ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS.

Similar documents
ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Final Plan Submittal Application Requirements.

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

SUBMITTAL REQUIREMENTS

Site Plan Review Residential Accessory Building

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Neo-Traditional Overlay Application

ARTICLE 17 SITE PLAN REVIEW

Major Subdivision Sketch Plan Checklist

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

CITY OF ZEELAND PLANNING COMMISSION

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH

CIVIL ENGINEERING PERMIT APPLICATION

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Chapter 4 - Preparation of Stormwater Site Plans

APPLICATION SUBMITTAL CHECKLIST LAND USE PERMITS

Town of West Point Plan of Development

SEMSWA s Role in the Land Development Process

SUBMITTAL REQUIREMENTS: PROJECT DEVELOPMENT PLAN (PDP)

Huntington Stormwater Utility

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651) Fax: (651)

Application for Site Plan Review

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

County of Prince George, Virginia

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

STREAM BUFFERS

FLOODPLAIN USE PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT W. Ten Mile Road Novi, MI (248)

Project phasing plan (if applicable) 12 copies of site plan

CHAPTER 3 REGULATED LAND-DISTURBING ACTIVITIES AND APPLICABLE REQUIREMENTS

Skamania County Community Development Department

Appendix I. Checklists

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

TREE REMOVAL PERMIT PACKET

DP-2 Development Permit Application

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch

THE CITY OF MOBILE, ALABAMA

A Guide to Open Space Design Development in Halifax Regional Municipality

ARTICLE 3. LARGE-SCALE SOLAR PHOTOVOLTAIC INSTALLATIONS SECTION XXI

Chesapeake Bay Critical Area Conservation Plan

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

King and Queen County Department of Building & Zoning P.O. Box 177, King and Queen Courthouse, VA Phone: Fax:

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

DRIVEWAY REGULATIONS

Request Conditional Rezoning (R-10 Residential & I-1 Light Industrial to Conditional I-1 Light Industrial) Staff Recommendation Approval

CONCURRENT SUBDIVISION/SITE PLAN REVIEW APPLICATION TOWN OF CONWAY, NH

Draft Rhode Island Stormwater Design and Installation Standards Manual

5. Would the proposed project require modifications to the existing regulations?

Request Conditional Use Permit (Religious Use) Staff Recommendation Approval. Staff Planner Jonathan Sanders

CONCEPT PLAN APPLICATION

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

SITE PLAN REVIEW APPLICATION AND CHECKLIST

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

The Development Review Process. Presentation to the GSSC IAC

Master Land Use Plan Application

Erosion & Sediment Control Plan Application Form & Checklist

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

4. To assure that adequate screening and buffering will be provided between the planned project and contiguous properties;

PLANNED UNIT DEVELOPMENT APPLICATION

Zoning Ordinance Article 3

Non-Metallic Mining Reclamation Checklist

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

TO BE FILLED OUT BY APPLICANT

APPLICATION FOR SITE PLAN REVIEW

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

Development Reviews. An overview of the Commission s review process, primarily in Klickitat County. March 13, 2018

CHAPTER 22 Rural Open Space Community Developments

Gloucester County PLAN SUBMITTER'S CHECKLIST

COMMERCIAL SITE PLAN SUMMARY & DEVELOPMENT GUIDE

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

APPLICATION FOR MINOR SITE PLAN REVIEW

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

ZONING COMPLIANCE PERMIT APPLICATION

MEDWAY PLANNING BOARD MINOR SITE PLAN PROJECTS Application Guidelines

7 May 9, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: COASTAL ENTERPRISES, LLC

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Florence County Small Commercial Land Disturbance Permit Application

A. General Information

APPLICATION FOR MINOR SITE PLAN REVIEW

Department of Planning & Development Planning Unit

Drainage Control Plans

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application

CHESAPEAKE LANDSCAPE ORDINANCE

Net Land Area (NLA): Area within zoning lot boundaries NLA= 1,076,181 sq. ft.

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

Sec Development design approval and procedures.

