TOWN OF SPENCER FIRE and EMERGENCY SERVICES

Similar documents
Fire & Life Safety Requirements For Fire Department Access and Water Supplies

City of Vista Fire Department

New Construction Fire Inspection Process

FIRE APPARATUS ACCESS AND WATER SUPPLY GUIDELINE

CONTRACT FOR USE OF FIRE PROTECTION SYSTEM

This guide is intended to provide assistance in the application of the fire code in all areas served by Tualatin Valley Fire & Rescue.

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

DIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS

Town of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE

Richardson Fire Department 136 N. Greenville Avenue, Richardson, TX Telephone: Fax:

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

DESIGN & CONSTRUCTION GUIDELINES

Site Plans. Fire Code Requirements

CITY OF PASADENA FIRE DEPARTMENT

Driveway Regulations TOWN OF FREMONT ROCKINGHAM COUNTY NEW HAMPSHIRE

VACAVILLE FIRE PROTECTION DISTRICT 420 Vine Street Vacaville, California (707)

OXNARD FIRE DEPARTMENT 360 West Second Street Oxnard, CA (805) Fax (805)

Construction and Development Guide

Florida Building Code 5 th Edition (2014) Building. Broward County Edition Loose-leaf Supplement

Chapter 2: Identification, water and access

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

STORMWATER - GENERAL NOTES

Environmental Health & Safety

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Fire & Life Safety Supplemental Rules & Regulations for New Construction & Significant Remodels

TABLE OF CONTENTS ADOPTED FIRE CODES... 3 AFPD SERVICE AREA... 3 SITE AND DEVELOPMENT SUBMITTAL REQUIREMENTS... 4 PLAN REVIEW FEES...

Louisville Metro Ordinance (Chapter 94: Fire Prevention) FIRE HYDRANTS, WATER MAINS AND WATER SUPPLY.

Business Fire Inspection. City of Guadalupe

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

TETON COUNTY FIRE PROTECTION RESOLUTION FOR NEW SUBDIVISIONS 2008 Edition. Chapter I General Provisions

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

Western Michigan University Facilities Management Engineering Division

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

PLANNED UNIT DEVELOPMENT APPLICATION

Town of Bridgton FIRE PROTECTION AND LIFE SAFETY ORDINANCE

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

4. TECHNOLOGY AND DESIGN CRITERIA

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

FIRE SERVICE FEATURES

FIRE SERVICE FEATURES

ICC CODE CORNER 2015 International Fire Code

TAMARAC FIRE RESCUE DEPARTMENT FIRE PREVENTION BUREAU 6000 North Hiatus Road Tamarac, Florida Telephone: (954) , Fax: (954)

Stormwater Control Plan: Small (Tier 1) Land Development Project

Regulations Governing Fire Protection Systems That will be connected to the Town of Wayland Municipal Fire Alarm System.

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

To expedite the plan review and inspection processes, please refer to the information below.

Planning Commission Application Summary

DRIVEWAY REGULATIONS

CITY OF CHESAPEAKE PUBLIC FACILITIES MANUAL CHAPTER XIII FIRE PROTECTION

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES

FIRE CODE APPLICATION GUIDE FOR DEVELOPMENT IN UNINCORPORATED MULTNOMAH COUNTY

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Boise Municipal Code. Chapter 9-04 EXCAVATIONS

APPENDIX X. Contents:

Liquefied Petroleum Gas Facility Written Fire Safety Analysis

CCCFPD RESIDENTIAL BUILDING REQUIREMENTS

Port of St Helens SIA Aircraft Hanger Scappoose, OR

This guide is intended to provide assistance in the application of the fire code in all areas served by Tualatin Valley Fire & Rescue.

SECTION FIRE-SUPPRESSION STANDPIPES

Orange Township Fire Department Fire Prevention Bureau

SITE PLAN REVIEW APPLICATION

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

Liquefied Petroleum Gas Facility Written Fire Safety Analysis

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

DRIVEWAY LOCATION APPROVAL RULES AND REGULATIONS

Appendix G. Detailed Design

Installation Instructions for. WaterMaster Series Fountains

Preparing a Stormwater Control Plan for a Small Land Development Project

Commercial Rules and Regulations

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

A. This Section includes the following domestic water piping specialties:

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

Enclosed are the required forms for completing an application for a Steep Slope Disturbance Permit with the

S000 SITE REVIEW APPR NO. FIRE CODE COMPLIANCE ITEM

City of Bonita Springs Driveway Permit Information Packet

36.1. PURPOSE APPLICABILITY DESIGN REVIEW GUIDELINES

Broward County Utility Connection Permit Part One Application for Plan Review

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

FLEXIBLE DUCTS BY SUBSURFACE INSTALLATION FOR MAGNETIC DETECTORS - Item No. RIGID DUCTS, CONCRETE ENCASED FOR MAGNETIC DETECTORS - Item No.

