DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

Similar documents
DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

DATE: May 25, Watershed Conservation Authority Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

Council Agenda Report

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

CITY OF SIMI VALLEY MEMORANDUM

AGENDA ITEM # 13A/B. AGENDA ITEM EXECUTIVE SUMMARY Village Board Meeting December 10, 2018

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

The maximum amounts shown in the Engineer s Report for each of those categories for FY 2008/09 are as follows (per house/per year):

RESOLUTION APPROVING THE DESIGN CONCEPT FOR THE JEPSON PARKWAY GATEWAY ENHANCEMENT PROJECT {FEDERAL PROJECT NO. RPSTPLE-5094(050)}

TRINITY COUNTY Board Item Request Form

IMPACT ON FINANCIAL AND PERSONNEL RESOURCES:

PLANNING APPROVAL STAFF REPORT Date: November 17, 2011

Agenda Report DESIGNATION OF 1855 E. COLORADO BOULEVARD (FORMER DRAPER'S BUILDING) AS A LANDMARK

REPORT TO COUNCIL City of Sacramento

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson

REPORT TO MAYOR AND COUNCIL

CITY OF YUBA CITY STAFF REPORT

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117.

#A -ille= O. Ciry Council Report. %-s. Item: Gategory: Meeting Date: New Business September 7,2010. err TITLE:

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing

Design Review Commission Report

City of Sacramento City Council 915 I Street, Sacramento, CA,

VILLAGE BOARD MEETING STAFF REPORT

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

Call to Artists Public Art for Los Angeles Metro Stations

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006

RESOLUTION NO. WHEREAS, the proposed Master Plan for Villa Esperanza (VE), located at 2116

REPORT TO MAYOR AND COUNCIL

RESOLUTION NO: WHEREAS, the subject property has a Public, Semi-Public (PS) zoning designation and a General Plan designation of Institutional; and

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

REPORT TO COUNCIL City of Sacramento

ORIGINAL RENDERING 1814 FRANKLIN STREET OAKLAND, CALIFORNIA 80 S MODIFICATIONS PROPOSED ELEVATION COVER THE LEAMINGTON architecture & interiors experi

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

LINDA HERMAN, PUBLIC WORKS ADMINISTRATION MANAGER ( Recommendation: The Acting Public Works Director-Engineering recommends:

CITY OF SIMI VALLEY MEMORANDUM

STAFF REPORT TO THE CITY COUNCIL. Conduct Public Hearing to vacate certain public right of way adjacent to Sycamore Avenue and San Pablo Avenue

Fall 2017 Construction Update

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SIMI VALLEY DOES ORDAIN AS FOLLOWS:

The Trinity River Corridor Project Update

AGENDA 07/14/11 PLANNING COMMISSION Meeting

MEMORANDUM OF UNDERSTANDING REGARDING MANAGEMENT OF THE LAKE MERCED TRACT

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

CHAPTER BEAUTIFICATION AND LANDSCAPE MANAGEMENT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

LOS ANGELES AIRPORT/EL SEGUNDO DUNES Specific Plan

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

CITY OF LARKSPUR Staff Report. August 21, 2013 Council Meeting UPDATE ON TRANSPORTATION AUTHORITY OF MARIN (TAM) GREENBRAE CORRIDOR WORKING GROUP

DESIGN AND LANDSCAPE GUIDELINES FOR DEVELOPMENT

M E M O R A N D U M February 21, 2018

CONSENT CALENDAR September 27, 2005

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Item 10E 1 of 5

City of San Juan Capistrano Agenda Report

TO: CITY COUNCIL DATE: MARCH 23,2009

Historic Preservation Commission Motion No Certificate of Appropriateness

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G. 1 STAFF REPORT August 4, Staff Contact: Tricia Shortridge (707)

4/8/2015 Item #10D Page 1

CITY COUNCIL OF THE CITY OF OXNARD RESOLUTION NO.

