voltage, note wire color code & polarity. The voltage should be between 2-6 vdc, if not then troubleshoot for wiring or sensor problems. Then remove wires located on terminals AQ & AQ1. 3. Apply power to the rooftop unit. Allow approximately 3 minutes for the rooftop unit to complete its start-up process. Observe the dampers, they should be closed and the DCV LED should be off. 4. Return to the Carrier Economizer controller (HH63AW001) and complete the following steps: 4.1. Install a jumper wire from the AQ1 terminal to the 9 volt battery negative post. 4.2. Install a jumper wire from the AQ terminal to the 9 volt battery positive post. The DCV LED should turn on. The actuator should modulate to 95% open. 4.3. Turn the DCV setpoint potentiometer CW until the DCV LED turns off. The actuator should drive to the reduced minimum outside air damper position. Step #2 - Air Balancer Setup of the Carrier Economizer controller CO2/DCV system, Min Pos, DCV setpoint, and DCV maximum potentiometers REMOTE SENSOR MOUNTING DETAIL With test conditions setup as defined in items above, please complete the following: 1. Adjust the DCV setpoint potentiometer to the 11 o'clock position, this equates to a CO2 level of approximately 1000 ppm. 2. Verify that the jumper wire from AQ terminal to the positive post of the 9 volt battery is disconnected. The DCV LED should be off. 3. Adjust he Min Pos potentiometer to 25% of the minimum outside air cfm value as noted on the mechanical equipment schedule for that rooftop unit. 4. Then connect the jumper wire from the AQ terminal to the positive post of the 9 volt battery. The DCV LED should be on. 5. Adjust the DCV Max potentiometer to 100% of the minimum outside air cfm value as noted on the mechanical equipment schedule for that rooftop unit. 6. Use a marker to permanently indicate the proper settings for the Min Pos, DCV Setpoint, and DCV Max potentiometers. 7. This concludes the setup & checkout of the Carrier Economizer controller CO2/DCV system. Disconnect power to the rooftop unit. Please remove all jumper wires from previous steps and reinstall the CO2 sensor wires to terminals AQ & AQ1 as appicable. novar www.novar.com C 738020000 U L 20M1 US ENERGY LISTED MANAGEMENT EQUIPMENT SUBASSEMBLY 538002100 B FAB YY WW UCM N314 SERIAL NUMBER SWITCH SETTINGS REFER TO INSTALLATION MANUAL FOR MODULE ADDRESS SETTING AND SETUP TYPE OFF ON ON ON ON OFF ON ON OFF OFF ON ON ON ON OFF ON OFF ON OFF ON ON ON ON OFF OFF ON ON OFF ON OFF ON OFF OFF OFF ON OFF ON ON OFF OFF OFF ON OFF OFF ON OFF OFF OFF OFF OFF OFF OFF MODULE TYPE UVC-1 ETC-1/ ETC-3 UVC-3 ETC-2/ ETC-4 HPC CC UVC-9 UVC-10 UVC--11 ETC-6 UVC-13 HPC PLUS HPC PLUS R novar www.novar.com C 738020000 U L 20M1 US ENERGY LISTED MANAGEMENT EQUIPMENT SUBASSEMBLY 