Welcome to this exhibition which shows emerging ideas for land owned by University of Bristol at Long Ashton.

Similar documents
Welcome to our exhibition

Newcourt Masterplan. November Exeter Local Development Framework

8.0 Design and Form of Development 43/

Kibworth Harcourt. Introduction. Introduction

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

Public Consultation. Land at Monks Farm, North Grove. Welcome

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

1. Local Plan Context

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Briefing Document of CNP. June 2017

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

North Somerset Council Local Development Framework. Core Strategy. Topic paper Sustainable Urban Extension South West Bristol

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows:

WELCOME. North East Haverhill. The Planning Process

Droitwich Spa 6. Reasoned Justification

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

Frequently Asked Questions

About 18 months ago we exhibited our plans to build three new villages in North Somerset,

Neighbourhood Plan Representation

1. Welcome. Background

Land at Rampton Road. Cottenham

Longhorsley Neighbourhood Plan

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your address

Welcome to our public exhibition

PLACE WORKSHOP REPORT. A+DS SNH sustainable placemaking programme

Site Assessment Technical Document Appendix A: Glossary

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

1. Welcome. Land at Cribbs Causeway. January The Joint Venture. Today s Exhibition. Project Team.

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

WELCOME TO THE NEW WILTON PARK

Alder View. Introduction. Alder View. Harwell. The Vision. The Team. Taylor Wimpey

Welcome to our Public Consultation

Welcome to our public exhibition

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

The Fairfield Partnership Vision for North-East Elsenham

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

The journey so far. The new masterplan for Dargavel Village

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Linden Homes Proposals for land east of Glebe Farm, Sawtry

Bradleys Both Parish Council

Elderberry Walk. Developer HAB Housing

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD

Evesham 7. Reasoned Justification

WELCOME LAND EAST OF TYE LANE, WALBERTON. Above all, it s about people

Welcome. Welcome to our first Open Day event

Land at Fiddington Hill Nursery, Market Lavington

Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council

Neighbourhood Planning Local Green Spaces

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

NORTH WEST SECTOR HORLEY, SURREY

ALLERTHORPE NEIGHBOURHOOD PLAN

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

Great Hammerton Growth Area: Our Vision August Hammerton Growth Area Harrogate: Our Vision

What progress have we made so far? NEWSLETTER PROPOSED IONA RESIDENTIAL DEVELOPMENT UPDATE

The Gwennap Parish Vision Statement

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

Land East of Cromwell Lane

Welcome to our public exhibition

Application Guide. Should you have any questions on the Outline Application please contact:

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

WELCOME. Thanks for visiting Hadley Property Group s exhibition on its initial plans to redevelop land at Bath Road in Totterdown.

Hodgson s Gate. Welcome. Who we are. Hodgson s Gate Developments. Thank you for taking time to attend today s event.

WELCOME. Welcome and thank you for visiting today.

Environmental and Landscape Mapping

CALA HO ME S WELCOME

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Neighbourhood Planning Guidance Local Green Spaces

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M)

elbridge Core Strategy

PHASE III: Reserved Matters Submission

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

SITE ASSESSMENT CHECKLIST

MAYFIELD WEST SECONDARY PLAN PHASE 2

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:-

Ashtead Neighbourhood Forum Site Assessment AS07 Old Chalk Pit, Pleasure Pit Road. Site ref: AS07 Site address: Old Chalk Pit, Pleasure Pit Road

Linden Homes Land at Hill Place Farm, East Grinstead

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

A VISION FOR BLAIRGOWRIE

The Place Solar Farm

INTRODUCTION. Land West of Main Road, Stanton Harcourt THE SITE. Why is the Site Suitable for Development?

