FKW PROPERTIES LINDON. Site VINEYARD OREM. Vicinity Map. Timpridge Development 451 East 1000 South Suite A Pleasant Grove, Utah

Similar documents
Florence County Small Commercial Land Disturbance Permit Application

SITE PLAN REVIEW APPLICATION AND CHECKLIST

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Huntington Stormwater Utility

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

THE CITY OF MOBILE, ALABAMA

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Plan Review Checklist

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

PLAN SUBMITTER'S CHECKLIST

Operations and Maintenance Plan

Gloucester County PLAN SUBMITTER'S CHECKLIST

PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"

NPDES - PCSM. Permit Preparation

SITE PLAN REVIEW APPLICATION

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

ENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN

ARTICLE 17 SITE PLAN REVIEW

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Urban Planning and Land Use

City of Sun Prairie Wetland Buffer Reduction Request

PROPOSED DRAINAGE PATTERNS

Deerfield Township Community Development Department

Use of Best Management Practices

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Preventing Storm Water Pollution: What We Can Do

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

Application for Site Plan Review

PLANNED UNIT DEVELOPMENT APPLICATION

LANDSCAPE ORDINANCE PASADENA PLANNING DEPARTMENT (713) FAX (713)

Erosion & Sediment Control Plan Application Form & Checklist

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

CITY OF ZEELAND PLANNING COMMISSION

CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO EAST 124TH AVE WASHINGTON CENTER PKWY WASHINGTON ST PROJECT LOCATION PRIVATE DRIVE

C-10. Disconnected Impervious Surface

Appendix I. Checklists

GRACE CHURCH EXPANSION

TENTATIVE MAP CHECKLIST

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

4. Contractor (and subcontractors if applicable) certification statement(s)

SUBMITTAL REQUIREMENTS: PROJECT DEVELOPMENT PLAN (PDP)

General Location Courtyard at LMH Final Development Plan and Final Plat

Soil Erosion and Sediment Control

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

Case Study Bioretention Installation and Maintenance

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

Lesson 2: Stormwater Best Management Practices (BMPs)

Town of West Point Plan of Development

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer

Landscaping Standards

THENCE NORTH 20 31'13" EAST, A DISTANCE OF 1, FEET ALONG SAID WEST LINE TO THE NORTH LINE OF SAID TRACT A;

Town of Essex Small Site Erosion Control Guide

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

Section 3 Non-Structural BMPs

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18


The following general requirements will be met for all planter box installations:

TO BE FILLED OUT BY APPLICANT

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

2.1.4 Roof Downspout Rain Gardens

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

6. CPRC Group, requests sketch plan review for 70 Pleasant Hill Road, Map R77, Lot 7

Just The Basics: Illicit Discharge. What does it mean to me?

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

L100 LANDSCAPE PLAN L101 SITE PHOTOMETRICS A1 BUILDING ELEVATIONS A2 BUILDING ELEVATIONS A3 BUILDING ISOMETRICS A-2 ARCHITECTURAL FLOOR PLAN

CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO GRANT ST WASHINGTON CENTER PKWY WASHINGTON ST PROJECT LOCATION LAFAYETTE ST PENNSYLVANIA ST

Chapter 4 - Preparation of Stormwater Site Plans

APPLICATION FOR MINOR SITE PLAN REVIEW

Planning & Zoning Commission Meeting Date: June 18, 2012

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

ARTICLE VI: SITE PLAN REVIEW

CRESCENT RESOURCES INC.

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

Sec Intent and purpose.

Draft Rhode Island Stormwater Design and Installation Standards Manual

Drainage Report. For: Owner/Developer:

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Transcription:

