Capital Projects impacting Odenton Town Center

Similar documents
Capital Projects in and near Odenton Town Center

Odenton Town Center 2016 Annual Report. October 2016 Office of Planning and Zoning Anne Arundel County

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

TECHNICAL MEMORANDUM #1 Summary of Prior Transportation Studies

2040 Long Range Transportation Plan

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Citizen Information Meeting

City of Meriden Harbor Brook Flood Control Project Overview

The transportation system in a community is an

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Section4 Design Vision & Implementation Plan

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

2017 General Obligation Bond

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Population and Demographics Alternatives Development Design Criteria Stormwater Management Guidelines Alternative 1: No Build

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

JOB CREATION PROJECTS

Executive Summary. NY 7 / NY 2 Corridor

Odenton Town Center Development Projects March 2018

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

(APN: );

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

TRANSPORTATION. Part 1: Background. Section 1: Introduction. P a g e 70

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

Places29: List of Implementation Projects

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

DRAFT. October Wheaton. Design Guidelines

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

Rutherford County Projects

Fall 2017 Construction Update

ESTABLISH AN EFFICIENT TOWN CENTER

Construction Engineering & Inspection

Right-of-Way Acquisitions and Relocations Technical Memorandum

A. INTRODUCTION B. PREFERRED ALTERNATIVE

SR 483 Clyde Morris Boulevard FDOT District 5

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

master plan of highways bus rapid transit amendment

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

PROPOSED IMPROVEMENTS

Town of Cornelius Bond Update August, 2017

ALTERNATIVE STATION AREA -

DESIGN CRITERIA PACKAGE

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Spring 2018 Construction Update

ARTICLE 6: Special and Planned Development Districts

AGENDA ACTION ITEMS INFORMATION ITEMS

9IMPLEMENTATION AND PHASING

Ann Arbor Intermodal Station Environmental Review

Description of Preferred Alternative

Westwood Shopping Center Sketch Plan, Plan # February 23, 2017 Item # 9

The Capital Design Advisory Committee St. Mary s College of Maryland & Historic St. Mary s City

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

TRANSPORTATION COMMITTEE

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

City of Toronto. Emery Village Transportation Master Plan

Preliminary Recommendations Tk Takoma/Langley Crossroads Sector Plan

Urban Planning and Land Use

COMPLETE GREEN STREET CHECKLIST

Project Overview. Get Involved. Public Information Meeting. Contact Information

The West Vaughan Employment Area Secondary Plan Policies

4.1 Build Alternative 1 Construction Phasing

4/8/2015 Item #10D Page 1

Long Branch Sector Plan

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

Asbury Chapel Subdivision Sketch Plan

University Park Subdivision Street Assessment Report

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Implementation Guide Comprehensive Plan City of Allen

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Cottage Grove Road Reconstruction. City of Madison Engineering

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

5-Year Street Reconstruction Plan ( )

Pine Island Road Corridor Master Plan

Prince William Street Project (Grant Avenue to Wellington Road)

Germantown Forward Status Report to the Planning Board M NCPPC

UNIVERSITY CITY AREA PLAN. Volume Two: Implementation Plan

Civic Center District

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

FDOT D4 Complete Streets

FY Capital Improvement Program Arroyo Projects - Central Arroyo Summary

RUTHERFORD NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

Planning Districts INTRODUCTION

Grand Rounds History

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

III - design standards

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

Transcription:

Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000 $30,589,000 $3,810,000 $0 Bid process. This project provides for the design, right of way acquisition, and construction of approximately 28,000 linear feet of 24-inch water transmission main. The project will provide a facility configured to support the educational program and relieve overcrowding in the existing facility as well as provide an enhanced community center. $36,867,800 $9,663,800 $9,068,000 $18,136,000 Schematic design. The project creates a 0.23-mile link from Reece Road to Town Center Boulevard constructed through Ft. Meade property. The extension will intersect the entrance of the Meade Heights Elementary School. 3 H371200/ H371201 Town Center Blvd. to Reece Road $245,000 $245,000 $0 $0 Continued rightof-way negotiations with Army. 4 This project is to design, acquire rights-of-way, and construct roadways, pedestrian and bicycle facilities, and streetscape improvements to grid streets within the Odenton Town Center area (Hale Street, Nevada Avenue, Duckens Street, Dare Street). The contract added Berger Street from Baldwin Road to Nevada Avenue. H563800/ H563801 Odenton Grid Streets $13,795,000 $13,795,000 $0 $0 Schematic Design. Page 1

The project will study the feasibility of relocating the Odenton Road District Yard. 5 C452100 General County Project Planning $255,492 $205,492 $50,000 $0 Initial Study complete and potential sites identified. DPW discussing options and selecting a few sites to investigate further. All surface parking spaces fronting the train platform on the west lot will be placed in a shared-use parking structure. Phase 1 would be creation of temporary use parking spaces to provide continous use during construction. Phase 2 will be comprised of a mix of private residential units and commercial uses. 6 C565500 Odenton MARC Transit Oriented Development (TOD) $19,100,000 $19,100,000 $0 $0 Sketch plan review. Funding for feasibility and preliminary planning for an Odenton Town Center Park. 7 P452500 / P452539 Recreation and Parks Project Plan - Odenton Town Center Park $89,950 $0 $89,950 $0 The Swim Center study is complete. Funding is for a park feasibility study. Page 2