CITY OF SIMI VALLEY MEMORANDUM

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

Certificate of Appropriateness Case Report HEARING DATE: MARCH 20, 2019

Rezoning Petition Zoning Committee Recommendation August 1, 2017

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Grand River Ravines Georgetown Township

COASTAL CONSERVANCY. Staff Recommendation December 13, 2007 COASTAL TRAIL AT LAND S END. File No Project Manager: Joan Cardellino

Planning Commission Report

WASATCH HOLLOW PRESERVE PHASE II RIPARIAN RESTORATION JOB NO

Hidden Pointe Landscape Master Plan. June, archi terra

SAN RAFAEL CITY COUNCIL AGENDA REPORT

Agenda Item No. May 27, Honorable Mayor and City Council Attention: David J. Van Kirk. Dale I. Pfeiffer, Director of Public Works

RESOLUTION NO. WHEREAS, the Planning Commission of the City certified said General Plan Update FPEIR, which certification was not appealed; and

Rights-of-Way Preservation Guidelines

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT

REPORT TO MAYOR AND COUNCIL

STATE OF NORTH CAROLINA DECLARATION OF

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

14 HIGHWAY PLANTING AND IRRIGATION

TOWN OF APPLE VALLEY TOWN COUNCIL STAFF REPORT

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

CITY of NOVI CITY COUNCIL

Public Works Project Delivery Report

L-1 LEGEND HOMES AT DEER HILL LAFAYETTE, CALIFORNIA

4.1 AESTHETICS AND VISUAL QUALITY

GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES

City of Sacramento City Council 915 I Street, Sacramento, CA,

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

The full agenda including staff reports and supporting materials are available at City Hall.

A RESOLUTION SETTING FORTH CATS S COMMITTMENT TO COMPLETE STREETS

M E M O R A N D U M CITY PLANNING DIVISION PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA

City of Lafayette Study Session Project Data

Transcription:

DATE: January 9, 0 TO: FROM: THROUGH: SUBJECT: WCA Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer : Consideration of a resolution to authorize Executive Officer, or designee, to negotiate and enter into a contract with a Youth Conservation Corps for the San Gabriel River Bike Trail Gateway Enhancement Project. RECOMMENDATION: That the Watershed Conservation Authority (WCA) Governing Board authorize the Chair, or designee, to negotiate and enter into a contract with a Youth Conservation Corps for the San Gabriel River Bike Trail Gateway Enhancement Project, for construction activities not to exceed $0,000. PROJECT DESCRIPTION: The WCA received Proposition A grant funding through the Los Angeles County Regional Park and Open Space District for the San Gabriel River Bike Trail Gateway Enhancement Project to improve the visibility and safety of the San Gabriel River Bikeway crossing at the heavily trafficked Arrow Highway intersection (Exhibit A). The artist Brett Goldstone has been contracted to construct three art sculptures and provide art direction for the landmark. WCA staff recommends contracting a Youth Conservation Corps to complete construction activities, including but not limited to demolish and excavate existing asphalt surface, install area development paving, boulders, signage and foundations for and aid in installation of landmark elements (Specifications Exhibit B, Budget Exhibit C). BACKGROUND: In June 00 a grant agreement for $,000 was executed between the WCA and Los Angeles County Regional Park and Open Space District for the First Supervisorial District Excess Funding to implement a place-making art installation referred to as the San Gabriel River Bike Trail Gateway Enhancement Project. The project site is located adjacent to the Santa Fe Dam at the busy crossing of the San Gabriel River Bike Trail over the Arrow Highway to improve visibility and safety. The project scope originally included landscaping and decorative monument signage within both the City of Irwindale street right-of-way (ROW) and the Santa Fe Flood Control Basin, which is under the jurisdiction of the U.S. Army Corps of Engineers (USACE). A multi-year long consultation with USACE and the City was unsuccessful in attaining the USACE s approval to permit the proposed improvements. However, the project scope has been evolved in working with the City of Irwindale to include sculptural art and interpretive signage solely within the City s ROW jurisdiction. Staff completed a preliminary CA review and determined that the proposed project constituted a Categorical Exemption pursuant to Section 0 (Class : New Construction or Conversion of Small Structures) and Section 0 (Class : Minor Alterations). The Santa Fe Dam Bike Trail Enhancement Project involves placement of interpretive signage, production and installation of environmental art

sculptures, site preparation work, and minor alteration to land. Staff filed a CA Notice of Exemption (NOE) with the Los Angeles County Clerk following WCA Board approval of the project in January 0. A conceptual site plan and sketches were prepared and submitted to the City for review and approval of an encroachment permit to allow installation within their right-of-way, which was approved in October 0 and finalized December 0. Following project approval City Public Works reviews continued through 0, which have culminated in agreements to approve construction of the installation with the addition of a fence around the periphery of the sculpture. A professional services contract was approved by the WCA Board May, 0 for Goldstone Gates to begin fabrication of the art installation May, 0. WCA staff has developed concept drawings and discussed the additions of the fence with the artist, who has proposed to fabricate the fence components to match the sculptural elements. With the construction approval and fabrication of the final elements the project will be ready to install. Construction services are required to: demolish the existing asphalt on-site, excavate fill material as necessary, place and mortar boulders, lay a concrete foundation, lay decomposed granite and gravel, assist in sculpture and fence installation, and plant and mulch vegetation material as necessary. The services required are appropriate for youth labor programs. With the Proposition A funding source imperative to employ youth corps and an agency interest in supporting work skills development WCA staff recommends awarding a contract to a Youth Conservation Corps for these construction services. FISCAL INFORMATION: The not to exceed $0,000 contract for planned construction services is fully funded by a Proposition A grant.