Legend LINDON Site VINEYARD OREM Vicinity Map Planning Department Electricity Developer: 240 East Gammon Rd Vineyard, Utah 84058 Phone (801) 226-1929 Community Development Director - Morgan Brim 385.248.7029 Rocky Mountain Power 70 North 200 East American Fork, Utah 84003 Phone (801) 756-1220 Fax (801) 756-1274 Timpridge Development 451 East 1000 South Suite A Pleasant Grove, Utah 84042 801-785-8025 Engineer: Public Works Department Phone (801) 766-6506 Mark Steele Telephone Dudley and Associates, Inc. 353 East 1200 South Orem, Utah 84058 Public Safety Emergency 911 Utah County Animal Shelter 801-785-3442 Building Inspection Building Inspector George Reid 801.226.1929 Qwest 75 East 100 North Provo, Utah 84606 Phone (801) 356-7050 Cell (801) 473-3385 Kasey Lunt Cable T.V. Site Data: Zone = Total Area = 184,137 sq. ft. 4.23 acres Total number of Units = 3 Parking Requirements: = 1000 sq.ft. Office = 4, 27,000 sq.ft. Warehouse = 31 = 1000 sq.ft. Office = 4, 29,000 sq.ft. Warehouse = 33 = 1000 sq.ft. Office = 4, 29,000 sq.ft. Warehouse = 33 Total Area Total Building / Pad Area Total Hard Surface Area Total Impervious Area Total Landscaped Area Square Footage Tabulation Table Acreage Percent of total 184,137 4.23 100 88,000 2.02 48 70,048 1.61 38 158,048 3.63 86 26,089 0.60 14 Sheet Index 1.0 Cover Sheet 1.1 General Notes 1.2 Demolition Plan 2.0 Site Plan 3.0 Utility Plan P-1 Utility Profile 4.0 Grading and Drainage Plan 5.0, 5.1, 5.2 Detail Sheets Gas Comcast Cable Communications, Inc. 1350 East Miller Avenue Spaces required = 97 Spaces provided = 98 Questar Salt Lake City, Utah 84106 1640 North Mountain Springs Parkway Phone (801) 485-0500 Springville, Utah 84663 Fax (801) 487-1887 Phone (801) 853-6585 Brad Mattinson C - 1.0

Sand Soils Clay Soils C - 1.1

S 00 20'45" E 360.32' PLAT "A" Located in a portion of the Northwest quarter of Section 5, Township 6 South, Range 1 East, Salt Lake Base and Meridian Vineyard City, Utah County Utah LINDON Surveyor's Certificate Boundary Description Site VINEYARD OREM LEGEND East lake Industrial Subdivision No. 2 Parcel A N 90 00'00" E 42.71' Vicinity Map Owner's Dedication C1 C3 C2 C4 LLC : - Manager Owner's Acknowledgement 2 N 00 20'45" W 318.73' 62,770 sq.ft. 55,691 sq.ft. 65,669 sq.ft. 5 Planning Commission Approval Curve Data Table All area within Lots 1,2 & 3 that is not covered by building is to be a Joint Reciprocal Access, Parking and Public Utility Easement in favor of Lots 1, 2 and 3. Acceptance by Legislative Body 253 E 281 E 307 E 333 E 197 E S 89 39'15" W 528.75' Sheet 1 of 1 PLAT "A" Plat Vacation Notice QUESTAR GAS COMPANY Approved this day of, A.D. 20 ROCKY MOUNTAIN POWER Approved this day of, A.D. 20 Including a Vacation of Lots 13 & 14, Phase 1 Amended, Eastlake at Geneva Industrial Business Park : 1" = 40' Prepared by: Dudley and Associates, Inc. 353 East 1200 South Orem, Utah 84058 office fax 801-224-1264 COMCAST CABLE TELEVISION Approved this day of, A.D. 20 QWEST Approved this day of, A.D. 20

C O N C R E T E P A V I N G L = 488.25' R = 2657.04' Chord = 487.56' Bears = N 84 44'09" E Anderson Geneva LLC C O N C R E T E P A V I N G N 89 58'38" E 42.99' N 00 20'45" W 318.77' C O N C R E T E P A V I N G 28,000 sq.ft. 62,696 sq.ft. 55,690 sq.ft. 65,750 sq.ft. C O N C R E T E P A V I N G S 00 20'45" E 360.32' A S P H A L T P A V I N G S 89 39'10" W 528.75' MS Properties Group 4 4Life Properties LLC Site Plan 7-12-2016 1" = 30' C - 2.0

