City of Los Angeles C ALIFORNIA

Similar documents
City of Los Angeles C ALIFORNIA

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA NOTICE OF EXTENSION

NOTICE OF. February 3, the Lead. by outside submitted. Project. of the Scoping ERIC MAYOR CALIFORNIA EXECUTIVE OFFICES

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

Notice of Preparation

September 20, 2017 ENV EIR

Proposed General Plan Amendments to the Southeast Los Angeles Community Plan, Framework Element and Circulation Element (CPC CPU)

March 29, Angels Landing Project Angels Landing Partners, LLC

December 18, January 14, 2019, 5:00 P.M. 7:00 P.M. See below for additional information.

Notice of Preparation

CITY OFLOS ANGELES CALIFORNIA

City of Los Angeles CALIFORNIA

DEPARTMENT OF CITY PLANNING

City of Los Angeles CALIFORNIA

Notice of Preparation

CALIFORNIA ERIC GARCETTI MAYOR NOTICE OF PREPARATION. Responsible Agencies, Trustee Agencies, Stakeholders, and Interested Parties

February 26, 2018 ENVIRONMENTAL CASE NO.: ENV EIR PROJECT NAME:

City of Los Angeles CALIFORNIA

PLANNING DEPARTMENT TRANSMITTAL TO THE CITY CLERK S OFFICE

CITY OF ALHAMBRA DEVELOPMENT SERVICES DEPARTMENT 111 S. First Street. Alhambra, CA (626) FAX (626)

MEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING: VERMONT CORRIDOR PROJECT

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

5.15 PUBLIC SERVICES Fire Protection and Emergency Services. 5. Environmental Analysis REGULATORY FRAMEWORK.

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT

RECIRCULATED NOTICE OF PREPARATION/NOTICE OF PUBLIC SCOPING MEETING

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

Inglewood Transit Connector Environmental Impact Report Scoping Meeting July 26, 2018

City of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters

II. PROJECT DESCRIPTION

A 3: Scoping Meeting Materials

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE WEST BROADWAY SPECIFIC PLAN COMMENT PERIOD

Food Waste Digestion in Water and Sludge. Daniel Gary, Rob Morton and Chi-Chung Tang

3.10 LAND USE PLANNING

PUBLIC EIR SCOPING MEETING

Project facts that will help me to understand the I-710 Corridor Project and DEIR/EIS

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

County of Los Angeles

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

Public Hearing April 12, Information as of April 12, 2018

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

Project Facts about the I-710 Corridor Project and RDEIR/SDEIS

Private On Site Fire Hydrant N/A N/A Fire Flow Requirements Private On Site Fire Sprinkler System

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

NOTICE OF PREPARATION

BROOKE PETERSON, AICP Associate Principal

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

5.10 LAND USE AND PLANNING

III. PROJECT DESCRIPTION

CITY OF LOS ANGELES CALIFORNIA NOTICE OF PREPARATION

City of Del Mar. Del Mar Resort Specific Plan Environmental Impact Report Notice of Preparation

3.0 Project Description

II. PROJECT DESCRIPTION

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

RECOMMENDATION REPORT

City of Los Angeles Department of Public Works

NOTICE OF PREPARATION

Notice of Preparation and Notice of Public Scoping Meeting. At Dublin Project

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT

SECTION 2.0 INTRODUCTION

TRADER JOES Riverside Dr. Trader Joes offer a variety of food from around the world conveniently located within Toluca Lake Village.

ENVIRONMENTAL IMPACT ANALYSIS PUBLIC SERVICES: FIRE PROTECTION 1. INTRODUCTION

Parts Standardization & Management Committee (PSMC)

DRAFT ENVIRONMENTAL IMPACT REPORT NORTH HOLLYWOOD-VALLEY VILLAGE COMMUNITY PLAN AREA

Appendix A: Notice of Preparation and Responses

TENTATIVE TRACT MAP NO (stamped map dated June 11, 2014.) PLANNING DEPARTMENT STAFF REPORT

Planning Commission Report

NOTICE OF PREPARATION

NOTICE OF PREPARATION

2 Project Description

Adam R. Lid Addendum to Proposed Amendments List for Mobility Plan 2035

Ripley East. Sketch Plan Amendment No A Preliminary Plan No Site Plan No MONTGOMERY COUNTY PLANNING DEPARTMENT

