A Green Solutions Company

Similar documents
Fertilizing Systems. Fertilize Responsibly INSTALLATION AND OPERATING GUIDE



INSTALLATION AND OPERATING GUIDE Model: EZ 1010-HB High Pressure Garden Hose & Drip Feeder 1 Gallon Liquid / 8LB Dry Capacity

Parts & Material Included

INSTALLATION INSTRUCTIONS GEO PRIME TANK. (Patent Pending) GPC

General System Layout Sketch

7800 Neutralizer Installation & Start-Up Guide

FLECK 5600 WATER SOFTENER INSTALLATION

Installation Guide. Inline Chlorinator TM. Vitasalus, Inc Rankin Drive Troy, Michigan USA

Cabinet Non-Electric Water Softener

Models: GW/R-T GW/R-2-T GW/R-3-T

Fleck 7000 Sediment Filter Installation & Start-Up Guide

Fleck 2510 SXT Catalox Installation & Start Up Guide

WS1 Greensand Installation & Start Up Guide

5700-E Sediment Filter Installation & Start-Up Guide

L24TWS. Beverage Tower Kit Components. L24TWD Lynx Beverage Kits Model L24TWS Single Tower and L24TWD Double Tower

HOT TANK INSTALLATION AND OPERATING INSTRUCTIONS. Model #: 5000

DOUBLE O-RING GEO-PRIME TANK Non-Pressurized Flow Center System INSTALLATION INSTRUCTIONS. Model: DORGPT-1 NOTE:

Fleck 5600 Carbon Filter Installation & Start Up Guide

Clean Water Made Easy. Fleck 7000 Tannin Filter Installation & Startup Guide. Questions?

Setup. Important. Texture Spraying (material supplied from unit)

55-Gallon Dispenser Package

Isolux Arsenic Removal Systems Central Treatment Systems Operation and Maintenance Manual

BEFORE OPERATING THE MACHINE: WARNING

Clean Water Made Easy

Safety. Rinse Kit for Multi-Pro 1200 and 1250 Turf Sprayers Model No Safety and Instructional Decals. Installation Instructions

HYDROGEN SULFIDE REMOVAL SYSTEMS

Clean Water Made Easy

55-Gallon Dispenser Package

Operations and Maintenance Manual

Installation Instructions AS-WH Whole House Water Filter

J-PRO-24 Soda Ash Injection Installation & Start-Up Guide

Electric Pressure Washer

Series 1140 and 1141 Temperature Regulators

Electric Pressure Washer

S1700 Electric Pressure Washer

Model HD 3501 Part No High Pressure Washer Operator Manual

Installation and Maintenance Guide

K Specifications. Max. Water Volume

AUC Cell Washer. User Manual

PRE-ASSEMBLED RADIANT CONTROL PANEL INSTALLATION MANUAL

Genesis Whole House Chlorination System Page 2

Dyna-Star HP or HF Pump 35# Pail Kit and Follower Plate

What is micro-irrigation. Easy Drip Irrigation for Your Garden. A little about myself. Why drip irrigation. Why drip irrigation

Rejuvenation Instructions

Model K 3000 G Part No

High Pressure Washer Operator Manual. Specifications Model HD 2700 DH/DB

INSTALLATION MANUAL ICE/BEVERAGE DISPENSER MODEL: ENDURO-200/250

Pressure Washers (courtesy of Mi-T-M Corp.)

BMW E36 Thermostat Removal And Coolant Flush

K 2.97 M. Specifications Operating pressure, max PSI Water volume GPM Voltage V Amp draw AMPS

Activity Sheet Chapter 1, Lesson 1 Molecules Matter

Model K 520 M Part No

Whole House Descaler Installation Instructions

17 GALLON PROFESSIONAL RESTROOM CLEANER

PRE INSTALLATION PROCEDURES

K Specifications. Max. Water Volume

SuperKlean Washdown Products

WARRANTY TABLE OF CONTENTS TECHNICAL SPECIFICATIONS. Product Warranty Always keep your receipt as proof of purchase. Technical specifications...

