Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Similar documents
Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

Getting Started On Your Green Infrastructure (GI) Plan

3. Are there any projects exempt from the definition of Regulated Projects?

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

Communications Planning Commission April 19, 2017

1 North San Antonio Road Los Altos, California MEMORANDUM GREEN INFRASTRUCTURE PLAN FRAMEWORK

Seattle s Natural Drainage Systems and Complete Streets

Melissa Bernardo Hess, PE, CFM February 18, 2016

Post - Construction Hydromodification Development Requirements

SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017

City of San Jose Green Infrastructure Plan Framework

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

Background / Regulatory Requirements

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Town of Oakville Streetscape Strategy

Green Infrastructure & Low Impact Development

5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

An Update on the Mandated Stormwater Initiative Chesapeake Bay TMDL

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

City of Richland Stormwater Management Plan

Low Impact Development Site Design

Stormwater Management Plan (SWMP) Revision Date: 11/05

STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. Example Commercial Project. February 21, 2018

Green Stormwater Infrastructure Handbook. Kristin Kerr, P.E. EOA / SCVURPPP November 29, 2018

Rebecca Dohn October 13, 2017

City of Hermosa Beach Administrative Policy #

New Tools/Resources for

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Julia Noordyk Water Quality Outreach Specialist Wisconsin Sea Building Resilient Communities One Code at a Time

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

ORDINANCE NO WHEREAS, the City provided the proposed code amendments to the Washington State Department of Commerce on September 20, 2017; and

Each Permittee s program must meet the requirements of the Los Angeles County municipal storm water permit (Permit), as summarized in Table 5-1.

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Chapter 1: General Program Information

Case Study: City of San Mateo

COLVER ROAD INDUSTRIAL CONCEPT PLAN

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Chesapeake Bay Critical Area Conservation Plan

Stafford County Strategic Plans

Scorecard. WaterQuality. Appendix B USEPA WATER QUALITY SCORECARD APPENDIX B

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Green Streets and Green Infrastructure Planning A Tale of Two Cities: San Mateo and Emeryville

COMPLETE GREEN STREET CHECKLIST

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

Green Infrastructure Recommendations For Parks and Public Spaces

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Green Infrastructure and LID Practice Construction Workshop

Watershed Planning Workshop

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

CHAPTER 12 IMPLEMENTATION

Planning for Sustainable Infrastructure: A Collaborative Integrated Approach. Background on Berkeley. Background on Paving Needs 8/30/2015

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

DRAFT PLAN PRESENTATION

Selecting Appropriate Stormwater Control Measures for Your Development Project

The transportation system in a community is an

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

a great new program that helps make the best use of something we re all familiar with - rainwater. Building a Better Long Beach

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Introduction Post Construction Stormwater Management Performance Requirements

Chapter 6. Green Streets

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

understanding Green Infrastructure In Zoning

CMAP Resources for Green Infrastructure Planning

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

SEMSWA s Role in the Land Development Process

Green Infrastructure and Low-Impact Development Technologies

Appendix E: Illustrative Green Infrastructure Examples

Rhode Island Shoreline Change Special Area Management Plan

STORMWATER UTILITY PRESENTATION November 18, 2014

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA

Kristin Kerr EOA, Inc. February 1, 2017

Planning and Growth Management Committee

Outflow to Saw Mill Run

4. CONCEPT PLAN DEVELOPMENT

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

Introduction Post-Construction Stormwater Management Performance Requirements

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

Detroit Stormwater Rules and Drainage Fee Updates

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

Transcription:

Date: August 17, 2016 To: From: Subject: Management Committee Dan Cloak, Consultant Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan Recommendation: Receive the attached Annotated Model Outline for a Framework for a Green Infrastructure Plan and a presentation regarding same. Background: The j. Green Infrastructure Plan requirements and deadlines are: Prepare a framework or workplan to be approved by the Permittee s governing body by June 30, 2017. Submit a Green Infrastructure Plan with the 2019 Annual Report. The attached Annotated Model Outline was prepared to assist Permittee staff to prepare the required framework for their municipality. It has been reviewed by the Development Committee. Fiscal Impact: None Attachment(s): 1. Annotated Model Outline (August 10, 2017) 2. Excerpted pages from MRP 2.0 j.i. Green Infrastructure Program Plan Development TD:dc G:\NPDES\Management Committee\Packet\16 17\Shells\Tom\2016-08\Presentation Item C - GI Framework.docx

