VERIFICATION OF FIRE ALARM SYSTEMS

Similar documents
BULLETIN BU/EL Revised August 11, 2015

BUILDING CODE INTERPRETATION

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

REQUEST FOR PROPOSAL No Fire Extinguishers, Fire Suppression, Fire Alarms, Emergency Lighting & Sprinkler Systems Maintenance

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

DIVISION C ADMINISTRATIVE PROVISIONS

Title: Fire Sprinkler System Permit Requirements

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Advisory Brief to Prince George City Council On the Matter of Bylaw 8727, 2013, Fire Protection and Emergency Response Bylaw

SECTION SECURITY TESTING AND COMMISSIONING

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

CERTIFICATION BULLETIN

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number:

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

NFPA 72 Code Changes vs 2013

Should you have further questions, please feel free to contact the Fire Prevention Branch.

SAFETY CODES COUNCIL ORDER. BEFORE THE FIRE TECHNICAL COUNCIL On June 21, 2012

RE: PERMIT REQUIRED TO WORK ON FIRE ALARM SYSTEMS IN THE RMWB

Florida Senate SB 982 By Senator Bennett

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

CAN/ULC-S561. To comply, or not to comply. actually it s not even a question! Underwriters Laboratories of Canada. By Alan Cavers & Brian McBain

FORM MUST BE SIGNED AND RETURNED FOR VENDOR PARTICIPATION

Florida Building Code 2010

Building Name: Our Lady of Sorrows Date: July 10, 2013

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED

Idaho Surveying & Rating Bureau, Inc South Cobalt Point Way Tel: (208) Meridian, Idaho FAX: (208)

AIRPORT OFFICE BUILDING. Smoke Control System. Testing Procedures Manual. September 10, 2016

PROPOSED CHANGE TO THE 2015 ONTARIO FIRE CODE (O. Reg. 213/07, as amended current to January 1, 2015)

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Town of Cochrane Policy

Unified Fire Authority - Fire Prevention Bureau

Bold items are particular to the City of Euless

Community Festival Permit Application - Cypriot Community of Toronto Inc. - Cultural and Wine Festival June 23 and 24, 2007

Louis-Philippe Gagnon Alarm System Auditor UNDERWRITTERS LABORATORIES OF CANADA May 13 th, 2015

Clarification. Summary of Changes. Summary of Changes. Alan Cavers Area Manager Fire & Security Systems Group

UNIFIED FACILITIES GUIDE SPECIFICATIONS

WESTIN HOTEL. Smoke Control System. Testing Procedures Manual. October 10, Copyright Impact Engineering, Inc All Rights Reserved

UNIVERSITY OF MANITOBA PROCEDURE

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO

Fire Sprinklers Working Group Final Report

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Chapter ALARM SYSTEMS

Recent Revisions and Proposed Key Changes to Fire Code

BOMA Calgary Luncheon Thursday, October 11, 2012 Building Owners Responsibilities for Fire Safety Equipment (Fire Alarm) Canadian Fire Alarm

MUNICIPALITY OF GREENSTONE BOX 70, 1800 Main Street Geraldton, Ontario P0T 1M0 Telephone Facsimile

Colorado Division of Fire Prevention & Control, Fire & Life Safety Section

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

AHJ PERSPECTIVE INTEGRATED SYSTEM TESTING. Eddy La Rocque

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

OPERATIONAL GUIDELINE. Office of the Fire Commissioner O.G.# Revision #1 TITLE: ISSUING ORDERS Page 1 of 8

OWNERS RESPONSIBILITIES & CASE STUDIES ONTARIO FIRE CODE. John Percy, Public Education Officer Waterloo Fire Rescue

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

DENVER INTERNATIONAL AIRPORT MAIN AND NORTH TERMINALS 2016

Definitions; contractors licensed by Board; examination; posting license, etc.

Standard Operating Procedure Ottawa Fire Services. Fire Safety Plan Approval - Revised

MAINTENANCE OF FIRE PROTECTION DEVICES WITHIN RESIDENTIAL SUITES OF MULTI-FAMILY BUILDINGS

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

CERTIFICATION BULLETIN

FIRE ALARM AUDIBILITY IN EXISTING RESIDENTIAL OCCUPANCIES

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE EXTINGUISHERS TABLE OF CONTENTS

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

SECTION ELECTRICAL SYSTEMS COMMISSIONING

Electrical Tech Note 107

CFAA Alberta Technical Seminar October 24, 2013 Calgary

STANDARDS BULLETIN

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Are You Prepared? The impending impact of Code on Servicing Security Systems