7500-S Sediment Backwash Filter Guide

Ultraviolet Systems UV-C 50 INSTALLATION INSTRUCTIONS & PRODUCT MANUAL

WL380 QUICK START GUIDE

OWNER S MANUAL. Models: Herkules Equipment Corporation 2760 Ridgeway Court Walled Lake, MI USA Fax

INSTALLATION & INSTRUCTION MANUAL

COMPRESSED AIR DRYER. SAFETY... Page 2 MAINTENANCE... Page 5. INSTALLATION... Page 3 PARTS AND KITS... Page 6

American Hydro Systems

Installation Instructions EQ-AST-WH & EQ-AST-WH-C. Whole House Water Filter

Owner's Manual. WS Series. Water Softener

READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

HELIATOS Bottom Feed Connector Installation Instructions Introduction. Step 1

SYSTEMS for CATALYTIC FILTERS

Aer-Max Installation Instructions

HR Powder Feed Hopper

Model K 5800 G Part No

INSTALLATION INSTRUCTIONS UNDERCOUNTER DISHWASHERS

Clean Water Made Easy

Read this entire manual before operation begins.

CWS Plus Sediment Filter Installation & Start Up Guide

5900S Softener Installation & Start-Up Guide

PRE INSTALLATION PROCEDURES

General System Layout Sketch

WASHING MACHINE OWNER S MANUAL

Clean Water Made Easy. CWS Time Clock Softener Installation & Start Up Guide. Questions?

1700 PSI Electric Pressure Washer

AUTOMATIC ICE-CUBE MAKER

20 TON AIR/MANUAL SHOP PRESS

INSTALLATION MANUAL ICE/BEVERAGE DISPENSER MODEL: ENDURO VALVE

INSTALLATION AND OPERATION MANUAL

AIR OPERATED CLUTCH & BRAKE BLEEDING KIT. MODEL NO: CHT637 Part No: OPERATING & MAINTENANCE INSTRUCTIONS GC01/12

User s Information Manual

RAPID RESPONSE Model RSV-1 Residential Shut-Off Valve, Dual-Purpose Water Supply, Domestic and Fire Sprinkler System General Description

Models Series Series

MICRO CLEANER. OPERATOR MANUAL Advance MODEL /10 Rev E Document Number

TRI-PLATE B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS PART NO EFFECTIVE MARCH 1, 1983 REPRINT APRIL 16, 1999

Used Fluid Handling Portable Used Oil Gravity Drains

IMER USA (301) Koine 35 Quick User Guide IMER USA

Clean Water Made Easy

13 GALLON Extractor MODEL NO

Thermo-Bob 4 Installation Manual KT5A Kit

Transcription:

A Green Solutions Company INSTALLATION AND OPERATING GUIDE HIGH CAPACITY SYSTEMS MODELS: EZ010-HC, EZ017-HC, EZ025-HC (EZ010-HC PICTURED) For an overview of the EZ-FLO System Installation & operation: www.ezfloinjection.com/videos/ * IMPORTANT * READ INSTRUCTIONS BEFORE INSTALLING THE SYSTEM TO INSURE PROPER INSTALLATION EZ-FLO Coupling Ball Valve Required for Installation Sold Separately Do not connect to an irrigation system that is not protected by an approved back flow prevention device. Do not install if pressure exceeds 80 PSI Use only with non-hazardous products Minimize exposure to direct sunlight to maximize service life Protect against freezing to avoid tank fracture 2018, EZ-FLO Fertilizing Systems

HC TANK ASSEMBLY & PARTS LIST TANK CAP FILL CAP # CAP-MBT TANK AIR VENT # TNK-HC AIR VENT GREEN BLUE CONNECTOR # PCG CONNECTOR # PCB # CAP-FILL CAP O-Ring Part # LOR Cap Fitting # APF PRESSURE RELIEF VALVE # TNK-PRV Dip Tubes # DT-SET Screen Part # PUF Dip tube with screen attaches to Fertilizer-Out connection in cap. 2 - Shut Off Valves Part # SOV (with 2 washers) Agitation Fitting DRAIN VALVE Part # AGT Agitation tube attaches to Water-In connection in cap. 3 - Tubing Clamps Part # RTC (1 Extra) 5- Feet 1/4 Black Tubing 5- Feet 1/4 Clear Tubing Part # BT5 Part # CT5 For EZ-FLO Warranty information visit our website at: www.ezflofertilizing.com 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 2