CITY OF BIDDEFORD PLANNING DEPARTMENT PLANNING BOARD REPORT. Larry Patoine, Chair & Members of the Biddeford Planning Board

Request Modification of Conditions (Conditional Use Permit for a Church approved by City Council in 1989 & modified in 1990, 2010, and 2014)

City of Fort Lupton Administrative Site Plan Process

Transcription:

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS Subdivision Name: Subdivision # S: Project # P: Date: Instructions: All submissions shall be bundled into the following packages for distribution to the appropriate agencies. Any submissions brought to the Permit Center with missing or incomplete packages may be rejected or set aside until all necessary information has been provided. All incomplete submissions will not be logged into the system until the date that all of the necessary information has been supplied to the Permit Center. If any items listed below are not provided, please indicate justification/reasons in the Letter of Explanation. It should be noted that not all items contained below will necessarily be required for every project. Design Professional shall place on of the following marks (as appropriate) on each line. N/A not applicable Y provided A minor subdivision is initiated by the filing of an application for final plan approval. Unless public notice has already been provided in connection with an application for sketch plan approval, within seven (7) days after the filing of an application for final plan approval, signs shall be posted and notice to community associations given as provided in the Development Regulations. The Final Plan shall be prepared and sealed/certified by an engineer, architect, landscape architect or land surveyor registered to practice in the State of Maryland. The Stormwater ManagementPlans must be signed and sealed by an engineer, landscape architect or land surveyor registered to practice in the State of Maryland. (Note that certain plans such as Water and Sewer Plans, some Stormwater Management Ponds, Structural Designs, etc., require the seal and signature of a Professional Engineer.) 1. Application Form 2. Certificate of Transmittal 3. Sketch Approval Letter 4. Submittal Review Fee: Residential - $120 per unit Commercial / Industrial - $420 per acre; for sites over an acre the fee will be based on the entire site acreage to the next full acre. Signs - $35 for each sign abutting County and State roads and navigable waterways will be required if a modification to Sketch is granted. 5. Modification Request: Provide as many copies as the Modification Procedures requires. Provide separate request for Floodplain and Stormwater Management. See Modification Procedures for fees. 1

6. Office of Planning & Zoning Public Information Package 7. Office of Planning & Zoning Planner/Environmental/Landscape Package e) One (1) copy of the current Planning and Zoning Final Plan Checklist. f) One (1) copy of the Community Meeting Minutes Letter. g) One (1) copy of the Post Community Meeting Notification Letter. h) One (1) copy of the Final Plan. i) One (1) copy of the Plat. j) One (1) copy of the "Cut & Paste" copy of the plat. k) One (1) "Cut & Paste" copy if the plan has more than one (1) sheet. l) One (1) copy of the Stormdrain Plan. m) One (1) copy of the Stormwater Management Plan. n) One (1) copy of the Environmental Conservation/Features Plan. o) One (1) copy of the Grading Sediment & Erosion Plan. p) One (1) copy of the Forest Stand Delineation Plan, Narrative, Data Sheets and current Checklist. q) One (1) copy of the Forest Conservation Plan and current Checklist. r) One (1) copy of the Chesapeake Bay Critical Area Report and habitat assessment. s) One (1) copy of the Critical Area Plan. t) One (1) copy of the Critical Area Buffer Management Plan. u) One (1) copy of the Critical Area Replanting Plan in the Limited Resource Conservation Area categories. v) One (1) copy of the Forest Interior Dwelling Species Report. w) One (1) copy of the Wetland Report. x) One (1) copy of the Wetland Delineation Plan. y) One (1) copy of the Bog Protection Plan, current Checklist, Agreement and Worksheet. z) One (1) copy of the Landscape Plan and current checklist. aa) One (1) copy of the Street Tree Plan. (Including traffic signs, traffic markings and street lighting. Plans must comply with the Anne Arundel County, Maryland Department of Public Works Design Manual/Standard Specifications (Chapter III, Page 1 through 16). Street trees are to be identified by their Botanical Names, English Names, Caliper and Height and are to be bonded under a Public Works Agreement.) bb) One (1) copy of written authorization from owner of property allowing contract purchaser/lessee to act on the owner's behalf. cc) Title references supply additional history and recorded plats beyond the previous history submitted at Sketch. dd) One (1) copy of Certificate of Title ee) Verification of paid taxes. 2

