Leduc Industrial Outline Plan SE W4

Similar documents
S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

OP Council Resolution June 16, Planning and Development Services

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

Palisades Outline Plan

C ity of Grande Prairie Development Services Department

City of Spruce Grove East Campsite Business Park Area Structure Plan

Bylaw C-1262 Adopted February 6, Planning and Development Department

Red Fox Commercial Outline Plan

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN

Bylaw C-1186 Adopted November 5, Planning and Development Services

The Uplands Area Structure Plan. City of Cold Lake, NE & SE W4

CONCEPTUAL SCHEME FULTON INDUSTRIAL

Bylaw No Page 1

Hawks Ridge Neighbourhood Structure Plan

Schonsee Neighbourhood Structure Plan of the Edmonton North Area Structure Plan

ADMINISTRATION RECOMMENDATION(S) 2017 February 09. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

When planning stormwater management facilities, the following principles shall be applied where possible.

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

4.6. Low Impact and Retentive Grading

Ten Mile Creek Planning Area

ADMINISTRATION RECOMMENDATION 2016 November 03. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

DEALING WITH STORM WATER MANAGEMENT

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

Prepared for: Prepared by: Revised November 2013 by Stantec Consulting Ltd. 200, th Street Se Calgary, AB, T2A 7H8

4. UTILITIES ELEMENT.

ADMINISTRATION RECOMMENDATION(S) 2017 June 15. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

Outline Plan in Belvedere (Ward 9) at Street SE, LOC (OP)

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Bylaw No. B-03/2011 Adopted by Airdrie City Council February 21, 2012

LAND USE AMENDMENT CORNERSTONE (WARD 3) COUNTRY HILLS BOULEVARD AND STONEY TRAIL NE BYLAW 9D2017

Oxford Neighbourhood Structure Plan

Chapter 3 Site Planning and Low Impact Development

Description of Preferred Alternative

Bylaw 884/13 Schedule A. Town of Rimbey. June 2008.

HURON COMMUNITY PLAN

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Section 28, Township 52, Range 26, West of the 4th Meridian

Village of New Maryland. Storm Water Management Master Plan

Draft Rhode Island Stormwater Design and Installation Standards Manual

4. Contractor (and subcontractors if applicable) certification statement(s)

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Toronto Complete Streets Guidelines

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

STREAM BUFFERS

CENTRAL PARK MAJOR AREA STRUCTURE PLAN. Bylaw No. 2017/30, Adopted February 20, P a g e

ELLERSLIE AREA STRUCTURE PLAN

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

Green Infrastructure and Low-Impact Development Technologies

ADMINISTRATION RECOMMENDATION(S) 2016 November 03. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Wolf Creek Crossing / Lacombe Market Square Outline Plan

WINTERBURN INDUSTRIAL AREA STRUCTURE PLAN

Aurum Industrial Business Park Area Structure Plan

Post Construction BMPs

Title 11 Streets and Sidewalks

HAMPTONS Area Structure Plan Medicine Hat, Alberta

Why a new Food & Farm Ordinance?


SANDSTONE SPRINGS AREA STRUCTURE PLAN

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017

Importance of Master Planning Marcy Colclough

TABLE OF CONTENTS. Sierra Springs Outline Plan

Appendix I. Checklists

Holmberg & Howe, Land Surveyors and Civil Engineers Zoning District: R-35

South Bismarck Watershed Model Update and Stormwater Improvement Project

Level 1 Downstream Analysis

CHECKLIST FOR PHASE II DRAINAGE REPORT

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Water Cycle ARC-452 DESIGN VI: INTEGRATION A5 ENVIRONMENTAL SYSTEM BURGENER SIMON YANGCHUAN SUN

AREASTRUCTURE PLAN AMENDMENT COCHRANE NORTH


ARTICLE 6: Special and Planned Development Districts

The Benefits and Challenges Associated with Green Infrastructure Practices

HAZARD MITIGATION GOALS AND OBJECTIVES

Maintenance Plan for Vegetated Portions of the MS4

Lesson 2: Stormwater Best Management Practices (BMPs)

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Green Roofs and Stormwater Management Virginia Stovin