Cap Tubing Fittings: Insert and Release Top View 1 2 Side View FAST SLOW IN OUT The EZ-FLO system uses push connect fittings to connect the clear and black 1/4 tubing to the cap. To Insert: Step 1. Insert the end of the tubing into the appropriate side (Clear to Green / Black to Blue) by pressing into the hole. Press gently until the tubing stops. 1/4 Tubing Press Tubing Step 2. Gently tug the tubing to insure it is locked into place. 1/4 Tubing To Remove: Collet Step 1. Shut off pressure to the system using the back flow valve or included gray shut off valves. Step 2. Apply gentle pressure to the Green or Blue collet with your fingers or provided washer. Press Collet 1/4 Tubing Step 3. While holding pressure, gently pull the tubing away from the fitting to release. Pull Tubing Note: Make sure to direct the fitting away from your face and body. A small amount of residual pressure may be in the tank and cause a momentary release of fluid. 2018, EZ-FLO Fertilizing Systems 1/4 Tubing www.ezflofertilizing.com Hold Pressure Page 3

System Installation: Location Selection Typical installation The system is normally installed in a valve box, connected to the main line of the irrigation system, after the back flow preventer and before the sprinkler valves. One unit will feed both drip and sprinkler zones without changing any connections or nozzles. It will feed all zones downstream of the connection. Water Flow To drip emitters Connection Back Flow Preventer TOP VIEW To sprinklers OUT IN To back yard Valve Box SLOW 1 2 FAST OUT IN To sprinklers EZ-FLO Unit Valve Box Step 1 - Locate the installation point. Connection must be made after an approved back flow prevention device. The connection can be made either vertically or horizontally in the irrigation main line. A CBV style connection manufactured by EZFLO is required. INSTALL CONNECTOR IN THIS AREA SPRINKLER VALVE SHUT OFF WATER Step 2 - Shut off water and relieve pressure Off RELIEVE PRESSURE BY OPENING A ZONE VALVE 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 4

System Installation: Connection Step 3 - Cut out a section of pipe slightly larger than the cut out length of the coupling. Ball Valve Coupling FLOW SOCKET CUTOUT LENGTH SOCKET GLUE IN COUPLING WITH FLOW ARROW POINTING IN THE DIRECTION OF THE WATER FLOW CUTOUT LENGTH FLOW CUT PIPE Step 4 - Glue the coupling into the line. GREEN BLUE FLOW Step 5 - Attach tubing to the coupling. ATTACH BLACK TUBING TO BLUE FITTING, CLEAR TUBING TO GREEN FITTING AND SECURE WITH TUBING CLAMPS GREEN BLUE FLOW *Calibrating the CBV connection is on page 9 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 5

System Installation: Initial Fill Step 6 - The EZ-FLO system can be filled with any liquid or water soluble product. EZ-FLO MAXX- PRODUCTS are specifically designed for use with all fertigation and irrigation systems. Fill the tank based on the product s coverage recommendations. Typical Fertilizer Coverage Rates: Liquid- Powder- 1 Gallon per 10,000 sqft every 4 to 6 weeks 1 Pound per 1,000 sqft every 4 to 6 weeks Model Tank Size Maximum Capacity EZ010-HC 10.0 Gallon 75 lbs dry or 10.0 gal liquid EZ017-HC 17.5 Gallon 150 lbs dry or 17.5 gal liquid EZ025-HC 25.0 Gallon 225 lbs dry or 25.0 gal liquid * ALL TANK CAPACITIES ARE APPROXIMATE * Remove Fill Cap Step 7 - Prepare the system for filling with Maxx Products or alternate fertilizer. Remove the fill cap from the tank (older versions will have a ball valve) by simply using hand pressure and turning to the left. Retain the cap and o-ring near the tank in a clean space. Close Drain Valve Confirm the drain valve is in the closed position MAXX PRODUCTS Step 8 - Insert the EZ-FLO High Capacity funnel into the fill port on the tank (optional). EZ-FNLHC Pour in the desired product or combination of products. The system may be filled to 100% of capacity with liquid and/or water soluble products. If the product is not colored, add dye, blue or green are generally the most visible. 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 6