REPORT TO COUNCIL City of Sacramento

- INVITATION - COURTESY INFORMATIONAL MEETING

Errata 1 Landmark Apartments Project Final Environmental Impact Report

APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS

City of Los Angeles CALIFORNIA

APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS-HANDWORK

ADVISORY BOARD OAKLAND, CA ADVISORY BOARD MEMBERS: October 17, 2005 Regular Meeting

AGENDA 07/14/11 PLANNING COMMISSION Meeting

,4Li/;{ a &a~/,2- 'Randa M. Hanna, Commission Executive Assistant South Valley Area Planning Commission

2.0 PROJECT DESCRIPTION

los Angeles City Planning Commission

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

PRIME RESTAURANT/RETAIL SPACE FOR LEASE

IV.B. VISUAL RESOURCES

Division of Land / Environmental Review. Volume I FINAL ENVIRONMENTAL IMPACT REPORT WEST LOS ANGELES COMMUNITY PLAN AREA

IV. ENVIRONMENTAL IMPACT ANALYSIS I. PUBLIC SERVICES 1. FIRE PROTECTION

II. PROJECT DESCRIPTION

CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707)

Call to Artists Public Art for Los Angeles Metro Stations

3.0 PROJECT DESCRIPTION

Roy L. Wickland 15 Belvedere Avenue - Belvedere, CA 94920

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

EXHIBIT "A" PROJECT DESCRIPTION Vibiana Development Project

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

Transcription:

DEPARTMENT OF CITY PLANNING - CITY PLANNING COMMISSION DAVID H. J. AMBROZ PRESIDENT RENEE DAKE WILSON VICE-PRESIDENT ROBERT L. AHN CAROLINE CHOE RICHARD KATZ JOHN W. MACK SAMANTHA MILLMAN VERONICA PADILLA-CAMPOS DANA M. PERLMAN - JAMES K. WILLIAMS COMMISSION EXECUTIVE ASSISTANT II (213) 978-1300 City of Los Angeles C ALIFORNIA ERIC GARCETTI MAYOR March 6, 2017 EXECUTIVE OFFICES 200 N. SPRING STREET, ROOM 525 LOS ANGELES, CA 90012-4801 VINCENT P. BERTONI, AICP DIRECTOR (213) 978-1271 KEVIN J. KELLER, AICP Deputy Director (213) 978-1272 LISA M. WEBBER, AICP DEPUTY DIRECTOR (213) 978-1274 JAN ZATORSKI DEPUTY DIRECTOR (213) 978-1273 http://planning.lacity.org NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING Note: A Notice of Preparation (NOP) was sent out for the project that is the subject of this notice on March 2, 2017. However, due to a mailing error, a revised NOP for the project is being sent to inform the public of the NOP comment period from March 6, 2017 to April 5, 2017. No changes to the project have been made since distribution of the NOP on March 2, 2017. CASE NO.: ENV-2016-3480-EIR PROJECT NAME: 2110 Bay Street Mixed-Use Project PROJECT APPLICANT: Bay Capital Fund, LLC PROJECT LOCATION/ADDRESS: 2100, 2130 Bay Street and 2141 Sacramento Street, Los Angeles, California 90021 COMMUNITY PLANNING AREA: Central City North COUNCIL DISTRICT: 14, Jose Huizar DUE DATE FOR PUBLIC COMMENTS: 4:00 pm, April 5, 2017 PUBLIC SCOPING MEETING: Thursday, March 16, 2017. See below for location. Pursuant to the California Environmental Quality Act (CEQA) Guidelines Section 15082, once the Lead Agency decides to prepare an Environmental Impact Report (EIR) for a project, a Notice of Preparation (NOP) describing the project and its potential environmental effects shall be prepared. You are being notified of the City of Los Angeles intent, as Lead Agency, to prepare an EIR for this Project, which is located in an area of interest to you and/or the organization or agency you represent. This EIR will be prepared by outside consultants and submitted to the Department of City Planning, Environmental Analysis Section, for independent review and certification. The Department of City Planning requests your comments as to the scope and content of the EIR. Comments must be submitted in writing pursuant to directions below. If you represent an agency, the City is seeking comments as to the scope and content of the environmental information in the document which is germane to your agency s statutory responsibilities in connection with the proposed Project. Your agency will need to use the EIR prepared by our agency when considering your permit or other approval for the Project. A Scoping Meeting will be held to receive input from the public as to what areas the EIR should study. No decisions about the Project are made at the Scoping Meeting. The project description, location, and the potential environmental effects identified thus far are set forth in this document. Also included below are the date, time, and location of the Scoping Meeting that will be held in order to solicit input regarding the content of the Draft EIR. The Scoping Meeting is in an open house format. THIS IS NOT THE REQUIRED PUBLIC HEARING FOR MUNICIPAL CODE ENTITLEMENT REQUESTS which will be scheduled after the completion of the EIR.