538002100 B FAB YY WW UCM N314 SERIAL NUMBER SWITCH SETTINGS REFER TO INSTALLATION MANUAL FOR MODULE ADDRESS SETTING AND SETUP TYPE OFF ON ON ON ON OFF ON ON OFF OFF ON ON ON ON OFF ON OFF ON OFF ON ON ON ON OFF OFF ON ON OFF ON OFF ON OFF OFF OFF ON OFF ON ON OFF OFF OFF ON OFF OFF ON OFF OFF OFF OFF OFF OFF OFF MODULE TYPE UVC-1 ETC-1/ ETC-3 UVC-3 ETC-2/ ETC-4 HPC CC UVC-9 UVC-10 UVC--11 ETC-6 UVC-13 HPC PLUS HPC PLUS R POT ADJ/ ETC-6 HUMIDITY (-) POT +5/ ETC-6 HUMIDITY (+) 1 2 TEMP SENSORS S1 (ZONE TEMP) COM S2 (DISCHARGE AIR TEMP) FAN STATUS DIGITAL STATUS COM DIRTY FILTER STATUS OVER- RIDE O/R (+) RETURN DAMPER ANALOG OUTPUTS 0-10VDC 1mA MAX HEAT COOL COMMON GROUND ALL CONNECTIONS ARE CLASS 2 MAX ALLOWABLE AMBIENIENT TEMP. 70 C (158 F) THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES POWER INPUT 24 VAC, 50/60 HZ, 8 VA 24 VAC COM MODULE NETWORK (+) SHIELD ( _ ) CONTROL 24 V FAN COOL 2 HEAT 2/ RELIEF DAMPER DAMPER HEAT1/ RVS (HPC+) COOL 1 25 26 POT ADJ/ ETC-6 HUMIDITY (-) POT +5/ ETC-6 HUMIDITY (+) 1 2 TEMP SENSORS S1 (ZONE TEMP) COM S2 (DISCHARGE AIR TEMP) FAN STATUS DIGITAL STATUS COM DIRTY FILTER STATUS OVER- RIDE O/R (+) RETURN DAMPER ANALOG OUTPUTS 0-10VDC 1mA MAX HEAT COOL COMMON GROUND ALL CONNECTIONS ARE CLASS 2 MAX ALLOWABLE AMBIENIENT TEMP. 70 C (158 F) THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES POWER INPUT 24 VAC, 50/60 HZ, 8 VA 24 VAC COM MODULE NETWORK (+) SHIELD ( _ ) CONTROL 24 V FAN COOL 2 HEAT 2/ RELIEF DAMPER DAMPER HEAT1/ RVS (HPC+) COOL 1 25 26 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 SW1 SW1 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 ADDRESS TYPE ADDRESS TYPE 6060 Rockside Woods Blvd. Cleveland, OH 44131 216.682.1600 www.novar.com NOTE: TERMINAL DESIGNATIONS ARE FOR ECONOMIZER ACTUATOR MOTORS. IF RTU'S DO NOT HAVE ECONOMIZER SECTION OR DO NOT HAVE IAQ/DCV OPTION, THEN DO NOT TERMINATE WIRES AND MAKE NOTE ON SURVEY FORM. NOTE: TERMINAL DESIGNATIONS ARE FOR ECONOMIZER ACTUATOR MOTORS. IF RTU'S DO NOT HAVE ECONOMIZER SECTION OR DO NOT HAVE IAQ/DCV OPTION, THEN DO NOT TERMINATE WIRES AND MAKE NOTE ON SURVEY FORM. Energy Management Plan UCM-RTU INTERFACE-CONVENTIONAL UCM-RTU INTERFACE-HEATPUMP R. James CR GN 11/13/2014 U- RTU Wiring Details N.T.S. EM-3

UPDATED 06/29/16 RESERVED RESERVED ZONE 3 - DIMMABLE LIGHTING BALLAST DETAIL ZONE 2 - DIMMABLE LIGHTING BALLAST DETAIL 9 13 14 R 1 1 5 T3 ZONE 1 - DIMMABLE LIGHTING BALLAST DETAIL 6060 Rockside Woods Blvd. Cleveland, OH 44131 216.682.1600 www.novar.com Energy Management Plan R. James CR GN 11/13/2014 U- Optional Daylight Harvesting Wiring Details LHP PANEL - LIGHT HARVESTING (AS REQUIRED) LDP PANEL - LIGHT DIMMING (AS REQUIRED) ZONE 1 - INDOOR PHOTOCELL DETAIL ZONE 2 - INDOOR PHOTOCELL DETAIL N.T.S. EM-4