Exhibit A Territory Map Santa Fe Dam Bike Trail Enhancement Project

0 9 A B C D E F CURB B S- ARROW HIGHWAY Site Plan '-0" TO VERTICAL ELEMENTS '-0" 9'-" '-0" TO ENCROACHMENT LINE EXISTING BIKEWAY MIN. '-0" FROM BIKEWAY TO ENCROACHMENT LINE '-0" LANDMARK AREA BIRD SCULPTURES ( TOTAL) TYP.. '-0" '-0" FROM CONTROLLER TO ENCROACHMENT LINE U.S. GOVERNMENT ARROW HIGHWAY ROW PROJECT AREA EXISTING CHAINLINK FENCE CHANNEL WALL '-0" ARROW HIGHWAY ROW SAN GABRIEL RIVER CONSTRUCTION NOTES: A S- Vicinity Map CONSTRUCT '-" HIGH FENCE PER DETAIL / S-. Project Location GENERAL NOTES CONTRACTOR TO COORDINATE ALL FIELD DIMENSIONS WITH ARTIST PRIOR TO COMMENCING INSTALLATION. MATERIAL SPECIFICATIONS:. STRUCTURAL STEEL TO BE AS FOLLOWS: HOLLOW SECTIONS: ASTM A00 GRADE B HOLLOW PIPE: ASTM A GRADE B PLATES: ASTM A HOT ROLLED SHAPES AND BARS: ASTM A. WELDING TO BE PERFORMED USING E0XX ELECTRODES. ENCROACHMENT PERMIT FOR CITY OF IRWINDALE RUIRED.. TRAFFIC CONTROL PER WATCH MANUAL, LATEST EDITION.. NO WEEKEND WORK ALLOWED, UNLESS AUTHORIZED BY THE CITY OF IRWINDALE. FINSHING:. HOT DIP GALVANIZE ALL STEEL PRIOR TO INSTALLATION. TOUCH UP FIELD WELD CONNECTIONS WITH ZINC RICH PAINT.. SEAL OPEN ENDS OF ALL TUBE SECTIONS. SPECIAL INSPECTIONS: NO SPECIAL INSPECTIONS ARE RUIRED. STRUCTURAL OBSERVATIONS: NO STRUCTURAL OBSERVATIONS ARE RUIRED. STRUCTURAL DESIGN CRITERIA: 0 CALIFORNIA BUILDING CODE WIND DESIGN: EXPOSURE B, WIND SPEED MPH, KZ = 0. KD = 0., G = 0., CF =. JANUARY, 0 ISSUED FOR BID Disclaimer: SANTE FE DAM TRAIL ENHANCEMENT BIRD SCULPTURES IDG STRUCTURAL ENGINEERING IRWINDALE, CA. 00 N FIGUEROA STREET LOS ANGELES, CA 900.. G Bird neck and head to be welded to body base /" tube /" thk plate shell cover GENERAL NOTES, PLANS & STRUCTURAL DETAILS No. Date Revision Sculpture per Detail & H Appx. '-0" " tapered tube Welded conn. typ. Appx. '-0" Steel sculpture - see Detail for add'l info PL / x 9" x 0'-9" min., centered on bird claws and shaped to rock surface /" min. typ. " min. " min. /" thk plate shell cover " thk solid bar Rock base J Max. weight of sculpture = lb PLAN DETAIL AT ANCHORS /" thk plate claws See Detail for sculpture anchorage Rock base Rock base See Detail for sculpture anchorage /" dia. HAS rod in Hilti HIT-RE 00 V adhesive, " min. embed. ( total). Install anchors so that anchor axis is perpendicular to rock surface Designed By: Drawn By: Checked By: SG SG FB K Max. weight of sculpture = lb Reviewed By: Project Number: FB Scale: AS NOTED Detail at Bird Sculpture S- Detail at Bird Sculpture S- Detail at Sculpture Anchorage S- S- Sheet: Of: 0 9

