Legend LINDON Site VINEYARD OREM Vicinity Map Planning Department Electricity Developer: 240 East Gammon Rd Vineyard, Utah 84058 Phone (801) 226-1929 Community Development Director - Morgan Brim 385.248.7029 Rocky Mountain Power 70 North 200 East American Fork, Utah 84003 Phone (801) 756-1220 Fax (801) 756-1274 Timpridge Development 451 East 1000 South Suite A Pleasant Grove, Utah 84042 801-785-8025 Engineer: Public Works Department Phone (801) 766-6506 Mark Steele Telephone Dudley and Associates, Inc. 353 East 1200 South Orem, Utah 84058 Public Safety Emergency 911 Utah County Animal Shelter 801-785-3442 Building Inspection Building Inspector George Reid 801.226.1929 Qwest 75 East 100 North Provo, Utah 84606 Phone (801) 356-7050 Cell (801) 473-3385 Kasey Lunt Cable T.V. Site Data: Zone = Total Area = 184,137 sq. ft. 4.23 acres Total number of Units = 3 Parking Requirements: = 1000 sq.ft. Office = 4, 27,000 sq.ft. Warehouse = 31 = 1000 sq.ft. Office = 4, 29,000 sq.ft. Warehouse = 33 = 1000 sq.ft. Office = 4, 29,000 sq.ft. Warehouse = 33 Total Area Total Building / Pad Area Total Hard Surface Area Total Impervious Area Total Landscaped Area Square Footage Tabulation Table Acreage Percent of total 184,137 4.23 100 88,000 2.02 48 70,048 1.61 38 158,048 3.63 86 26,089 0.60 14 Sheet Index 1.0 Cover Sheet 1.1 General Notes 1.2 Demolition Plan 2.0 Site Plan 3.0 Utility Plan P-1 Utility Profile 4.0 Grading and Drainage Plan 5.0, 5.1, 5.2 Detail Sheets Gas Comcast Cable Communications, Inc. 1350 East Miller Avenue Spaces required = 97 Spaces provided = 98 Questar Salt Lake City, Utah 84106 1640 North Mountain Springs Parkway Phone (801) 485-0500 Springville, Utah 84663 Fax (801) 487-1887 Phone (801) 853-6585 Brad Mattinson C - 1.0
Sand Soils Clay Soils C - 1.1
S 00 20'45" E 360.32' PLAT "A" Located in a portion of the Northwest quarter of Section 5, Township 6 South, Range 1 East, Salt Lake Base and Meridian Vineyard City, Utah County Utah LINDON Surveyor's Certificate Boundary Description Site VINEYARD OREM LEGEND East lake Industrial Subdivision No. 2 Parcel A N 90 00'00" E 42.71' Vicinity Map Owner's Dedication C1 C3 C2 C4 LLC : - Manager Owner's Acknowledgement 2 N 00 20'45" W 318.73' 62,770 sq.ft. 55,691 sq.ft. 65,669 sq.ft. 5 Planning Commission Approval Curve Data Table All area within Lots 1,2 & 3 that is not covered by building is to be a Joint Reciprocal Access, Parking and Public Utility Easement in favor of Lots 1, 2 and 3. Acceptance by Legislative Body 253 E 281 E 307 E 333 E 197 E S 89 39'15" W 528.75' Sheet 1 of 1 PLAT "A" Plat Vacation Notice QUESTAR GAS COMPANY Approved this day of, A.D. 20 ROCKY MOUNTAIN POWER Approved this day of, A.D. 20 Including a Vacation of Lots 13 & 14, Phase 1 Amended, Eastlake at Geneva Industrial Business Park : 1" = 40' Prepared by: Dudley and Associates, Inc. 353 East 1200 South Orem, Utah 84058 office fax 801-224-1264 COMCAST CABLE TELEVISION Approved this day of, A.D. 20 QWEST Approved this day of, A.D. 20
C O N C R E T E P A V I N G L = 488.25' R = 2657.04' Chord = 487.56' Bears = N 84 44'09" E Anderson Geneva LLC C O N C R E T E P A V I N G N 89 58'38" E 42.99' N 00 20'45" W 318.77' C O N C R E T E P A V I N G 28,000 sq.ft. 62,696 sq.ft. 55,690 sq.ft. 65,750 sq.ft. C O N C R E T E P A V I N G S 00 20'45" E 360.32' A S P H A L T P A V I N G S 89 39'10" W 528.75' MS Properties Group 4 4Life Properties LLC Site Plan 7-12-2016 1" = 30' C - 2.0