Annotated Model Outline for a Framework (due September 2017) for a Green Infrastructure Plan (due September 2019) I. Purpose State the purpose of the Green Infrastructure Plan, as it applies to future actions taken by the local agency. Note the following from MRP j.:.the Plan is intended to describe how Permittees will shift their impervious surfaces and storm drain infrastructure from gray, or traditional, storm drain infrastructure where runoff flows directly into the storm drain and then to the receiving water, to green that is, to a more resilient, sustainable system that slows runoff by dispersing it to vegetated areas, harvests and uses runoff, promotes infiltration and evapotranspiration, and uses bioretention and other green infrastructure practices to clean stormwater runoff. The Plan is intended to serve as an implementation guide and reporting tool to set goals for reducing, over the long term, the adverse water quality impacts of urbanization and urban runoff on receiving waters. II. Policies List and describe ordinances, departmental policies, findings, and other actions that are required, or are planned, to authorize and guide the development of Green Infrastructure. Identify the staff who will be responsible for developing and reviewing Green Infrastructure policies, preparing staff reports, and making presentations. III. Integration with Existing Plans and Guidance List and describe current guidance and documents used to plan, design, and construct transportation and drainage infrastructure. Include guidance and documents used for agencyinitiated capital improvement projects and for improvements within the public right of way constructed by developers or other private parties. Describe the process, and the personnel responsible, for revising or amending these documents, or for substituting different guidance. A. Updates to Planning Documents Examples: General Plans Specific Plans Downtown Master Plans Complete Streets Plans Streetscape Plans Active Transportation Plans Storm Drain Master Plans Pavement Work Plans Urban Forestry Plans 1 of 2 2016-08-10

B. Updates to Engineering Design Guidance, Standard Specifications, and Criteria Examples: Standard Drawings and Specifications Engineering Requirements for Street Frontage Improvements for New Developments and Redevelopments C. Examples of Green Infrastructure Design Criteria and/or Standard Designs To be reviewed during preparation of the Plan and/or considered for reference in the Plan D. Process for Facility Sizing Reference the outcomes of the BASMAA Green Infrastructure facility sizing study IV. Process and Projected Results of Project Prioritization Identify and discuss the mechanism, currently in development on a countywide basis, for prioritizing and mapping areas for potential and planned Green Infrastructure projects and for estimating pollutant load reduction benefits. Note how the outcomes of this process will be incorporated into the Green Infrastructure Plan. V. Schedule Show a schedule for creating and adopting the Green Infrastructure Plan and submitting with the 2019 Annual Report. Include key outreach activities related to the adoption of the Plan and revision of related plans. VI. Budget A. Financial Resources for Preparing the Green Infrastructure Plan Identify the budget amounts and sources that will be used to prepare the Green Infrastructure Plan during FY 2017-2018 and FY 2018-2019. B. Financial Resources for Implementing Green Infrastructure Identify and describe potential sources of grant funding. Identify the agency s resources to pursue grant funding, including the personnel responsible for preparing grant applications and initiating grant-funded projects. VII. Resources List reports, documents, and other resources that will be reviewed and may be used in preparation of the Green Infrastructure Plan. 2 of 2 2016-08-10

C.3.i. C.3.j. Required Site Design Measures for Small Projects and Detached Single-Family Home Projects i. Task Description The Permittees shall require all development projects, which create and/or replace > 2,500 ft 2 to < 10,000 ft 2 of impervious surface, and detached single-family home projects, 11 which create and/or replace 2,500 square feet or more of impervious surface, to install one or more of the following site design measures: Direct roof runoff into cisterns or rain barrels for reuse. Direct roof runoff onto vegetated areas. Direct runoff from sidewalks, walkways, and/or patios onto vegetated areas. Direct runoff from driveways and/or uncovered parking lots onto vegetated areas. Construct sidewalks, walkways, and/or patios with permeable surfaces. 2 Construct bike lanes, driveways, and/or uncovered parking lots with permeable surfaces. 2 This provision applies to all development projects that require approvals and/or permits issued under the Permittees planning, building, or other comparable authority. ii. Reporting On an annual basis, discuss the implementation of the requirements of i, including ordinance revisions, permit conditions, development of standard specifications and/or guidance materials, and staff training. Green Infrastructure Planning and Implementation The Permittees shall complete and implement a Green Infrastructure Plan for the inclusion of low impact development drainage design into storm drain infrastructure on public and private lands, including streets, roads, storm drains, parking lots, building roofs, and other storm drain infrastructure elements. The Plan is intended to serve as an implementation guide and reporting tool during this and subsequent Permit terms to provide reasonable assurance that urban runoff TMDL wasteload allocations (e.g., for the San Francisco Bay mercury and PCBs TMDLs) will be met, and to set goals for reducing, over the long term, the adverse water quality impacts of urbanization and urban runoff on receiving waters. For this Permit term, the Plan is being required, in part, as an alternative to expanding the definition of Regulated Projects prescribed in b to include all new and redevelopment projects that create or replace 5,000 square feet or more of impervious surface areas and road projects that just replace existing imperious surface area. It also provides a mechanism to establish and implement alternative or 11 Detached single-family home project The building of one single new house or the addition and/or replacement of impervious surface to one single existing house, which is not part of a larger plan of development. November 19, 2015 Page 43

