Task Force on Kai Tak Harbourfront Development

Similar documents
Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study. PlanD CEDD GPA IRD ArchSD

Task Force on Kai Tak Harbourfront Development

Overview of Land Use Framework for Victoria Harbourfront. Planning Department February 2011

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Task Force on Kai Tak Harbourfront Development. Update on Implementation of Public Creatives in Kai Tak Development

Harbour-front Enhancement Committee. Urban Design Study for the New Central Harbourfront Revised Planning and Urban Design Concepts

Task Force on Harbourfront Developments on Hong Kong Island

Task Force on Harbourfront Developments on Hong Kong Island

Task Force on Kai Tak Harbourfront Development. Proposed Establishment of Government Flying Service Kai Tak Division at Ex-Kai Tak Runway Tip

Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review

Task Force on Harbourfront Developments on Hong Kong Island. Hong Kong Island East Harbour-front Study

Waterfront Promenade adjacent to the Hong Kong Children's Hospital at Kai Tak. Harbourfront Commission Aug 2015

Preliminary Land Use Proposal for the Western Part of Kennedy Town Task Force on Harbourfront Developments on Hong Kong Island

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing. Renovation of the Hong Kong Museum of Art

Harbour-front Enhancement Committee. Wan Chai Development Phase II. Planning and Engineering Review

Task Force on Kai Tak Harbourfront Development. Minutes of Twenty-sixth Meeting

Minutes of Seventeenth Meeting

Representing Hong Kong Institution of Engineers. Representing Society for Protection of the Harbour

HBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications

Official Plan Review: Draft Built Form Policies

Planning for Liveability in Hong Kong

By & Fax. Creating a Better Pedestrian Environment to Improve Streetscape and Promote Walking

New Towns in Hong Kong: Planning for the Next Generation

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Bloor St. W. Rezoning - Preliminary Report

Enclosures Appendix 1: Draft Golders Green Station Planning Brief. Summary

Task Force on Kai Tak Harbourfront Development

McCowan Precinct Plan Study Background & Deliverables

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Agreement No. CE 57/2013 (TT) Pedestrian Environment Improvement Scheme for Transformation of Kwun Tong Business Area.

HKIUD Speech. Urban Renewal in a new dimension. 5 September Ir WAI Chi Sing GBS JP FHKEng. Managing Director, Urban Renewal Authority

4 RESIDENTIAL ZONE. 4.1 Background

URBAN DESIGN STUDY FOR THE WAN CHAI NORTH AND NORTH POINT HARBOURFRONT AREAS FEASIBILITY STUDY

Draft Western District Plan

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

DIGITAL SCREENS PROJECT CONSULTATION. Enhancing Communication through Digital Screen Technology

Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar

Task Force on Water-land Interface

350, 370, and 390 Queens Quay West Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Air Ventilation Assessment (AVA) System for High Density Planning and Design

Summary of Public comments on Draft Harbour Planning Guidelines and Responses

Welcome to the Oakridge Centre Open House

1071 King Street West Zoning Amendment Application - Preliminary Report

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

The Tonsley Park Sustainable. Precinct

HARBOUR-FRONT ENHANCEMENT REVIEW WAN CHAI, CAUSEWAY BAY & ADJOINING AREAS REALIZATION STAGE

North Fair Oaks Community Plan Summary and Information

Executive Summary. NY 7 / NY 2 Corridor

Edenderry Local Area Plan

Ebbsfleet Development Corporation

QUEEN S WHARF BRISBANE PRIORITY DEVELOPMENT AREA PROPOSED DEVELOPMENT SCHEME AILA COMMENTS

George Hotel application STAFF REVIEW COMMITTEE OF THE WHOLE JANUARY 14, 2014

38 Queen s University Campus Master Plan Part 1

Case studies. B1.1 Lloyds Crossing, Portland (USA)

Minutes of Fourteenth Meeting

Environmental Permit No. EP-457/2013/C. Central Kowloon Route. Independent Environmental Checker Verification