Product Overview. About Us. Grease Traps Generic Types. Extended Capacity Hydromechanical Grease Traps

SITE PLAN REVIEW APPLICATION AND CHECKLIST

AUTOMATIC FIRE SPRINKLER SYSTEMS

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.

FIRE & LIFE SAFTEY STANDARD

CHAPTER SIX Automatic Gates

NORTHWEST FIRE DISTRICT

6.1 Bioretention Areas

HOLDING TANK COMPONENT MANUAL FOR PRIVATE ONSITE WASTEWATER TREATMENT SYSTEMS

Construction & Development Procedures Guide

Transcription:

TOWN OF SPENCER FIRE and EMERGENCY SERVICES Fire Prevention and Protection Regulations For Sub divisions 1. General requirements 2. Hydrants 3. Fire Cisterns Chapter 4. Dry Hydrants 5. Residential Sprinklers 6. Street Names and Signs 7. Emergency Access Roads 8. Attachments Table of Contents 1. GENERAL REQUIREMENTS 1.1 In accordance with Spencer s Sub-Division Regulations, and Massachusetts General Law Chapter 148, Section 28, the Spencer Fire Department adopts the following regulations with regard to Water Supply for the purposes of fire protection. 1.2 Anyone fulfilling the enclosed regulations is to meet all requirements specified by other boards and departments as they may relate to the work performed. 1.3 Any development fitting Spencer s Sub-Division Regulations, that is within 500 feet of the current geographical area serviced by the municipal water system shall provide municipal water supply for fire protection. (See Section 2.) 1.4 In those areas where the extension of the municipal water system is technically unfeasible, the developer shall be required to provide a water supply for fire protection commensurate to the hazard, as approved by the fire department. (See Section 3.) 1.5 In the case that residents wish to install a fire protection water supply and neither extending the hydrant system or installing a cistern is feasible a dry

hydrant system into an existing water supply or new water supply may be installed for fire protection purposes. (See Section 4.) 1.6 The term Fire Chief in this document shall mean the Fire Chief or his designee. 2. HYDRANT REQUIREMENTS 2.1 GENERAL HYDRANT REQUIREMENTS 2.1.1 Any development occurring within 500 feet of an existing water main shall extend the system to provide fire hydrants for fire protection purposes. 2.1.2 Fire hydrants type and installation will be installed in accordance with the requirements of the Utilities and Facilities Superintendent. 2.1.3 The fire chief shall review all fire hydrant locations. 2.2 TESTING AND INSPECTION 2.2.1 All public hydrants shall be tested and inspected in accordance with the Town of Spencer Water Department prior to acceptance. 2.2.2 All private hydrants shall be tested and inspected in accordance with the Town of Spencer Private Fire Hydrant Regulations. 3. FIRE CISTERN REQUIREMENTS 3.1 GENERAL FIRE CISTERN REQUIREMENTS (must meet National Fire Protection Association (NFPA) 1142 3.1.1 Fire cisterns shall be located no more than 1,200 feet road way/driveway travel distance from any structure on the furthermost lot within a development. 3.1.2 The design of the fire cistern shall be trouble-free for a design life expectation of 20 years. 3.1.3 The capacity of the cistern will be based on the size of the largest home to be constructed within the development. However no fire cistern shall be smaller than 20,000-gallon water capacity.