INTRODUCTION. Land off Main Road, Great Leighs. Introduction

PUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN

Information about the site we need to take into account

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Hampton Park North Littlehampton West Sussex

Linden Homes Proposals for land at Field Road, Ramsey

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Transcription:

1 Introduction Welcome to this exhibition which shows emerging ideas for land owned by University of Bristol at Long Ashton. The University of Bristol owns a 170 acre site south of Long Ashton village bounded to the north by the main railway line, to the west by Wildcountry Lane and to the south by the A370. The site is one of several in the area currently being promoted for new development in the Draft Regional Spatial Strategy as part of the South West Bristol Urban Extension. The University has appointed a project team to look at ways of redeveloping the site as a new, sustainable extension to Long Ashton village. The core/underlying principle is to ensure that Long Ashton maintains its identity and remains separated from the larger expansion of Bristol being promoted south of the A370, whilst also adding much-needed community facilities and family homes to the area. The current proposals are for approximately 1,100 new homes, together with a new primary school, improved community facilities and open space provision. The development would also help secure better transport linkages, including a new connection onto the A370 and also a possible new station on the railway line between Bristol and Weston-Super-Mare. Following initial discussions with North Somerset Council and Long Ashton Parish Council, the University would like to hear the views of the local community and invite public comment. Have your say: ABC has been appointed as an independent facilitator to organise a programme of public consultation on behalf of the University and their project team. Having looked at the exhibition please let us know what you think by completing one of the comment forms which you can either post in the box provided or return to the address shown on the form. You can also view the exhibition material online and download a form at: www.bristol.ac.uk/estates Planning Consultant Architects/ Masterplanners Engineering Landscape Consultant

2 Planning policy for the area The Draft Regional Spatial Strategy (RSS) The Regional Spatial Strategy will form the governments planning policy for the location of development in the south west region until 2026. The draft RSS has identified the need for an urban extension of 10,500 dwellings to the south west of Bristol. 9000 of these dwellings are to be in north Somerset. This will mean removing land to be developed from the Green Belt. Whilst the RSS has yet to be finally confirmed the Government has said that the strategy s housing requirement will be an important factor in deciding whether or not planning applications for development should be granted. = South West Bristol Urban Extension North Somerset Council Options The whole of the University s land is located in north Somerset. When North Somerset Council consulted the public on its core strategy issues and options in October 2007, it showed four possible approaches to the location of new development in the area (as shown above). Three of these options included part or all of the land at Long Ashton owned by University of Bristol (highlighted) as an extension to the village.

3 Area of search and current proposals The Area of Search defined by North Somerset Council is shown to the right. Ashton Vale Key: K Ke ey: Site boundary Initi al Area Search tial ti Are rea of Sea ((Broadway Broadway Br aayy Malyan Malya 26th November 2008) The Site Bedminster Down Barrow Gurney Bishopsworth Bristo Bristol tto o University ol U iver Un ers er rsity iss one o e of four landowners on proposingg development deve veelopm men within the area, as numbered (below right):1a/1b. LandTrust Developments: propose 10,000 new homes, employment, schools, open space and community facilities. Planning applications have been submitted (August 2009) to both Councils. 2. 3. 4. 4 University of Bristol: propose 1100 homes, primary school, employment, recreation, and open space as an extension to Long Ashton Village. Possibly including a new railway station. 1b 2 Del Piero: already have permission for 24,000m2 employment at Barrow Hospital. They are likely to propose additional housing on adjacent land. Bristol City Football Club: planning application recently submitted (July 2009) for new football stadium plus associated housing (320 units), hotel, restaurants, bars and conference facilities. 3 All boundaries approximate 1a

4 Our vision Current development proposals for South- West Bristol urban extension:- Current proposals for the south west Bristol urban extension highlight development through Ashton Vale to the A370, greatly reducing Long Ashton s separation from Bristol. Our key aim is to ensure that Long Ashton maintains its identity and remains separate from the larger expansion of Bristol. The main principles underpinning our development are: Development should be concentrated in areas where it has least environmental impact. Our vision for the South-West Bristol urban extension :- Existing development Proposed development It should be in locations where it can utilise existing facilities and provide additional benefits to local communities. In practice this means adding to existing communities/ built up areas. New development should be of a density and character that is in keeping with the local community to which it most closely relates. It should preserve green belt separation between Bristol and Long Ashton. Existing development Proposed development The diagram left shows how extensions to the west of the built up area and south of Long Ashton would allow the retention of the prominent ridge and hillside to the north and west of Yanley as a wedge of green space between Long Ashton and the outskirts of the city. Approved development at Barrow Hospital is contained within the existing woodland. The potential for development at Long Ashton is explored on boards 5-11.

