MEMORANDUM. Re: A3680, New Jersey Economic Opportunity Act of 2013

Similar documents
IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

Living in Albemarle County s Urban Places

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

This page has been intentionally left blank.

BLOOMSBURY BOROUGH. Regional Master Plan Overlay Zone Designation. 1 inch = 0.28 miles. Zone. Sub-Zone FRANKLIN TOWNSHIP GREENWICH TOWNSHIP

Outlawing Sprawl. Pennsylvania Chapter American Planning Association October 6, 2009

ASSEMBLY, No. 475 STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION

WEST WESTFIELD AVENUE REDEVELOPMENT PLAN I BOROUGH OF ROSELLE PARK

Rural Land Use Designations Kittitas County December 6, 2007 Draft

Statewide Greenways Vision

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

APPENDIX 1 - STEERING COMMITTEE ISSUES RESPONSE SUMMARY (WORKSHOP N'p. 1)

INTRODUCTION. b. The extent to which such problems and objectives have been reduced or have increased subsequent to such date.

2002 MASTER PLAN REEXAMINATION REPORT

Town of Peru Comprehensive Plan Executive Summary

I. STAFF POLICY RECOMMENDATIONS. The following RMP policy strategies are proposed by staff in support of a Scenic Resource Protection Program:

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

6. Consistency with Local Plans

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Peel Region. Greenbelt Plan Conformity. Plan Review. Background & Approach

Chapter 1 Vision Statement & Goals

OPEN SPACE CHAPTER 7: OVERVIEW. Preserve open space to protect natural resources, enhance character and provide passive recreation opportunities

Sorted citizen input comments in review of Blount County plans July, August, and September 2007

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Section XI RELATIONSHIP TO OTHER PLANS

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

Goal 14 Urbanization

4 Sustainability and Growth Management

HIGHLANDS ELEMENT MASTER PLAN SUPPLEMENT TOWNSHIP OF CHESTER MORRIS COUNTY, NEW JERSEY

LU Encourage schools, institutions, and other community facilities that serve rural residents to locate in neighboring cities and towns.

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

Appendix A- A - Relief sought

A Growing Community Rural Settlement Areas

Edward R. Sajecki Commissioner of Planning and Building

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

VILLAGE & TOWN OF BERGEN: COMPREHENSIVE PLAN

A New Plan For The Calgary Region June calgary.ca call 3-1-1

CHAPTER 4 FUTURE LAND USE AND URBAN SERVICES DISTRICTS

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

GENERAL PLAN UPDATE ISSUES MEETING. January 21, 2010 City Hall Mitchell Room 6:00 pm 9:00 pm

Chapter 5: Natural Resources and Environment

Proposed Water Ski Wakeboard Cable Park (former Cedar Run Horse Park) Kevin Bechard Deputation to Committee of the Whole June 4, 2018

CAMPUS MASTER PLAN, AMENDMENTS

CHAPTER 12 IMPLEMENTATION

Source: Albemarle County Community Development 2010

Planned Development Review Revisions (Project No. PLNPCM )

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

[Third Reprint] ASSEMBLY, No. 516 STATE OF NEW JERSEY. 211th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2004 SESSION

Intergovermental Coordination

Master Plan for Preservation and Scenic Conservation (1995)

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

Mill Woods Town Centre Proposed Rezoning LDA

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

NEW CASTLE COUNTY S ZONING DISTRICTS

Growth Management Planning in the Central Puget Sound Region. Today s Presentation. Puget Sound Region. New Partners for Smart Growth

The protection of the agricultural resources of the Province;

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator

Chair and Members of the Planning, Public Works and Transportation Committee. Tara Buonpensiero, Senior Planner Policy, MCIP, RPP

Land Use Plan Element Of the Greenwich Township Master Plan

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8B5

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

County of Haliburton. Effective March 14, 2006

Green Infrastructure. by Karen Engel, NYS DEC. NYS Department of Environmental Conservation

TOWNSHIP OF MONTGOMERY MASTER PLAN MASTER PLAN AND DEVELOPMENT REGULATIONS PERIODIC REEXAMINATION REPORT December 5, 2008