Line of fence, centered 0 9 A B C D E F Enlarged Plan S- /" = '-0" " wide ftg typ. " wide conc. curb typ. Typ. at fence post S- on boulder Note: Bird sculptures and sculpture base rocks not shown for clarity. on conc. curb, typ. Typ. at fence post on curb S- " dia. solid stock post @ '-0" o.c. Project area max. typ. '-0" setback typ. Boulder as occurs per Landscape dwgs, typ. '-0" wide removable fence panel " " " " /" thk pl. " Base Pl. Detail Boulder beyond as occurs () # cont. Finish surface per Landscape dwgs /" dia. galvanized Simpson Titen HD screw anchor, ea. side of post, " min. embed. Concrete ftg " (9" max.) (9" max.) Typ / " dia. solid stock post and rails " wide concrete curb, per Plan Finish surface per Landscape dwgs " " min. " () # cont. Per Plan Detail at Fence Post Base (Curb) S- " = '-0" ' - " Sim S- " " " " " /" thk pl. Base Pl. Detail Boulder per Landscaping drawings Top of conc. curb # dowels to match footing or curb reinf., epoxy-drilled with Hilti HIT-RE 00 V adhesive, " min. embed. into rock, typ. Detail at Fence Post Base (Boulder) S- " = '-0" " dia. solid stock post and rails. See Detail, this sheet, for add'l fence info. /" dia. HAS threaded rod in Hilti HIT-RE 00 V adhesive, " min. embed. ( total). Boulder as occurs per Landscaping drawings " lap splice typ. Top of conc. ftg JANUARY, 0 ISSUED FOR BID Disclaimer: SANTE FE DAM TRAIL ENHANCEMENT BIRD SCULPTURES IDG STRUCTURAL ENGINEERING 00 N FIGUEROA STREET LOS ANGELES, CA 900 IRWINDALE, CA... G No. ENLARGED PLAN & STRUCTURAL DETAILS Date Revision H J K Designed By: SG Drawn By: SG Checked By: FB Reviewed By: FB Project Number: Scale: AS NOTED S- Sheet: Of: 0 9

San Gabriel Bikeway Enhancement Project Construction Services Scope of Work Estimate Services Demolition of existing asphalt $,00.00 Install boulders in place $,00.00 Concrete footer for fence $,0.00 Placement of sculptures $,00.00 Fence installation $,00.00 Placement of gravel/aggregate/stabilized DG $,00.00 Subtotal $,0.00 Materials Option to Purchase Large Boulders () $,00.00 Option to Purchase Cobbles/Gravel/Decomposed Granite $,00.00 Concrete $,0.00 yard bins $,00.00 Bob Cat with Claw attachment $90.00 Auguer Drill for Sculpture Installation to Boulders $.00 Subtotal $,0.00 Total $9,.00

January 9, 0 - RESOLUTION 0-09 RESOLUTION OF THE WATERSHED CONSERVATION AUTHORITY TO AUTHORIZE EXECUTIVE OFFICER, OR DESIGNEE, TO NEGOTIATE AND ENTER INTO A CONTRACT WITH A YOUTH CONSERVATION CORPS FOR THE SAN GABRIEL RIVER BIKE TRAIL GATEWAY ENHANCEMENT PROJECT. WHEREAS, the Watershed Conservation Authority (WCA) has been established as a joint powers agency between the Rivers and Mountains Conservancy and the Los Angeles County Flood Control District; and WHEREAS, the Watershed Conservation Authority (WCA) has further been established to focus on projects which will provide open space, habitat restoration, and watershed improvement projects in both the San Gabriel and Lower Los Angeles Rivers watershed; and WHEREAS, this action authorizes the Chair, or designee to negotiate and enter into a contract with a Youth Conservation Corps for the San Gabriel River Bike Trail Gateway Enhancement Project; and WHEREAS, the proposed action is exempt from the provisions of the California Environmental Quality Act (CA); NOW Therefore, be it resolved that the WCA hereby:. FINDS that the actions contemplated by this resolution are exempt from the environmental impact report requirements of the California Environmental Quality Act (CA).. ADOPTS the staff report dated January 9, 0.. AUTHORIZES the Executive Officer, or designee, to enter into a construction services contract with a Youth Conservation Corps for the San Gabriel River Bike Trail Gateway Enhancement Project for a total authorized value not to exceed $0,000. ~ End of Resolution ~ // Motion Second: Ayes: Nays: Abstentions:

Passed and Adopted by the Board of the WATERESHED CONSERVATION AUTHORITY ON January 9, 0 Governing Board Chair ATTEST: David Edsall Deputy Attorney General