ff) One (1) copy of covenants, conditions and restrictions attached to the property. gg) One (1) copy of any Variance, Special Exception, Rezoning or Board of Appeals decision. 8. Office of Planning & Zoning Engineer/Utility Package e) One (1) copy of the current Road Plan Checklist. f) One (1) copy of the current Stormdrain Checklist. g) One (1) copy of the current Stormwater Management Plan Checklist. h) One (1) copy of the current Water & Sewer Plan Checklist. i) One (1) copy of each current Stormwater Management Device Checklist (if applicable). j) One (1) copy of the Final Plan. k) One (1) copy of the Plat. l) One (1) copy of the Road Plans. m) One (1) copy of the Stormdrain Plan and Computations. n) One (1) copy of the Road and Stormdrain Cost Estimates. o) One (1) copy of the Stormwater Management Plan. p) One (1) copy of the Environmental Conservation/Features Plan. q) One (1) copy of a map that clearly shows the entire drainage area that affects the site and establishes the location of the Point of Investigation. r) One (1) copy of the Stormwater Management Report. s) One (1) copy of the Geo-Technical Report. Include infiltration test for all proposed infiltration devices. t) One (1) copy of the Floodplain Study (if applicable). u) One (1) copy of the Sediment & Erosion Control Plan and current checklist. v) One (1) copy of the Water & Sewer Plan. w) One (1) copy of the Water & Sewer Cost Estimates. x) One (1) copy of the EDU Worksheet. y) One (1) copy of the SWAMP Analysis (if one has already been completed for this project). z) One (1) copy of the Perc Test Results & approved Health Department Site Plan showing the perc test locations (if applicable). aa) Nine (9) copies of the Sewer Study (if applicable). bb) Two (2) copies of the Pumping Station Design Plan and Report (if applicable). cc) Two (2) copies of the Grinder Pump Study. dd) One (1) copy of the Wetland Report. ee) One (1) copy of the Wetland Delineation Plan. ff) One (1) copy of the Landscape Plan. 9. Office of Planning & Zoning Traffic Package 3

e) One (1) copy of the Traffic Impact Study. f) One (1) copy of the current Traffic Checklist. g) One (1) copy of the Final Plan. h) One (1) copy of the Plat. i) One (1) copy of the Road Plan. j) One (1) copy of the Traffic Plan. k) One (1) copy of the Traffic Control Plan. l) One (1) copy of the Traffic Signal Plan. m) One (1) copy of the Landscape Plan. n) One (1) copy of the Street Tree Plan. (Including traffic signs, traffic markings and street lighting. Plans must comply with the Anne Arundel County, Maryland Department of Public Works Design Manual/Standard Specifications (Chapter III, Page 1 through 16). Street trees are to be identified by their Botanical Names, English Names, Caliper and Height and are to be bonded under a Public Works Agreement.) 10. Office of Planning & Zoning Long Range Planning Planner Package 11. Office of Planning & Zoning Long Range Planning Water & Sewer Master Plan Package 12. Office of Planning & Zoning Long Range Transportation Package g) One (1) copy of the Traffic Plan and current Checklist. 4

13. Office of Planning & Zoning House Number/Street Name Package 14. Office of Planning & Zoning Archeology & Historical Package f) One (1) copy of the Plat 15. Department of Public Works Technical Engineering & Planning Division Mayo Package** **Only need package if in Mayo Sewer Service Area** f) Three (3) copies of the Mayo Plan. g) Four (4) copies of the Sewer Study and Pumping Station Design Plan and Report. h) Four (4) copies of the Grinder Pump Study. 16. Department of Public Works Technical Engineering & Planning Division Utility Package** ** Only need package if proposing Grinder Pumps and/or Sewer Pumping Station ** f) One (1) copy of the EDU Worksheet. g) One (1) copy of the SWAMP Analysis Worksheet h) Four (4) copies of the Sewer Study and Pumping Station Design Plan and Report. i) Four (4) copies of the Grinder Pump Study. 5

17. Department of Public Works Technical Engineering & Planning Division Utility Package** ** Only need package if five (5) or more EDU's will be assessed ** f) One (1) copy of the EDU Worksheet. g) One (1) copy of the SWAMP Analysis Worksheet 18. Department of Public Works Traffic Package g) One (1) copy of the Traffic Control Plan. h) One (1) copy of the Traffic Signal Plan. i) One (1) copy of the Landscape Plan. j) One (1) copy of the Street Tree Plan. (Including traffic signs, traffic markings and street lighting. Plans must comply with the Anne Arundel County, Maryland Department of Public Works Design Manual/Standard Specifications (Chapter III, Page 1 through 16). Street trees are to be identified by their Botanical Names, English Names, Caliper and Height and are to be bonded under a Public Works Agreement.) 19. Department of Recreation & Parks g) One (1) copy of the Sediment & Erosion Control Plan h) One (1) copy of the Wetland Report. i) One (1) copy of the Wetland Delineation Plan j) One (1) copy of the Landscape Plan 6

