Application to become an Approved Certifier of Construction (ACC/1)

Similar documents
Application to become an Approved Certifier of Construction (ACC/1)

Certification of Construction (Drainage, Heating and Plumbing) Scheme Application to become an Approved Certifier of Construction (ACC/1)

5.5 CD/14 (Warning & Advice Notice)

If you wish to make payment by card please complete the attached SJIB Payment Request form and submit with your application form.

QUALIFICATION, PRE-REQUISITES AND THE CERTIFICATION PROCESS FOR COMPETENCE CERTIFICATION SCHEMES

Application for the Issue of Initial SJIB Grade (ECS) Card

Initial Application for Fire Detection & Alarm Systems Operatives SJIB Grade (ECS) Card

Application for Up-Grade Approved Electrician

Initial Application for Emergency & Security Systems Operatives SJIB Grade (ECS) Card

Plumbing, Heating & Gas Industry Course Information

Boiler Replacement Scheme Boiler Installer Form

5.5.1 General CD/30 (Oil Condensing Boiler Installation Assessment Form) General Technician Stationary...

TECHNICAL BOOK 4: OIL FIRED APPLIANCE & SYSTEM INSTALLATION REQUIREMENTS

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Annex 4a Common Minimum Technical Competency Requirements for Oil Appliance Installation Work (Domestic)

NATIONALLY ACCREDITED CERTIFICATION SCHEME FOR INDIVIDUAL GAS FITTING OPERATIVES GUIDANCE TO ACS GAS SAFETY ASSESSMENT FRAMEWORK VERSION 9

TREE PRUNING AND REMOVAL PERMIT APPLICATION Made under clause 5.9 of the Canada Bay Local Environmental Plan 2008

Initial Application for ECS Related Discipline Card

CD/12 Form (Landlord Oil Installation Check)

Membership Application

Initial Application for an Electrical Fitter (ECITB) SJIB Grade (ECS) Card

Telephone: Mobile Number.

Membership Application

INDEPENDENT QUALIFIED PERSON APPLICATION

CERTIFICATION OF CONSTRUCTION (DRAINAGE, HEATING & PLUMBING) TECHNICAL GUIDE

7.4 CD/12 (Landlord Oil Installation Safety Check)

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation

S T O R E R A N G E C Y L I N D E R & G R A N T FEATURES: GRANT MONOWAVE UNVENTED DIRECT AND INDIRECT SINGLE-COIL CYLINDERS

Water Heating UK 14 th May 2016

Application Form. Qualified Accreditation

Introduction. There is no obligation to follow the methods or comply with the standards set out in this Technical Booklet.

Standard Assessment Procedure Instantaneous Waste Water Heat Recovery Systems Design Checklist for 'System A' Installation Configuration

Ground source heat pump range. Why Vaillant? because we can unearth the energy.

Standard Assessment Procedure Instantaneous Waste Water Heat Recovery Systems Design Checklist for Configurations A, B & C

Loss Prevention Standard

DATE: CHECK AMOUNT: CHECK NUMBER: RENEWAL APPLICATION. COMPANY CERTIFICATE OF REGISTRATION And INDIVIDUAL LICENSE RENEWAL

DANESMOOR 12-14, 15-19, 20-25, 26-32, 32-50, FLOOR-STANDING OIL-FIRED PRESSURE-JET BOILERS USER INSTRUCTIONS & CUSTOMER CARE GUIDE

Jefferson Cocke County Utility District Marketing Plan (July 1, 2008 through June 30, 2019) Revised effective July 01, 2016 A) Identify commercial

Information for persons seeking acceptance as Independent Qualified Persons (IQP)

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

BIG WEEKEND 7 th 9 th July 2017 CATERERS APPLICATION FORM

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Assessment Schedule - TS.6

Guide to Condition Reports for Domestic Electrical Installations

Loss Prevention Standard

Vote for your Installer of the year at. 9/14, 14/19 & 19/24CBi. Worcester supports the Benchmark code of practice

The Gas Safety (Installations and Use) Regulations 1998.

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE EXTINGUISHERS TABLE OF CONTENTS

Level 3 Diplomas in Domestic Heating ( /42/43) Candidate logbook/workplace evidence record

At least 10 calendar days prior to project start date Within the last 30 days of a project that will extend beyond 12 months

HHIC consumer guide to gas boiler servicing

Request For Quotations. For The. Fire Sprinkler Retrofit Program For Licensed Small Or Rural Retirement Homes. October 11, 2017

Victorian Solar Hot Water Rebate Guidelines for Applicants and Suppliers (Updated 4 September 2009)

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

Eligibility criteria

EMERGENCY LIGHTING COMPLETION CERTIFICATE For small installations and verification of existing installations

Microgeneration Certification Scheme: MCS 008

DANESMOOR FRONT SERVICE (FS) 12-18, FLOOR-STANDING OIL-FIRED PRESSURE-JET BOILERS USER INSTRUCTIONS & CUSTOMER CARE GUIDE

OFTEC s role in promoting safe domestic oil storage

THE MAURITIUS FIRE AND RESCUE SERVICE ACT. Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act

Guide to condition reports for domestic electrical installations.