3.1.4 The design of the fire cistern shall be submitted to the Fire Chief for approval prior to construction. All plans must be signed and stamped by Structural or Fire Protection licensed/registered engineer in the State of Massachusetts 3.1.5 The entire fire cistern shall be rated for H-20 highway loading unless specifically exempted by the Fire Chief. 3.1.6 Each cistern shall be sited to the particular location by a Registered Engineer and approved by the Fire Chief. All appropriate easements to the Town shall be in place at Fire Department Acceptance. 3.1.7 Pre-cast concrete shall achieve a 28-day strength of 4,000 PSIG. It should be placed with a minimum of 4" slump and vibrated in a professional manner. 3.1.8 The concrete shall be mixed, placed and cured without the use of calcium chloride. Winter placement and curing shall follow the accepted American Concrete Institute (ACI) codes. 3.1.9 All piping shall be American Society for Testing and Material (ASTM) D 2665 SCH 40 180 PSI PVC DWV with glued joints. 3.1.10 All connections shall be clean and the appropriate sealing material used according to manufacturer's specifications so as to ensure all joints are airtight. All connections must be anchored to the cistern to resist movement. 3.1.11 The entire cistern shall be completely piped and inspected prior to any backfilling being accomplished. 3.1.12 All backfill materials shall be screened gravel with no stone larger than 1.5" (inches) and shall be compacted to 95% ASTM 1557. 3.1.13 Bedding for the cistern shall consist of a minimum of 12" (inches) of.75" to 1.5" (inch), crushed washed stone, compacted. No fill shall be used under the stone. 3.1.14 The cistern shall be designed and installed so it will not float when empty. 3.1.15 The entire tank will be guaranteed to be watertight (leak proof) by the installer for one year.

3.1.16 The design engineer for the cistern will inspect all steps of the installation and provide a report of acceptance to the specifications to the Fire Department. 3.1.17 All cisterns shall be equipped with a raised 32" (inch) watertight manhole with a blank cover and secured with a Knox exterior padlock Model 3753. There is to be access to the manhole cover after backfilling and site work. Access must be provided to all sections of the tank. 3.1.18 Perimeter of tank at floor/wall joint should be sealed with 8 PVC Waterstop. 3.2 SUCTION CONNECTION 3.2.1 The suction connection shall be factory supplied painted aluminum, threaded male connection 6" (inches) in diameter, with NH thread and provided with fixed strainer and a suitable cap. 3.2.2 The suction piping system shall be 6" (inches) in diameter and capable of delivering 1,000 gallons per minute, for three quarters of the cisterns rated capacity. 3.2.3 The suction pipe connection shall be 36 inches above the level of the grade where the vehicle wheels will be located when the cistern is in use. 3.2.4 Suction piping shall be supported on top of the tank and to the bottom of the cistern with a space of 8" from the floor of the tank to prevent vertical or horizontal movement, using noncorrosive hardware. Support/s at top of tank shall be located not to be affected by frost. 3.2.5 The bottom of the suction pipe to the pumper connection shall not exceed 14 feet vertical distance. 3.2.6 Suction piping should be designed to minimize whirl pooling. 3.2.7 The suction pipe connection shall terminate not more than 8' (feet) from the edge of the pavement. 3.2.8 All above the tank suction piping shall be pitched slightly back towards the tank for proper drainage.

3.3 VEHICLE PARKING AREA 3.3.1 The shoulder and vehicle pad should be of a sufficient length to permit convenient access to the suction connection when the pumper is set at 45 degrees to the road. 3.3.2 The pitch of shoulder and vehicle pad from edge of pavement to pumper suction connection shall be 1 % to 3% downgrade. 3.4 FILLER CONNECTION 3.4.1 The filler pipe shall be 6" in diameter. 3.4.2 The filler connection shall have one, Siamese fitting with two 2-1/2 (inch) connections, with NH thread with two Knox FDC Cap Model 3012 - Matte Grey Stainless locking covers attached to a 45 degree downward sweep elbow. The filler connection shall be supported vertically to the cistern. 3.4.3 The filler pipe connection shall be 36 inches above the final grade. 3.4.4 Filler piping shall be supported on top of the tank to prevent vertical or horizontal movement. 3.5 VENT PIPE 3.5.1 The vent pipe shall be 8 inches in diameter. 3.5.2 The vent pipe shall terminate not less than 36 inches above the final grade, with the opening to the pipe facing downward. 3.5.3 Vent piping shall have screen covers installed to prevent access by wildlife. 3.6 BACKFILLING OF CISTERN 3.6.1 4 feet of fill; or. 3.6.2 The top and highest 2 feet of the cistern shall be insulated with vermin resistant foam insulation, and 2 feet of fill.