20. Agricultural Review Package **Only need package if site is zoned RA ** 21. Board of Education 22. Health Department g) One (1) copy of the Sediment & Erosion Control Plan. h) One (1) copy of the Water & Sewer Plan. i) One (1) copy of the Perc Test Results & approved Health Department Site Plan showing the perc test locations. 23. Fire Department g) One (1) copy of the Water Plan. 7

24. Library 25. Soil Conservation District b) One (1) copy of the Sketch Approval letter. f) One (1) copy of the plat. g) One (1) copy of the Road Plans. h) One (1) copy of the Stormdrain Plan and Computations. i) One (1) copy of the Stormwater Management Plan. j) One (1) copy of the Environmental Conservation/Features Plan. k) One (1) copy of the Stormwater Drianage Maps. l) One (1) copy of the Stormwater Management Report. m) One (1) copy of the Stormwater Computations. n) One (1) copy of the Geo-Technical Report. o) One (1) copy of the Floodplain Study. p) One (1) copy of the Sediment & Erosion Control Plan. j) One (1) copy of the Wetland Report. k) One (1) copy of the Wetland Delineation Plan 26. Maryland State Highway Administration (Item marked below by an * must be included if the project is on a State Road) c) One (1) copy of the Final Plan. d) One (1) copy of the Plat. e) One (1) copy of the Application. f) One (1) copy of the Modification Decision Letters. g) Six (6) copies of the Road Plans.* h) One (1) copy of the Stormdrain Plan and Computations.* i) One (1) copy of the Road and Stormdrain Cost Estimates.* j) Six (6) copies of the Traffic Impact Study.* 8

k) Six (6) copies of the Traffic Control Plan.* l) One (1) copy of the Stormwater Management Plan.* m) One (1) copy of the Environmental Conservation/Features Plan.* n) One (1) copy of the Stormwater Drianage Maps.* o) One (1) copy of the Stormwater Management Report.* p) One (1) copy of the Stormwater Computations.* q) One (1) copy of the Geo-Technical Report.* r) One (1) copy of the Sediment & Erosion Control Plan.* 27. Maryland State Aviation Administration (MAA package is required if the project is within the 4-mile radius of BWI Airport includes projects located on Tax Maps 1A, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 14, 15 or 16) d) One (1) copy of Modification Decision Letters g) One (1) copy of the Stormwater Management Plan. h) One (1) copy of the Environmental Conservation/Features Plan. i) One (1) copy of the Stormwater Drianage Maps. j) One (1) copy of the Stormwater Management Report. k) One (1) copy of the Stormwater Computations. l) One (1) copy of the Geo-Technical Report. 28. Baltimore Gas & Electric 29. Baltimore Gas & Electric Forestry Review Package** **Only required if in Critical Area or if Forest Stand Delineation or Forest Conservation Plan are included** d) One (1) copy of Modification Decision Letters 9

f) One (1) copy of the Forest Stand Delineation Plan, Narrative and Data Sheets. g) One (1) copy of the Forest Conservation Plan. h) One (1) copy of the Chesapeake Bay Critical Area Report and habitat assessment. i) One (1) copy of the Critical Area Plan. j) One (1) copy of the Critical Area Buffer Management Plan. k) One (1) copy of the Critical Area Replanting Plan in the Limited Resource Conservation Area categories 30. Verizon 31. Critical Area Commission** **Only required if site is within Critical Area** f) One (1) copy of the Chesapeake Bay Critical Area Report and habitat assessment. g) One (1) copy of the Critical Area Plan. h) One (1) copy of the Critical Area Buffer Management Plan. i) One (1) copy of the Critical Area Replanting Plan in the Limited Resource Conservation Area categories. j) One (1) copy of the Forest Interior Dwelling Species Report 32. Department of Natural Resources Fish & Wildlife Division** **Only required if site is in the Critical area or Bog Protection Area** e) One (1) copy of the Chesapeake Bay Critical Area Report and habitat assessment. f) One (1) copy of the Critical Area Plan. g) One (1) copy of the Critical Area Buffer Management Plan. h) One (1) copy of the Bog Protection Plan, Internet Checklist, Agreement and Worksheet. 10

33. Department of Natural Resources Heritage Division** **Only required if Bird Study is required** b) One (1) copy of Application. c) One (1) copy of Modification Decision Letter(s) d) One (1) copy of the Forest Interior Dwelling Species Report. 11