System Installation: Initial Fill Step 9 - Remove the fill funnel and fill any remaining room with fresh water. Water soluble powders will leave air space in the tank and must be topped off with a fluid. The fluid may be a compatible liquid product such as Hydro-Maxx, fresh water, or a combination. If using only liquid products, this step may be skipped if the tank is filled to its maximum capacity. DO NOT LEAVE AIR IN THE TANK MAY CAUSE FRACTURE Step 10 - The fill cap and o-ring may be put back in place and secured by hand tightening only. With the o-ring seal and proprietary thread design, the fill cap can be sealed with minimal effort. Do not use a wrench. IF LEAKING CHECK O-RING The system is now ready to be connected to the irrigation system. Step 11 - Attach tubing to the cap: Clear to Green & Black to Blue Make sure the shut off valves are in the closed position Press Tubing Closed Position 2018, EZ-FLO Fertilizing Systems Press Tubing Closed Position www.ezflofertilizing.com Page 7

System Installation: Initial Fill Pressurize System Step 12- Reconfirm the shut off valves are in the off position Off Off Turn water on at back flow preventer opening valve slowly to minimize hydraulic shock / water hammer. On Turn on both shut off valves at the proportioning cap On On Allow the tank to pressurize and view all connections for leaks IF LEAKING CHECK O-RING FIRST 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 8

Connector Calibration- Coupling Ball Valve The CBV connection must be calibrated to the flow rate of your irrigation system. If the irrigation system is higher flow, primarily composed of spray heads or larger drip irrigation zones, adjustment to the CBV may not be required. The EZ-FLO system must be full of fertilizer which provides a color that can be used to indicate flow through the clear line. If your fertilizer is not colored, add blue or green dye to the tank. Start by setting the proportioning cap adjustment setting to the fast position and the CBV in full open position. CBV Full Open 1 2 FAST SLOW Adjustment Knob OUT IN OUT IN CBV Full Closed PROPORTIONING CAP Water Flow Step 9 - Turn on a sprinkler or drip zone with the closest to average gallons per minute flow rate and watch the clear fertilizer out tubing for color If color is steadily flowing through the clear output tube, the CBV does not require adjustment. Please note the color in the tube will be lighter than the color in the tank due to the mixing If color is not flowing, slowly turn the CBV to the closed position in small increments, stopping once color begins to flow. Full Open 15% Closed 50% Closed Full Closed Water Flow Once color is visible, you no longer have to adjust the CBV connection. You may leave it in position permanently. Full closed is not common and may indicate improper installation or filling of the system. Set the Proportioning Cap feed rate to the desired level. Please note, color will be lighter on the slower feed rate settings. Adjusting the ball valve will not affect the performance of the irrigation system. The valve closure is only necessary when the irrigation system is not operating at full capacity. Water is diverted through the EZ- FLO system as a bypass and reintroduced downstream of the valve eliminating the pressure and flow loss. 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 9

Set Flow Adjustment Set Flow Adjustment Step 10 - Set the flow rate by adjusting the adjustment knob to the proper setting. Slow Setting - is used for normal and most common setting in regions with high watering requirements such as hot dry climates or sandy soils. #1 Setting - is used for normal maintenance in regions with more moderate climates and moderate watering schedules where soils have good moisture retention. #2 Setting - is used to encourage fast growth or to quickly improve the condition of a landscape in poor condition. The unit will empty more quickly and can be refilled more often. Fast Setting - is used to for periodic fertilization. The unit will empty more quickly and can be refilled more often. Setting *Ratio Slow 1 2 Fast OZ. of fertilizer per gal. of water 15000:1 8000:1 2000:1 400:1 1 2 Based on Watering Frequency*.008 (1/20 tsp).017 (1/10 tsp).064 (2/5 tsp).320 (2 tsp) FAST SLOW SLOW OUT IN 4+ days per week 3 days per week 2 days per week 1 day per week 12 FAST OUT IN *Ratio refers to the amount of water mixed with the fertilizer. For example, a 400:1 ratio means 400 gallons of water will be mixed with 1 gallon of fertilizer. The adjustment knob can be set in between settings if desired. These ratios are approximate because feed rates can vary by the type of product being distributed. Ratios are provide as a general guideline only. The watering frequency guideline is general and for convenience only. Additional caution and care should be taken when using a feed setting faster than #1. Gallons Of Water Until Empty The following table shows the approximate gallons of water required to distribute the fertilizer from the EZFLO system at the various flow settings. Model EZ010-HC EZ017-HC EZ025-HC Slow #1 #2 Fast 150,000 80,000 20,000 4000 262,500 140,000 35,000 7,000 375,000 200,000 50,000 10,000 More detailed application instructions are available on our website: www.ezflofertilizing.com 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 10