FIRE & LIFE SAFTEY STANDARD

SECTION ISOLATED POWER SYSTEMS

Building Standards Advisory Promoting construction of safe, healthy, habitable buildings

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector Permit

Changes in NFPA

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

PROPOSED CHANGE TO THE 2007 FIRE CODE (OFC)

Narrative Reports As Regulated by 780 CMR, Section 903.0

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector

XRRS Specification Fire Ready Hood

PORTABLE FIRE EXTINGUISHERS

CHAPTER Committee Substitute for Committee Substitute for Committee Substitute for House Bill No. 973

Canadian Fire Alarm Association (CFAA)

Occupant Load Calculations For Assembly Occupancies and Licensed Beverage Establishments

Northeast Corner of Steeles Avenue West and Alness Street, East of Keele Street, City of Vaughan

ORDINANCE NO. _ THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

Chubb Monitoring Solutions

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London

Transcription:

DEVELOPMENT, BUILDINGS AND LICENSING Chief Building Official (CBO) and Building Code and Policy Building Policy Branch The intent of this bulletin is to clarify requirements of verification of the fire alarm systems in accordance with Article 3.2.4.5. of Division B the Vancouver Building By-law (VBBL); to establish City of Vancouver s acceptance criteria for persons deemed to be qualified to perform verification of fire alarm systems, for purpose of the CAN/ULC-S537. Note: This Bulletin supersedes Bulletin 2003-009-BU/EL. Article 3.2.4.5. of the VBBL requires that fire alarm systems including the voice communication capability where provided, shall be: a) installed in conformance with CAN/ULC-S524, Installation of Fire Alarm Systems., and b) verified in conformance with CAN/ULC-S537, Verification of Fire Alarm Systems, to ensure they are operating satisfactorily. Upon completion of the verification procedure, a verification report (see Appendix C form) and record of verification details must be submitted to the City s Building or Electrical Inspections Branch by an acceptable qualified person employed by the fire alarm verification organization listed by the City of Vancouver (see Note A below). The fire alarm verification report and record must be completed and signed by a qualified person employed by the acceptable fire alarm verification organization. The referenced Appendix C form is a part of the CAN/ULC-S537, and it has been amended for use in the City of Vancouver (see attachment). When a fire alarm system (FAS) is connected to a ULC listed fire signal receiving facility, a ULC Certificate (Fire Protective Signalling Service) must be completed as a part of fire alarm verification report, see Bulletin 2000-019-BU/EL for sample of the ULC certificates. When an existing FAS in the building is subjected to an addition or alteration (deletion or replacement of components, addition, modification or software change), then the extent of the FAS verification must be provided as follows: 1. When a control unit, transponder or an annunciator has been replaced with a new control unit, transponder or an annunciator, the entire FAS must be verified in accordance with the CAN/ULC-S537. 2. When a control unit or transponder has been modified, the control unit or transponder must be made approved in conformance with Rule 2-024 of the CE Code, and must be verified in accordance with the Standard. 3. When a unit assembly of electrical parts or module in an existing control unit or transponder has been replaced, the control unit or transponder must be made approved in conformance with Rule 2-024 of the CE Code, and must be verified in accordance with the Standard. 4. When an existing single-zone FAS has been subjected to an addition or alteration, the entire FAS must be re-verified. DOC/2018/402499 Page 1 of 4 City Hall 453 West 12th Avenue Vancouver BC V5Y 1V4 website: vancouver.ca/cbo Office of the Chief Building Official tel: 604.873.7611 fax: 604.873.7100 email: cbo@vancouver.ca

