ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Similar documents
ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

Project Overview. Get Involved. Public Information Meeting. Contact Information

Issues Requiring Future Study

Southern Gateway Project and Public Green

Fairfax County Parkway (Route 286) Widening Project

Executive Summary. NY 7 / NY 2 Corridor

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Endorsement of Design for Route 7/George Washington Boulevard Overpass. Algonkian and Broad Run

DRAFT. Urban Development Areas Fairfax County. UDA Needs Profile: Tysons Corner 13% Location Characteristics. Socio-Economic Characteristics

Agenda. Background Review of public process Recent project activities Current Status Next steps for construction

MEMORANDUM AGENDA ITEM #6c

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

KING GEORGE COUNTY BOARD OF SUPERVISORS. Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018

LOCATION AND DESIGN DIVISION

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF LARKSPUR Staff Report. August 21, 2013 Council Meeting UPDATE ON TRANSPORTATION AUTHORITY OF MARIN (TAM) GREENBRAE CORRIDOR WORKING GROUP

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 23, 2019

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Three Decades of Smart Growth: Arlington s Urban Village

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

2040 Long Range Transportation Plan

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

County of Fairfax, Virginia

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

DRAFT MAP AMENDMENT FLU 04-4

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

COUNCIL COMMUNICATION

I-70 Corridor Enhancement Plan

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

Chapter Master Planned Communities (MPC) District

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

Kenilworth Avenue and Town of Cheverly Industrial Study Briefing

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Memorandum CITY OF DALLAS

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

Glenmont III Parking Garage: Approval of Supplemental Public Hearing Staff Report and Staff Recommendations

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

Introductions Project overview Scope of work Schedule. Agenda. Community/Stakeholder Input Process Discussion Summary/Next Steps

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Stafford County Strategic Plans

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

38 Queen s University Campus Master Plan Part 1

Prepared by: Casey Kempenaar, Senior Planner

ARLINGTON COUNTY, VIRGINIA

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Mavis Road Class Environmental Assessment

Transportation. Strategies for Action

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Corridor Enhancements

PROJECT SHOWING MINUTES

Urban Planning and Land Use

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

GENERAL PLAN UPDATE ISSUES MEETING. January 21, 2010 City Hall Mitchell Room 6:00 pm 9:00 pm

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

COMMONWEALTH OF VIRGINIA County of Fairfax BOARD OF SUPERVISORS TELEPHONE: 703/

EXPANDING THE NETWORK ALEXANDRIA, VIRGINIA

POTOMAC YARD METRORAIL STATION

COLLIER BOULEVARD (CR 951) CORRIDOR

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

A Connected Region for Our Future. Tampa Bay Regional Planning Council

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Guiding Principles for the SR 520 Replacement Project

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 19, 2015

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8B5

The transportation system in a community is an

Intergovermental Coordination

PUBLIC SPACES MASTER PLAN UPDATE (POPS) Joint Facilities Advisory Commission (JFAC) November 28, 2018

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

CHAPTER 12 IMPLEMENTATION

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

PROPOSED IMPROVEMENTS

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Q:%4~ Memorandum CITY OF DALLAS

Asheville Design Center March 2010

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Heritage Road Improvements from Steeles Avenue to Rivermont Road

DRAFT Amsterdam/Churchill Community Plan (4/17/08) Adopted By the Gallatin County Commission

Transcription:

ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2 DATE: January 27, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the Beltway: Environmental Assessment for the widening of I-66 from the Dulles Connector to Fairfax Drive. DISCUSSION: Attached is a revised resolution regarding the Virginia Department of Transportation s (VDOT) Transform66: Inside the Beltway eastbound widening of I-66 from the Dulles Connector to Fairfax Drive and the Environmental Assessment for that project. This version strengthens the County s position related to Transform66: Inside the Beltway Program components to toll the facility and implement multimodal improvements and outlines ongoing concerns related to the widening component of the Transform66: Inside the Beltway Program. The revised resolution also clarifies the difference between the overarching Transform66: Inside the Beltway Program and the component addressed in the Environmental Assessment under review: the eastbound widening from the Dulles Connector to Fairfax Drive. County Manager: ### ## County Attorney: ***** Staff: Dennis Leach, DES 37.