Quick Refill Guide Step 1 - Turn off the water using the shut off valves, both valves must be closed Off Off Step 2 - Open the drain valve allowing for depressurizing and drain until empty. The system will be full of fresh water when fertilizer is gone Some products may leave a slight residual. This may be left in the tank or flushed out Remove Fill Cap Step 3 - Remove Fill Cap & Close Drain Valve Close Drain Valve MAXX PRODUCTS Step 4 - Fill tank with product Reference Fill Section on page 6 for Tank Maximum Capacities Results depend on product quality, use MAXX-PRODUCTS for best performance 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 11

Quick Refill Guide Step 5 - Fill tank with water by opening shut off valve or hose until full DO NOT LEAVE AIR IN THE TANK Step 6 - Screw on fill cap *Check to make sure o-ring is in place prior to screwing the cap back on. Step 7 -Turn on both shut off valves at the proportioning cap Allow the tank to pressurize and view all connections for leaks 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 12

Frequently Asked Questions How much product to put into the tank? Refer to the product label and tank capacity. The system feeds very slowly and it is difficult to over fertilize when using the system properly. Typical rates are 1 gallon of liquid per 10,000 sqft of landscape per month and 10 lbs of dry powder fertilizer per 10,000 sqft of landscape per month. What fertilizer can I use? Almost any liquid or water soluble powder product. All Maxx-Products work with the system and are specifically engineered for fertigation. Do not use dry broadcast fertilizers, they are not compatible and may cause damage to the EZ-FLO or Irrigation system. Can I use weed killer/ herbicide in the system? Typically no, hazardous products are not recommended for use in the EZ-FLO system and the application of herbicide should be tightly controlled. What cap setting should I use? Slow and #1 are the most common settings and generally the safest unless you are familiar with the fertilizer product and injection system. The closer to fast, the faster the system will run out of product. How often do I need to refill? This will vary on landscape size and watering schedule. If you follow the EZ-FLO sizing and use recommendations, you will typically last 4 to 6 weeks. If your landscape is smaller it will last longer. If the landscape is larger or you water heavily, the system will empty faster. How do I know when to refill? The system can be checked for color by viewing the clear output tubing during irrigation operation. If the fertilizer color is gone, you need to refill the system. Alternatively, you may let the system run empty and refill based on a set schedule. How do I know it is working? When the irrigation system is running and the system is full of fertilizer, watch the clear output tube for color. You may adjust the cap from slow to fast to see the color change. You can use blue or green food dye to add color to the fertilizer. 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 13

Frequently Asked Questions Will I over fertilize? No. When the unit is set on the maintenance (slow) setting it feeds in small amounts. It applies less fertilizer over the same period of time than applying in large amounts once every 6 weeks.. Will the system clog drip irrigation? No. The EZ-FLO and Maxx-Products can help clean drip systems and make them work effectively. If product is mixed with water, will it dilute? This depends on the product but the patented flow process prevents dilution. EZ-FLO dispenses products slowly over a long period of time so if dilution occurs, it will not effect the products performance. Will the fertilizer stain? EZ-FLO MAXX-PRODUCTS and most fertilizers will not stain when dispensed through the EZ-FLO system. Check with manufacturers of other products to confirm they will not stain prior to use. How do I winterize the system? Simply close the shut off valves, disconnect it from the irrigation system and drain the tank. The system did not inject any fertilizer Refer to the connector calibration and set the CBV to a further closed position. The system is emptying too fast Confirm you used the correct cap setting and check the connector calibration page and adjust the CBV to a more open position. My system is always full of water, is it working? Yes! This is part of our patent and you can review the videos on our website to see how it works. All EZ-FLO systems have been specifically designed and engineered to be installed by a professional irrigation or landscape contractor but may be installed by the end user without voiding the warranty. Improper installation or use could cause risk of water contamination due to back flow or tank rupture. Failure to follow all safety instructions and warnings could result in serious bodily injury. Improper installation or use of the system voids all warranties. 2018, EZ-FLO Fertilizing Systems www.ezflofertilizing.com Page 14