Center of Competence Refrigeration and Air conditioning

Similar documents
R E P O R T W R G D I N E N

R E P O R T D I N E N

Modular air-handling units

TSEK VHR EC HEAT RECOVERY UNITS

Heat Recovery Units. Heat Recovery 1

Heat Recovery ventilation Dee Fly Cube 550 Field of application Description Advantages Range Technical details Installation Remote controls Servicing

Acoustic Verification Report

KN-KWL 110 SE-EC Kontrollierte Wohnraumlüftung KN

Climate Control System

COMMERCIAL ENERGY SAVINGS GUIDE

Instructions for the BASIC Air Handling System, Sizes General 1.1 Description of the System

A MEMBER OF MUHIBBAH ENGINEERING

Separating Ventilation and Temperature Regulation

A MEMBER OF MUHIBBAH ENGINEERING

CONTENTS. Page 1. THE DRYPAC SYSTEM - CUSTOM MADE 1 2. PRINCIPLE OF OPERATION 2 3. CONTROLS 4 4. FLEXIBILITY 6 5. DRYPAC OPTIONS 7

Gemini EC. Engineered with Excellence, Specified with Confidence All-in-One Renewable Energy Climate Control

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume

VIESMANN VITOVENT 300-F Mechanical ventilation system with heat recovery

Air Handling Units. T F E.

Trane Performance Climate Changer Air Handlers. An air handler for every need.

AIR COMPACT. Air handling units. Ultra high performance USE RANGE DESCRIPTION

HEAT RECOVERY UNITS TSEK. Mech-Elec, 41, Hawthorn Road, Western Ind. Est., Dublin 12 Tel:

9. Check condensate piping for sagging and/or leakage. Repair any sags or leaks before restoring power to the appliance.

Single Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

AIR HANDLING UNITS. AmberAir Compact Smarty RIS EKO 3.0 RIRS EKO 3.0

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

39G Air Handling Unit

Compact. Efficient. TROX.

Liquid desiccant dehumidification systems. Product guide

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

Others ( 50Hz areas ) ADVANCED SUBJECT DATE: May-08 PRODUCT NEWS. Advanced Product News: Launching of New KPI-(502~2002)E1E & KPI-3002H1E units

Press Release. How can the efficiency of the dryer section be increased? Dryer Section All Paper Grades. Heimbach wherever paper is made.

Certified Passive House Component For cool, temperate climates, valid until 31 December 2017

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

Pharmaceutical Facility Design

Vallox Oy. manufactures. over LOW POWER EFFICIENCY Specific electrical

Compact. Efficient. TROX.

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Small Room Heat Recovery Ventilation

Sub-Critical Operation of the CO2 Expander/ Compressor

APPLICATION, INSTALLATION, AND MAINTENANCE MANUAL CA2XRT, CA3XRT, CA4XRT

DADANCO E U R O P E. Induction unit. Installation, operation & maintenance manual. Induction Units

Comfort Series. Energy Recovery Ventilator. Why Fresh Air Ventilation is Vital for Today s Energy-Efficient Homes

GFD. GVD V-shape coil condenser. Güntner Info. 8 additional basic models for container transport!w. V-shape coil drycooler

HRU SINGLE DWELLING HOUSES - ENERGY RECOVERY VENTILATION SYSTEMS WITH HEAT EXCHANGER AKOR BP HR Series

GreenMaster HP Exhaust air heat pump for residential properties

Technical Assignment 1

Heat recovery unit RDKS

Trane Performance Climate Changer Air Handlers. An air handler for every need.

Technical documentation Comfort domestic ventilation system

Drying Tumblers Pound Capacity

GENERAL CAPABILITIES

Residential Duct Mount Builder s Box Media Air Cleaner

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option.

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

SECTION AIR COILS

AT4 Hygienic Application According to Guideline VDI 6022

The Book of AERMEC NRL Sequence of Operation

Assessment Schedule - TS8

HOT AIR GENERATOR WITH GAS BURNER NA11.45 A GGS. Installation Operation Commissioning Maintenance

Energy Recovery Ventilator

VEX100 series Air handling units with cross-flow heat exchanger

11.4 Component Assembly Diagrams and Parts Lists Case Assembly

MLM. Multi-Layer Media for Regenerative Thermal Oxidizers. from Lantec Products Installation Manual

Custom Air Handler Solutions Custom Units to Meet Your Unique Design Needs

Fans Air Handling Units Air Distribution Products Fire Safety Air Curtains and Heating Products Tunnel Fans. Topvex SoftCooler TR. Specification data

ErP - COMPLIANT TO EUROPEAN DIRECTIVE VENTILATION UNITS (AHU) TECHNICAL DATA RIGHT VIEW TOP VIEW

COMcheck Software Version Mechanical Compliance Certificate

SECTION AIR HANDLING UNITS WITH COILS. 1. Central Station Air Handling Units. 1. Section Basic Mechanical Requirements.