Chapter 4 - Preparation of Stormwater Site Plans

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

One County s Success in Linking Watershed Protection and Land Use Planning

Canossa NSP. Office Consolidation August Prepared by: Planning and Policy Services Branch Planning and Development Department City of Edmonton

BRIDGES OF LANGDON CONCEPTUAL SCHEME

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

Use of Best Management Practices

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

COMMUNITY, DISTRICT AND SPECIAL STUDY AREA PLANS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

Mayliewan Neighbourhood Structure Plan Neighbourhood 7 of the Edmonton North Area Structure Plan

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Transcription:

Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5

Table of Contents 1.0 PURPOSE OF PLAN AND DEFINITION OF PLAN AREA... 1 2.0 LAND OWNERSHIP... 1 3.0 CONTEXT OF PLAN AREA... 4 4.0 GENERAL SUBDIVISION CONCEPT... 5 5.0 LAND USE CONCEPT... 7 6.0 ROADWAYS... 9 7.0 SUBDIVISION SEQUENCE... 10 8.0 MAJOR UTILITY SERVICES... 12 8.1 CONCEPTUAL UTILITY SERVICING SYSTEMS... 12 8.1.1 Water Servicing... 12 8.1.2 Sanitary Servicing... 12 8.1.3 Stormwater Management... 15 8.2 SERVICING STANDARDS... 18 9.0 LAND USE SUMMARY... 18 LIST OF TABLES Table 1 Land Use Areas... 18 LIST OF FIGURES Figure 1 Location Plan... 2 Figure 2 Context Map... 3 Figure 3 General Subdivision Concept... 6 Figure 4 Land Use Concept... 8 Figure 5 Approximate Subdivision Staging... 11 Figure 6 Conceptual Water Distribution System... 13 Figure 7 Conceptual Sanitary Sewer Network... 14 Figure 8 Conceptual Stormwater Management System... 17 ii

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Purpose of Plan and Definition of Plan Area 1.0 PURPOSE OF PLAN AND DEFINITION OF PLAN AREA This Outline Plan is intended to illustrate conceptually the manner in which the North Leduc Area Structure Plan (ASP) will be applied to guide future subdivision and development within SE 1-50- 25-W4. The area containing these lands is outlined on Figure 1 Location of Plan Area and is, for the purpose of this Outline Plan, referred to as the plan area. It includes a total area of 64.80 ha. It should be noted that all reference to area measurements are subject to minor changes and adjustment based on final area measurements which will be determined by survey calculations at such time as each existing titled area is subdivided. 2.0 LAND OWNERSHIP SE 1-50-25-W4, which forms the boundary of the plan area, is owned and/or controlled by Leduc Energy Ltd. 1

N BLK. 1 BLK. 2 BLK. 3 BLK. 1 BLK. 4 LOT B LOT A BLK. 9 BLK. 1 BLK. 6 BLK. 7 BLK. 2 BLK. 10 N.E.1/4 SEC.12-50-25-4 BLK. 12 BLK. 8 BLK. 20 BLK. 7 BLK. 19 BLK. 11 BLK. 1 BLK. 19 BLK. 9 LOT 1A BLK. 8 BLK. 12 LOT 1B BLK. 19 BLK. 10 LOT 1PUL BLK. 19 BLK. 1 LOT 14 BLK. 18 LOT 13A BLK. 1 LOT 13 LOT 12 BLK. 11 BLK. 21 LOT 11 LOT 16 BLK. 1 BLK. 3 BLK. 12 N.E.1/4 SEC.1-50-25-4 LOT 2 LOT 18 BLK. 4 LOT 10 BLK. 14 BLK. 1 BLK. 2 BLK. 3 S.E.1/4 SEC.1-50-25-4 S.E.1/4 SEC.1-50-25-4 BLK. 12 BLK. 15 64.80 ha BLK. 5 BLK. 4 BLK. 12 BLK. 17