Re: Royal Welsh Winter Fair 27 November & 28 November 2017 Tradestand Forms

meters explained The benefits How it works Water efficiency

THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

Developer, new connection and infrastructure charges. 1 April 2015 to 31 March 2016

Annex 5a Solid fuel (Domestic) Annex 5a Common Minimum Technical Competency Requirements for Solid fuel burning appliance installation (domestic)

Temporary LPG Heat for Construction Sites Information Packet

THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

Unvented Hot Water Criteria

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

CALL FOR EXPRESSION OF INTEREST

Application for hedgerow removal notice. The Environment Act 1995, The Hedgerows Regulations 1997.

NEW CONNECTION Heat Pump Application Form C

Community Development Department Commercial Permit Application

SFA Guide to Building Regulations and Solid Fuel Heating

CHC's One Big Housing Conference Health and Safety Update: Gas Safety

IOWA STATE FIRE MARSHAL DIVISION Attn: Licensing Administrator

Baxi System 100 HE Plus. User s Operating Instructions. Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler

Spring/Summer Incentives

Spring/Summer Incentives

Vented and Unvented Hot Water Systems

Please tape down. NewTeam Ltd. Customer Service Dept. Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW

APPLICATION FOR FIRE CERTIFICATE / FIRE CLEARANCE UNDER THE MAURITIUS FIRE AND RESCUE SERVICE ACT 2013 OFFICE USE ONLY

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Installation and Servicing Instructions

Domestic Heating Compliance Guide

RADIATION PROTECTION BOARD OHSA Building 17 Edgar Ferro Street, Pietá, PTA1533 Malta Tel: , Fax:

AIRE. Thermostatic bath shower mixer. Installation and Operating Instructions INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

Please tape down. NewTeam Ltd. Customer Service Dept. Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW

PIKES PEAK REGIONAL BUILDING DEPARTMENT Fire Alarm Contractor License Application

Commissioning Pack. Heating and Hot Water Heat Pumps. IMPORTANT DOCUMENTS To Be Kept At All Times. With Equipment. Accredited Ecodan Installer:

6.6.3 Minimum Provision for New Systems in New Dwellings Minimum Provision for New/Replacement Systems in Existing Dwellings

NENE. Installation and Operating Instructions. Thermostatic bar mixer shower PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

cash-back on a Worcester Greenstar boiler for your own home

SOUTHERN AFRICAN EMERGENCY SERVICES INSTITUTE NPC. FORM: ACC 5 (Accreditation Application Form-2018) Valid from 1 October September 2018

product safety Please read these instructions before operating the appliance and retain them for future use.

CUMULATIVE (ENVIRONMENTAL) IMPACT ASSESSMENT

STAR HOUSE BANK OF INDIA NATIONAL BANKING GROUP NORTH-I H-2 CONNAUGHT CIRCUS Middle/Outer Circle, Phone No

APPLICATION FOR THE CERTIFICATION/ ASSESSMENT OF A MANAGEMENT SYSTEM C C C

Application for Certification for an Alarm System Contractor

Transcription:

Application to become an Approved Certifier of Construction (ACC/1) Please complete one form for each Approved Certifier of Construction SECTION 1: DETAILS OF APPROVED CERTIFIER OF CONSTRUCTION (ACC) (If you are a sole trader you can act as both the Approved Body and the Approved Certifier but you must complete a separate application to be registered as an Approved Body). Full Name of Nominated Approved Certifier of Construction Grade held: (tick as appropriate) Advanced Plumber Technician Plumber Heating Engineer Heating Technician Other ( Please specify what grade you hold if you have ticked other) Do you hold a current SNIJIB Registration Card? Yes No National Insurance Number: Address: (for correspondence) Postcode: Telephone: Mobile: E-Mail: Page 1 of 8 10/13

SECTION 2: WORK AND SUPERVISORY EXPERIENCE Please provide details of your current work experience in the box below. In particular you should highlight supervisory work you undertake and also indicate if you carry out any current certification work. E.g. Gas work notification, Water Byelaws etc here if you currently act in a supervisory capacity within the business. here if you are responsible for the work of the other operatives including apprentices. Do you: Measure jobs for pricing or quotations? Yes No Set out jobs from plans where necessary? Yes No SECTION 3: DETAILS OF APPROVED BODY Company Name: Type of Company: (Please tick as appropriate) Sole Trader Partnership Limited Company Other Contact Name: Approved Body Registration Number: (If known) Address: Post Code Office Telephone: Fax: Mobile: E-Mail: Page 2 of 8 10/13