in-lieu compliance options for Regulated Projects and to account for and justify Special Projects in accordance with e. Over the long term, the Plan is intended to describe how the Permittees will shift their impervious surfaces and storm drain infrastructure from gray, or traditional storm drain infrastructure where runoff flows directly into the storm drain and then the receiving water, to green that is, to a more-resilient, sustainable system that slows runoff by dispersing it to vegetated areas, harvests and uses runoff, promotes infiltration and evapotranspiration, and uses bioretention and other green infrastructure practices to clean stormwater runoff. The Plan shall also identify means and methods to prioritize particular areas and projects within each Permittee s jurisdiction, at appropriate geographic and time scales, for implementation of green infrastructure projects. Further, it shall include means and methods to track the area within each Permittee s jurisdiction that is treated by green infrastructure controls and the amount of directly connected impervious area. As appropriate, it shall incorporate plans required elsewhere within this Permit, and specifically plans required for the monitoring of and to ensure appropriate reductions in trash, PCBs, mercury, and other pollutants. The Permittees may comply with any requirement of this Provision through a collaborative effort. i. Green Infrastructure Program Plan Development Each Permittee shall: (1) Prepare a framework or workplan that describes specific tasks and timeframes for development of its Green Infrastructure Plan. This framework or workplan shall be approved by the Permittee s governing body, mayor, city manager, or county manager by June 30, 2017. At a minimum, the framework or workplan shall include a statement of purpose, tasks, and timeframes to complete the elements listed in j.i.(2) below. (2) Prepare a Green Infrastructure Plan, subject to Executive Officer approval, that contains the following elements: (a) A mechanism (e.g., SFEI s GreenPlanIT tool or another tool) to prioritize and map areas for potential and planned projects, both public and private, on a drainage-area-specific basis, for implementation over the following time schedules, which are consistent with the timeframes for assessing load reductions specified in Provisions C.11. and C.12: (i) By 2020; (ii) By 2030; and (iii) By 2040. The mechanism shall include criteria for prioritization (e.g., specific logistical constraints, water quality drivers (e.g., TMDLs), opportunities to treat runoff from private parcels in retrofitted street November 19, 2015 Page 44

right-of-way) and outputs (e.g., maps, project lists) that can be incorporated into the Permittee s long-term planning and capital improvement processes. (b) Outputs from the mechanism described above, including, but not limited to, the prioritization criteria, maps, lists, and all other information, as appropriate. Individual project-specific reviews completed using these mechanisms are not required to be submitted with the Plan, but shall be made available upon request. (c) Targets for the amount of impervious surface, from public and private projects, within the Permittee s jurisdiction to be retrofitted over the following time schedules, which are consistent with the timeframes for assessing load reductions specified in Provisions C.11. and C.12: (i) By 2020; (ii) By 2030; and (iii) By 2040. (d) A process for tracking and mapping completed projects, public and private, and making the information publically available (e.g., SFEI s GreenPlanIT tool). (e) General guidelines for overall streetscape and project design and construction so that projects have a unified, complete design that implements the range of functions associated with the projects. For example, for streets, these functions include, but are not limited to, street use for stormwater management, including treatment, safe pedestrian travel, use as public space, for bicycle, transit, vehicle movement, and as locations for urban forestry. The guidelines should call for the Permittee to coordinate, for example, street improvement projects so that related improvements are constructed simultaneously to minimize conflicts that may impact green infrastructure. (f) Standard specifications and, as appropriate, typical design details and related information necessary for the Permittee to incorporate green infrastructure into projects in its jurisdiction. The specifications shall be sufficient to address the different street and project types within a Permittee s jurisdiction, as defined by land use and transportation characteristics. (g) Requirement(s) that projects be designed to meet the treatment and hydromodification sizing requirements in Provisions C.3.c. and C.3.d. For street projects not subject to b.ii. (i.e., non- Regulated Projects), Permittees may collectively propose a single approach with their Green Infrastructure Plans for how to proceed should project constraints preclude fully meeting the C.3.d sizing requirements. The single approach can include different options to address specific issues or scenarios. That is, the approach shall identify the specific constraints that would preclude meeting the sizing requirements and the design approach(es) to take in that November 19, 2015 Page 45