N S.E.1/4 SEC.1-50-25-4 64.80 ha

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Context of Plan Area 3.0 CONTEXT OF PLAN AREA The plan area is situated within the southeastern portion of a larger planning area, which is the North Leduc Industrial ASP. The ASP establishes a general planning framework intended to guide future land use and development in the northern industrial land use section of the City of Leduc. It includes two-square miles of land that was undeveloped in 2001, and designates this undeveloped area predominantly for future industrial use. The ASP also requires the preparation and approval of Outline Plans to guide development within the undeveloped area prior to subdivision and rezoning. Since 2001, significant planning and development activity has taken place within the ASP planning area, which includes: The Northwest Quarter of Section 12-50-25-W4, which has now been nearly fully subdivided and developed as Phases 1 and 2 of Leduc Business Park by Farm Air Properties Inc., under an Outline Plan approved by the City in 2001; The Southwest Quarter of Section 12-50-25-W4, which has been developed as Phase 3 of Leduc Business Park by Farm Air Properties Inc., under another Outline Plan approved by the City in 2005; Landowners within the Northeast Quarter of Section 12-50-25-W4 proposed an outline plan entitled Saurabh Park Outline Plan, which was approved by the City in early 2006, and some subdivision and development is currently taking place; and The area encompassed by the South Central Outline Plan, which was approved by the City in January, 2007 has been developed by Farm Air Properties Inc. as Phases 4A and 4B of Leduc Business Park. Landowners of SW 1-50-24-W4, NE 1-50-25-W4, and SE 12-50-25-W4 prepared an outline plan entitled Cathton-Farm Air Outline Plan, which was approved in 2013 and has been developed with the exception of the south half of NE 1-50-25-W4. The locations of the plan areas encompassed by these approved outline plans are identified on Figure 2 Context Map. As of 2015, the lands within the Outline Plan remain cleared for agriculture use. 4

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 General Subdivision Concept 4.0 GENERAL SUBDIVISION CONCEPT The General Subdivision Concept is illustrated on Figure 3 General Subdivision Concept. It depicts a modified grid layout which is intended to form the basic structure for the development of the plan area. That basic structure will be delineated more precisely, on a stage-by-stage basis, through individual stages of subdivision that will be proposed to the City of Leduc for approval as outlined in Section 7.0. The basic structure depicted on Figure 3 is intended to be conceptual and flexible, and will be modified to provide for: Variations in parcel sizes; Variations in roadway access; Adjustment to topography and provision of stormwater management; Adaptation of servicing requirements to meet the needs of particular land uses; and Accommodation of potential large parcel uses as may be identified in the future marketing program. 5

N BLK. 11 BLK. 21 N.E.1/4 SEC.1-50-25-4 BLK. 14 SWMF PUL PUL BLK. 15 S.E.1/4 SEC.1-50-25-4 BLK. 17 PUL

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Land Use Concept 5.0 LAND USE CONCEPT The pattern of land use proposed within the plan area is outlined on Figure 4 Land Use Concept. The land uses identified on Figure 4 and envisioned for the areas which are specified include the following: Medium Industrial Use: Areas identified as Medium Industrial on Figure 4 Land Use Concept will be designated as IM under the Land Use Bylaw, and will be proposed for this zoning category in conjunction with future proposals for subdivision. The predominantly industrial land use character of the plan area represents a continuation of the land use pattern established through earlier phases of development to the north and west, in accordance with the general concept defined by the North Leduc Industrial ASP. Stormwater Management: The areas identified as Stormwater Management on Figure 4 Land Use Concept will be utilized as stormwater management facilities (SWMF) that are required to service the plan area. The stormwater ponds are depicted schematically on Figure 4, and are intended to be landscaped to create an attractive open space element within the pattern of industrial land uses. All Land Use Bylaw designations are intended to be established at the time when specific land areas within the plan area are proposed for subdivision, and are subject to the approval of City Council. Public Utility Lots: Utility Buildings, facilities, equipment, lots, and easements that are identified on Figure 4 Land Use Concept will be utilized as for underground as well as above ground municipal infrastructure. 7

