AREA-WIDE PEDESTRIAN AND BICYCLE CIRCULATION

Similar documents
LAKE MERRITT CHANNEL PROJECT PRELIMINARY ART CONCEPTS. Sasaki & Associates Lewis desoto John Roloff

A larger version of this map is located on the last page of this PDF.

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

Illustrative Development Plan

San Francisco Bay Pilot: Sausal Creek Community Leader Charrette May 11, 2016 Marcus Griswold

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Affordability & Equity

Comprehensive Plan ADOPTED APRIL 2014

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Executive Summary. Section II: Objectives Issues & Opportunities. Section III: District Recommendations. Oak-to-Ninth Avenue District

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

LAKE MERRITT PARK MASTER PLAN

PARKS AND RECREATION

RECREATION AND OPEN SPACE ELEMENT

The Trust for Public Land. in Minnesota

10.0 Open Space and Public Realm

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

2 Executive Summary This section summarizes some key topics and possibilities identified throughout the report. These include defining sub-areas,

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

Isabel Neighborhood Plan: Alternatives

Emerson Park Master Plan Update. Public Meeting III August 27, 2014

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

Concord Community Reuse Project Goals and Guiding Principles. Overarching Goals (OG)

UNIVERSITY OF TEXAS BRACKENRIDGE TRACT THE TEAM

Implementation Guide Comprehensive Plan City of Allen

The Five Components of the McLoughlin Area Plan

Mendota Heights 2040 Comprehensive Plan Draft Vers

The City shall enhance and improve the accessibility of parks and recreational facilities while protecting their quality. by:

Measure DD Project Status Summary

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

Courthouse Planning Area

Restoring Soil Ecology and Native Plant Communities in an Altered Salt Pond Ecotone

Increase density to meet housing and affordability goals and to support transit investments.

Candlestick Point SRA Yosemite Slough Restoration Project. Presented by

MCCOYS CREEK RESTORATION 30% DESIGN

CAL POLY MASTER PLAN UPDATE, March 2015

The Turtle Creek Master Plan- A Summary. July 7, 2011

The University District envisions, in its neighborhood

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

The John Bartram Association Action Plan to advance the 10 year Strategic Plan

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing

PARKS. Chapter Introduction

City of Lafayette Study Session Project Data

PARKS AND RECREATION ELEMENT

Table of Contents. Executive Summary... vii

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

ADVISORY BOARD OAKLAND, CA ADVISORY BOARD MEMBERS: October 17, 2005 Regular Meeting

OPEN SPACE AND RECREATION

ITA and Vicinity Master Plan Update

Planning for Sustainable Infrastructure: A Collaborative Integrated Approach. Background on Berkeley. Background on Paving Needs 8/30/2015

TOWN COUNCIL / PLANNING COMMISSION

APPENDIX C Township 9 Consistency with Applicable Plans

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

San Diego River Coalition 2012 Work Plan

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

This page intentionally blank.

Pinellas County Greenways

900 Innes & India Basin Shoreline Park

CHONGMING ISLAND SHANGHAI CENTRAL CITY

National Park Service U.S. Department of the Interior. The National Park Service in the Chesapeake Bay

T O W N O F H I G H R I V E R

City of Nogales General Plan

The Mystic River Greenway

Westside Creeks. Elmendorf Lake Park and Linear Creekway Trails Project

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

RECOMMENDATIONS. Design Recommendations

Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

SBPO BOARD MEETING MARCH 20, 2018

The following principles guide the development of goals and strategies to protect and promote these amenities:

Please read the entire document

Workshop #3 June 13, 2016

ENVIRONMENTAL / OPEN SPACE

The Napa River Flood Protection Project

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

BAY AREA PARKS & RECREATION

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Oakland County s Green Infrastructure Vision. L. Brooks Patterson Oakland County Executive

Public Meeting May 20, 2014

The Benefits and Challenges Associated with Green Infrastructure Practices

ORDINANCE NO WHEREAS, the recommendations from the Pinellas County Local Planning Agency have been received and considered.

