MNJIYA CONSULTING ENGINEERS - COMPLETED PROJECTS:

Similar documents
TSEPA CONSULTING TRADING AS AFRICAN FORRESTER DEVELOPERS CONSULTING ENGINEERS PROJECT MANAGERS CORPORATE PROFILE

AIR CONDITIONING, VENTILATION, RERFRIGERATION SPECIALIST (HVAC) INCLUDING PLUMBING & ELECTRICAL SERVICES CERTIFICATE OF COMPLIANCE -COC SESSA ENERGY

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21

Stephen Berrisford Planning law and policy consultant Concise CV

CURRUCULUM VITAE OFFICE UNIT D40, BLOCK D, FIRST FLOOR, BROOKLYN OFFICE PARK, 1109 JAN SHOBA STREET, BROOKLYN, PRETORIA CONTACT

SAQCC Fire TALK October 2014 Edition

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

COUNCIL HEALTH, SAFETY AND WELLBEING COMMITTEE. Projects Update

Baseline Study for Clamp Kilns in South Africa and Possible Regulatory Approaches

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

Urban Context 3.4/ 20 Muckleneuk. Mears Train Station Elandspoort Road UNISA. Urban Frame3.5/ 21 Movement Lines Active Edges Building Fabric

This document has been compiled to ensure our clients have all necessary documentation from Desco Electronic Recyclers.

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

BASIC INFRASTRUCTURE CONT. & TRAD.

Business Plan for development of the Water Palace waterfall.

What are the Contents of an Effective Fire Safety Plan? Name: Date: Address of Project: Building Permit Number:

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Warren County Schools Plant and Operations

TRANSPORTATION ILISO 1

SOUTH AFRICAN NATIONAL STANDARD

Advantage Services Capabilities

Westminster College Fire Safety Report

Fire prevention and protection

Fig. 3.1 Three dimensional view of the site in its context in the CBD SITE AND RATIONALE 03

Davron Equipment are the appointed agents for the Patterson range of pumps for fire protection in Sub Saharan Africa.

ANALYSIS OF CALLS RESPONDED TO BY THE CITY FIRE BRIGADE ~ YEAR

Sustainable Campus: Towards a Model for the University of Pretoria

CONSULTING ENGINEERS FIRE PROTECTION CAPABILITY STATEMENT HYDRAULIC FIRE CIVIL SYDNEY WATER ACCREDITED WATER SERVICING CO-ORDINATOR AND DESIGNER

An analysis of the transportation planning for the 2010 Soccer World Cup in South Africa

REPORT CARD TO THE COMMUNITY MAY 15, 2018

COMPANY PROFILE Registration Number: VAT Number: Tax Number: PAYE Registration Number: Physical Address: Postal Address:

SAGU AMERICAN INDIAN COLLEGE 2018 ANNUAL FIRE SAFETY REPORT INCLUDING STATISTICS FOR THE 2017 CALENDAR YEAR PREPARED BY:

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

South Africa Socio-Economic overview. Ndibu Motaung Head of Research South Africa

Mount Mercy University. Department of Public Safety. Campus Fire Safety Annual Compliance Report. Overview:

Contingency Plan Dangerous Waste WAC

2004 Safety and Management of the Environment of Care Programs TABLE OF CONTENTS POLICY NUMBER

2017 Concordia College Moorhead MN Campus Public Safety Fire Safety Report

Phase I Redevelopment Plan. First Community Meeting

Remi Mendoza City Planning Academy March 13, 2017

SUSTAINING CERT RESPONSE DURING EMERGENCIES 12 January 2016

Washington Metropolitan Area Transit Authority (WMATA)

Community Meeting of May 19, Meeting the Challenge

Fire safety procedure

Sprinkler Fitter Transition Plan

Municipal Development Plan Update Urban Service Area and Hamlets

Grossmont Cuyamaca Community College District Fire Report 2014

Priorities. Public Communication & Transparency Website, CM Public Updates, Magic City Newsletter

TRANSPORTATION: Roads and Highways Services

Company Profile. Micropower Modulek (PTY) Ltd.

INTEGRATED INFRASTRUCTURE SERVICES

WHERE DO WE GROW FROM HERE?

Activity Residential Site Planning

TEL:

THE ANNUAL FIRE SAFETY REPORT

Swedish Edmonds Incident WE RE IN THE DARK HERE!

DISASTER RECOVERY PLAN. Disaster Planning Evacuation Planning Emergency Planning Recovery Planning Business Continuity Planning

GENERAL FIRE PROCEDURES

What s Green Infrastructure?