5. When field devices, water flow devices, audible signal devices or components of voice communication have been added, replaced or relocated in a FAS circuit, the entire fire alarm zone/circuit must be reverified (see Note for Conventional Field Device). 6. When an existing FAS component has been replaced with a different manufacturer s component, all components in the FAS must be compatible in conformance with CAN/ULC-S524. The ULC Test Report for such compatibility must be accompanied with the completed Appendix C form submitted in accordance with this Bulletin. NOTES - FAS MODIFICATIONS The CAN/ULC-S537 provides specific verification requirements for FAS modifications. Subsection 7.2 of the CAN/ULC-S537 requires where a conventional field device is added; or modifications or deletions are made to an existing input circuit or output circuit and the new or altered wiring is extended from an existing field device, the new devices, the devices connected on either side of the addition or alteration as well as at the end-of-line device for that circuit shall be verified in accordance with the Standard. For the foregoing item 5, Subsection 7.2 of the CAN/ULC-S537 is deemed to be acceptable to the City s Building and Electrical Inspections when only a minor modification is made to an existing fire alarm circuit (i.e. replacement, relocation or addition of not more than 10% of conventional field devices in the circuit). Conventional Field Device is defined by both of the CAN/ULC-S537 and CAN/ULC-S524 standards. FAS VERIFICATION BY QUALIFIED PERSONNEL IN THE EMPLOY OF AN ORGANIZATION The PREFACE of the CAN/ULC-S537 states that the requirements of this Standard contemplates that the verification procedure described herein will be conducted by an organization other than the installing contractor and designer, and that the verification will be carried out by qualified personnel in the employ of an organization acceptable to the authority having jurisdiction. For Qualified Personnel; Appendix A of the CAN/ULC-S537 describes that any person who performs the verification of a FAS should be familiar with this Standard and have received suitable formal training or sufficient experience acceptable to the authority having jurisdiction. Maintenance, commissioning, evaluation and verification of electrical equipment are deemed to be electrical work in accordance with the BC Electrical Safety Regulation. The Scope of CAN/ULC-S537 describes that this Standard prescribes verification procedures for the purpose of verifying that the FAS is installed in conformance with the design and CAN/ULC-S524, and performs all of its intended functions as designed. These requirements mean that qualified persons involved in a verification procedure must have sufficient technical knowledge of FAS components, their function and performance, and must have necessary electrical qualification for evaluating conformance of these components and devices with installation provisions mandated by the CAN/ULC-S524, and Section 32 of the Canadian Electrical Code, Part 1. The following acceptance criteria have been established by the City of Vancouver for persons deemed to be qualified, provided that such qualified person is employed by the fire alarm verification organization listed by the City of Vancouver: 1) A qualified person(s) employed by a ULC listed manufacturer of a FAS (i.e. qualified persons employed by Simplex, Edwards, Honeywell, Mircom, Notifier, etc.). Presently (in accordance with Section 4(1)(e) of the BC Electrical Safety Regulation) employees of an electrical equipment manufacturer are deemed to be qualified for the purpose of doing electrical work of commissioning of the equipment supplied by that manufacturer. Page 2 of 4

a) Acceptance of technicians employed by these manufacturers is based on the fact that these technicians have respective factory training and relevant electrical qualifications. b) Manufacturers must provide the City Electrician with detailed substantiation in this regard. 2) A Registered Professional - Electrical or Fire Protection Engineer. (See below definition 2) 3) A Certified Technologist (ASc.T) registered with the ASTT BC in the Electrical Technology area who in addition has successfully completed relevant FAS courses. 4) A qualified person employed by a fire alarm service company, provided this person possesses sufficient documentation indicating a successful completion of relevant factory training on fire alarm equipment and possesses a provincial certificate of qualification to do electrical work on fire alarm systems. Note: The following criteria are provided by the TSBC - The current Electrical Safety Regulation permits the following qualified persons, that are the holder of a valid Certificate of Qualification (C of Q), perform electrical work on fire alarm systems; C of Q in the trade of Electrician, C of Q Restricted Class C, and C of Q Alarm & Communication Systems - Restricted class AC FSR or RB 203. Definitions: 1. A qualified person is deemed to be a person in the employ of the verification organization (proof of qualification-training courses and relevant fire alarm and electrical certificates, etc., is required). 2. A Professional Engineer is deemed to be Electrical or Fire Protection Engineer registered with the ENGINEERS AND GEOSCIENTISTS BC, who is not involved in the design or installation of the FAS subjected to this engineer s verification. A. Effective immediately, City of Vancouver is using a List of Acceptable Organizations / Qualified Persons for purpose of the CAN/ULC-S537 as the attachment to this Bulletin. All fire alarm verification reports are permitted to be signed only by qualified persons employed by verification organizations accepted by the City of Vancouver; as per the List of Acceptable Organizations / Qualified Persons. The List of Acceptable Organizations / Qualified Persons is primarily for staff use, this list will be updated approximately twice a year, and it will not be posted on the City s website. The City s Building Inspections and Electrical Inspections Branches accept fire alarm verification reports only from the List of Acceptable Organizations / Qualified Persons for purpose of the CAN/ULC-S537. B. To be listed in the City of Vancouver as an acceptable verification organization and qualified persons for purpose of the CAN/ULC-S537, the organizations and qualified persons must meet the foregoing criteria. Manager of Trades Inspection or Deputy City Electricians must be contacted directly for evaluation of listing criteria. Page 3 of 4

