Environmental Permit No. EP-457/2013/C. Central Kowloon Route. Independent Environmental Checker Verification

Similar documents
Alignment of Options 2 & 3. Lam Tin. Tseung Kwan O Town Centre South. Ocean Shores. Cemetery. Cross Bay Link. Alignment Option 1

Task Force on Kai Tak Harbourfront Development

Job Reference of Threaded Rod & Holding Down Bolt

Longbridge Town Centre Phase 2 Planning Application

Electrical Safety Policy and Management System

Pedestrian Connectivity Facilities. Consultation Digest

Task Force on Kai Tak Harbourfront Development

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

3.1 This evidence is based on the landscape and visual impact assessment included in Chapter 10 and Appendix I of the EIS.

Foreword. Síle de Valera, TD, Minister for Arts, Heritage, Gaeltacht and the Islands

Newcourt Masterplan. November Exeter Local Development Framework

URBAN DESIGN STUDY FOR THE WAN CHAI NORTH AND NORTH POINT HARBOURFRONT AREAS FEASIBILITY STUDY

Draft for Comment Please comments to Part A(i)

Highlands Region Stormwater Management Program Guidance

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

DESIGN OF FOOTBRIDGES

SECTION SECURITY TESTING AND COMMISSIONING

VERIFICATION OF FIRE ALARM SYSTEMS

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

24 October 2013 Civil Engineering and Development Department

Wan Chai Development Phase II Planning and Engineering Review

Suggested Reference List for the HKILA Professional Practice

Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.

MARKET LEADERS IN LARGE SCALE COMMERCIAL CLEANING SERVICES

SECTION 12 LANDSCAPE

Environmental Impact Assessment

Parks & Recreation Tree Board - Tree Ordinance Angola, Indiana

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

Experiences of dealing with Lesser Horseshoe Bats (Rhinolophus

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study. PlanD CEDD GPA IRD ArchSD

UNIFIED INTERPRETATION OF PROVISIONS OF IMO SAFETY, SECURITY, AND ENVIRONMENT-RELATED CONVENTIONS

Baseline Data Required for AS

Australian Standard. Degrees of protection provided by enclosures (IP Code) AS IEC Ed 2.1:2001 AS 60529

Chapter 4 - Preparation of Stormwater Site Plans

Request for Lockout. Initiating. Affected Systems and Areas Information

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Mr Tony HO Chief Geotechnical Engineer Geotechnical Engineering Office Civil Engineering and Development Department Hong Kong, China

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

An overview of the main proposals in BS th Edition. Electrical Contractors Association

Waterfront Promenade adjacent to the Hong Kong Children's Hospital at Kai Tak. Harbourfront Commission Aug 2015

Fire Safety Policy. Document Author: Director of Estates, Fleet & Facilities Management

FIRE SAFETY MANAGEMENT PROTOCOL FIRE DOORS & FIRE DOOR ASSEMBLIES

Traffic Control and Surveillance System (TCSS) Infrastructure, Challenges and Trends

August 2013 Technical Requirements for Remote Controlled Temporary Traffic Management Signs for use on the Highways Agency Strategic Road Network

Task Force on Harbourfront Developments on Hong Kong Island

Road Safety Impact Assessment

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B5 Construction Heritage Management Plan

Biosolids Dewatering, Monitoring, and Disposal Programs

ESSEX COUNTY COUNCIL. Reason: To comply with section 91 of the Town and Country Planning Act 1990 (as amended).

Milpitas College Extension Milpitas Dry Landscape

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Chapter 1: General Program Information

3 Summary of Major Views and Responses

Electrical Safety Policy

ENVIRONMENTAL IMPACT ASSESSMENT

DESIGN & CONSTRUCTION GUIDELINES

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

City of Fort Lupton Administrative Site Plan Process

Final Revisions: Reason: For the avoidance of doubt and in the interests of proper planning.