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

ACU DEVELOPMENT PLAN OBJECTION RESPONSE

Local Growth Planning in North Central Green Line Communities

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

CENTRAL HARBOURFRONT AND ME (CHarM) DESIGN BRIEF

Place Brief. National Collections Facility (NCF site)

Contents of Part 6. Part 6 Zones

South of Eastern Strategic Direction Status Update

PRIORITIES COMMITTEE MEETING

Auckland City Council

Urban Planning and Land Use

Hamilton Pier 7&8 Draft Urban Design Plan

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

South Norfolk Municipal Facilities Study

I539. Smales 2 Precinct

411 Victoria Park Redevelopment Community Consultation Meeting

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Wan Chai Development Phase II Planning and Engineering Review

CENTURY CITY URBAN DESIGN FRAMEWORK

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Urban Microclimate Design in Hong Kong

Long Branch Neighbourhood Character Guidelines Final Report

3 Summary of Major Views and Responses

Alignment of Options 2 & 3. Lam Tin. Tseung Kwan O Town Centre South. Ocean Shores. Cemetery. Cross Bay Link. Alignment Option 1

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development

TOURIST AREA DESIGN GUIDELINES

BERTRAMS PRIORITY BLOCK. Dra support documentation to the recommendations to SAHRA for the Priority Block, Bertrams, Johannesburg OCTOBER 2008

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

Task Force on Harbourfront Developments in Kowloon, Tusen Wan and Kwai Tsing. Provision of An Art Square at Salisbury Garden, Tsim Sha Tsui

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

The Proposed Auckland Unitary Plan (notified 30 September 2013)

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

Draft Eastern District Plan

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report

Notes. Schedule of Uses. Explanatory Statement

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

Planning Commission April 4, 2013 BOCC Workshop Page 1

Transcription:

Task Force on Kai Tak Harbourfront Development For discussion on 1 September 2014 TFKT/08/2014 Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study PURPOSE This paper aims to brief Members on the proposed increase in the development intensity of Kai Tak Development (KTD) and the findings of the associated technical study; and to seek Members views on the proposal. BACKGROUND 2. In his Policy Address 2013, the Chief Executive (CE) announced that the Government was committed to increasing the housing and office land supply in short-to medium-term by various means, which include increasing the development intensity of KTD, and would consult the public on the outcome of the associated studies. Among others, the Government has reviewed the planning for the KTD and initiated the technical study in mid-2013 to ascertain the feasibility of increasing the development intensity of the KTD while the planning intention and associated urban design concept can be maintained. Due consideration has also been given to not overstraining the capacity of the planned engineering infrastructure or introducing any unacceptable environmental impacts. 3. In the 2014 Policy Address, it is promulgated that the number of flats and commercial GFA to be developed in KTD could be increased by 6,800 (i.e. about 20%) and 430,000m 2 (i.e. about 20%) respectively. The related review and study are now completed.

Task Force on Kai Tak Harbourfront Development TFKT/08/2014 THE PROPOSAL OF INCREASING DEVELOPMENT INTENSITY OF KTD 4. As a result of the public engagement activities in 2004 to 2006 and the public consultation on enhancement of the planning of KTD in 2011 to 2012, a consensus towards the planning of Kai Tak and urban design concept has been generally reached among the public. On the basis of the approved Kai Tak Outline Zoning Plan (OZP) No. S/K22/4 and in accordance with the planning intention and urban design concept, the proposal suggests minor relaxation of the maximum plot ratio and building height restrictions, and changes in land use for some sites in order to increase the supply of flats and office space while maintaining the overall townscape and design concept of KTD. 5. Taking the above into consideration, it is suggested increasing the development intensity by a general lifting of overall building height of the sites in the North Apron by 20m, which would generally keep the building height profile and urban design concept. With due consideration to the undulating building height profile in the Runway Precinct, the proposal also suggests increasing the development intensity by a general lifting of building height of 10 sites in the area by 10m to 20m. In addition, to build up a critical mass of office space near Kowloon Bay and create synergy in support of the policy initiative on Energizing Kowloon East, it is proposed to rezone some sites in the South Apron for commercial use with relaxation of building height. 6. The details of the proposal are shown in Plans 1 and 2 as well as Annexes 1 and 2. IMPACT ASSESSMENT 7. The Government has completed the technical study, including a series of impact assessments, and confirmed that the proposal of increasing the development intensity of KTD would have no significant impact on the capacity of the transport, water supply, stormwater drainage, sewerage infrastructures and the Page 2

