Existing Transportation System 5-1

Similar documents
The transportation system in a community is an

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

510 Highways, Streets & Roads Comprehensive Plan Section 510

Chapter V-Transportation

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

Planning Districts INTRODUCTION

Preliminary Assessment of Transportation Issues Related to Proposed Casino at Gateway South

1.0 Circulation Element

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

CHAPTER 7: Transportation, Mobility and Circulation

Harlem Avenue Corridor Plan: Corridor Planning Across Municipal Boundaries

Mavis Road Class Environmental Assessment

5.0 IMPLEMENTATION STRATEGIES

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

C h a p t e r 4 - L a n d U s e, T r a n s p o r t a t i o n N e t w o r k & S o c i o e c o n o m i c C h a r a c t e r i s t i c s

Figure 5. Previously Identified Viable Corridors

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Visitor's Guide to Historic Bridge Park

Issues Requiring Future Study

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

4.1 Build Alternative 1 Construction Phasing

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

Context Sensitive Solutions A Process to Achieve Better Results

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

FDOT D4 Complete Streets

Public input has been an important part of the plan development process.

The GATEWAYS Sub Area Master Plan. City of Walker

178 Carruthers Properties Inc.

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017

Comprehensive Development Guide

TRANSPORTATION PLAN TOWN OF FISHERS, INDIANA

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y

Planning & Zoning Board Meeting. DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version

City of Lebanon, Tennessee. Major Thoroughfare Plan

7Page 72 CLEMMONS COMMUNITY COMPASS 5 DEVELOPMENT AND GROWTH

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Technical Memorandum 5

Transportation. Strategies for Action

Albert Lea. Redevelopment Plan. 701 Xenia Avenue South, Suite 300 Minneapolis, MN Tel: (763) Fax: (763) wsbeng.

Creating Complete Roadway Corridors:

South Fulton Parkway Transit Feasibility Study

Downtown Dubuque...it s a great time.

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

RURAL AND URBAN PLANNING CONSIDERATIONS

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

Southern Gateway Project and Public Green

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

HAZARD MITIGATION GOALS AND OBJECTIVES

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Access Management: An Overview

I. INTRODUCTION. Project Background and Study Area

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Ann Arbor Intermodal Station Environmental Review

Land Use. Existing Land Use. Existing Land Use Categories. Faribault Comprehensive Plan 4-1

DRAFT. Waterfronts and Open Spaces. 10 The Riverfront Open Space System

STUDY AREA LOCATION & CONTEXT:

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

I-84 HARTFORD PROJECT HARTFORD, CONNECTICUT DRAFT PURPOSE AND NEED STATEMENT

APPENDIX C SPECIAL PLANNING AREAS

March 1, PWG Meeting #4

I-75 Overpass Study Summary

CURRICULUM VITAE. James J. Valenta, PE, MSCE, FITE 8463 Shield Road Dexter, MI (734)

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Route 1 Corridor Study

POCKET COMMUNITY PLAN

ARTICLE 13 STREETS General

SUSSEX COUNTY COMPREHENSIVE PLAN COUNTY PLANNING AND ZONING COMMISSION WORKSHOP

1.0 PROJECT PURPOSE AND NEED

ARTICLE 13 STREETS General

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

CENTERS CORRIDORS WEDGES GLOSSARY

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

This page left intentionally blank.

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

WHAT MAKES A GREAT PLACE?

3. ELEMENTS OF THE METRO VISION 2035 PLAN

LAND USE MEADOWS PLANNING AREA

16E. 24 th Street Corridor. A. Background

Urban Development Areas James City County

LAND PARK COMMUNITY PLAN

TRANSPORTATION PROJECTS

Regional Transportation District

\JIL1 u ) i r. [ouu r fo. /~ap< s 4^ (*7 S (0. uul ooo

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM

4.1.3 LAND USE CATEGORIES

Transcription:

5-1

The Jackson County transportation system is served by several modes of transportation including streets and highways, multi-modal, non-motorized, rail, and aviation. While the focus of the transportation planning process tends to emphasize streets and highways, the other modes of transportation utilized to move people and goods are equally important and must be addressed in the long range planning effort. This chapter provides an overview of the existing roadway system and Chapters 6, 7, and 8 deal with its multimodal aspects. State and Federal Major Highways Jackson County, located in south-central lower Michigan, is fortunate to be positioned on the freeway network linking Michigan and the Midwest to other areas of the United States (Figure 3-1). Interstate 94 (I-94), a North American Free Trade Act (NAFTA) route, connects the JACTS area to Ann Arbor, Detroit, and Canada to the east and Battle Creek, Kalamazoo and Chicago to the west. The City of Detroit is approximately 73 miles east of the City of Jackson and the City of Chicago is approximately 205 miles west of Jackson. US-127 provides a connection to Lansing to the north and continues south into Ohio. This major north-south highway traverses Jackson County. Figure 5-1- Regional Map 2040 Long Range Transportation Plan 5-2