Urban and Landscape Design Frameworks Highways and Network Operations Guideline

PLANNING COMMITTEE REPORT

ONTARIO MUNICIPAL BOARD

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

Example Codes. City of Brentwood, Tennessee Brentwood Hillside Protection Overlay District Summary

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 37/2010/ND CP Hanoi, April 07, 2010

Current difficulties with creation of standardized digital climate calculations for infrastructural projects

City of Kingston Heritage Commemoration Program Guidelines: 7 May 2010

University of Delaware

5 Eireann Quay Site Plan Control Application

TOWN AND COUNTRY PLANNING ACT 1990

Australian Standard. Electroacoustics Sound calibrators AS IEC This is a free 7 page sample. Access the full version online.

Each Permittee s program must meet the requirements of the Los Angeles County municipal storm water permit (Permit), as summarized in Table 5-1.

SECTION 02230BP AGGREGATE BASE

BASIC ASSESSMENT PROCESS

Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire. Hazel Dormouse Surveys

City of Richland Stormwater Management Plan

2016 Annual Inspection Report

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

PLANNING AND BUILDING STANDARDS COMMITTEE 3 JUNE 2013 APPLICATION FOR PLANNING PERMISSION

Furenflex RWV Advanced Liner

PRODUCT SPECIFICATION. 0.5mm Fine Stacking. Hermaphroditic Type BTB Connector

SUBJECT TO ATTACHED SCHEDULE OF THIRTY SIX CONDITIONS

Fact File 75. Published Document PD CEN/TS 54-32:2015 Fire detection and fire alarm systems

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Memorandum Planning. Thursday, January 8, 2015

CITY OF MEDINA OFFICE OF THE HEARING EXAMINER

SHOP PRIMERS FOR CORROSION PROTECTION OF STEEL PLATES AND SECTIONS

Australian Standard. Fire detection, warning, control and intercom systems Control and indicating equipment. Part 1: Fire

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Life Safety Code Comparison

Overview of Land Use Framework for Victoria Harbourfront. Planning Department February 2011

Harbour-front Enhancement Committee. Wan Chai Development Phase II. Planning and Engineering Review

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development

Transcription:

Environmental Permit No. EP-457/2013/C Central Kowloon Route Independent Environmental Checker Verification Works Contract: (HY/2014/09) Reference Document/Plan Document/Plan to be Certified/ Verified: Landscape Mitigation Plan Date of Report: 11 January 2018 (HMTS/LMP/006 Rev. A) Date received by IEC: 11 January 2018 Reference EP Condition Environmental Permit Condition: 2.8 Submission of Landscape Mitigation Plan of the Project 2.8 The Permit Holder shall, at least one month before the commencement of construction of the corresponding component(s) of the Project, deposit with the Director four hard copies and one electronic copy of a Landscape Mitigation Plan(s). The Landscape Mitigation Plan(s) shall be certified by the ET leader and verified by the IEC as conforming to the information and recommendations of landscape and visual mitigation measures in the EIA Report (Register No.: AEIAR-171/2013) or otherwise approved by the Director in compliance with the requirements in the Technical Memorandum on Environmental Impact Assessment Process, and Condition 2.10 of this Permit. IEC Verification I hereby verify that the above referenced document/plan complies with the above referenced condition of EP-457/2013/C. Ms Mandy To Independent Environmental Checker Date: 11 January 2018 Our ref: 0436942_IEC Verification Cert_Landscape Mit Plan_20180111.docx

Nishimatsu Construction Co. Ltd. Central Kowloon Route Contract HY/2014/09 Landscape Mitigation Plan HMTS/LMP/006 Rev. A Certified by: Position: Environmental Team Leader Date: 11 th January 2018

SHEET 2 OF 8 REVISION HISTORY: Revision Effective Date Summary of Revision - January 2018 Issued for Approval A 11 January 2018 Comments received from IEC via email on 11 January 2018 Revised 1.1.2, 1.1.3, 2.1 Added 1.3.2 to 1.3.5