Welcome to Nola Electrical

REVIEW AND EVALUATION OF REGIONAL LAND USE

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN

Defiance College Annual Fire Safety Report for 2016

St. Vincent s Health System Page 1 of 6

Atlantic Coast Service Center

PROJECTS & REACTIVE MAINTENANCE SPECIALISTS

SAMPLE FIRE SAFETY PLAN. ABC Manufacturing Ltd. 123 Main Street Steinbach, Manitoba. Prepared by: John Smith Last reviewed: Bill Jones 2014

ENGINEERING CONSULTANTS (PVT.) LIMITED

LA GRANGE FIRE DEPARTMENT APRIL 2018

SUMMARY CURRICULUM VITAE FOR DR. MCEDWARD MURIMBIKA

Inspection & maintenance of fire doors a credible action plan. Presented by Clive Reilly Checkmate Fire Solutions Ltd

Grossmont Cuyamaca Community College District Fire Report 2012

Plan Change 56: Fire Fighting Water Supplies Code of Practice

LASER SAFETY TRAINING CATALOG LASER LASER INSTITUTE OF AMERICA S MAKE LASER SAFETY YOUR PRIORITY.

BASIC ASSESSMENT PROCESS

WELCOME MEV SECONDARY PLAN OPEN HOUSE. A Place of Possibility

2018 Concordia College Moorhead MN Campus Public Safety Fire Safety Report

University of Pretoria etd - Van Wyk, H (2003) Site Analysis P G S ite Analysis

BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS

AUTOMATIC FIREFIGHTING SYSTEMS IN HOSPITALS

Academic and Administrative Buildings

This plan, its contents, and emergency notification procedures shall be made available to all appropriate university employees.

Cuyamaca College Administrative Services

PROJECTS OF DUBRUTO URBAN PLANNING Inc.

NMSU Fire Department Annual Fire Safety Report Clery Act Requirement

Midlothian Fire Department 2015 Annual Report

Emergency Codes. Student Orientation Centre for Education. Modified September 2017

Adopted February 1977 Recoded May 1998 Revised September 2007 Reviewed July 2014 Revised July 2017 EMERGENCY DRILLS

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

Briefing for Fire and Safety Marshals

Management Standard: Fire Safety

St. Elizabeths East - 5 Year Anticipated Use Plan

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT

Imagine RBC 2010 The Plan

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

NATIONAL COMPETENCY STANDARD

OFFERS INVITED PREMIER DEVELOPMENT LAND. 40 Sir John A. Macdonald Blvd., Kingston, ON. Click to View Aerial Video. Providing Solutions

Housing & Residence Life - Building Emergency Evacuation Plan

Transcription:

MNJIYA CONSULTING ENGINEERS - COMPLETED PROJECTS: Project(s) Name & Value (R) Atteridgeville Prison Refurbishment and Maintenance Project R12, 000, 000.00 Silverton SAPS Forensic Laboratory Fire Assessment Project R 21, 000, 000.00 Project Description Site Surveying, Cost Estimating, and Documentation & Supervision in Mechanical & Electrical namely: HVAC, Smoke Detection & Alarm System, Kitchen Equipment, Fire Protection, Domestic & Fire Water Reticulation, Internal Electrical Reticulation and Area Lighting. Planning, design, documentation & supervision in mechanical services namely: HVAC Upgrading to Comply with Fire Regulations, Fire Detection & Evacuation System, Fire Protection Equipment (Hydrants, Hose Reels, Fire Extinguishers, etc.), Fire Water Reticulation and Laboratory Gases Systems. Client and Contact Offered Year Completed Works for Department of Correctional Service Mr J. Bapela DPW : (012) 337 2000 Works for South African police Mr T.Mafabatho DPW: (012) 337 3419 Electrical Laboratory Gas Systems March 2009 July 2011 Pretoria Magistrate Offices R 13, 000, 000.00 Heating, Air Conditioning and Mechanical Ventilation Installations, Fire Prevention Installations, Gas, Fire Detection and alarm System, Building Evacuation Systems, Security Access Control System and Building Management System Works: PTA Regional Office Thulasizwe Masina DPW: (012) 337 2150. Electronics Completed November 2010 Vereeniging Prison- Refurbishment and maintenance project R 5, 000, 000.00 - Heating,Air Conditioning and Mechanical Ventilation Installations, Refrigeration Installations, Fire Prevention Installations. Works (011) 609 5061 Refrigeration Completed May 2009. Upgrading of 5B Residence and Mokgokong students residence Planning, design, documentation, supervision in electrical, & mechanical, Civil and Structural services including project University of Limpopo Medunsa Campus Mr S. Masoga Completed in June 2010