SECTION 4: DECLARATION AND SELECTION OF SCHEME SCOPE ACTIVITIES (including qualifications and work experience) The operated by SNIPEF requires Approved Certifiers to hold appropriate qualifications. To certify work in the following designations, ACCs will be required to hold appropriate qualifications and to submit evidence that they hold such qualifications with this application. To apply to become an Approved Certifier of Construction under the Building (Scotland) Act 2003 you agree by completing and signing this application that all work carried out under the scheme will undertaken in compliance with the Building (Scotland) Regulations 2004 (as amended). Please tick each scope you wish to certify; Here Scheme Designation and Qualifications required 1.0 The installation and commissioning of: Above Ground Drainage Technician Plumber SNIJIB Registration card or be eligible to qualify for such a card and hold a current Water Byelaws/Regulations qualification. Scope of Work Activities Covered Includes all pipe-work, pipe protection, appliances, traps and fittings for: waste water (including grey water) installations; surface water (including rainwater harvesting) installations; up to connection with below ground drainage. 1.1 The installation and commissioning of: Below Ground Drainage Technician Plumber SNIJIB Registration card or be eligible to qualify for such a card and hold a current Water Byelaws/Regulations qualification. Gravity Systems: Includes all pipe-work, pipe protection, connections, access and inspection units and traps, from connection to any above ground drainage to the point of connection to any: disconnecting manhole within the property curtilage; vested public drain or sewer; private waste-water treatment plant (including septic tanks); soakaway; sustainable urban drainage system (SUDS). Pump Systems: Includes all connection, pipe protection and discharge of waste-water to point of connection to underground gravity system. C) Soakaway: Limited to a soakaway installation serving a single dwelling Page 3 of 8 10/13

Here Scheme Designation and Qualifications required Scope of Work Activities Covered 2.0 The installation and commissioning of Fixed combustion appliances and or heating or hot water systems: Gas installations up to 70kw qualify for such a card and hold a current Water also hold the following qualifications: CCN1 and CENWAT1 or such other qualifications which may replace these and be registered with the appropriate Gas Safety Registration Scheme. 2.1 The installation and commissioning of Fixed combustion appliances and or heating or hot water systems: Gas installations over 70kw Approved Certifiers must hold a current Advanced or Technician Plumber or Heating Engineer or Heating Technician SNIJIB Registration card or be eligible to qualify for such a card and hold a current Water Byelaws/Regulations qualification. Certifiers must also hold the following qualifications: COCN1, ICPN1, CIGA1, CORT1, and TPCP1 or such other qualifications which may replace these and be registered with the appropriate Gas Safety Registration Scheme. 2.2 The installation and commissioning of Fixed combustion appliances and or heating or hot water systems: Oil installations up to 45kw qualify for such a card and hold a current Water also hold the following qualifications: OFTEC105E, OFTEC600A and either: OFTEC101and/or OFTEC102. Includes the installation of gas fired combustion appliances (up to 70kw), all associated pipework, controls, hearths, flues, ventilation, hot and cold water storage vessels and unvented storage systems. Includes fuel storage with associated pipe-work Includes the installation of gas fired combustion appliances (Over 70kw), all associated pipework, controls, hearths, flues, ventilation, hot and cold water storage vessels and unvented storage systems. Includes fuel storage with associated pipe-work Includes the installation of oil combustion appliances (Up to 45kw), all associated pipework, controls, hearths, flues, ventilation, hot and cold water storage vessels and unvented storage systems. Includes fuel storage with associated pipe-work connections and safety controls. Page 4 of 8 10/13

Here Scheme Designation and Qualifications required Scope of Work Activities Covered 2.3 The installation and commissioning of Fixed combustion appliances and or heating or hot water systems: Solid Fuel installations up to 50kw qualify for such a card and hold a current Water also hold the following qualification: HETAS Wet system installer course. 2.4 The installation and commissioning of: Unvented hot water systems. qualify for such a card and hold a current Water also hold an appropriate unvented qualification. 2.5 The installation and commissioning of: Solar Thermal Panels. qualify for such a card, and hold a current Water also either hold an industry approved SVQ Level 3 Certificate in Renewable Technology in the relevant technology or hold a competence based qualification such as a BPEC course or such other qualification(s) which may be approved by the Scheme. 2.6 The installation and commissioning of: Biomass Boilers qualify for such a card, and hold a current Water also either hold an industry approved SVQ Level 3 Certificate in Renewable Technology in the relevant technology or hold a competence based qualification such as a BPEC course or such other qualification(s) which may be approved by Includes the installation of solid fuel combustion appliances (Up to 50kw), all associated pipework, controls, hearths, flues, ventilation, hot and cold water storage vessels and unvented storage systems. Includes fuel storage with associated pipe-work Includes the installation of Unvented Units, all associated pipework, safety controls and hot and cold water storage vessels. Includes the installation of solar panels, all associated pipework, controls, hearths, flues, ventilation, hot and cold water storage vessels and unvented storage systems. Includes fuel storage with associated pipework Includes the installation of Biomass Boilers, all associated pipework, control systems and ventilation. Associated hot and cold water storage vessels and controls (including unvented systems). Fuel storage tanks and associated pipe-work connections and safety controls. Page 5 of 8 10/13