SHEET 3 OF 8 CONTENT LIST 1 INTRODUCTION... 4 1.1 Project Description... 4 1.2 Objectives of this Submission... 4 1.3 Scope of this Submission... 5 2 LANDSCAPE AND VISUAL MITIGATION MEASURES IN EIA&EM&A... 6 3 SUMMARY... 7 APPENDICES Appendix A Landscape Mitigation Plan

SHEET 4 OF 8 1 INTRODUCTION 1.1 Project Description 1.1.1 Highways Department (HyD) commissioned the Design and Construction Assignment for the Central Kowloon Route in June 1998. CKR is a dual 3-lane trunk road across central Kowloon linking the West Kowloon in the west and the proposed Kai Tak Development (KTD) in the east. The CKR will be about 4.7km long with an underground tunnel section of about 3.9km long, in particular, there will be an underwater tunnel of about 370m long in Kowloon Bay to the north of the To Kwa Wan Typhoon Shelter. It will connect the West Kowloon Highway at Yau Ma Tei Interchange with the road network at Kowloon Bay and the future Trunk Road T2 at KTD which will connect to the future Tseung Kwan O Lam Tin Tunnel (TKO-LTT) and Cross Bay Link (CBL). CKR, Trunk Road T2 and TKO-LTT will form a strategic highway link, namely Route 6, connecting West Kowloon and Tseung Kwan O. Consultancy studies for Trunk Road T2, TKO-LTT and CBL have been commissioned by CEDD. In addition, 3 ventilation buildings, which will be located in Yau Ma Tei, Ho Man Tin and ex-kai Tak airport area, are proposed to ensure acceptable air quality within the tunnel. 1.1.2 The Central Kowloon Route Design and Construction Environmental Impact Assessment Report (Register No.: AEIAR-171/2013) approved with conditions by the Environmental Protection Department (EPD) on 11 July 2013. An Environmental Permit (EP-457/2013) was issued on 9 August 2013. Variations of EP (VEP) was subsequently applied for and the latest EP (EP-457/2013/C) was issued by EPD on 16 January 2017. 1.1.3 The Works to be executed under this Contract are to construct the civil works for Ho Man Tin access shaft as a part of Central Kowloon Route. The Works to be executed under this Contract include the construction of a vertical access shaft at Ho Man Tin approximately 100mm deep and 21m internal diameter for the Central Kowloon (CKR) project. The foundation works and construction of the Ventilation Buildings are excluded in the scope of works for this Contract. Therefore, some mitigation measures including screen planting, green roof and reinstatement are not relevant to this Contract, they are relevant to other parts of the Project. 1.2 Objectives of this Submission 1.2.1 This is the Landscape Mitigation Plan (LMP) submission made in fulfillment of Clause 2.8 of Environmental Permit (EP) (No. EP-457/2013/C). 1.2.2 As stated in Condition 2.8 in the EP No. EP-457/2013/C, The Permit Holder shall, at least one month before the commencement of construction of the corresponding component(s) of the Project, deposit with the Director four hard copies and one electronic copy of a Landscape Mitigation Plan in compliance with the requirements in the Technical Memorandum on Environmental Impact Assessment Process and Condition 2.10 of the EP. 1.2.3 Condition 2.10 of the Environmental Permit No. EP-457/2013/C for Central Kowloon Route stated that The Permit Holder shall incorporate more innovative designs and green features in the detailed planning of the landscape features on deckings and ventilation buildings, e.g. plant of trees, preferably scented trees, to provide greening in Kowloon area, tree planting arranged in east-west orientation to create wind corridor effect and use of roof garden/vertical green walls to enhance aesthetic effect. The