Task Force on Kai Tak Harbourfront Development TFKT/08/2014 provision of other community facilities, or any unacceptable noise, air quality, ventilation and visual impacts. OTHER POTENTIAL SITES 8. It is proposed to revise the building height of two Government, Institution or Community (G/IC) sites in the North Apron, i.e. s 1D2 and 1D3, which will be used for Government Offices and the proposed Inland Revenue Tower respectively. The details of the proposal are shown in Plans 1 and 3 and Annex 3. 9. By relaxing the building height restrictions of 1D2 and 1D3 by 20m, the building footprint could be reduced to allow more ground level landscaping. In addition, a 35-m wide ventilation corridor (including a 10-m pedestrian street) would be introduced between 1D3 and 1D4 to enhance the visual permeability, ventilation and streetscape. The above proposal has been developed with due regard to the site limitations and would not introduce any unacceptable ventilation, landscape and visual impacts. 10. It is also proposed to combine and rezone 3E1, 3E2 and part of the adjoining open space at South Apron Corner area to one whole site for mixed use development, in order to help form a development cluster mainly for residential use in the area, which is compatible with the approved planning applications for the redevelopment of the nearby godown uses at Kai Hing Road for residential development. The details of the proposal are shown in Plans 1 and 4 and Annex 4. 11. Reference has been made to the findings of the technical study and confirmed that the above proposals in paragraphs 8 to 10 would have no significant impact on the capacity of the transport, water supply, stormwater drainage, sewerage infrastructures and provision of other community facilities, or any unacceptable noise, air quality, ventilation and visual impacts. Page 3

Task Force on Kai Tak Harbourfront Development STATUTORY PROCEDURES TFKT/08/2014 12. For proposals which involve relaxation of development parameters as detailed in Annexes 1 and 3, the Civil Engineering and Development Department would submit planning application under the Town Planning Ordinance (TPO). For proposals which involve changes in land use as detailed in Annexes 2 and 4, the Planning Department would propose amendments to OZP to the Town Planning Board (TPB) under the TPO. HARBOUR PLANNING PRINCIPLES 13. When formulating the above development proposals, due regard has been given to the prevailing Harbour Planning Principles which are summarized as follows - (a) Preserving Victoria Harbour the proposal will not jeopardize the intention to preserve the waterfront areas for enjoyment by Hong Kong people and visitors. The development sites in KTD are utilized in the way where the waterfront areas will be maintained as parks and promenades; (b) Stakeholder Engagement prior consultation with the Harbourfront Commission s Task Force on Kai Tak Harbourfront Development, as well as Kowloon City, Kwun Tong and Wong Tai Sin District Councils will be conducted before the relevant planning applications and rezoning amendments are submitted to the TPB. The statutory procedures in consulting the public on the planning applications and proposed amendments to OZP as required under the TPO will also be followed; (c) Sustainable Development the proposed increase in development intensity of Kai Tak is to take forward the policy initiative to meet the increasing needs of the society for housing and office land. It has been ascertained in Page 4