The environmental file is available for review at the Department of City Planning, 200 North Spring Street, Room 750, Los Angeles, CA 90012. A copy of the Initial Study prepared for the Project is not attached but may be viewed online at http://planning.lacity.org by clicking on the Environmental Review tab, then Notice of Preparation & Public Scoping Meetings. PROJECT LOCATION: 2100, 2130 Bay Street and 2141 Sacramento Street, Los Angeles, California 90021. The Project Site is located east of Santa Fe Avenue, between Bay Street to the north and Sacramento Street to the south. The Project Site is approximately 77,432 square feet (or 1.78 acres). The Site is subject to Zoning Information (ZI) ZI-2129 East Los Angeles State Enterprise Zone, ZI-2358 River Improvement Overlay District, ZI-2452 Transit Priority Area in the City of Los Angeles, ZI-2427 Freeway Adjacent Advisory Notice for Sensitive Uses, and Zi-2317 Central Industrial Redevelopment Project. PROJECT DESCRIPTION: The Project Site is currently developed with an existing surface parking lot, an open-air industrial shed to be incorporated into the new development, and an approximately 4,000 square feet manufacturing building to be demolished. The Project proposes a new residential and commercial development including 110 live/work apartment units (67 studio units, 34 1-bedroom units, and 9 2-bedroom units), 113,350 square feet of creative office space, and 50,848 square feet of new commercial space that may include commercial retail, and/or restaurant floor area. The Project would include several buildings with connections via pedestrian walkways, ground floor plazas and elevated terraces. Parking would be provided on-site on multiple subterranean floors, with access/egress via a driveway intersecting the north side of Sacramento Street, east of Santa Fe Avenue, and egress only via a driveway intersecting the south side of Bay Street, east of Santa Fe Avenue. A loading driveway and trash/utility access would be provided adjacent to the egress-only driveway on Bay Street. Another loading driveway would be located on Sacramento Street, just east of Santa Fe Avenue. The Project would provide 479 vehicle parking spaces. The requested floor-area-ratio (FAR) is 3.9:1 (287,137 square feet), made of 114,825 square feet live/work, 113,350 square feet office, 50,848 square feet commercial, and 8,114 square feet covered ancillary space. The proposed Live/Work Building will be 139 feet (149 feet with the elevator tower), the proposed Retail Building will be 27 feet, and the proposed Office Building will be 90.5 feet (100.5 feet with the elevator tower). REQUESTED PERMITS/APPROVALS: 1. Pursuant to Los Angeles Municipal Code (LAMC) Section 11.5.6, as authorized by the Los Angeles Charter Section 555, the Applicant requests approval of General Plan Amendments to permit the construction of a new mixed use project containing a maximum of 110 Live/Work Units ( LW ), 11% of the base density or 11 units will be set aside as Restricted Affordable units at a Very Low Income level, approximately 50,848 square feet of commercial space and 113,350 square feet of creative office space. The Amendments include: a. To revise the land use designation in the Central City North Community Plan from Heavy Industrial to Commercial Industrial. b. The deletion of Community Plan Footnote s 1 (Height District No. 1) and 6 (For properties designated on zoning maps as Height District Nos. 1, 1L, 1VL, or 1XL (or their equivalent), development exceeding a floor area ratio of 1:5:1 up to 3:1 may be permitted through a zone change height district change procedure, including an environmental clearance from the Industrial land use category to accommodate a 2 Height District in the CM zone. 2. Pursuant to LAMC Section 12.32 F and Q, the Applicant requests approval of a Vesting Zone and Height District change from M3-1-RIO (Heavy Industrial Zone) to CM-2-RIO (Commercial Manufacturing Zone in Height