Here Scheme Designation and Qualifications required the Scheme. Scope of Work Activities Covered 2.6 The installation and commissioning of: Air Source Heat Pumps. Approved Certifiers must hold a current Advanced or Technician Plumber or Heating Engineer or Heating Technician SNIJIB Registration card or be eligible to qualify for such a card, and hold a current Water Byelaws/Regulations qualification. Certifiers must also either hold an industry approved SVQ Level 3 Certificate in Renewable Technology in the relevant technology or hold a competence based qualification such as a BPEC course or such other qualification(s) which may be approved by the Scheme. 2.7 The installation and commissioning of: Ground Source Heat Pumps. Approved Certifiers must hold a current Advanced or Technician Plumber or Heating Engineer or Heating Technician SNIJIB Registration card or be eligible to qualify for such a card, and hold a current Water Byelaws/Regulations qualification. Certifiers must also either hold an industry approved SVQ Level 3 Certificate in Renewable Technology in the relevant technology or hold a competence based qualification such as a BPEC course or such other qualification(s) which may be approved by the Scheme. 3.0 The installation and commissioning of: Electrical work in connection with 1.0 to 2.7 inclusive Except: a) any new electrical circuit to the building; b) any extension or alteration to the building s electrical circuits (other than a single fused outlet connection). Approved Certifiers must be either: An Approved Certifier of Construction (Electrical Installations to BS7671); or Must hold a current Advanced or Technician Plumber or Heating Engineer or Heating Technician SNIJIB Registration card or be eligible to qualify for such a card, and hold a current Water Byelaws/Regulations qualification. Certifiers must also hold the following qualification: SVQ Unit 5 electrical course. Includes the installation of air source heat pumps, all associated pipework, control systems and ventilation. Associated hot and cold water storage vessels and controls (including unvented systems). Fuel storage tanks and associated pipe-work connections and safety controls. Includes the installation of ground source heat pumps, all associated pipework, control systems and ventilation. Associated hot and cold water storage vessels and controls (including unvented systems). Fuel storage tanks and associated pipe-work Includes the electrical connections for gas (under and over 70kw, Oil (under 45kw), Solid Fuel (under 50kw) combustion appliances, Solar Panels, Biomass Boilers, Air Source and Ground Source Heat Pumps, control systems, associated hot and cold water storage vessels and controls (including unvented systems). Fuel storage tanks and safety controls. Page 6 of 8 10/13

SECTION 5: FEES An annual fee of 50 (plus vat) applies to each Approved Certifier and a cheque for this amount made payable to SNIPEF Management Ltd must accompany this application. Approved Certifiers are also required to attend and complete the undernoted course and your application to become an ACC will not be approved until the course assessment has been passed. Building Standards Training Course & Assessment The Scottish Building Standards Course & Assessment will cost: 120 + VAT (If you are a current SNIPEF member) or 150 + VAT for Non SNIPEF members Details of the Course locations and dates will be issued on receipt of your application, accompanying technical qualifications and fee. Form ACC/1 07/10 Page 7 of 8 10/13

SECTION 6: CHECKLIST Please ensure you enclose with this form: Your registration Fee of 50 + VAT per Approved Certifier (cheques made payable to SNIPEF Management Ltd) You must also supply copies of the relevant qualification certificates for the appropriate scope of work you wish to certify. Qualification Required JIB Registration Card or evidence of technical qualification Water Byelaws/Regulations CCN1 and CENWAT1 COCN1, ICPN1, CIGA1, CORT1, TPCP1. Gas Safe Register membership certificate OFTEC105E, OFTEC600A, OFTEC101 OFTEC102 HETAS Wet system heating installer course Unvented Solar Hot Water Ground Source Heat Pump Air Source Heat Pump Biomass Boiler Unit 5 Electrical Name: Signature: Date: Please complete and return this form to SNIPEF, Bellevue House, 22 Hopetoun Street, Edinburgh, EH7 4GH Page 8 of 8 10/13