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

Standard Features. Performance/Capacities

Air Distribution Fan and Outside Air Damper Recycling Control

1998 Expedition/Navigator Workshop Manual

CERTIFICATE of QUALITY TEST

KOMFORT EC DB Suspended heat recovery air handling units

100% Outdoor Air Dehumidification Methods

Controlled mechanical ventilation GB 03

RoofPak Applied Rooftop Systems

Adconair 76. Comfort air conditioning unit with counterflow plate heat exchanger. AIR VOLUME FLOW: 2,600 23,600 m³/h

INSTALLATION DO S AND DON TS

Evaporative Cooling products

Schedule of Fees Schedule B

HVAC Mandatory Provisions Part II, Page 1

Vallox Oy. manufactures ventilation units Vallox TSK Multi 80 MC. over Vallox TSK Multi 80 MC

Implementation of the Laboratory Air Handling Unit Systems (LAHU)

TURBO HOODS. Product Brochure

Natatorium Economizer Vs. Conventional Dehumidifier

Museum of Bavarian History Regensburg, Germany

Smoke Control Ducts and Dampers For Single Compartment Applications. Fulfilling new requirements for EN product standards for CE Marking

Insty-Pac Steam Humidifiers

Mold/Moisture Control Case Study

KOMFORT EC S5B KOMFORT EC D5B KOMFORT EC S. Heat and Energy Recovery Ventilators

CONTENTS DE-HUMIDIFICATION IN INDOOR SWIMMING POOLS 2 DESIGN PROPERTIES OF THE INDOOR POOL DE-HUMIDIFYING UNIT 4 FRAME STRUCTURE 6 PANEL STRUCTURE 6

ducted / recirculating separately 2.1 WS / 11.8 HS 3-stage Rear Yes (600 CFM options sold separately) 29 3/8" x 31" x 2 3/4" 6" or 8"

CLIMACIAT. air HanDLIng UnIT: CLIMaCIaT. Air handling unit

The world s first batch annealing plant with fully automatic crane operation ensures optimal use of energy

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

Compact VERTICAL FLAT. Compact. Condensers GCHC/GCVC for HFCs, NH 3

Transcription:

k Center of Competence Refrigeration and Air conditioning Information sheet air handling unit Basic requirements The unit which should be tested has to be delivered completely with all necessary equipment. An operation manual, an electrical wiring diagram, and sufficient sealing and connection material has to be provided also with the unit. The unit should be mounted on an one-piece basic frame and should have a facility to move the unit with a crane. If this is not possible, the one-piece basic frame should be delivered separate to the unit and the parts of the air handling unit should be provided with a facility to move them with a crane. The maximal height of the air handling unit should not exceed 2,2 m (inclusive the basic-frame and the facility to move the unit with a crane). The unit has to be delivered with a complete electrical connection (repair switch, plug and if necessary with a frequency transformer). WRG Example for a unit with cooler, heater and heat recovery system www.tuev-sued.dd/is page 1 of 9 Issue: 07/ 2010

Test of the mechanical performance The following mechanical performance has to be tested on the real unit: leakage of the casing - bypass- leakage casing strength Therefore two covers for each air side (e.g. sheet metal) and sealing material has to be provided. These covers should be equipped with a pipe ( o 6 mm, length min. 25mm) for the measuring of the internal pressure of the casing and a pipe ( i 105 mm, length min. 150 mm) in order to connect the unit to our leakage test facility. For units with a heat recovering system please take into account that we need the above mentioned covers for the exhaust side to. pipe ( 6 mm) HRS + - pipe i 105 mm Example for covers www.tuev-sued.de/is Seite 2 von 9 Stand: 07/ 2010