M-50 provides a southeastern connection to the Village of Brooklyn and the cities of Tecumseh, Dundee and Monroe. It also provides a northwestern connection to Charlotte, I-96 and the City of Grand Rapids. M-60 provides for a southwest connection through the Spring Arbor area and to the South Bend/Mishawaka/Elkhart, Indiana area. M-106 extends to the northeast and provides a connection to the Village of Stockbridge. Functional Classification System Identifying the existing function of the road system in terms of what are principal and minor arterials; major and minor collectors; and local streets is an important process in defining the existing transportation system. The functional classification system defines travel in the area by how movement is conducted through the area s network of roads. The importance of this system in the long range transportation process is to define the role of any particular road or street in facilitating the flow of trips through a highway network. The functional classification process involves the identification of service functions provided by each street and highway in the area based upon the principal function they serve. Classification is also useful in determining whether the route serves a primary function by the degree to which it either moves traffic or provides access to property. An examination of existing land use trends helps to define the relationship between land use and transportation and directs planning toward achieving a suitable match between travel needs generated by community activity systems and transportation system capacity. In a time of limited resources, improvements in traffic flow can also be proposed to promote development of adjacent land uses and support higher intensity developments. Transportation exerts a major influence on urban form. Transportation improvements alter accessibility and thereby land development or redevelopment potential. Transportation improvements not only benefit traffic flow but also support economic development by improving accessibility to land. The coordination of land use planning and transportation planning is, therefore, essential to creation of a viable community. The responsibility for maintaining the roads and streets within the City of Jackson lies with the city s Neighborhood & Economic Operations Department. This Department routinely collects Annual Average Daily Traffic (AADT) volumes and maintains an inventory of pavement conditions in order to develop and program improvement and maintenance projects. Township roads in Jackson County are the responsibility of the Jackson County Road Commission (JCRC). The assessment and determination of road maintenance and improvement project needs is facilitated through the collection of AADT volumes and pavement condition inventories. Finally, each of the six (6) villages located in Jackson County, including Brooklyn, Concord, Grass Lake, Hanover, Parma and Springport are each responsible for the overall maintenance and operation of their street systems. 2040 Long Range Transportation Plan 5-3

Because of the pattern of development in Jackson County, and the County s slow growth, the majority of the road improvement projects within the JACTS study area are focused on the preservation and maintenance of the existing road system. Funding for these improvements includes appropriations from city and village general funds, state funding for general use on major and local streets through the Act 51 Michigan Transportation Fund (MTF) gas tax program, and federal transportation funds for use on the federal-aid eligible roadways. There are approximately 1,934 total roadway miles in Jackson County. The Federal Highway Administration (FHWA) provides specific guidelines for assigning roadways a classification. As noted above, once a roadway has been classified, the classification establishes the basis for determining eligibility for federal funding for roadway improvements. The following statistics for Jackson County, obtained from the Michigan Department of Transportation, indicate the total number of miles within each of the functional classifications as approved by the Federal Highway Administration: Table 5-1 Total Mileage of Jackson County Roadways Designated Areas Facility Urban Rural Interstate 9.93 miles 20.59 miles Other Freeway 15.66 miles 5.06 miles Other Principal Arterial 38.65 miles 6.52 miles Minor Arterial 80.47 miles 72.41 miles Urban and Major Rural Collector 62.92 miles 291.57 miles Minor Rural Collector 158.84 miles Local Collector 358.65 miles 812.91 miles Total Mileage 566.18 miles 1,367.90 miles Figures 5-2a and 5-2b illustrate the National Functional Classification System for the Jackson urbanized area and the balance of Jackson County as updated in 2011. Interstates and Other Freeways. The principal arterial system includes freeways and non-freeway classifications. In the Jackson area, the principal arterial system consists of both an urban and rural system with integration internally and between major rural connections, interstate highways, freeways and principal arterials. I-94, an interstate highway, is the major transportation route serving the Jackson metropolitan area. The freeways in the urban area that connect to rural principal arterials are M-60 (located south of I-94) and US-127. 2040 Long Range Transportation Plan 5-4