R16,000,000.00 management on the entire project. University of Limpopo (012) 5214243 National Treasury Pretoria R 10,000,000.00 Conditional assessment and recommendation of the Remedial work for the building management system HAVC, fire prevention and detective systems. Works: Pretoria N. Mulovhedzi Tel: 012 310 5259 Completed July 2012 New Pharmaceutical Facility at Military Health Depot R35, 000, 000.00 Planning, design, documentation & supervision in electrical services. namely: HVAC, Fire Detection & Alarm system, Evacuation System, Fire Protection Equipment, Automatic Sprinkler system, Security Systems, etc Works: PTA Regional Office Mr C. Ndlovu DPW: (012) 337 2000 Electronics Completed October Thohoyandou Intermodal Facility R 420, 000, 000.00 Benoni, Actonville Police Station Project Management,,, Fire Prevention Installations, Fire Installations, Fire Detection, Access and Security Control, and Construction Management. Refurbishment and Upgrade of all Civil Engineering works. Intersite Property Management P.Gombert (012) 602 9633 National Works: JHB Regional Offices Project Management Electronics Engineering Completed May Competed October R 2,500, 000.00 Dawn Park Ext 31 Residential Development R 1,500,000.00 Planning, Design, Documentation and Supervision: Electrical Infrastructure. C Honwani ( 011) 339 1698 CSDM Fanile Mntambo (011)873 6127 Completed 2010

Limpopo Social Development Projects R 50,000,000.00 Installations and refurbishments of Heating, Ventilation and Air Conditioning Installations, Fire Prevention Installations, Fire Prevention Installations and Electrical in 8 Socila development centres in Limpopo Province Limpopo Department of Health and Social Development Sibongile Mabuto (011)463 9467 March 2009 Thohoyandou Government Complex R 5,000, 000.00 GCIS Hatfield Festival Offices R 14,000,000.00 Refurbishment and Upgrade of Electrical & Mechanical Infrastructure for the Thohoyandou Government complex. Design and construction supervision for, Fire Protection, Security and Access Control for the new GCIS Festival offices in Hatfield Works Limpopo Province T.S Kutama 015 295 8896 Growth-Point Properties Pieter Engelbrecht Tel: 082 351 9977 Completed May 2013. Completed October Matsimela School R 5, 000, 000.00 Upgrade of Addington Hospital in KZN R 4 000,000.00 Design and construction supervision for refurbishment of Civil and Structural works in the school building infrastructure Refurbishment and Upgrading of Electrical and. Works: Limpopo Province Nomthandazo Sikhosana Tel: 015 284 7000 Proconse Peter Wanjau 012 348 1488 Civil & Completed July 2013 Completed 21 July 2010 GPG Kopanong Pricinct Upgrade GPG buildings in Heating, Ventilation and Air Conditioning Installations, Fire Prevention GPG:Department of Infrastructure Development Completed July 2010.

Johannesburg Bank of Libson Building R 12, 000, 000.00 Alberton High School R 3,500 000.00 Installations, Automatic Sprinkler Installations, Fire Detection and Alarm System, Building Evacuation Systems. Refurbishment and Upgrading of Civil & Structural Infrastructure of Alberton High Scooll. Johan Gouws 082 887 6723 Works(Gauteng Infrastructure development Tongai Ramhewa 011 355 0927 Civil & Structural Engineering Completed May Tshwane University of Technology Fire Protection and Smoke detection R 69, 000,000.00 Conditional Assessment of Fire Protection and Fire Detection in all the TUT campuses countrywide Tshwane University of Technology Project Director: Thulani Mabaso Tel : +2712 382 4501 Fax :+2712 382 4532 e-mail: mabasosit@tut.ac.za Completed November 2013 Muyexe Library Giyani R 4, 500, 000.00 Programme for Priority Clients R 69, 000,000.00 Design and Construction Supervision of for Muyexe Community Library Management of DOD and DCS projects under NDPW in Polokwane and Uthata Independent Development Trust (IDT) Nare Marakalala Tel: 015 297 1300 National Works Programme Manager: Chuma Mbande Tel 031 584 1760 Cell: 082 328 1133 Competed September 2015 Project Management Completed July