3.6.3 Backfill shall extend 10 feet beyond the edge of the cistern and then have a maximum 3: 1 slope, loamed and seeded. 3.6.4 All construction, backfill, and grading material should be in accordance with proper construction practices and acceptable to the Fire Chief. 3.7 SITE WORK 3.7.1 After backfilling, the cistern and piping shall be protected from potential vehicular damage, by; 3.7.1.1 Steel, concrete filled, pipe bollards no less than 8" in diameter set in the ground below the frost line, or 3.7.1.2 Large rocks, or 3.7.1.3 By fencing, or any combination of bollards, rocks, or fence. 3.7.2 The installer is responsible for completely filling the cistern prior to acceptance by the authority having jurisdiction. Water level is not to drop more than 1-inch in 24 hours initially, and not more than 1-inch additionally in 30 days. 3.7.3 The installer is responsible to supply and install identification signs as directed by the fire chief. (See Attachments) 3.7.4 The installer is responsible to install a deep well and pump, in accordance with accepted industry practices that will automatically maintain a full water level in the tank. The well/pump combination must be capable of delivering a minimum of 5 gallons per minute. If the well is determined capable of delivering higher volume, equipment will be installed to provide the higher volume. 3.7.5 The installer is responsible to install a water fill notification light that will flash a red light when the well pump is operating. The light will be mounted at least 5 above the surface of the ground. 3.7.6 Site utilities shall be installed to match the utilities of the development. For example if the utilities are below grade the utilities for the cistern would also need to be below grade. 3.8 GENERAL CONDITIONS

3.8.1 NO BUILDING PERMITS WILL BE ISSUED UNTIL CISTERN IS INSTALLED, TESTED, AND ACCEPTED BY THE FIRE DEPARTMENT 3.8.2 The Installer shall be required to post a 1-year bond in the amount of $5,000 per 10,000 gallons for maintenance and repair prior to final acceptance. 3.8.3 The Installer is responsible to convey to the town a one-time sum in the amount of $10,000 for perpetual maintenance and repair. 3.9 FIRE DEPARTMENT ACCEPTANCE SEQUENCE: 3.9.1 The Fire Department will review all cistern plans and engineering data prior start of construction. 3.9.2 The Fire Department will be notified and provided the opportunity to inspect at the following mid points of construction. 3.9.2.1 Site Prep prior to tank installation 3.9.2.2 Prior to backfill 3.9.3 The developer will notify the Fire Department when all site work is complete and tank is operational and ready for operational acceptance, and provide evidence of bond for oneyear maintenance. 3.9.4 The Fire Department performs functional test including water recovery at minimum of 5 gpm and validates operation of cistern. 3.9.5 Developer provides town with perpetual maintenance fee. 3.9.6 The Fire Department provides operational acceptance and turns off well pump to start 30-day stability test. 3.9.7 Building Permits can be now be processed if being held for cistern completion. 3.9.8 30-days after operational acceptance the Fire Department will inspect the cistern to see that water level has been maintained, and if any functional issues exist the developer will be notified to resolve issues.

3.9.9 Within 1-year the developer will deed any easements to the town with regard to the cistern. 3.9.10 During the first 12 months the Fire Department will perform inspections and tests of cistern and notify developer to resolve any issues. 3.9.11 Twelve months from the Fire Department s operational acceptance they will perform one final inspection and test of cistern to validate operation and will notify the developer if any issues need to be resolved. If no issues exist the Fire Department will notify the developer of final acceptance and release any claims against the bond. 4. DRY HYDRANT REQUIREMENTS 4.1 GENERAL 4.1.1 The design of the dry hydrants shall be trouble-free and last a lifetime. 4.1.2 The dry hydrant water supply capacity shall be based on the largest home/building being protected. However no dry hydrant water supply shall be smaller than 30,000 gallons of water. The water supply capacity calculation shall be made by a professional engineer utilizing 50-year drought records. 4.1.3 The design of the dry hydrants shall be submitted to the Fire Chief for approval prior to construction. 4.1.4 Each dry hydrant shall be sited to the particular location and approved by the Fire Chief. 4.1.5 All piping shall be American Society for Testing and Material (ASTM) D 2665 SCH 40 180 PSI PVC DWV with glued joints. 4.1.6 All connections shall be clean and the appropriate sealing material used according to manufacturer's specifications so as to ensure all joints are airtight. 4.1.7 The suction connection shall be factory supplied painted aluminum, threaded male connection 6" (inches) in diameter, with NH thread and provided with fixed strainer and a suitable cap.