Highlands Region Stormwater Management Program Guidance

Introducing the Main Street Strategic Toolbox

Green Infrastructure: Implementation at the Community Level

DRAFT MAP AMENDMENT FLU 04-4

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

TABLE OF CONTENTS. Transportation Chapter 1 - Introduction and Purpose of Planning to 1-3. Utilities

Preface. Erie. Scranton. Allentown. Pittsburgh. Harrisburg. Philadelphia

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

OFFICIAL PLAN FOR THE TOWN OF NEW TECUMSETH

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109

RESILIENT COMMUNITIES PROJECT CITY OF MINNETONKA

Gloucester County s Comprehensive Plan. The Community Connection

Capital Area Regional Planning Commission. DANE COUNTY LAND USE & TRANSPORTATION PLAN Amended Goals and Objectives

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Local Growth Planning in North Central Green Line Communities

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

Getting and Giving the Most

TOWN OF SAUGEEN SHORES OFFICIAL PLAN

6.0 Conclusions & Recommendations

ALBEMARLE COUNTY CODE CHAPTER 18 ZONING SECTION 20A NEIGHBORHOOD MODEL - NMD

Intents and Purposes of Select Florida Statutes Dealing With Land Use and Development

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

Rappahannock- Rapidan Regional Commission

Northern Territory Compact Urban Growth Policy

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016)

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

Municipal Action Teams

Growth Management: Common Value 2 of Community Character

Appendix A. Planning Processes. Introduction

Jefferson Township Highlands Preservation Area Master Plan Element

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

The Floyds Fork Area Study A Framework for Growth

Transcription:

New Jersey Conservation Foundation NJ Highlands Coalition Association of New Jersey Environmental Commissions (ANJEC) American Littoral Society Burnham Park Association Musconetcong Mountain Conservancy New Jersey Audubon NJ League of Conservation Voters NY/NJ Baykeeper NJ League of Women Voters Pinelands Preservation Alliance Raritan Headwaters Assoc. Stony Brook-Millstone Watershed Association MEMORANDUM Date: April 3, 2013 To: Assemblyman Prieto, Chair, Assembly Budget Committee Assemblyman Schaer, Vice Chair, Assembly Budget Committee Assembly Budget Committee Members: Assemblypersons Brown, Bucco, Burzichelli, Coutinho, Johnson, O Scanlon, Singleton, Watson Coleman, Webber, Wimberly Assemblyman Coutinho, Chair, Assembly Commerce and Economic Development Committee Assemblyman Gusciora, Vice Chair, Assembly Commerce and Economic Development Committee Primary Sponsors: Assemblyman Coutinho, Assemblyman Singleton, Assemblywoman Watson Coleman, Assemblyman Ramos, Assemblyman Green, Assemblyman Bramnick, Assemblyman Bucco, Assemblyman Conaway Co-Sponsors: Assemblyman Burzichelli, Assemblyman Coughlin, Assemblywoman Stender, Assemblyman Fuentes, Assemblywoman Mosquera, Assemblywoman Riley, Assemblywoman Lampitt, Assemblywoman Munoz From: Alison Mitchell, Policy Director and Wilma Frey, Sr. Policy Manager, NJ Conservation Foundation alison@njconservation.org 908-234-1225 x 107 wilma@njconservation.org 908-234-1225 x 131 Sandy Batty, Executive Director, ANJEC sbatty@anjec.org 973-539-7547 Elliott Ruga, NJ Highlands Coalition elliott@njhighlandscoalition.org 973-588-7190 x 2 Jaclyn Rhoads, Pinelands Preservation Alliance jaclyn@pinelandsalliance.org 609-859-8860 x 18 Re: A3680, New Jersey Economic Opportunity Act of 2013 Thank you for the opportunity to offer amendments to A-3680 (outlined on page 2). We appreciate the desire to rejuvenate and support economic development in New Jersey; however, we have concerns about where A3680 targets these efforts. There is general consensus that the state should support smart growth, and not support sprawl development. Both the 2001 State Plan and the proposed Strategic Growth Plan make this point. 1

