START UP FORM PACKET Condenser/Fluid Cooler DIVISIONS OF RAE CORPORATION 4492 Hunt St. - Pryor, OK 74361 - (918) 825-7222 - Fax (918) 825-6366 www.rae-corp.com Bulletin# CONFLUIDCOOLER-START UP-1213
RAE Corporation Condenser/Fluid Cooler Start-Up Form Century Refrigeration Technical Systems Refrigeration Systems Unit Model #: Unit Serial #: Voltage/PH/Hz: Refrigerant: First Day of Start-Up: Last Day of Start-Up: Job Name: Job Street Address: Job City: Job State and ZIP: Equipment Installation Service Company Information: Company Name: Company Address: Company City: Company State and ZIP: Maintenance & Labor Warranty Service Company Information: Company Name: Company Address: Company City: Company State and ZIP: PART A - Pre Start-Up System Check: Has the unit been checked for shipping damage? Yes No If there is any shipping damage, please list all damage in detail: Has water bypass valve been checked as operational? Yes No Has field water piping been verified correct? Yes No Has all field wiring been verified as completed and checked as functional per electrical diagram? Yes No Has all piping been thoroughly leak checked? Yes No Has all field connected main power and control wiring been completed and checked? Yes No Has a grounded conductor been installed from the main panel to earth ground? Yes No Has the unit been solidly mounted to the mounting structure? Yes No
Main Voltage Check: Voltage L1 to L2: Voltage L2 to L3: Voltage L3 to L1: Voltage L1 to G: Voltage L2 to G: Voltage L3 to G: Main fuse or breaker size: amps Control Voltage Check: Voltage H to N: Voltage H to G: Voltage N to G: PART B - Start-Up: Ambient temperature: F Setpoint (if applicable): F Amount of refrigerant in condenser (if applicable): lbs. of R- in each circuit. Condenser/Fluid Cooler Circuit Operation: Fan Amps/leg Condenser Cut In/Cut Out PSI Fluid Cooler Cut In/Cut Out Water Temp ( F) 1 / / / / 2 / / / / 3 / / / / 4 / / / / 5 / / / / 6 / / / / 7 / / / / 8 / / / / High pressure control setting, if used (cut in/cut out, circuits 1-8): Cut in: Cut out: What percentage of load was available at start-up? If a VFD is used, what are the basic settings on the VFD, and/or what was changed on the VFD during start-up and why? N/A At what PSI/Temp does the condenser VFD start? At what PSI/Temp is the VFD at 100%?
Safety Check: Have condenser overloads been verified correct? Yes No N/A Settings: #1 #2 #3 #4 Controller Check: Are controllers labeled and correspond to the diagram? Yes No Was a program downloaded in the field? Yes No If program was field downloaded, what version was used? Have controllers been scrolled through line by line ensuring that all transducers, sensors, switches, failures, GPM, etc. read correctly? Yes No List any fields not reading correctly: #5 #6 #7 #8 Have changes to any parameter been documented? List any parameters or settings that were changed: Yes No Have all adjustable refrigeration or diverting/mixing valves (if equipped) been adjusted appropriately? Yes No Which valves were adjusted? Other: Does any work need to be completed on the unit after start-up? Yes No Please list any additional work in detail:
Start-Up Notes: Start-up performed by (Print): Start-up performed by (Signature): Date: To validate equipment parts warranty, return completed form within (10) day of start-up to: RAE Corporation Attn: Service Department 4492 Hunt St. Pryor, OK 74361 (918) 825-7222 service@rae-corp.com