ATTACHMENT 1 Resolution regarding the Virginia Department of Transportation s Transform66: Inside the Beltway Eastbound Widening of I-66 from the Dulles Connector to Fairfax Drive and the Environmental Assessment for that Project WHEREAS, the I-66 corridor is a crucial regional multimodal corridor in Northern Virginia, including the Metrorail Orange and Silver Lines, Arlington Boulevard, Lee Highway, and other important facilities; and WHEREAS, the Virginia Department of Transportation s (VDOT) 2012 I-66 Multimodal Study proposed tolling, transit, and other multimodal options for improving I-66, including the explicit recommendation that VDOT implement a broad range of multimodal improvements prior to pursuing widening I-66; and WHEREAS, VDOT is implementing the 2012 study with a multi-phase construction project program called Transform66: Inside the Beltway, consisting of dynamic tolling, conversion from HOV-2-to-HOV-3, multimodal transit and bicycle/pedestrian improvements funded by toll revenue administered by the Northern Virginia Transportation Commission (NVTC), and eastbound widening of I-66 between the Dulles Connector and Fairfax Drive, previously identified for completion by 2040; and WHEREAS, for decades Arlington has consistently opposed widening the I-66 roadway due to the negative effects widening would have upon the community; and WHEREAS the goals of the Transform66: Inside the Beltway project Program are to (1) move more people, (2) enhance transportation connectivity, (3) improve transit service, (4) reduce congestion, and (5) increase transportation options; and WHEREAS, Arlington recognizes the value of the Transform66 project s Program s multimodal components, which are crucial to the community; and WHEREAS, in February 2016, Governor Terry McAuliffe and members from both parties and both chambers of the Virginia General Assembly announced a bipartisan agreement that changed the original plans for widening and instead immediately proceed with the eastbound widening of I-66 from the Dulles Connector to Fairfax Drive; and WHEREAS, on November 16, 2016 the National Capital Region Transportation Planning Board adopted the Constrained Long Range Plan for the Washington metropolitan area, which included the Transform66 project Program and updated the project schedule to advance the eastbound widening to 2020; and WHEREAS, on November 18, 2016, VDOT released the Environmental Assessment and associated technical documentation related to the eastbound widening for a public comment period that closes on January 30, 2017; and - 1 -

WHEREAS, the purpose of the I-66 eastbound widening, as identified in the Environmental Assessment, is to increase capacity in order to improve traffic operations and reduce congestion issues, as well as address safety needs between the Dulles Connector Road and Fairfax Drive; and WHEREAS, a number of unresolved issues with eastbound widening component of VDOT s Transform66 project Program, including the need to widen I-66 before assessing the impacts of the tolling and multimodal components, the impact of additional traffic from I-66 to Arlington County s multimodal road network, and the potential adverse environmental impacts from the installation of noise barriers, hamper Arlington s complete understanding of the full project impacts; and WHEREAS, the Arlington Transportation Commission reviewed the Environmental Assessment documentation for the eastbound widening of I-66 from the Dulles Connector to Fairfax Drive on January 12, 2017, and voted 6-1-1 to recommend the Arlington County Board adopt this Resolution and identified the following issues: that VDOT will not assess either the functionality of the toll facility and multimodal improvements prior to widening I-66, or the induced traffic resulting from increased capacity on I-66; that the trail network be preserved and enhanced and remain operational during construction; and that VDOT not pursue any additional widening of I- 66 until after an evaluation of the effectiveness of the tolling, widening, and multimodal improvements; NOW, THEREFORE, BE IT RESOLVED THAT THE ARLINGTON COUNTY BOARD: 1. Endorses the goals of the Commonwealth s Transform66: Inside the Beltway project Program, to (1) move more people, (2) enhance transportation connectivity, (3) improve transit service, (4) reduce congestion, and (5) increase transportation options; and 2. Endorses the improvements to the regional trail network, specifically related to the Washington & Old Dominion Trail (W&OD) crossing at Lee Highway and the Custis Trail improvements at Bon Air Park, as well as continued coordination with VDOT on these elements of the project; and 3. Endorses the enhancements to the noise barrier system identified through the Noise Analysis Process and proposed as part of the project, including the replacement of failing noise barriers, improvements to existing noise barriers, and the completion of gaps between noise barriers; and 4. Asserts that the package of multimodal improvements and tolling would have been the optimal path to realize the stated goals of the Transform66: Inside the Beltway Program, and that the immediate eastbound widening of I-66 from the Dulles Connector to Fairfax Drive prior to an evaluation of tolling and multimodal improvements runs in conflict with County policy goals; and 5. Registers ongoing concerns regarding the aforementioned unresolved impacts of the Transform66 eastbound widening project on the County s multimodal street network and environmental resources. - 2 -