Task Force on Kai Tak Harbourfront Development TFKT/08/2014 the technical study that the proposals will not overload the infrastructures or create any unacceptable environmental impacts; (d) Integrated Planning the proposals are formulated on the basis of maintaining the planning intention and urban design concept of KTD. Due consideration has been given to not overstraining the capacity of the planned engineering infrastructure, and not introducing any unacceptable impacts on the water quality of the Victoria Harbour; (e) (f) (g) Proactive Harbour Enhancement the urban design concept of KTD in achieving a stepped height profile rising generally from the waterfront to the inland areas and an undulating height profile along the ex-runway has been maintained in the proposal; Vibrant Harbour the proposal to rezone sites in the South Apron area for commercial and mixed use developments will help create a critical mass of office supply to facilitate the transformation of Kowloon East and add vibrancy to the waterfront area; Accessible Harbour the proposal will not affect the accessibility to the harbour as the major connections between the inland area and the waterfront in KTD will be maintained; and (h) Public Enjoyment the proposal will not compromise the opportunities for the public to enjoy the waterfront areas. The proposed land uses are compatible to the waterfront sites and will not require additional land in the waterfront for infrastructure developments. Page 5

Task Force on Kai Tak Harbourfront Development CONCLUSION TFKT/08/2014 14. Members are invited to provide views and comments on the proposals of increasing development intensity in KTD and findings of the associated technical study. Planning Department Civil Engineering and Development Department Government Property Agency Inland Revenue Department Architectural Services Department August 2014 Page 6

Annex 1 Proposed Relaxation of Development Parameters Max. Plot Ratio Max. Building Height No. Land Use (mpd) Original Proposed Original Proposed 1K1 R(B)2 4.5 5.5 110 130 1K2 R(B)2 4.5 5.5 110 130 1K3 R(B)2 4.5 5.4 110 130 1L1 R(B)2 4.5 5.4 100 120 1L2 R(B)2 4.5 5.4 100 120 1L3 R(B)2 3.5 4.2 50/100 50/120 2A1 CDA(3) 5 6.0 80 100 2A2 CDA(4) 4.5 5.2 70 90 2A3 C(3) 4.5 5.7 70 90 2A4 C(3) 4.5 5.5 60 80 2A5 C(3) 4.5 5.2 60 80 2A6 C(3) 4.5 5.5 60 80 2B1 CDA(5) 5 6.4 110 130 2B2 R(B)1 5 6.1 100 120 2B3 R(B)1 5 5.7 85 105 2B4 R(B)1 5 5.9 85 105 2B5 R(B)1 5 5.7 85 105 2B6 R(B)1 5 5.7 85 105 4A1 R(C) 3 3.4 65/80 80 4B1 R(C) 3 3.7 55 65 4B2 R(C) 3 4.5 55 75 4B3 R(C) 3 3.9 65 75 4B4 R(C) 3 3.7 55 65 4A2 C(4) 4 5.0 45 55 4C1 C(4) 4 5.0 45 55 4C2 C(4) 4 5.9 55 65 4C3 C(4) 4 5.0 45 55 4C4 C(4) 4 5.0 45 55 1E1 Mixed Use(3) 7 8.2 100 120 1F1 Mixed Use(2) 7 8.1 125/150 145/170 1E2 C(6) 6 7.2 100 120

Annex 2 Proposal of Change in Land Use and Relaxation of Development Parameters Land Use Max. Plot Ratio Max. Building Height No. (mpd) Original Proposed Proposed Original Proposed 2A7 6.0 30 80 C(6) 3A6 6.0 45 100 3B1 C(5) 5.8 45 80 G/IC 3B2 5.8 45 80 3B3 5.8 45 80 3B4 5.8 45 80

Annex 3 Relaxation of Development Parameters (Other Potential s) Land Use Zoning Max. Building Height (mpd) Original Proposed 1D2 G/IC 100 120 1D3 G/IC 60 80

Annex 4 Proposal of Change in Land Use and Relaxation of Development Parameters (Other Potential s) 3E1 3E2 and adjoining Open Space Land Use Zoning Max. Building Max. Plot Ratio Height (mpd) Original Proposed Original Proposed Original Proposed Mixed C(2) 9.5 100 90 Use (1) Domestic: 3 OU (Gas Mixed Non-domestic: 1 Pigging - 15 60 Use (1) Station) and O

s Proposed for Change in Development Parameters/ Land Use Plan 1 s 1D2, 1D3 s 1E1, 1E2, 1F1 Kai Tak Land Use Plan s 1K1-3, 1L1-3 s 2A1-7, 2B1-6 s 3A6, 3B1-4 Legend s covered by Technical Study s covered by Other Proposals s 4A1-2, 4B1-4, 4C1-4 s 3E1, 3E2 Kwun Tong 1