5 The site and context Historic Expansion The original settlement of Long Ashton, which dates from the 15th century, grew up around All Saints Church at the east end of the village. By 1880 ribbon development had taken place along much of Long Ashton Road. These and the later phases of development are shown on the adjoining plan. Pre 1890s 1945-2000 - present 1920-1980 - All Saints Church Amenities and Connectivity Long Ashton village is a linear settlement. The majority of facilities (in particular shops, the leisure centre and health) are located towards the west end. Expansion of Long Ashton to the south of the railway would mean that the village would become more rounded in shape and that all new homes would be within ten minutes walk of the local shops.

6 Background Studies The project team has investigated the factors most likely to influence site development: Topography Landscape planning designations 30m and below 30-40m 40-50m 50-60m 60-70m 70-80m 80-90m 90-100m 100-110m 110-120m 120-130m 130-140m 140-150m 150 and above Principal areas of woodland 15m Landscape and Landform The ridge to the south acts as a visual and noise barrier to the A370 and views beyond. Views of development will be mainly from the upper slopes of Long Ashton and be restricted by adjacent houses and garden vegetation. We will aim to avoid views of development from Tyntesfield, Ashton Court and Barrow Court historic landscapes. Woodland and hedgerows on site should be retained. Ecology: The woodland, stream and lake are part of a County Site of Nature Conservation Interest. Most of the site is of limited ecological interest. Bat, great crested newt, bird, invertebrate, badger, dormice, water vole, otter, reptile and flora surveys have been undertaken. Where protected species have been found, their habitats should be retained or reprovided. Railway 2 A370 10 Long Ashton B 8 9 LEGEND Site Site boundary 6 2 North Photograph Somerset locations County boundary North Somerset County boundary Conservation Areas National Landscape 4 5 Character Area (Note 1) National Character Landscape Area 118: Bristol, Avon Character Valleys Area and (note Ridges1) 3 Character County Area Landscape 118: Bristol, Character Avon 7 Valleys Areas and (Note Ridges 2) Failand Settled Limestone County Landscape Plateau Character Areas (note 2) Tickenham Ridge Failand Settled Limestone Plateau Land Yeo and Kenn Rolling Valley Farmland Tickenham Land Yeo Ridge and Kenn River Floodplain Colliters Brook Rolling Valley Land Farmland Yeo and Kenn Rolling Valley Cleeve Farmland Ridge 12 Land Yeo and Kenn River 13 Dundry Hill Floodplain A Yanley Planning Designations Colliters Brook Rolling Valley Farmland Conservation Areas (Note 3) 11 Cleeve Listed Ridge Buildings (Note 7) A A C Ash ton Bro o k A370 Railway Ancient Woodland (Note 4) Dundry Hill Registered Historic Parks and Gardens (Note 3) 2 Photograph locations Definitive Public Rights of Way (Note 5) Scheduled Ancient Monuments (Note 3) Notes: Regionally Important 1. National Landscape Character Area Geological site (Note 3) taken from: Countryside Character Volume 8, South West, which Tree Preservation covers the Orders entire study area; (Note 6) 2. County Landscape Character Areas taken from: North Somerset Landscape Character Assessment, adopted 2005. Transport: The site needs to link directly from the A370, as Wildcountry Lane provides limited scope for increased traffic movements Inter-linkage with other developments elsewhere in the urban extension will be important, to encourage improved public transport connections. A new railway station / halt will be promoted and land will be provided east of Ashton Brook, to serve Long Ashton and the wider urban extension. Engineering: Some further stabilisation works may be necessary near to the railway. Any instability from past mining activity can be dealt with on an ad-hoc basis. Contamination: There is no history of contamination. Drainage: There is no significant flood risk on the site meaning that housing development is appropriate. A sustainable drainage strategy has been developed to accommodate new development that will keep the surface water run-off rate to that of a green field site. The main principles of sustainable drainage systems (SuDS) are to reduce the impact of man on the environment and to enhance the quality of water that runs off all artificial surfaces. Archaeology: An archaelogical study has been undertaken and has shown the site is of low archaeological importance. A watching brief will be maintained. Proposed osed development at Long Ashton

7 Constraints and opportunities Constraints Summary - Ridge / steep embankment to the south. - Public rights of way cross the site. - Woodland and hedgerows need to be preserved. - Drainage ditch runs along base of ridge - Potential noise from railway and A370. - Development will need to be low rise to minimise impact of views onto / across the site. - Ashton Brook woodland and lake form an important ecological and recreational area within the site. Opportunities Summary - Land to the north and east is relatively level. - Several foot / cycle paths already cross the railway. - Ridge to south provides buffer and screen to A370. - Village extension links directly to A370 and development to south. - Development would include a new school and improved community recreation facilities. - Land will be protected for a new station which could be provided. Investigations with Network Rail and other potential partners will continue to promote the opportunity.

