START UP FORM PACKET

Similar documents
START UP FORM PACKET

START UP FORM PACKET

Liebert CRV Warranty Inspection Check Sheet

Liebert Small System MCD and PFH Condensers (1-5 Ton) Warranty Inspection Check Sheet

SA Series Startup Form

SA Series Start up Report

Service Step by Step Trouble-Shooting Check-List

30GT FLOTRONIC AIR-COOLED CHILLERS

Liebert Xtreme Density Chiller (XDC) Unit Warranty Inspection Check Sheet

PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE. Master Rack Compressor Sequencer 7/21/2017

Otherwise, you can continue reading the file on the following pages.

M2 Series Startup Form

30GN FLOTRONIC II AIR-COOLED CHILLERS

SUBMITTAL DATA SHEET FEATURES. SPLIT-SYSTEM EVAPORATOR BLOWERS 7.5, 10, 15 & 20 TONS MODELS: NH-07 thru -20, 2-PIPE NJ-10 thru -20, 4-PIPE

M2 Series Startup Form

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s)

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

VertiCool CLASSIC. Engineering Guide. Effective March Air-Cooled, Water-Cooled, Chilled Water and Water Source Heat Pump

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE 11/03/2015 Rev 00

INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE

DEALER SERVICE BULLETIN

DANFOSS OPTYMA PLUS INVERTER UNITS

MACH N-407 Heat Pump Air-Cooled Chiller

Instructors: Contact information. Don Reynolds Doug McGee Factory Tech Support

Condensing Unit Installation and Operating Instructions

User s Information and Installation Instructions

For an administrative fee of $9.97, you can get an un-locked, printable version of this book.

Air-Cooled Condensing Units with Compact Screw Compressors

C13-Series Engineering Guide

Condensing Unit Installation and Operating Instructions

Contour TM Screw Compressors

MicroTech Series-200 Flooded Screw Chiller

I N STALLATIO N. VRC Series IOM-M Part Number

Liebert Fin/Tube Condenser Warranty Inspection Check Sheet

INSTRUCTIONS! DO NOT DISCARD!

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

INSTRUCTIONS! DO NOT DISCARD!

User s Information and Installation Instructions

4A6H5042G1000A 208/230/1/ DURATION - SCROLL 3/4 208/230/1/ NO (Use BAYKSKT263) YES YES PROPELLER DIRECT

Commercial High-Efficiency Condensing Units

VertiCool Aurora Engineering Guide

Air-Cooled Condensing Units with Screw Compressors. Technical Bulletin Low Temperature Models SSV DSV

MAC N-407 Air-Cooled Chiller

VariCool VAV Engineering Guide

N4H4. Product Specifications 14 SEER HEAT PUMP. ENVIRONMENTALLY SOUND R 410A REFRIGERANT 1½ THRU 5 TONS SPLIT SYSTEM 208 / 230 Volt, 1 phase, 60 Hz

TECHNICAL GUIDE. Description SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS YD360, 480 & THRU 50 NOMINAL TONS YTG-B-0811

Trouble Shooting Guide FAA, 3-phase (D3631)

PS SERIES PARALLEL RACK SYSTEM START UP GUIDE

INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE

INSTRUCTIONS! DO NOT DISCARD!

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA

Trailblazer air cooled scroll chillers

NON-CYCLING REFRIGERATED AIR/GAS DRYERS QPNC 75 to QPNC 250 OPERATOR S MANUAL

TECHNICAL. Series 18. Pump Packages

Product Data PH13(N,P)R FEATURES AND BENEFITS. SPLIT SYSTEM HEAT PUMP For Use With R Refrigerant 1---1/2 TO 5 TONS ( )

PROAIR Air Conditioner. CR23 Model INSTRUCTION MANUAL nvent Rev. D P/N

WIBR SERIES. Unit Coolers - Technical Catalog Hunt St - Pryor, OK Fax

User s Information and Installation Instructions

Trouble Shooting Guide PWA, 3-phase (D10571)

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8)

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

UP TO 17.5 SEER / 13.5 EER / 9.5 HSPF HEAT PUMP ENVIRONMENTALLY BALANCED R- 410A REFRIGERANT 2 THRU 5 TONS SPLIT SYSTEM

Data Aire LCS TM (Large Ceiling System) R-407C. 6, 8, 10, and 13 ton. ISO 9001 Certified

TECHNICAL, OPERATING & INSTALLATION MANUAL TC 15, 33, 52 AIR COOLED PACKAGED WATER CHILLERS

Installation and Operation Manual

A Series T 3. Unit Coolers - Technical Catalog. Product Benefits: Comdustrial TM Refrigeration. Adaptability- Durability- Serviceability-

Unit Controller (UC8) Quick Reference Operation and Fault Diagnosis

Trouble Shooting Guide RAA, 1-phase (D3627)

Commercial Air Source Heat Pump Water Heater Operations and Installation Manual

Trouble Shooting Guide PAA, 1-phase (D3731)

WCH5**4. Product Specifications

I.O.M. #075 11/05 INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE. with CF-1 Instrument

62DA,DB,DC,DD,DE,DF07-38

Installation and Operation Manual

KITS COMMON TO HEATING AND COOLING EQUIPMENT 504,652M 03/04. Supersedes 503,249M

PROAIR Air Conditioner. CR29 Model INSTRUCTION MANUAL nvent Rev. I P/N

Installation and Operation Manual

Checking the Charge on a Heat Pump in the Winter

Operating Letter. Operating Letter #730 January 1, 2014 WARRANTY AND TECHNICAL SERVICE