Air volume flow rate test The air volume flow rate of the unit will be tested with an orifice plate test stand. From the air volume flow rate test stand Transition piece Example of the test set-up for the air volume flow test For the adjustment of the unit to our air volume flow test stand it is necessary that the manufacturer delivers the following transition pieces with the unit. Supply air inlet: 625 mm 1 Transition piece according to the sketch, fitting to the below described duct 1 Duct with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping Supply air outlet: 1 Duct with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping and a downstream connected damper (with the possibility to adjust and lock from the outside). www.tuev-sued.de/is Seite 3 von 9 Stand: 07/ 2010

Capacity test (cooler / heater) To carry out the capacity test on a cooler/heater it is necessary that the manufacturer delivers the following transition pieces and additional equipment with the unit: 1 x siphon for a controlled drain of the condensate (only for cooling capacity tests). 2 x Fitting transition pieces for the water connection to the cooler/heater (inlet/outlet) in order to connect the cooler/heater to our test facility. Connection of the coil/ heater) Transition piece with o = 2 and a threat (outside) pipe: length min. 10 x ø Transition pieces for the air side of the unit in order to connect the unit to our test facility(see sketch). Supply air inlet: 620 mm 1Transition piece according to the sketch, fitting to the below described duct 1 Duct with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping www.tuev-sued.de/is Seite 4 von 9 Stand: 07/ 2010

Supply air outlet: 1 Duct with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping and a downstream connected damper (with the possibility to adjust and lock from the outside) 620 mm 1 Transition piece according to the sketch, fitting to the below described duct (damper) Test of the heat recovery system To carry out the capacity test on the heat recovery system of the unit it is necessary that the manufacturer delivers the following transition pieces and additional equipment with the unit: Transition pieces for the air side of the unit in order to connect the unit to our test facility (see sketch). www.tuev-sued.de/is Seite 5 von 9 Stand: 07/ 2010

Supply/ Exhaust air inlet: 620 mm 2 Transition pieces according to the sketch, fitting to the below described duct 2 Ducts with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping Supply/ Exhaust air outlet: 2 Ducts with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping and a downstream connected damper (with the possibility to adjust and lock from the outside) 620 mm 2 Transition pieces according to the sketch, fitting to the below described duct (damper) www.tuev-sued.de/is Seite 6 von 9 Stand: 07/ 2010

Induct sound power For the determination of the induct sound power the unit will be built into a chamber. The air outlet of the unit is in the level of the door of the chamber. Chinks between the unit and the door of the chamber are sealed with sound reducing material. The air volume flow of the unit will by adjusted be closing the air inlet damper of the unit. The sound power level is determined at an appropriate measuring surface. Only the induct sound power of the supply side is measured. Measuring surface for the determination of the in duct sound power Example for the test set-up of the induct sound power www.tuev-sued.de/is Seite 7 von 9 Stand: 07/ 2010

Airborne sound power The unit will be placed in a free field. On the inlet and outlet of the supply side of the unit sound attenuators will be mounted. The attenuators have to be provided by the manufacturer. The connection between the sound attenuators and the air handling unit has to be suitable and easy to install. Necessary additional equipment for the fixing of the attenuators have to be provided by the manufacturer. During the airborne sound power measurement only the supply side is working. Measuring surface for the determination of the airborne sound power Support (delivered by manufacturer Example for the test set-up of the airborne sound power www.tuev-sued.de/is Seite 8 von 9 Stand: 07/ 2010

Important: All above mentioned equipment has to be delivered with the air handling unit at the same time to the test house. The missing equipment will be procured by TÜV Süd Industrie Service. The procuring of these equipment (material and working time) and through it caused waiting periods will be separately be charged by TÜV Süd Industrie Service. The hourly laboratory wage come to 129 Euro/h. The units have to be delivered and picked up at the laboratory without costs for TÜV Süd Industrie Service. Eventually necessary costs for customs clearance will be charged separately by TÜV Süd Industrie Service. Delivery address: TÜV SÜD Industrie Service Center of Competence für Kälte- und Klimatechnik Ridlerstraße 65 80339 München Contact person: Dipl.-Ing. (FH) Thomas Bichler phone.: +49 89 51 90-3368 fax.: +49 89 51 55-1075 e-mail: luft@tuev-sued.de internet: www.tuev-sued.de/is (search for: air conditioning) www.tuev-sued.de/is Seite 9 von 9 Stand: 07/ 2010