Plan 2 (Sheet 1 of 6) 1K1 1K2 1K3 1L1 1L3 1L2 1K1 Land Use Zoning Max. Plot Ratio Max. Building Height (mpd) Original Proposed Original Proposed 4.5 5.5 110 130 1K2 4.5 5.5 110 130 1K3 4.5 5.4 110 130 R(B)2 1L1 4.5 5.4 100 120 1L2 4.5 5.4 100 120 1L3 3.5 4.2 50/100 50/120

Plan 2 (Sheet 2 of 6) 2A2 2A1 2A3 2A4 2A5 2A7 2A6 Land Use Zoning Max. Plot Ratio Max. Building Height (mpd) Original Proposed Original Proposed Original Proposed 2A1 CDA(3) 5.0 6.0 80 100 2A2 CDA(4) 4.5 5.2 70 90 2A3 4.5 5.7 70 90 2A4 4.5 5.5 60 80 C(3) 2A5 4.5 5.2 60 80 2A6 4.5 5.5 60 80 2A7 G/IC C(6) - 6.0 30 80

Land Use Zoning Max. Plot Ratio Max. Building Height (mpd) Original Proposed Original Proposed 2B1 CDA(5) 5.0 6.4 110 130 2B2 5.0 6.1 100 120 2B3 5.0 5.7 85 105 2B4 R(B)1 5.0 5.9 85 105 2B5 5.0 5.7 85 105 2B6 5.0 5.7 85 105 Plan 2 (Sheet 3 of 6) 2B1 2B2 2B3 2B4 2B5 2B6

Land Use Zoning Max. Plot Ratio Max. Building Height (mpd) Original Proposed Original Proposed 1E1 Mixed Use (3) 7.0 8.2 100 120 1E2 C(6) 6.0 7.2 100 120 1F1 Mixed Use (2) 7.0 8.1 125/150 145/170 Plan 2 (Sheet 4 of 6) 1E1 1E2 1F1

Plan 2 (Sheet 5 of 6) 4A1 Land Use Zoning Max. Plot Ratio Max. Building Height (mpd) Original Proposed Original Proposed 4A2 4B1 4A1 3.0 3.4 65/80 80 4B1 3.0 3.7 55 65 4B2 R(C) 3.0 4.5 55 75 4C1 4B2 4B3 3.0 3.9 65 75 4B4 3.0 3.7 55 65 4C2 4B3 4A2 Land Use Zoning Max. Plot Ratio Original Proposed Original Max. Building Height (mpd) Propo sed 4.0 5.0 45 55 4C3 4C4 4B4 4C1 4.0 5.0 45 55 4C2 C(4) 4.0 5.9 55 65 4C3 4.0 5.0 45 55 4C4 4.0 5.0 45 55

Plan 2 (Sheet 6 of 6) 3B1 3A6 3B2 3B3 3A6 3B1 Land Use Zoning Max. Plot Ratio Max. Building Height (mpd) Original Proposed Original Proposed Original Proposed C(6) - 6.0 45 100-5.8 45 80 3B2 G/IC - 5.8 45 80 C(5) 3B3-5.8 45 80 3B4-5.8 45 80 3B4

Plan 3 1D3 1D2 1D4 Land Use Zoning Max. Building Height (mpd) Original Proposed 1D2 100 120 G/IC 1D3 60 80

Plan 4 3E1 3E2 and adjoining Open Space Land Use Zoning Max. Plot Ratio Max. Building Height (mpd) Original Proposed Original Proposed Original Proposed C(2) OU (Gas Pigging Station) and O Mixed Use (1) 9.5 100 90 Domestic: 3 - Non-domestic: 1 15 60 3E1 3E2 Open Space