Precise Temperature Control; Compact Footprint

4A6H5049E1000B 208/230/1/ /8 7/8 7/8 7/8 DURATION 208/230/1/ /230/1/ SPINE FIN 13 LBS., 10 OZ. YES

R4H4. Product Specifications

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

Refrigeration / Air Conditioning Systems Circuit Drawings. Student Resource Package No: NR 24

RSMV Technical Guide

Air Cooled Condenser Installation and Operating Instructions

4TTB3060D1000B 208/230/1/60 35 SCROLL /230/1/ /8

OPERATING MANUAL Enertronic Control System 2

INTRODUCTION. Special Applications of Package Air Conditioners. Instant Cooling Requirement in Wedding Ceremonies

General Purpose Ventilation Fan - Venturi-Style Blower PSIG

1025, BOUL. MARCEL-LAURIN INSTRUCTION MANUAL FOR WATER COOLED ENVIROCHILL CHILLER. Prepared par Claude Gadoury, P. Eng MTL TECHNOLOGIES INC.

T-Series Air Conditioner T15 Model

SERVICE MANUAL FOR 6795B,C,D SERIES PACKAGED AIR CONDITIONERS

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

TECHNICAL SPECIFICATIONS

DRY CHARGE UNITS. 1.5 to 5 Tons AIR CONDITIONERS LCS13DC PRODUCT SPECIFICATIONS L C S 13 DC MODEL NUMBER IDENTIFICATION

50TM TFF COMBINATION HEATING/COOLING UNITS

SERVICE MANUAL FOR 6636A & 6636B SERIES TWO TON HIGH EFFICIENCY PACKAGED AIR CONDITIONERS

Transcription:

START UP FORM PACKET Condensing Unit DIVISIONS OF RAE CORPORATION 4492 Hunt St. - Pryor, OK 74361 - (918) 825-7222 - Fax (918) 825-6366 www.rae-corp.com

RAE Corporation Condensing Unit Start-Up Form Century Refrigeration Technical Systems Refrigeration Systems Unit Model #: Unit Serial #: Voltage/PH/Hz: Refrigerant: First Day of Start-Up: Last Day of Start-Up: Job Name: Job Street Address: Job City: Job State and ZIP: Equipment Installation Service Company Information: Company Name: Company Address: Company City: Company State and ZIP: Maintenance & Labor Warranty Service Company Information: Company Name: Company Address: Company City: Company State and ZIP: PART A - Pre Start-Up System Check: Has the unit been checked for shipping damage? Yes No If there is any shipping damage, please list all damage in detail: Crankcase heaters are verified operational and have been on continuously for at least 12 hours? Yes No Has field water piping been verified correct? Yes No Has the air handler been verified operational? Yes No Has an air balance been completed? Yes No Has the evaporator been verified as functional with even refrigerant distribution? Yes No Has all field wiring been verified as completed and checked as functional per electrical diagrams? Yes No

Are pressure lines free from compressor, with pressure line coils spaced at least 1 inch apart? Yes No Has all piping been thoroughly leak checked? Yes No Has all field connected main power and control wiring been completed and checked? Yes No Have filter driers been installed if equipped? Yes No Has a grounded conductor been installed from the main panel to earth ground? Yes No Main Voltage Check: Voltage L1 to L2: Voltage L2 to L3: Voltage L3 to L1: Voltage L1 to G: Voltage L2 to G: Voltage L3 to G: Main fuse or breaker size: Control Voltage Check: PART B - Start-Up: amps Voltage H to N: Voltage H to G: Voltage N to G: Ambient temperature: F Setpoint: F Amount of refrigerant in system: lbs. of R- in each circuit. Compressor and Circuit Operation: Compressor Number Amps/leg Suction Discharge Superheat 1 / / PSI PSI F 2 / / PSI PSI F 3 / / PSI PSI F 4 / / PSI PSI F 5 / / PSI PSI F 6 / / PSI PSI F 7 / / PSI PSI F 8 / / PSI PSI F Blower Fan Amps/leg Volts/leg Is blower/fan rotation correct? 1 / / / / Yes No 2 / / / / Yes No 3 / / / / Yes No 4 / / / / Yes No 5 / / / / Yes No 6 / / / / Yes No 7 / / / / Yes No 8 / / / / Yes No 9 / / / / Yes No 10 / / / / Yes No

If hot gas bypass is used, what is it set at? High pressure control setting (cut in/cut out, circuits 1-8): Cut in: Cut out: Low pressure control setting (cut in/cut out, circuits 1-8): Cut in: Cut out: What percentage of load was available at start-up? If a VFD is used, what are the basic settings on the VFD, and/or what was changed on the VFD during start-up and why? N/A At what PSI does the condenser fan/blower start? Safety Check: Have compressor overloads been verified correct? Yes No N/A Settings: #1 #2 #3 #4 Have condenser overloads been verified correct? Yes No N/A Settings: #1 #2 #3 #4 Controller Check: Are controllers labeled and correspond to the diagram? Yes No Was a program downloaded in the field? Yes No If program was field downloaded, what version was used? Have controllers been scrolled through line by line ensuring that all transducers, sensors, pumpdown switches, failures, GPM, etc. read correctly? Yes No List any fields not reading correctly: Have all changes to any parameter been documented and sent to the lab, programming, and service? Yes No List any parameters or settings that were changed: Have all adjustable refrigeration valves been adjusted appropriately? Yes No Which valves were adjusted?

Other: Does any work need to be completed on the unit after start-up? Yes No Please list any additional work in detail: Start-Up Notes: Start-up performed by (Print): Start-up performed by (Signature): Date: To validate equipment parts warranty, return completed form within (10) day of start-up to: RAE Corporation Attn: Service Department P.O. Box 1206 Pryor, OK 74362 (918) 825-7222 service@rae-corp.com