Smart growth means supporting development and redevelopment in our cities, inner suburbs and industrial areas areas where infrastructure already exists, including water supply, access to sewers, and transportation, especially mass transit, rail, and bus service. 1. Smart growth has traditionally comprised State Planning Areas PA1 (Urban), PA2 (Suburban) and designated Centers. We urge that the bill conform its target priority and incentive areas to smart growth areas as so defined, and that PA 3, PA4a, PA4b and PA5 be removed from the legislation. 2. We are deeply concerned that some specifics of this legislation conflict with the previously enacted Pinelands Protection Act and Highlands Water Protection and Planning Act and with their mandated regional plans that support smart growth -- the Pinelands Comprehensive Management Plan and the Highlands Regional Master Plan. 2a. In the Pinelands, all incentive areas should be in accordance with the Pinelands Comprehensive Management Plan. Villages, which are generally small and residential, are not appropriate locations for the incentives envisioned and should be removed from the bill. The regional growth areas and Towns are the appropriate focus in the Pinelands region. Villages are recognized in the Pinelands Act as discrete settlements that are to be retained for their rural, community character. 2b. In the Highlands Region, the planning area is inappropriate as a broad categorical focus for the bill s incentives. Rather, the bill should direct its incentives to areas in the Planning Area that were identified in the adopted 2008 Highlands Regional Master Plan developed pursuant to Sections 10 and 11 of the Highlands Act. (See Attachment A) Appropriate areas for the bill to include are the Planning Area Existing Community Zone and Highlands Designated Centers. The Highlands Regional Master Plan apportioned the Planning Area into zones based on updated, verified, detailed data and analysis, responding to the Highlands Act required resource assessment. (See Attachment B) The Planning Area Existing Community Zone is the zone that is appropriate for the development incentives in A3680, along with the centers designated by the Highlands Council, so long as there is adequate water and sewer infrastructure capacity to support new growth. The other Zones are the Protection Zone and the Conservation Zone, and 3 smaller Environmentally Sensitive Subzones, all of which are inappropriate areas to focus the development incentives in the bill. We respectfully ask you to amend the bill to remove inappropriate areas from the incentive and priority areas in this legislation, and insert appropriate language that references the Highlands Act and its Regional Master Plan. Thank you very much for your consideration of our comments and amendments. We look forward to working with you on changes as the bill moves forward. Proposed Amendments to A.3680, the NJ Economic OpportunityAct of 2013: 6. Section 2 of P.L.2011, c.149 (C.34:1B-243) is amended to read as follows: (Please similarly amend definitions located elsewhere in the legislation.) 2. As used in [this act] P.L.2011, c.149 (C.34:1B-242 et seq.): 2