The Board expects VDOT to honor its commitment to work cooperatively and in good faith with the County in achieving the following goals for the implementation of the eastbound widening of I-66 Inside the Beltway from the Dulles Connector to Fairfax Drive: A. That VDOT address the staff requests related to the analysis conducted in the draft Environmental Assessment and the impacts to Arlington County s multimodal road network resulting from the eastbound widening of I-66 be monitored by VDOT and mitigated in consultation with Arlington County; a. That intersections identified within the I-66 Interstate Analysis Study Area, but not included in the VISSIM analysis for the draft Environmental Assessment, be included in the VISSIM analysis for the final Environmental Assessment; b. That VDOT address that multimodal travel is not included in the VISSIM traffic model analysis and explain the potential impacts this lack of information could have on Arlington s multimodal road network operations, specifically in Ballston, where more trips occur by a mode other than single occupant vehicle; c. That VDOT mitigate impacts identified in the traffic analysis for the draft Environmental Assessment, specifically in the vicinity of: i. Washington Boulevard from Lee Highway to North Sycamore Street ii. Fairfax Drive at Lee Highway iii. Westmoreland Street at the I-66 off-ramp iv. North Glebe Road and Fairfax Drive d. That VDOT review the Lee Highway overpass of I-66 for pedestrian enhancements and include the County s design proposal for an additional northbound left turn lane on the Lee Highway overpass of I-66 and traffic signal operations related to the intersection, and also yield to the County final disposition of the mode of operation; B. That VDOT ensures a robust community process, including design charrette, will be incorporated into the design process for the grade-separated crossing of the W&OD Trail at Lee Highway, that negative impacts to the immediate community resulting from the structure be mitigated, and that elements of the I-66 widening in this area recognize and maintain consistency with Arlington County s 2011 East Falls Church Area Plan; a. That VDOT demonstrate that all possible alternative routings of the W&OD Trail at Lee Highway were explored and deemed not feasible nor reasonable before proceeding with the selected alternative of a trail bridge at Lee Highway immediately south of Fairfax Drive / Washington Boulevard; b. That VDOT develop with staff and the community a context-sensitive design that is appropriate in scale to the surrounding development and consistent with the - 3 -

urban form anticipated in the East Falls Church Area Plan; C. That VDOT ensure minimal impacts to natural resources as the project advances through design to construction, comply with all federal, state, and County regulations and parameters during the environmental review, design, and construction of the project, and shall mitigate any impacts in accordance with all federal, state, and County regulations and parameters, specifically related to the following: a. That any necessary stream and wetland mitigation be applied locally within Arlington; b. That language related to encroachment of Resource Protection Areas, the County s Chesapeake Bay Preservation Ordinance, and the County s revised Resource Protection Area Map be incorporated in the Natural Resources Technical Report; c. That Chesapeake Bay impacts outlined in the Natural Resources Technical Report should be expressed and evaluated based on local rather than Chesapeake Baywide impacts; d. That the pond located within the Fairfax Drive Interchange, if required for stormwater mitigation, be impacted as minimally as possible; e. That any new stormwater management facilities proposed with this project be adequately maintained, specifically that erosion and sediment controls should be outlined and contain information on inspections and enforcement actions; f. That all plantings be native to Arlington and that replacement plantings be calculated per the Arlington County Tree Replacement Guidelines; D. That VDOT work collaboratively with all jurisdictions in the affected corridor as it continues to advance the Noise Analysis Process to ensure that final design of possible noise barriers do not unduly or negatively impact cultural or natural resources; and E. That the Commonwealth shall not pursue any additional widening of I-66 inside the Beltway until after a meaningful evaluation of the effectiveness of the implementation of peak period tolling, conversion to HOT-3, implementation of tolling in both directions during peak periods, and implementation of multimodal components. a. Such evaluation shall at a minimum assess the I-66 facility itself as well as the impact of diversion to parallel roadways, and shall be conducted no sooner than four years after conversion to HOV-3, and no sooner than four years after opening of multimodal projects that significantly increase the transit capacity of the corridor. - 4 -

b. In conducting said evaluation, VDOT shall not recommend widening I-66 inside the Beltway unless between Sycamore Street and the Fairfax Drive exit the average eastbound vehicle operating speed drops below 45 miles per hour for more than 10% of the toll period, despite implementation of dynamic toll rates that specifically attempt to manage vehicle volume during periods of congestion. - 5 -