N BLK. 11 BLK. 21 N.E.1/4 SEC.1-50-25-4 BLK. 14 SWMF PUL PUL BLK. 15 S.E.1/4 SEC.1-50-25-4 BLK. 17 PUL

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Roadways 6.0 ROADWAYS The plan area is bounded on the south and east by 65 Avenue (Township Road 500) and Range Road 250. Thirty-Ninth Street runs approximately parallel near the westerly boundary of the plan area. Access to the site will be provided through local and arterial roadway networks, including connections to 66 Avenue, which joins to 39 Street, a direct connection to 65 Avenue, and a connection through the local road system to Allard Avenue. The final layout of the intersection of 65 Avenue and RR 250 is still in development. The amount of land required to accommodate this intersection will be determined with detailed design utilizing the recommendations from the City of Leduc Transportation Master Plan that was under development at the time of this Outline Plan. On the south side of the plan area, 65 Avenue is also developed as a two-lane rural crosssection roadway which is planned, as determined by a future Transportation Master Plan, to become an east-west arterial roadway that will connect with the Queen Elizabeth II Highway, to the west of the plan area, by means of a planned interchange. An additional etres is required along 65 Avenue for right-of-way to accommodate the future design. Figure 3, the General Subdivision Concept, identifies this widening. An arterial road widening is also required along the east side of the plan area. etres of additional ROW width is required along Range Road 250 between Allard Avenue and Township Road 500 to accommodate the Nisku Spine Road. The Nisku Spine Road will connect 41 Avenue in Edmonton to the Queen Elizabeth II Highway, south of the City of Leduc. The collector and local roadways shall be constructed by the developer for each stage of subdivision. Local public transportation will be provided to the area in the future once service is established by the City of Leduc. The specifics of the routing of this future service, as well as the locations of stops, will be considerations at the subdivision stage of development. 9

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Subdivision Sequence 7.0 SUBDIVISION SEQUENCE The stages depicted on Figure 5 Approximate Subdivision Staging are intended to be approximate, and may vary depending upon specific lot configurations, and market conditions, that may influence the shape and size of areas that may actually be proposed for subdivision. The first stage of development is anticipated to be the north portion of the plan area. It is intended to include the stormwater management pond that is required to serve Stages 1 and 2 as well as a portion of the parcel to the north. The area identified as Stage 2 would complete the build out of the Leduc Business Park lands and connect the plan area to 66 Avenue and 65 Avenue. 10

N BLK. 11 BLK. 21 N.E.1/4 SEC.1-50-25-4 BLK. 14 1 BLK. 15 S.E.1/4 SEC.1-50-25-4 2 BLK. 17 1

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Major Utility Services 8.0 MAJOR UTILITY SERVICES 8.1 CONCEPTUAL UTILITY SERVICING SYSTEMS The plan area will be provided with major utility services through extensions of established facilities that exist in developed areas to the west and north, and in accordance with the servicing concepts defined by the North Leduc Industrial Area Structure Plan. Provision of each of the major utility services, including water distribution, sanitary sewer, and storm water management, is described generally as follows: 8.1.1 Water Servicing The conceptual system for the extension of the water distribution system within the plan area is illustrated on Figure 6 Conceptual Water Distribution System. 8.1.2 Sanitary Servicing The conceptual system for the extension of the sanitary sewer network to the plan area is illustrated on Figure 7 Conceptual Sanitary Sewer Network. There are two separate sanitary basins that serve the plan area, which is illustrated on Figure 7 by the line-break on the proposed sewer lines. As development progresses, the sanitary servicing network will extend southward and westward. 12