"Qualified incentive area" means [an] any area designated pursuant to P.L.1985, c.398 (C.52:18A- 196 et seq.) as Planning Area 1 (Metropolitan), Planning Area 2 (Suburban), [or any urban, regional, or town] DELETE: [Planning Area 3 (Fringe Planning Area), or Planning Area 4A (Rural Planning Area)], a designated center under the State Development and Redevelopment 1 Plan [; an area zoned for development pursuant to] ; or a designated growth center in an endorsed plan until June 30, 2013, or until the State Planning Commission revises and readopts New Jersey s State Strategic Plan and adopts regulations to refine this definition as it pertains to Statewide planning areas, whichever is later; a smart growth area and planning area designated in a master plan adopted by the New Jersey Meadowlands Commission... a regional growth area DELETE: [village, and] or Town designated in the comprehensive management plan prepared and adopted by the Pinelands Commission pursuant to section 7 of the "Pinelands Protection Act," P.L.1979, c.111 (C.13:18A-8); DELETE: [the planning area of the Highlands Region as defined in section 3 of the "Highlands Water Protection and Planning Act," P.L.2004, c.120 (C.13:20-3), and] INSERT: the Planning Area Existing Community Zone designated in the 2008 Highlands Regional Master Plan pursuant to sections 10 and 11 of P.L. 2004, c. 120 (C.13:20-10 and 11), the Highlands Water Protection and Planning Act and any Highlands center designated by the Highlands Water Protection and Planning Council, established pursuant to section 4 of P.L.2004, c.120 (C.13:20-4);. "Qualified incentive area" shall not include an area designated pursuant to the State Development and Redevelopment Plan adopted, as of the effective date of P.L.2008, c.78, pursuant to P.L.1985, c.398 (C.52:18A-196 et seq.) as INSERT: Planning Area 3 (Fringe), Planning Area 4A (Rural), Planning Area 4B (Rural/Environmentally Sensitive) or Planning Area 5 (Environmentally Sensitive), DELETE: [except for any area within Planning Area 4B or Planning Area 5 that is a deep poverty pocket, a designated center or a designated growth center in an endorsed plan, the site of a qualified incubator facility, transit oriented development, disaster recovery project, tourism destination project, or any federally owned land approved for closure under a federal Base Realignment Closing Commission action, 1 or any [property consisting of a] vacant commercial building having over 400,000 square feet of office, laboratory, or industrial space available for occupancy for a period of over one year or [is] any site that has been negatively impacted by the approval of a "qualified business facility," as defined pursuant to section 2 of P.L.2007, c.346 (C.34:1B-208).] INSERT: nor shall it include the Protection Zone, the Conservation Zone, or any of the Environmentally Sensitive Sub-Zones delineated by the 2008 3

Highlands Regional Master Plan pursuant to sections 10 and 11 of P.L. 2004, c. 120 (C.13:20-10 and 11), the Highlands Water Protection and Planning Act. ATTACHMENT A Excerpts from the Highlands Water Protection and Planning Act that dictate the goals and contents of the Highlands Regional Master Plan with reference to the Planning Area (P.L.2004, c. 120) C13:20-10 Goals of Regional Master Plan 10. a. The goal of the regional master plan with respect to the entire Highlands Region shall be to protect and enhance the significant values of the resources thereof in a manner which is consistent with the purposes and provisions of this act. c. The goals of the regional master plan with respect to the planning area shall be to: (1) protect, restore, and enhance the quality and quantity of surface and ground waters therein; (2) preserve to the maximum extent possible any environmentally sensitive lands and other lands needed for recreation and conservation purposes; (3) protect and maintain the essential character of the Highlands environment; (4) preserve farmland and historic sites and other historic resources; (5) promote the continuation and expansion of agricultural, horticultural, recreational, and cultural uses and opportunities; (6) preserve outdoor recreation opportunities, including hunting and fishing, on publicly owned land; (7) promote conservation of water resources; (8) promote brownfield remediation and redevelopment; (9) encourage, consistent with the State Development and Redevelopment Plan and smart growth strategies and principles, appropriate patterns of compatible residential, commercial, and industrial development, redevelopment, and economic growth, in or adjacent to areas already utilized for such purposes, and discourage piecemeal, scattered, and inappropriate development, in order to accommodate local and regional growth and economic development in an orderly way while protecting the Highlands environment from the individual and cumulative adverse impacts thereof; and (10) promote a sound, balanced transportation system that is consistent with smart growth strategies and principles and which preserves mobility in the Highlands Region. 4

ATTACHMENT B Resource Assessment required by the Highlands Act (PL 2004, Chapter 120) C.13:20-11 Contents of regional master plan 11. a. The regional master plan shall include, but need not necessarily be limited to: (1) A resource assessment which: (a) determines the amount and type of human development and activity which the ecosystem of the Highlands Region can sustain while still maintaining the overall ecological values thereof, with special reference to surface and ground water quality and supply; contiguous forests and woodlands; endangered and threatened animals, plants, and biotic communities; ecological factors relating to the protection and enhancement of agricultural or horticultural production or activity; air quality; and other appropriate considerations affecting the ecological integrity of the Highlands Region; and (b) includes an assessment of scenic, aesthetic, cultural, historic, open space, farmland, and outdoor recreation resources of the region, together with a determination of overall policies. 5