INSTALLATION OF FIRE ALARM SYSTEMS CONTROL UNITS OR ANNUNCIATORS OUTOORS The CAN/ULC-S527-11 Standard For Control Units For Fire Alarm Systems contains the following information: Scope of the Standard, Clause 1.7 states that these requirements apply to control units and control unit accessories for ordinary (non-hazardous) indoor and outdoor locations. Clause 9.2.1 item N of the Standard states that a product shall be marked for its intended installation environment (indoor or outdoor) and location (dry, damp, or wet). Section 10.10 of the Standard requires Variable Ambient Temperature And Humidity Test. Clause 10.10.1.1 of the Standard states that a product shall operate in the intended manner for all conditions of intended use at the test ambient conditions specified in Subsections 10.10.2, Low Temperature Test; 10.10.3, High Temperature Test; and 10.10.4, Humidity Test. Clause 10.10.5.1.1 of the Standard states that a product intended for either indoor / wet or outdoor / wet or damp installations shall be subjected to the tests indicated in Clauses 10.10.5.2.1.1 through 10.10.5.4.7, unless indicated otherwise. REQUIREMENTS Devices and equipment used in a fire alarm system must comply with the applicable Standards listed in Subsection 4.1.3. of the CAN/ULC-S524-14. (Also See Subsections 5.1.7. and 5.1.8. of the CAN/ULC-S524-14) Where the fire alarm devices and equipment (including remote annunciators) intended to be installed outdoor (damp/wet/outdoor location), these devices and equipment must be approved for the condition of use with respect to the listed installation environment (i.e. ambient temperature and relative humidity) and location (i.e. indoor or outdoor) and legibly marked on the product in conformance with Rule 2-100(1)(m) of the CE Code. (Original signed by) P. Ryan, M.Sc., P.Eng. Chief Building Official Director, Building Code and Policy (Original signed by) W. White Deputy City Electrician Manager, Trades Inspection Page 4 of 4

DEVELOPMENT, BUILDINGS AND LICENSING Chief Building Official (CBO) and Building Code and Policy BULLETIN 2000-021-BU/EL - Attachment APPENDIX C Revised November 1, 2018 (FAS) CAN/ULC-S537-13 - APPENDIX C (INFORMATIVE) FIRE ALARM SYSTEM VERIFICATION RECORDS (Amended for use in the City of Vancouver) (Reference: Subsection 4.1, Clauses 4.1.7, 4.2.1, 4.2.2) C1. FIRE ALARM SYSTEM VERIFICATION REPORT (Reference: Clause 4.1.6, 4.2.2) Address: Date: New FAS: System Manufacturer: Electrical Permit #: Existing FAS: Model Number: Building Permit #: (See Note 1) A. System provides single-stage operation. B. System provides two-stage operation. C. The entire fire alarm system has been verified in accordance with CAN/ULC-S537, Standard for Verification of Fire Alarm Systems. D. This is a partial verification for a partial occupancy. (see scope of electrical permit and Note 1) E. Components of the existing fire alarm system have been modified or replaced with components from a different manufacturer and are compatible with the existing fire alarm system components. (see Note 2) F. This is a partial verification for a FAS that has been replaced in stages. (see Note 1) G. This is a verification of a portion of an existing fire alarm system verified in accordance with Section 7, System Modifications of the CAN/ULC-S537. (see Note 1) H. Installed in accordance with the design and CAN/ULC-S524, Standard for the Installation of Fire Alarm Systems. I. The FAS documentation is on site and includes a description of the system. J. The fire alarm system is fully functional without deficiencies. (see Note 3) K. The FAS is connected to a ULC-listed fire signal receiving centre via a supervised circuit of a ULC-listed signal transmitting unit approved for the purpose. If Yes : - Please specify the name and location of the ULC Listed Alarm Company: - And, provide a copy of ULC Fire Protective Signalling Service Certificate issued for the address above - Certificate No.: (Note: A sample of the ULC Certificates is shown on Attachments 1 and 2 of Bulletin 2000-019-BU/EL.) L. Comments: Yes No N/A M. A copy of this report will be given to the following, who is the owner or owner s representative for this building: Company This is to certify the information contained in this fire alarm system Verification Report is correct and complete. Email Telephone Printed Name and Signature of Qualified Person(s) conducting the Verification 1. Please, elaborate on the extent of verification of the existing FAS: 2. If Yes, ULC Test Report must be attached in conformance with Item 6 of Bulletin 2000-021-BU/EL (Revised). 3. Identified deficiencies relate to: (a) The existing portion of the FAS is not covered by the scope of work under electrical permit EP- (b) The newly installed FAS (or modified/added portion of the existing FAS). DOC/2018/402509 City Hall 453 West 12th Avenue Vancouver BC V5Y 1V4 website: vancouver.ca/cbo Office of the Chief Building Official tel: 604.873.7611 fax: 604.873.7100 email: cbo@vancouver.ca