N BLK. 11 BLK. 21 N.E.1/4 SEC.1-50-25-4 BLK. 14 BLK. 15 S.E.1/4 SEC.1-50-25-4 BLK. 17

N BLK. 11 BLK. 21 N.E.1/4 SEC.1-50-25-4 BLK. 14 BLK. 15 S.E.1/4 SEC.1-50-25-4 BLK. 17

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Major Utility Services 8.1.3 Stormwater Management Stormwater management will be provided within the plan area to achieve an efficient system of surface drainage incorporating existing topographic features and planned open space within the plan area. Stormwater runoff must be properly managed to ensure that the water entering the receiving water body is of a high quality with a low level of suspended solids. The strategy for achieving this is the incorporation of Low Impact Development (LID) concepts into the design of the stormwater management system. LID is an approach that uses simple ecological principles to reflect natural ecosystem processes with respect to managing stormwater in a developed area. Stormwater management systems designed using LID concepts can simultaneously satisfy regulatory requirements, act as amenities for the surrounding area, protect the environment by reducing runoff, and improve water quality. One concept is to implement alternative conveyance systems to slow the erosive velocity of stormwater, increase time of concentration, and use natural systems to filter pollutants such as sediment, nutrients and heavy metals. Another initiative is to reduce the quantity of stormwater runoff to improve the quality of water which will outfall into Telford Lake. This can be achieved through the installation of various infiltration systems which encourage the downward movement of water into the underlying soil to reduce the total quantity of overland runoff and pollutants from impervious surfaces. The strategies best suited to achieving these goals within the plan area are bioswales and stormwater management facilities (SWMFs) designed as constructed wetlands. Bioswales are vegetated swales which are an alternative to piping stormwater, with significant environmental advantages. Bioswales reduce storm water velocities, allow sediment and pollutants contained within stormwater to be filtered, as well as allowing water infiltration into the ground. When used in conjunction with stormwater management facilities, bioswales collect and convey stormwater, and function as initial sites for stormwater treatment. These vegetated channels improve water quality by decreasing water velocity and thus allowing suspended solids and heavy metals to fall out of the flow. Some metals and nutrients (like nitrogen or phosphorous) will also be absorbed by the plant life in the channels. This OP also proposes a constructed wetland as a key step in stormwater retention, filtration and infiltration. Constructed wetland systems use soils, vegetation, and hydrology to remove pollutants from stormwater through increased contact time with soils and plant materials. The systems are effective in attenuating flood flows, reducing pollutant loadings, and providing wildlife habitat. As compared with conventional stormwater management systems, constructed wetlands more closely mimic the natural hydrologic cycle, allowing soils and plants to filter pollutants from stormwater and permitting the processes of infiltration, evaporation, and transpiration to occur. The systems create wildlife habitat, minimize erosion, and recharge local groundwater supplies. Similar to their natural counterparts, constructed wetlands can vary from seasonally inundated to year-round, open-water systems, depending on seasonal rainfall levels and soil conditions. To optimize pollutant removal capacities, engineers aim to maximize flow paths through wetland systems to prolong exposure to soils and vegetation, thereby facilitating nutrient and pollutant uptake, retention, and settling. Both bioswales and constructed wetlands are identified as Stormwater Best Management Practices by Alberta Environmental Protection 15

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Major Utility Services (Stormwater Management Guidelines for the Province of Alberta, Alberta Environmental Protection, January 1999). The conceptual stormwater management system is illustrated on Figure 8 Conceptual Stormwater Management System. The plan area is comprised of one watershed. The plan area will be graded to drain toward the stormwater management facility (SWMF) identified on the Land Use Concept (Figure 4). The SWMF, which spans over the northern boundary of the plan area, will manage stormwater from the plan area as well as part of the parcel to the north. The stormwater management pond will be designed to be an integral and attractive element within the industrial land use pattern of the plan area. The detailed design and actual configuration of the pond within the area depicted on Figure 4 will be undertaken as part of the process of completing the municipal servicing agreements for the subdivision stage containing the pond. 16

N

LEDUC INDUSTRIAL OUTLINE PLAN SE 1-50-25-W4 Land Use Summary 8.2 SERVICING STANDARDS The general standard to which municipal services and infrastructure will be developed within the plan area will be designed to meet the identified requirements of the specific types of industrial and commercial users which are anticipated. The specific level or extent of utility services that are required for different parcels will depend upon the actual needs of industrial users and will be determined at later stages of planning and approval. The actual services and infrastructure which are required will be defined at the subdivision stage of the development process, and will generally be similar to the standards established for previous subdivisions for medium industrial use in the east half of Section SW 1-50-25-W4, to the north and NE 1-50-25-W4. 9.0 LAND USE SUMMARY The plan area encompasses a total land area of 64.80 ha. The City of Leduc will take the remainder of its municipal reserve dedication in the form of cash-in-lieu. Based upon the gross developable area of 64.8 ha, the total municipal reserves dedication would amount to the equivalent of 6.48 ha of land. Table 1 Land Use Areas Total Outline Plan Area Gross Developable Area Medium Industrial Use Circulation (Local Roads) Stormwater Management Facilities Area for (Range Road 250 & 65 Avenue) Area (hectares) 64.80 ha 51.68 ha 7.43 ha 3.13 ha 2.56 ha 18