FKW Properties Vineyard Utah Xeriscape Landscaping Xeriscape Landscaping PLANTING SCHEDULE Xeriscape Landscaping 28,000 sq.ft. 62,696 sq.ft. GRASS (TYP) Grass planter area Grass planter area 55,690 sq.ft. GRASS (TYP) Grass planter area 65,750 sq.ft. Grass planter area Xeriscape Landscaping Xeriscape Landscaping Grass Area Landscaping Notes: Xeriscape Landscaping All common area shall be permanently landscaped with trees, shrubs, or ground cover and maintained in accordance with good landscaping practice. All area not covered by buildings or driveways shall be landscaped and watered with an automatic sprinkling system. GRASS GRASS GRASS 3' high Berm 3' high Berm 3' high Berm All Deciduous trees provided = 2" Caliper in size when planted (min). All Evergreen trees provided = Minimum of 6' in height. All shrubs provided = 5 gallon in size when planted. (min). All trees and shrubs placed near any entrance shall be of the nature not to obstruct the sight onto the street. FKW Properties Landscape Plan 7-13-2016 1" = 30' L - C - 2.1
ck ck 65,750 sq.ft. Vineyard 62,696 sq.ft. 55,690 sq.ft. Utility Plan 28,000 sq.ft. Utah ck Do Do ck Do Do 7-12-2016 1" = 30' C - 3.0
Utility Profile Note: Asbuilt location and elevations for 48" CUW pipe was provided by the CUWCD. Contractor to verify location and elevation prior to construction. Contractor to notify engineer of any differences. 9-27-2016 1" = 30' L - P - 1
28,000 sq.ft. 62,696 sq.ft. FFE = 4537.15 55,690 sq.ft. FFE = 4539.38 FFE = 4539.38 65,750 sq.ft. 9-21-2016 (add combo box) Grading and Drainage Plan 7-12-2016 1" = 20' C - 4.0
Storm Water Management Note: The disturbed area of the project = 4.95 Acres and therefore a State UPDES Storm Water General Permit from the Division of Water Quaity is required. BMP's are required to be in place prior to any construction activity. NOTES: This plan is to be used to control storm water runoff and reduce pollutants in storm water runoff until construction is complete and the subject site is in operation. THE FOLLOWING BEST MANAGEMENT PRACTICES (BMP'S) ARE TO BE USED AS A PART OF THE CONSTRUCTION SITE STORM WATER MANAGEMENT PLAN FOR THIS SITE 1. Contaminated or Erodible Surface Areas (CESA) Prevent the discharge, pollutants, and storm water from contaminated or erodible surface areas by maintaining undisturbed site until construction of Phase II is completed. 28,000 sq.ft. 62,696 sq.ft. 55,690 sq.ft. 65,750 sq.ft. 2. Dust Controls (DC) Dust control measures including vegetation, seeding, etc. to stabilize site from wind erosion and reduce dust until site is completely developed. 3. Detention/Infiltration Device Maintenance (DIDM) Detention basin and accompanying facilities will be regularly maintained and corrected to promote effective storm drain pollutant removal for pond, piping, and boxes. 4. Material Storage (MS) Any hazardous, toxic, or chemical substances will be stored and controlled inside building areas. No control substances will be discharged into storm water or sewage systems. 5. Portable Toilets (PT) Temporary on site sanitary facilities will be furnished and maintained during all construction activity until on site facilities are constructed and usable. 6. Stabilized Construction Entrance and Wash Area (SCEWA) A stabilized pad of crushed stone located at the construction entrance as shown will be provided and maintained during all construction activities. 7. Spill Cleanup (SCU) All on site materials used in construction will be maintained on site to prevent harmful materials from entering off site receiving waters. SWPPP 8. Silt Fencing (SF) placed on the perimeter of the project where there is potential runoff from site to adjacent streets, or properties. 7-12-2016 1" = 30' C - 5.0
REVISIONS Detail Sheet Dudley and Associates, Inc. Engineers Planners Land Surveyors 353 East 1200 South Orem, Utah 84058 DATE SCALE not to scale BY TRACING NO. SHEET No. D - 1.0
REVISIONS Detail Sheet Dudley and Associates, Inc. Engineers Planners Land Surveyors 353 East 1200 South Orem, Utah 84058 DATE SCALE not to scale BY TRACING NO. SHEET No. D - 2.0