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

HUMBER BAY PARK PROJECT - BUILDING CONCEPT

3.0Guiding Principles

Keyport. Vision for Keyport

Chapter 5: Natural Resources and Environment

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Transcription:

OUSD LANEY CHILD CARE CENTER ART BUILDING LANEY COLLEGE BALL FIELDS PCCD OFFICES PERALTA PARK AQUATIC CENTER & ESTUARY PARK EDOFF MEMORIAL BANDSTAND SNOW PARK COURT HOUSE OAKLAND MUSEUM OAK ST AREA-WIDE PEDESTRIAN AND BICYCLE CIRCULATION THE EMBARCADERO E 7th ST FOOTHILL BLVD E 15th ST INTERNATIONAL BLVD E 12th ST E 11th ST E 10th ST 4th AVE E 8th ST Berkeley Emeryville Area of Enlargement Downtown Oakland 5th AVE 3rd AVE to San Francisco Alameda Bay Bridge E 18th ST LAKESHORE AVE 2nd AVE LAKE MERRITT ESTUARY BELLEVUE AVE CONVENTION CENTER ROTARY SCIENCE MUSEUM GRAND AVE SAILBOAT HOUSE CAMERON STANFORD HOUSE NATURAL SCIENCE CENTER FALLON ST LAKESIDE PARK BOAT HOUSE B A R T ba MADISON ST 2nd ST 3th ST 4th ST 5th ST 880 FWY 6th ST 7th ST 8th ST 9th ST 10th ST 11th ST 12th ST 13th ST 14th ST 17th ST CHILDREN'S FAIRYLAND JACKSON ST AMTRAK LEGEND Multi-Use Path in Project Area Multi-Use Path On-Street Bikeways Bay Trail Major Pedestrian Linkage Project Area LAKESIDE DR ALICE ST THE EMBARCADERO HARRISON ST HARRISON ST 20th ST WEBSTER ST WEBSTER TUNNEL 0 100 200 400 800 Improvements at Lake Merritt Channel

Project Background Lake Merritt Master Plan Mission Statement: Lake Merritt should continue to be a park for all of Oakland. Its green space, water area, playgrounds, and attractions should serve the widest audience of Oakland citizens and visitors. From the programs we should learn about the park as a natural resource a unique ecology within our urban city. The needs of human users must be carefully balanced with goals for improving habitat value and water quality. Our City s youth should take their first sail and grow comfortable in a kayak on this water. We should be free to explore our park in all modes of transport. The grand perimeter roads should be made grand for bikes and pedestrians too. The rich botanical collections should be made inviting and in keeping with their famed status. As our Park ages with each generation, we must make the needed repairs that maintain the glory of Lake Merritt. Lake Merritt Master Plan Overall Illustrative Plan

Project Background Lake Merritt Master Plan The planned improvements at Lake Merritt Channel include a new bridge at 10 th Street and improvements at the 7 th Street Flood Control Station, which build on concepts and principles presented in the Lake Merritt Master Plan (LMMP) and the Lake Merritt Channel Feasibility Study. The LMMP was adopted by the City of Oakland and will act as a guide for improvement projects in the years to come. LMMP guiding principles include: Ecology: to manage and enhance the park as a refuge for people and wildlife. Natural resources in ecological zones are given the highest priority for use by wildlife. Education: to reveal the natural processes, botanical interests, culture, and history of Lake Merritt and its surrounding community through organized youth programs, art, signage, and overall park design. Recreation: to improve the park as a place of informal, outdoor recreation. Oakland s youth should especially benefit from the lake s resources. Culture: to reflect the unique culture of Oakland, its diverse peoples, neighborhoods, built form, history, and natural environment. Art elements are one way of exploring cultural factors.