District 2) to permit the construction of a new mixed use project containing a maximum of 110 Live/Work Units ( LW ), 11% of the base density or 11 units will be set aside as Restricted Affordable units at a Very Low Income level, approximately 50,848 square feet of commercial (retail) space and 113,350 square feet of creative office space. 3. Pursuant to LAMC Section 16.05, the Applicant requests the approval of Site Plan Review findings. 4. Pursuant to California Government Code Sections 66473.1 AND 66474 (Subdivision Map Act) and LAMC, Section 17.00 of Article 7 (Division of Land), the Applicant requests approval of a Vesting Tentative Tract Map to merge all lots into one development site. a. Pursuant to LAMC Section 17.03 A, the request also includes an adjustment of less than 20% in the CM lot area requirements (1 per 800 square feet of lot area) to permit a density equal to one unit per 712 square feet of lot area (11%). 5. Pursuant to various sections of the LAMC, the Applicant will request approvals and permits from the Building and Safety Department (and other municipal agencies) for project construction actions including, but not limited to the following: demolition, excavation, shoring, grading, foundation, building, and tenant improvements. 6. Pursuant to California Environmental Quality Act, certification of the Project s Environmental Impact Report. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: Aesthetics; Air Quality; Cultural Resources; Geology/Soils; Greenhouse Gas Emissions; Hazards/Hazardous Materials; Hydrology/Water Quality; Land Use/Planning; Noise; Population, Housing & Employment; Public Services (Fire, Police, Schools, Recreation & Parks, Libraries); Recreation; Transportation/Traffic; Tribal Cultural Resources, and Utilities/Service Systems (Water, Wastewater, Solid Waste, Energy Demands). PUBLIC SCOPING MEETING: A public scoping meeting in an open house format will be held to receive public comment regarding the scope and content of the environmental analysis to be included in the Draft EIR. City staff, environmental consultants and project representatives will be available, but no formal presentation is scheduled. You may stop by at any time between 5:00 pm and 7:00 pm to view materials, ask questions, and provide comments. The Department of City Planning encourages all interested individuals and organizations to attend this meeting. The location, date, and time of the public scoping meeting for this Project are as follows: Date: Thursday, March 16, 2017 Time: 5:00 PM to 7:00 PM Arrive any time between 5:00 PM to 7:00 PM to speak one-on-one with City staff and Project consultants. Location: 634 Mateo Street, Los Angeles, CA 90021 Free on-site parking will be provided. The enclosed materials reflect the scope of the project (subject to change). The Department of City Planning welcomes and will consider all written comments regarding potential environmental impacts of the project and issues to be addressed in the EIR. Written comments must be submitted to this office by 4:00 PM, April 5, 2017. Written comments will also be accepted at the public scoping meeting described above. Please direct your responses to: Mail: Sergio Ibarra Environmental Analysis Section, Department of City Planning

Proter Ranch San Fernando Lake View Terrace 118 210 5 Angeles National Forest Northridge Van Burbank Nuys 170 North Hollywood Glendale 2 101 Pasadena Encino 134 Toluca 210 Sherman Lake Oaks Eagle South 5 405 110 101 Rock Pasadena West Silver Irwindale Hollywood Lake Alhambra Baldwin Park Beverly Hills Brentwood Beverly Hills 10 Los Angeles Monterey Park 1 City of 60 Industry 10 PROJECT Culver LOCATION Vernon Montebello City Hacienda Baldwin Heights Hills Huntington Pico Park Rivera 605 Santa Monica 90 Inglewood Marina Del Rey 710 Whittier Los Angeles 110 South Gate International Downey Airport El Segund 105 1 Hawthorne Paramount Manhattan Compton Norwalk La Mirada Beach 91 Hermosa 5 Beach Gardena Lakewood Cerritos 107 Redondo Beach Torrance 405 Carson Signal Hill Anaheim Pacific Ocean Rancho Palos Verdes Long Beach Huntington Beach 22 405 0 5 10 Miles Legend Project Site Source: Google Maps, 2016. 0 100 200 Scale (Feet) Figure 1 Regional Map

Legend Project Site Source: Google Maps, 2016. 0 50 100 Scale (Feet) Figure 2 Aerial Map

0 20 40 Source: Studioneleven at Perkowitz+Ruth Arch, 2016. Scale (Feet) Figure 3 Site Plan

3RD STREET P Scoping Meeting Information Date: Time: Location: Thursday, March 16, 2017 5:00 PM to 7:00 PM 634 Mateo Street, Los Angeles, CA Free on-site parking will be provided. PROJECT SITE 0 200 400 Source: Google Maps, 2017. Scale (Feet) Figure 4 Scoping Meeting Location

Figure 5 500-foot Radius Map