8 Development principles Green Infrastructure Strategy Circulation Primary route Pedestrian priority/ public footpath Train line The site will be very permeable to allow new and existing residents movement to the countryside to the south. Pedestrian and cycle links have a priority on the north-south axis across the site respecting the existing rights of way. Vehicular routes through the site are secondary and integrated on an east-west axis. Masterplan Concept Identity and character The proposed extension to Long Ashton will introduce green corridors that follow the routes of the existing hedgerows and public rights of way across the site, breaking it down into definable neighbourhoods with individual character and sense of place. The green corridors allow north-south pedestrian and cycle movement across the site linking to Long Ashton and the countryside beyond. They also act as recreation areas for the residents and provide rich wildlife habitats to encourage as much bio-diversity as possible. Where the development reaches the base of the ridge the green corridors soften the edge of development allowing frontages and footpaths to face south forming a gradual transition and natural edge to the countryside. 35-55 dwellings per hectare 30-40 dwellings per hectare 25-35 dwellings per hectare Through the use of different dwelling types and road layouts a series of neighbourhoods will be created. Each will have a distinct identity and will build on the existing sense of community within the extended village. Recreation and play space 4-6 years 4-8 years 8-14 years Green space By maintaining and expanding upon the green corridor and lake at the centre of the site much of the public areas will be informal recreation space, being separated from traffic, well overlooked and having excellent access. Secure play areas will be provided across the site and will aim to be located to satisfy the planning and Fields in Trust (FiT) standards. Along with these play areas it is intended allotments and public open space would be provided across the site.

9 Transport Strategy 1 T-junctions onto A370 Transport Options The new development will have a sustainable transport strategy promoting a new rail link within the site. The new links to the A370 along with pedestrian, cycle and bus routes linking to the wider area will be determined through continuing dialogue with the local authorities and other proposed adjacent developments. Alternatives shown illustrate potential emerging strategies currently under consideration. 2 Split feeder lanes onto A370 3 Roundabout onto A370

10 Emerging proposals Connection provided to A370 via T-junction or link to roundabout. The plan above illustrates our emerging proposals for development of the site. Train Station approx 0.7 hectares Key features are: - Development of about 1100 homes and 3 ha. of employment land. - Density similar to the existing village, averaging 35 dwellings per hectare. - Ashton Brook, woodland and lake are retained and improved as an ecological and recreation area. - Site for a new railway station (subject to approvals). - A new primary school and associated playing fields. - New playing fields and local/ neighbourhood play areas. - Direct linkage from the new development to the A370 and other parts of the proposed SW Bristol urban extension. Employment approx. 1 hectares School approx. 1.6 hectares Agricultural land Residential approx. 23 hectares Public open space Residential approx. 6 hectares Employment approx. 1 hectares Employment Residential Train Station Contributions are possible to help improve local shopping and health services. School

11 Emerging proposals in context This plan shows the proposed extension in the context of the existing village, and how the development will be of a similar character and density.

12 Next steps Your comments and views are important Your comments and views will be important in helping to shape the emerging proposals and will be carefully considered by the University and its design team as they proceed to draw up more detailed proposals. If you leave contact details at the exhibition we will make sure you are kept informed about the progress of this project. What happens next: work up more detailed proposals. Feedback from this exhibition will inform the work of the masterplanning team as they A further round of public consultation will take place in October 2009 when once again feedback will be sought on the development proposals, prior to submission of an outline planning application to North Somerset Council in November 2009. This will be followed by the start of the formal planning process which will be subject to further consultation and discussion. If you have any queries about this exhibition or the consultation process please contact: ABC, consultation co-ordinator Email: info@abc-pr.co.uk tel: 0117 977 2002 or fax: 0117 977 4255