SHEET 5 OF 8 Permit Holder shall monitor performance of the contractors to ensure that sufficient and suitable soil substrates will be provided for the planting and that there shall be good and sustained horticultural management/maintenance. 1.3 Scope of this Submission 1.3.1 This submission aims to demonstrate the landscape mitigation measure adopted during the construction period of. These Mitigation Measures (MM) are developed in accordance with the approved EIA report and EM&A Manual. They include the following: Good Site Management Screen Hoarding Lighting Control during Construction Erosion Control Tree Protection & Preservation Tree Transplantation Compensatory Planting 1.3.2 Tree Survey Report will be prepared by qualified person to determine the trees conditions and record the findings of topographical and horticultural characteristics of each individual tree (including Tree Survey Plan, Tree Survey Schedule and Tree Photographs) before the tree to be felled in this Contract. 1.3.3 A qualified person will carry out bi-monthly tree inspection to all the preserved trees and prepare the bi-monthly tree monitoring report for submission. 1.3.4 Nishimatsu Construction Company Ltd. (NCC) will minimise the number of tree to be felled and to provide adequate tree protection and preservation mitigation measures to the retained trees through the construction period of this Contract. 1.3.5 The compensatory tree planting is not the scope of work in this Contract conducted by NCC, while compensatory tree planting will be provided in other Contracts of Central Kowloon Route. The required numbers of compensatory trees will not be less than the numbers of trees to be felled in this Contract.

SHEET 6 OF 8 2 LANDSCAPE AND VISUAL MITIGATION MEASURES IN EIA&EM&A 2.1 In the Table 10.9 of the approved EIA report and the Environmental Mitigation Implementation Schedule Central Kowloon Route of the Appendix C in the EM&A Manual, various measures are proposed as landscape and visual mitigation measures during the construction stage. These mitigation measures are considered and will be adopted as far as practicable. These landscape and visual mitigation measures applicable to this Contract are listed below: MM3 - Good Site Management Large temporary stockpiles of excavated material will be covered with unobtrusive sheeting to prevent dust and dirt spreading to adjacent landscape areas and vegetation, and to create a neat and tidy visual appearance. Construction plant and building material will be orderly and carefully stored in order to create a neat and tidy visual appearance. MM4 - Screen Hoarding Decorative screen hoarding will be erected to screen the public from the construction area. It will be designed to be compatible with the existing urban context. MM5 - Lighting Control during Construction All lighting in the construction site will be carefully controlled to minimise light pollution and night-time glare to nearby residencies and GIC. NCC will consider other security measures, which will minimise the visual impacts. MM6 - Erosion Control The potential for soil erosion will be reduced by minimising the extent of vegetation disturbance on site and by providing a protective cover over newly exposed soil. MM8 - Tree Protection & Preservation Existing trees to be retained within the Project Site will be carefully protected during construction. Note no Registered Old and Valuable Trees are located within Works Area and none of the affected trees are LCSD champion Trees or Registered Old and Valuable Trees, neither are they rare or endangered species, but mainly common exotic trees. Tree protection measures will be detailed at the Tree Removal Application stage and plans submitted to the relevant Government Department for approval in due course in accordance with ETWB TC no. 3/2006. Care will be taken to preserve as many trees as possible by avoidance.

SHEET 7 OF 8 3 SUMMARY 3.1 This is the Landscape Mitigation Plan (LMP) submission made in fulfillment of Clause 2.8 of Environmental Permit (EP) (No. EP-457/2013/C). 3.2 Proposed mitigation measures as landscape and visual mitigation measures during the construction stage in accordance with the Table 10.9 of the approved EIA report and the Environmental Mitigation Implementation Schedule Central Kowloon Route of the Appendix C in the EM&A Manual, to comply with the Condition 2.10 of the Environmental Permit No. EP-457/2013/C for Central Kowloon Route. 3.3 All relevant design measures listed in the Table 10.9 of the approved EIA report and the Environmental Mitigation Implementation Schedule Central Kowloon Route of the Appendix C in the EM&A Manual have been considered in the construction stage. These measures have been incorporated in the landscape mitigation plan as far as practicable.

SHEET 8 OF 8 APPENDIX A Landscape Mitigation Plan