2040 Long Range Transportation Plan 5-5

2040 Long Range Transportation Plan 5-6

Other Principal Arterials. The functional classification system of principal arterials in the Jackson area is significant because of the composition of traffic that is served. The principal arterial system should serve the major centers of activity of a metropolitan area, the highest traffic volume corridors, and the longest trip desires. It should also carry a high proportion of the total urban area travel on a minimum of mileage. Urban principal arterials that connect to rural minor arterials have been identified as McDevitt Street, M-60 west of Spring Arbor Road, M-50 north of Parnall Road and Cooper Street (M-106). These routes also serve major centers of activity, have high traffic volumes and are similar to the interstate route by providing a connection between outlying cities and villages. These routes differ, however, from the interstate, freeways and expressways by allowing automobile access to adjacent property. Minor Arterials. The minor arterial street system interconnects and augments the principal arterial system and provides service for trips of moderate length at a lower level of travel mobility than major arterials. Collectors. The collector system provides both land access and traffic circulation within residential neighborhoods, commercial and industrial areas. It differs from the arterial system in that facilities on the collector system may penetrate residential neighborhoods, distributing trips from the arterials through the area to the ultimate destination. Conversely, the collector street also collects traffic from local streets in residential neighborhoods and channels it to the arterial system. Existing Traffic Conditions In analyzing the existing Jackson urban area roadway network, it is necessary to examine how the thoroughfare system accommodates the movement of traffic through the area. This section reviews the network in terms of its existing traffic operations. From the basis of traffic volumes in the study area, the major traffic movements identified within Jackson County are as follows: 1. To and from retail and hotel establishments at US-127 North near I-94 to retail and office activities along W. Michigan Avenue and the City of Jackson Central Business District (CBD) 2. From US-127 South to commercial and industrial areas along E. Michigan Avenue, High Street and the CBD 3. From US-127 South into the CBD along S. Cooper Street (US-27 BR /M-50) 4. From the southwest at M-60 north to Michigan Avenue 5. From the southwestern residential areas along Horton Road and Kibby Road to S. West Avenue and Fourth Street into retail areas on N. West Avenue, W. Michigan Avenue and the CBD 2040 Long Range Transportation Plan 5-7

Less significant but still important traffic movements exist along Airport Road from County Farm Road to Wildwood Avenue; Brown Street from Michigan Avenue to Spring Arbor Road; and, along the Francis Street corridor which carries traffic from M-50 and the traffic generated by Jackson Community College. Another area of concern in the Jackson urban area involves the efficient movement of large volumes of traffic from one part of the urban area to another. Some of the primary issues include the north-south movement on the west side of the City, movement from I- 94 into the downtown area, access into the downtown area from the east and movement between the southeast and the southwest portions of the City. These movement problems are characterized by discontinuous north/south and east/west routes. The physical arrangement of the streets and railroads and the physical location of I-94 has resulted in the north/south routes that terminate south of I-94 at/or near the CBD. Parks, schools, and recreational uses have also prevented the development of continuous routes in the urban area. Because of these obstacles, many motorists travel a circuitous path from one side of the urban area to the other. West Avenue provides for good access from the urban center to the major commercial areas to the north and the residential areas to the south. This is due largely to an absence of railroad and automobile conflicts. A new bridge over the Norfolk Southern railroad at N. West Avenue was completed in 2012, as well as intersection improvements at Ganson Street. This has improved the traffic flow through the area considerably. Vehicles traveling to or from the CBD with destinations at commercial uses along N. West Avenue can also use Wildwood Avenue or W. Michigan Avenue as a connector. Lansing Avenue is a minor arterial which provides for travel between the urban center and the north. The route, however, terminates near the urban center and only facilitates movements to and from the south by diverting to other streets. A moderately traveled route, Lansing Avenue experiences some delays for northbound traffic at the intersection of Lansing Avenue and North Street during peak periods. Southbound traffic along Lansing Avenue flows smoothly as it is diverted onto Steward Avenue. Traffic flow between Lansing Avenue and the CBD is occasionally interrupted by the railroad at Steward Avenue and Blackstone Street. Access to the north along Lansing Avenue is good as the route extends over and beyond I-94 and into Ingham County. Future plans include changing both Steward Street and Lansing Avenue from one-way to two-way. Cooper Street (M-106) provides the best access from I-94 and the northeast Jackson County area into the CBD. It also links I-94 traffic to industrial areas east of Cooper Street near the urban center. Travel from Cooper Street traverses through the CBD and continues south as M-50/US-127 BR (Brooklyn Road) eventually connecting to US-127 South. However, a railroad crossing exists at the Cooper Street/E. Michigan Avenue intersection compounding access problems between the CBD and I-94. The city plans on 2040 Long Range Transportation Plan 5-8

converting both Washington Street and Louis Glick Highway from one-way to two-way between Michigan Avenue and Cooper Street in the future. There are difficulties relating to the transition of flow between East Michigan Avenue, the CBD and West Michigan Avenue. Michigan Avenue, other than I-94, is the only major route that directly traverses the entire width of the urban area. W. Michigan is a major route linking the western section of the City to office development and retail uses near and in the downtown area. E. Michigan Avenue is also the major east-west route linking the CBD with the eastern sections of the urban area. Glick Highway acts as a perimeter route that provides for a transition for westbound E. Michigan travelers to W. Michigan Avenue. Westbound travel is, however, occasionally hindered by railroad closures due to the close proximity to the Amtrak station. The I-94 Freeway Modernization Study, completed in 2005, evaluated the need and feasibility of upgrading nine (9) miles of the interstate between M-60 and Sargent Road in Jackson County, including all interchanges and bridges located within the study area corridor. The Hawkins Road and Dettman Road bridges have been replaced to meet the requirements of the Modernization Study. The Sargent Road interchange is currently under construction and the bridge will be replaced and widened. MDOT is planning on reconstructing the Cooper Street interchange as well as replacing the bridge over the Grand River in 2017. 2040 Long Range Transportation Plan 5-9