Overview of Planned Improvements The Planned Improvements at Lake Merritt Channel build on concepts in the Lake Merritt Master Plan and the Lake Merritt Channel Feasibility Study. Key project elements include: Kaiser Convention Center 12th Street» Channel Improvements: Restore wetlands and enhance the bicycle and pedestrian paths and green space along the Channel» 10 th Street: Replace the 10 th Street culverts with a clear spanning bridge over the Channel» 7 th Street: Improve bicycle, pedestrian, and small boat access, aesthetics and safety at the 7 th Street pump station Laney College 7th Street The Channel 10th Street Pedestrian Bridge I-880

Project Background Goals Key goals of the planned improvements at Lake Merritt Channel:» Improve bicycle, pedestrian, and small boat access» Enhance multi-use paths along the Channel» Improve water quality and the habitat for fish and wildlife» Restore wetlands along the Channel

Project Background Benefits of Tidal Wetlands General benefits of tidal wetlands» Wetlands act as a natural buffer zone and improve the flow of water where tidal movement occurs» Wetlands provide a unique environment for wildlife, fish and plant life» Wetlands recycle nutrients such as nitrogen and help reduce algal blooms and associated water quality problems» Wetlands release carbon to the Estuary to support a wide and diverse food chain» Wetlands sequester sediment reducing estuary turbidity and improving the wider environment for filter feeders such as oysters» Wetlands improve water quality by reducing bacteria associated with any unclean waters such as urban run off SPECIFIC BENEFITS OF RESTORED WETLANDS IN THE CHANNEL» Restored wetlands will improve the tidal circulation between Lake Merritt and the Estuary» Habitat along the fringe of the Channel is where many of the ecological and biogeochemical processes take place which are important to sustaining the wider health of Lake Merritt and the Estuary» an enhanced Channel wetland habitat will improve nursery and feeding areas for young fish» Tidal wetlands along the Channel provides habitat for endangered species such as the locally endemic and rare Clapper Rail and the Salt Marsh Harvest Mouse» The unique wetland environment can serve as a natural laboratory for students and faculty

Project Funding Measure DD: The Oakland Trust for Clean Water & Safe Parks The Lake Merritt Channel Projects are elements of the City of Oakland Bond Measure DD which was approved by over 80% of Oakland voters in the November 2002 general election. The Measure authorized the City of Oakland to issue $198,250,000 in bonds to create the Oakland Trust for Clean Water and Safe Parks. The primary purpose of Measure DD is to fund a variety of parks, clean-water protection and youth recreation projects in the following five categories:» Lake Merritt restoration and water quality improvements» Estuary waterfront access parks and clean up» Lake Merritt-to-Oakland Estuary connection (Lake Merritt Channel)» Youth and public recreation facilities» Creeks and waterways restoration and acquisition Measure DD will dedicate funds for the design and construction of these projects.

Other Related Projects Lake Merritt Master Plan Projects» 12th Street Reconstruction Project: Consolidate the existing 12 lane expressway into a six-lane, tree lined boulevard with bicycle lanes and create a park along the lakeshore and Channel wetlands» Extension of the pathway system to the Oakland waterfront trail and the Estuary

Next Steps Targeted Schedule & Project Information 2006 2007 2008 2009 Concept Development & Community Input Design & Engineering Environmental Coordination & Permitting Construction For information about the progress of the planned improvements at Lake Merritt Channel please visit www.oaklandpw.com.

Overview of Planned Improvements Public Art Enhancements In 1989 the City of Oakland adopted a Public Art Ordinance plan which authorizes the allocation of 1.5% of municipal capital improvement project costs for commissioning of public artwork. These monies are set aside in the Public Art Program Fund. Measure DD Public Art Plan Project Goals» Identify key sites where public art will have greatest impact» Create interesting, innovative artwork integrated into reconstruction projects» Celebrate the magnificence of Lake Merritt, the Channel and Estuary; elevate experience of users; enhance positive sense of place Lake Merritt Channel Public Art: Design Team Approach Design team artists help create the character of our infrastructure and our public places by narrating the site s story, building community, creating identity, and including artwork in unexpected, thoughtful ways. For the Lake Merritt Channel Projects, the artist team of John Roloff & Lewis desoto is collaborating with the design team to identify artistic enhancements to the urban design plans and to design public art elements along the Channel.