Design and construct teen area for Odenton Library. 8 L479600/ L479649 Odenton Teen Area $127,195 $63,500 $63,695 $0 Project Complete. The Odenton Library is planning an innovation lab for various research and development innovations for the public to access. 8 L479600/ L479655 Odenton Library Innovation Lab $247,015 $33,989 $117,918 $95,108 Notice to proceed issued 1/26/2018. This project will replace approximately 5,303 l.f. of 2" diameter and 1,098 l.f. of 3" diameter water lines in Odenton and Crofton. 9 X733700/ X7337112 Small Diameter Replace Odenton/ Crofton $1,200,000 $500,000 $0 $700,000 Bid and award stage. This project will design, acquire right of way, and construct a sidewalk along Monterey Avenue between Odenton Road and June Drive. 10 H569600/ H569601 Monterey Ave. Sidewalk $1,302,000 $1,302,000 $0 $0 Design notice to proceed was issued in February 2018. Page 3

11 This project is for the design and construction for stormwater management infrastructure improvements necessary to comply with Federal and State clean water requirements. B557800/ B557801 Picture Spring Branch $1,577,189 $1,172,189 $405,000 $0 Schematic Design. This contract is for the construction and inspection of Severn Run SPS upgrades, including expansion of wet well, provisions for storage, wet well cleaning and access. 12 S805900/ S805905 Odenton Town Center - Severn Run Sewage Pump Station Upgrade $4,567,110 $5,003,110 -$436,000.00 $0 Construction complete. Project is in performance period. This contract is the County's contribution for a sidewalk feasibility study along MD 175 from Sappington Station roundabout to MD 170. Funding is not available for future phases. 13 H563700/ H563707 Pedestrian Improvements - SHA $198,000 $198,000 $0 $0 SHA completed feasibility study 9/2018. Project is on priority list. 14 This contract includes the design and construction of Phase 2 of the South Shore Trail utilizing the abandoned WB & A railroad from MD 175 and Sappington Station Road to Bonheur Avenue. The trail will ultimately connect with the Colonial Annapolis Maritime Trail on the east end and the WB & A Trail on the west. The trail will be a component of the East Coast Greenway and the American Discovery Trail. P372000/ P372005 South Shore Trail Phase 2 Design/Constru ction $7,421,357 $2,710,000 $0 $4,711,357 Design development. Page 4

Outside Map Range E569100 Old Mill West HS This project will provide for a new high school within the Old Mill feeder zone. $149,226,000 $0 $0 $149,226,000 The project has not started. Outside Map Range This project is for design, permitting and construction of improvements to the existing multi-use park - Odenton (GORC - Gambrills Odenton Recreation Council) Park. P576200 Odenton Park Improvements $2,791,000 $0 $284,000 $2,507,000 The project has not started. TOTAL $273,409,108 $84,581,080 $13,452,563 $175,375,465 Updated August 2018 Page 5

Capital Projects impacting Odenton Town Center State Highway Administration Project # Description Total Cost The project will seek to improve existing capacity, traffic operations, as well as vehicular MD 198 (West and pedestrian safety along MD 198, while A AA510_11 of MD 295 to supporting existing and planned development $5,803,000 MD 32) in the area. Bicycle and pedestrian access will be provided where appropriate. (BRAC Related) Planning activities on this project are complete. The first breakout phase of the project is Phase 1 (AA510_22) - Russett Green East to Baltimore Washington Parkway placed on hold until additional design and construction funding is available. MD 175 Widen MD 175 from National Business (National Parkway to McCarron Court from two lanes to Business B AA436_23 six lanes and reconfigure ramps at the MD 295 $87,212,000 Parkway to interchange to create signalized left turns at McCarron MD 175. Court) Plans are complete and the project has been advertised for construction. Coordination with utilities in the area of the interchange continues. BGE Gas is relocating the transmission line under MD 295. BGE Electric has resumed relocations over and east of MD 295. Construction of the bridge and roadway is expected to begin in the fall and to be completed in 2023. Page 6

Project # Description Total Cost The study will seek to improve the existing capacity, traffic operations, intermodal connectivity, and vehicular and pedestrian MD 175 (MD safety of MD 175, while supporting existing C AA436_21 295 to MD and planned development in the area. In $7,726,000 170) addition, this project will serve to accommodate future transportation needs in and around Fort Meade, and it will improve connectivity between Odenton and MD 295. MD 175 from Disney to Reece Road is now under construction. MD 175 (West Widen MD 175 from Disney Road to Reece of Reece Road Road, from the existing two/four lane roadway D AA436_54 $19,280,000 to East of to a six lane roadway (1.1 miles). Bicycle and Disney Road) pedestrian facilities will be provided. Contractor has finished the new F-Line Road and is now opened to traffic. Water main tie in complete at both Reese and McArthur roads. The storm drain installation at McArthur road is nearing completion. Contractor continues to work on road grading and Graded Aggregate Base stone placements from Clark to Reese Road. Utility relocation continues. Project estimated completion date is Spring 2020. MD 175 Construct intersection capacity improvements (Reece Road at Mapes Road/Charter Oaks Boulevard and E AA580_56 and Mapes Reece Road (0.6 miles). (BRAC intersection $17,854,000 Road/Charter Oaks Boulevard) improvement) This project includes construction of a new security fence and tree buffer along Fort Meade's property. Contractor continues to install curb, gutter, sidewalks, and storm drain.construction to be complete Summer 2019. Page 7

Project # Description Total Cost MD 175 Converting the existing four lane roadway to a F AA436_25 (Mapes Road six-lane highway. The new roadway will include $7,726,000 to MD 32) a raised median, sidewalk and shared-use path. Conceptual storm water management plans have been approved. Roadway plans are 30 percent complete. Future phases of this project are currently unfunded. Updated August 2018 Page 8