FKW Properties Vineyard Utah Xeriscape Landscaping Xeriscape Landscaping PLANTING SCHEDULE Xeriscape Landscaping 28,000 sq.ft. 62,696 sq.ft. GRASS (TYP) Grass planter area Grass planter area 55,690 sq.ft. GRASS (TYP) Grass planter area 65,750 sq.ft. Grass planter area Xeriscape Landscaping Xeriscape Landscaping Grass Area Landscaping Notes: Xeriscape Landscaping All common area shall be permanently landscaped with trees, shrubs, or ground cover and maintained in accordance with good landscaping practice. All area not covered by buildings or driveways shall be landscaped and watered with an automatic sprinkling system. GRASS GRASS GRASS 3' high Berm 3' high Berm 3' high Berm All Deciduous trees provided = 2" Caliper in size when planted (min). All Evergreen trees provided = Minimum of 6' in height. All shrubs provided = 5 gallon in size when planted. (min). All trees and shrubs placed near any entrance shall be of the nature not to obstruct the sight onto the street. FKW Properties Landscape Plan 7-13-2016 1" = 30' L - C - 2.1

ck ck 65,750 sq.ft. Vineyard 62,696 sq.ft. 55,690 sq.ft. Utility Plan 28,000 sq.ft. Utah ck Do Do ck Do Do 7-12-2016 1" = 30' C - 3.0

Utility Profile Note: Asbuilt location and elevations for 48" CUW pipe was provided by the CUWCD. Contractor to verify location and elevation prior to construction. Contractor to notify engineer of any differences. 9-27-2016 1" = 30' L - P - 1

28,000 sq.ft. 62,696 sq.ft. FFE = 4537.15 55,690 sq.ft. FFE = 4539.38 FFE = 4539.38 65,750 sq.ft. 9-21-2016 (add combo box) Grading and Drainage Plan 7-12-2016 1" = 20' C - 4.0

Storm Water Management Note: The disturbed area of the project = 4.95 Acres and therefore a State UPDES Storm Water General Permit from the Division of Water Quaity is required. BMP's are required to be in place prior to any construction activity. NOTES: This plan is to be used to control storm water runoff and reduce pollutants in storm water runoff until construction is complete and the subject site is in operation. THE FOLLOWING BEST MANAGEMENT PRACTICES (BMP'S) ARE TO BE USED AS A PART OF THE CONSTRUCTION SITE STORM WATER MANAGEMENT PLAN FOR THIS SITE 1. Contaminated or Erodible Surface Areas (CESA) Prevent the discharge, pollutants, and storm water from contaminated or erodible surface areas by maintaining undisturbed site until construction of Phase II is completed. 28,000 sq.ft. 62,696 sq.ft. 55,690 sq.ft. 65,750 sq.ft. 2. Dust Controls (DC) Dust control measures including vegetation, seeding, etc. to stabilize site from wind erosion and reduce dust until site is completely developed. 3. Detention/Infiltration Device Maintenance (DIDM) Detention basin and accompanying facilities will be regularly maintained and corrected to promote effective storm drain pollutant removal for pond, piping, and boxes. 4. Material Storage (MS) Any hazardous, toxic, or chemical substances will be stored and controlled inside building areas. No control substances will be discharged into storm water or sewage systems. 5. Portable Toilets (PT) Temporary on site sanitary facilities will be furnished and maintained during all construction activity until on site facilities are constructed and usable. 6. Stabilized Construction Entrance and Wash Area (SCEWA) A stabilized pad of crushed stone located at the construction entrance as shown will be provided and maintained during all construction activities. 7. Spill Cleanup (SCU) All on site materials used in construction will be maintained on site to prevent harmful materials from entering off site receiving waters. SWPPP 8. Silt Fencing (SF) placed on the perimeter of the project where there is potential runoff from site to adjacent streets, or properties. 7-12-2016 1" = 30' C - 5.0

REVISIONS Detail Sheet Dudley and Associates, Inc. Engineers Planners Land Surveyors 353 East 1200 South Orem, Utah 84058 DATE SCALE not to scale BY TRACING NO. SHEET No. D - 1.0

REVISIONS Detail Sheet Dudley and Associates, Inc. Engineers Planners Land Surveyors 353 East 1200 South Orem, Utah 84058 DATE SCALE not to scale BY TRACING NO. SHEET No. D - 2.0