situation. The approach should also consider whether a broad effort to incorporate hydromodification controls into green infrastructure, even where not otherwise required, could significantly improve creek health and whether such implementation may be appropriate, plus all other information, as appropriate (e.g., how to account for load reduction for the PCBs or mercury TMDLs). (h) A summary of the planning documents the Permittee has updated or otherwise modified to appropriately incorporate green infrastructure requirements, such as: General Plans, Specific Plans, Complete Streets Plans, Active Transportation Plans, Storm Drain Master Plans, Pavement Work Plans, Urban Forestry Plans, Flood Control or Flood Management Plans, and other plans that may affect the future alignment, configuration, or design of impervious surfaces within the Permittee s jurisdiction, including, but not limited to, streets, alleys, parking lots, sidewalks, plazas, roofs, and drainage infrastructure. Permittees are expected to complete these modifications as a part of completing the Green Infrastructure Plan, and by not later than the end of the permit term. (i) To the extent not addressed above, a workplan identifying how the Permittee will ensure that green infrastructure and low impact development measures are appropriately included in future plans (e.g., new or amended versions of the kinds of plans listed above). (j) A workplan to complete prioritized projects identified as part of a e Alternative Compliance program or part of Provision C.3.j Early Implementation. (k) An evaluation of prioritized project funding options, including, but not limited to: Alternative Compliance funds; grant monies, including transportation project grants from federal, State, and local agencies; existing Permittee resources; new tax or other levies; and other sources of funds. (3) Adopt policies, ordinances, and/or other appropriate legal mechanisms to ensure implementation of the Green Infrastructure Plan in accordance with the requirements of this provision. (4) Conduct outreach and education in accordance with the following: (a) Conduct public outreach on the requirements of this provision, including outreach coordinated with adoption or revision of standard specifications and planning documents, and with the initiation and planning of infrastructure projects. Such outreach shall include general outreach and targeted outreach to and training for professionals involved in infrastructure planning and design. (b) Train appropriate staff, including planning, engineering, public works maintenance, finance, fire/life safety, and management staff on the requirements of this provision and methods of implementation. November 19, 2015 Page 46

(c) Educate appropriate Permittee elected officials (e.g., mayors, city council members, county supervisors, district board members) on the requirements of this provision and methods of implementation. (5) Report on Green Infrastructure Planning as follows: (a) Each Permittee shall submit documentation in the 2017 Annual Report that its framework or workplan for development of its Green Infrastructure Plan was approved by its governing body, mayor, city manager, or county manager by June 30. 2017. (b) Each Permittee shall submit its completed Green Infrastructure Plan with the 2019 Annual Report. (c) Each Permittee shall submit documentation of its legal mechanisms to ensure implementation of its Green Infrastructure Plan with the 2019 Annual Report. (d) Each Permittee shall submit a summary of its outreach and education efforts in each Annual Report. ii. Early Implementation of Green Infrastructure Projects (No Missed Opportunities) Each Permittee shall: (1) Prepare and maintain a list of green infrastructure projects, public and private, that are already planned for implementation during the permit term and infrastructure projects planned for implementation during the permit term that have potential for green infrastructure measures. (2) Submit the list with each Annual Report and a summary of planning or implementation status for each public green infrastructure project and each private green infrastructure project that is not also a Regulated Project as defined in b.ii. Include a summary of how each public infrastructure project with green infrastructure potential will include green infrastructure measures to the maximum extent practicable during the permit term. For any public infrastructure project where implementation of green infrastructure measures is not practicable, submit a brief description of the project and the reasons green infrastructure measures were impracticable to implement. iii. Participate in Processes to Promote Green Infrastructure (1) The Permittees shall, individually or collectively, track processes, assemble and submit information, and provide informational materials and presentations as needed to assist relevant regional, State, and federal agencies to plan, design, and fund incorporation of green infrastructure measures into local infrastructure projects, including transportation projects. Issues to be addressed include coordinating the timing of funding from different sources, changes to standard designs and design criteria, ranking and prioritizing projects for funding, and implementation of cooperative in-lieu programs. November 19, 2015 Page 47