4.1.8 The entire dry hydrant shall be completely piped and inspected prior to any backfilling being accomplished. 4.1.9 All backfill materials shall be screened gravel with no stone larger than 1.5'1 (inches) and shall be compacted to 95% ASTM 1557. 4.1.10 Bedding for the dry hydrant piping shall consist of a minimum of 12 inches of screened gravel with no stone larger than 1.5" (inches.) compacted. 4.1.11 The suction pipe connection shall be between 20 and 24 inches above the level of the grade when the hydrant is in use, and the 90-degree elbow in the ground is to be supported by a large flat rock or concrete pad. 4.1.12 After backfilling, the cistern and piping shall be protected from potential vehicular damage, by; 4.1.12.1 Steel, concrete filled, pipe bollards no less than 8" in diameter set in the ground below the frost line, or 4.1.12.2 Large rocks, or 4.1.12.3 By fencing, or any combination of bollards, rocks, or fence. 4.1.13 The end of the suction pipe shall be protected by a screen equipped with a removable cover. 4.1.14 The pitch of shoulder and vehicle pad from edge of pavement to pumper suction connection shall be 1 % to 3% downgrade. 4.1.15 The shoulder and vehicle pad should be of a sufficient length to permit convenient access to the suction connection when the pumper is set at 45 degrees to the road. 4.1.16 The suction pipe connection shall terminate not more than 8' (feet) from the edge of vehicle access. 4.1.17 The installer is responsible to supply and install signage as directed by the fire chief. 4.1.18 Within one year the developer will deed all easements for the property to allow the Town of Spencer to maintain the site. 4.1.19 The developer shall ensure that the Fire Department has all the necessary equipment to connect to the fire hydrants or cisterns

to reach the target structures. The developer at their expense shall provide any new fire equipment that is required. 5. RESIDENTIAL SPRINKLER SYSTEMS General: 5.1 Residential sprinkler systems shall be installed in accordance with National Fire Protection Association (NFPA) 13, 13D,13R and 231C. Sprinklers may be a viable alternative to a cistern or dry hydrant system. 6. STREET NAMES AND SIGNS General 6.1 The Fire Department reserves the right to review all street names proposed to alleviate any confusing or similar street names. 6.2 Suitable street signs conforming to standards of the Spencer Utility and Facilities Department will be installed prior to any building construction. 6.3 Standardized and easy to read house numbers to be installed prior to any building construction to locate lots more easily. 7. EMERGENCY ACCESS ROADS General 7.1 The width of the roads will be a minimum of 12 feet wide. 7.2 Gates shall be locked using a Town of Spencer Fire Department Knox Lock. 7.3 Gate Opening shall have an opening two feet wider than the width of the roadway. 7.4 Emergency access roads shall be provided in all developments longer than 500 feet in length. 7.5 Access roads shall be made per NFPA guidelines and be cleared 4 feet wider than the twelve feet width of the roadway.

8.1 Attachment 1: Example of Cistern Sign SPENCER FIRE DEPT. WATER SUPPLY CAPACITY: GALLONS SFD WATER SUPPLY NUMBER: 1. Cistern Sign must be made after cistern has been inspected and installed prior to being accepted by the Spencer Fire Department. 2. Sign will reflect gallons and the Spencer Fire Department assigned site number. 3. Sign dimensions will be 12" x 18". 4. Sign will be white lettering on red background (Reflective) 5. Sign will be permanently installed at a height of 80" (to top of sign)

8.2 Attachment 2: Example of No Parking Sign FIRE HYDRANT NO PARKING 1. No Parking Sign must be made and installed prior to being accepted by the Spencer Fire Department. 2. Sign dimensions will be 12" x 18". 3. Sign will be white lettering on red background (Reflective) 4. Sign will be permanently installed just below the Water Supply Sign

5.3 Attachment 3: Example of Notify Fire Department If Flashing NOTIFY FIRE DEPARTMENT WHEN RED LIGHT IS FLASHING 508-885-3555 1. Notify Fire Department when Red Light is Flashing Sign must be made and installed prior to being accepted by the Spencer Fire Department. 2. Sign dimensions will be 12" x 18". 3. Sign will be white lettering on red background (Reflective) 4. Sign will be permanently installed just above the height of the red light