MNJIYA CONSULTING ENGINEERS PROJECTS CURRENTLY INVOLVED WITH: Project(s) Name & Value (R) Redevelopment of Mabopane Concourse R 180, 000, 000.00 National Intervention Unit R 12, 000, 000.00 Project Description Client Year Design and Construction supervision of the Intersite Property Management Project Management refurbishment and upgrade of the Mabopane Railway Station into a modern concourse with Seabata Dintle December passenger transit and shopping facilities 2008. (012) 320 8608 Electronics Engineering New installations and refurbishment of existing, Fire Protection, Security and Access Control Works: PTA Regional Office Isaac Maholwane Tel: 012 377 2000 Mechanical Engineering Access & Security Control October 2007 Pretoria Minnaar Streets Workshops R 500, 000.00 Design and construction supervision of for new cafeteria and ablution blocks at DPW Minaar Street Workshops Works: PTA Regional Office L Ramalata Tel:012 337 2000 August 2010 Nelson Mandela Children s Hospital R 75,000,000.00 Design and construction supervision of a 282 bed children s hospital for Nelson Mandela Children s Trust. Nelson Mandela Children s Home Trust Joe Seloane Tel: 011 274 566 Mechanical Engineering Electrical Engineering January 2011 Central Government Offices R 15,000,000.00 Installation of additional security equipment: Integrated security access control and monitoring system. Works: Pretoria T. Masina Tel: 012 310 5711 Access & Security January 2012

Infrastructure Audit and Master Plans for TUT Arts Campus R 415, 000,000.00 Conducting an infrastructure audit for engineering services, and making a maintenance plan for existing infrastructure and proposing master plans for new infrastructure and buildings for of existing infrastructure and master planning for 20 years -2034 for TUT Arts Campus. Tshwane University of Technology Humphrey Mathibe Tel +27 12 382 2676 Cell + 27 82 202 1827 E-Mail: BoniSPK@tut.ac.za Town Planning Traffic Engineering Access & Security Control 2013 UJ Residences in Soweto R15, 000,000.00 Infrastrucre Audit and Master Plan, TUT Soshanguve South R 16 000 000.00 Infrastructure Audit and Master Plan, TUT Garankuwa Campus R8 600 000.00 Design & Construction supervision of Mechanical, Electrical and Electronic n of new student residences in Soweto Campus Conducting an infrastructure audit for fire protection services, and making a maintenance plan for existing infrastructure and proposing master plans for new infrastructure and buildings for TUT Soshanguve South Campus Conducting an infrastructure audit for fire protection services, and making a maintenance plan for existing infrastructure and proposing master plans for new infrastructure and buildings for TUT Garankuwa Campus University of Johannesburg W Mbelele Tel 012 661 3435 Cell. 079 266 2141 e.wmbembele@proserveconsulting.co.za MIMP DESIGNS Mayan Pillay Tell: +27 012 996 3414 Faxl: +27 086 631 5045 Cell: +27 082 491 2472 Cell: +27 079 872 3019 Email: mimp@absamail.co.za MIMP DESIGNS Mayan Pillay Tell: +27 012 996 3414 Cell: +27 082 491 2472 Email: mimp@absamail.co.za Fire protection 2012 Discovers CHC R171 000 000.00 Conversion of Discoverers Community Health Gauteng Department of Infrastructure Development for Gauteng Department of January 2015

Lilian Ngoyi District Hospital R360 000 000 Lebone College of Emergency R25 000 000 Centre to a 300 Level 1 District Hospital Design and construction supervision of a 500 bed Level 1 District hospital in Soweto Design and onstruction supervision of infrastructure upgrades on existing buildings and additional new buildings in on the Lebone College of emergency care. Health Jacob Dladla Tel: 012 665 0908 Email: jdladla@pmplus.co.za Gauteng Department of Infrastructure Development for Gauteng Department of Health Jacob Dladla Tel: 012 665 0908 Email: jdladla@pmplus.co.za Gauteng Department of Infrastructure Development For Gauteng Department of Health Jacob Dladla Fire protection Piped Medical Gas Fire protection Piped Medical Gas Fire protection March 2015 February 2015 ASB Potchefstroom DOD Shamrock Mess 7 000 000 Mahiikeng Stadium R 76 000 000 The design and construction supervision of the refurbishment of the Shamrock mess kitchen including kitchen equipment Refurbishment and upgrade of Mahikeng Stadium Tel: 012 665 0908 Email: jdladla@pmplus.co.za Works K Thobejane Tel 018 386 5231 Cell 082 849 8533 Works and Roads North West Provincial Government July 2015 March 2015