CAESAREA SUBSTATION BATTERY ENERGY STORAGE SYSTEM PREFABRICATED EQUIPMENT CONTAINER SPECIFICATION ATTACHMENT TO ANNEXURE "B"

Similar documents
GARCIA GALUSKA DESOUSA Consulting Engineers

DV-5 Red-E Cabinet Integrated Deluge Fire Protection Package. General Description. Technical Data. Page 1 of 6 AUGUST 2018 TFP1300. Worldwide Contacts

CHAPTER 20 SERVICE EQUIPMENT

Technical Data. Approvals The 1-1/2 in. to 8 in. (DN40 to DN200) DV-5 Red-E Cabinets are UL Listed and C-UL Listed with the following system types:

Technical Data. Working Pressure Range 20 to 250 psi (1,4 to 17,2 bar)

Technical Data. Approvals The 1-1/2 thru 8 inch (DN40 thru DN200) DV-5 Red-E Cabinets are UL Listed and C-UL Listed with the following system types:

DETECT-A-FIRE Heat Detectors

IT AFEM. Table of Contents. Error! Table not allowed in footnote, endnote, header, footer, comment, or text box.

MODULAR TRACTION SUBSTATIONS CITY ELECTRIC TRANSPORT

GENERAL SPECIFICATION ELECTRICAL

Worldwide Contacts.

SPECIFICATION: ARGONITE Engineered Fire Suppression System

LaserFOCUS VLF-250 Engineering Specification

RAWABI ELECTRIC

Integrated Solutions Low Voltage Systems

Electrical Design Guidelines Table of Contents

Certificate of Compliance

Certificate of Compliance

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

Electrical Safety Requirements

SPECIFICATION: ECS SERIES CLEAN AGENT FIRE SUPPRESSION SYSTEM

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

new new Industrial plugs and sockets

TOTALPAC2 Integrated Fire Protection System

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

A. NFPA 2001 Standard for Clean Agent Fire Extinguishing Systems 2004 edition.

SUGGESTED SPECIFICATION For Series 300 Manual Transfer Switches (3MTS)

40 CDe ENCLOSURES AND DISTRIBUTION BOARDS FOR SPECIFIC STANDARDS

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

SECTION INTERIOR LIGHTING

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

VESDA VLP. Engineering Specification

SCOPE OF SUPPLY SUPPLY OF H2S ANALYZER

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

SPECIFICATION: Kidde Engineered Fire Suppression System Designed for use with 3M Novec 1230 Fire Protection

DESIGN GUIDELINES. THERMAL building SOLUTIONS

T THATCHED BUILDINGS Electrical installations in. 1 of 5. Introduction. Consultation. Assessment of general characteristics

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

Open-area Smoke Imaging Detector. Engineering Specification

Annubar Flowmeter Series

Independent, accredited testing station Member laboratory of STL and LOVAG

5 m pre-wired 2NC/1NO F3S-TGR-NLMX m pre-wired 2NC/1NO F3S-TGR-NLMX m pre-wired 2NC/1NO F3S-TGR-NBMX-21-05

standards: standards:

PROFILE. industrial services rental trading

technical datasheet technical datasheet

Explosion Proof Exit Sign - Class I, Division I - IP65-120V/277VAC - Emergency Battery Back-Up

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

SLATE. Base Module INSTALLATION INSTRUCTIONS R8001A1001

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

FALCON SERIES 12 METAL CLAD

Photovoltaic (Solar) Array Installation Guide

LANDE SmartQube 19 Air-Conditioned Cabinet

DAF DETECT-A-FIRE. DAF DETECT-A-FIRE Detection and Release Devices

SECTION COMMERCIAL-KITCHEN HOODS

SECTION : FIRE ALARM & DETECTION SYSTEMS

Products Solutions Services CT287. Hazardous Area Classifications and Protection Systems

Section 5.0: HAZARDOUS MATEIRAL STORAGE TABLE OF CONTENTS. A. Regulations, Standards and References 2. B. Scope 3. C. Approvals and Listings 3

Dräger Polytron 5700 IR Detection of flammable gases and vapours

Product Specifications Dialog Room Controller* (*patent pending)

PHOTOVOLTAIC SYSTEMS

CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated)

PRODUCT OVERVIEW. Light fittings, boxes & custom built control panels for explosive atmospheres

Dublin airport - Dublin, Ireland

UL TEST REPORT AND PROCEDURE

Operating Instructions

UL Topic III. Converting European EEx Certificates. Into. North American Division Certificates

STANDARD RESPONSE FUSIBLE LINK PENDENT SPRINKLER VK008 (K4.2) TECHNICAL DATA 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3. TECHNICAL DATA.

CONTENTS AUTOMATIC TRANSFER SWITCHES

WFDE Series Waterflow Detector

TECHNICAL DATA OBSOLETE

INERIS 01ATEX0060 (standard) TR CU (marking upon request, ordering code to be required)

SmartShelter Room. Technical Description. Version 1.1 Jul. 2017

TUNNELS BOXES AND CONNECTORS

micromatic standard response Upright sprinkler VK100 (K5.6)

Dräger Flame 2500 (IR3) Flame Detection

Fan-and-filter units 4.3. Features. Fast assembly. Application diversity and functions

9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.

Amerex Clean Agent System with FM200. Potential Applications: System Coverage Overview: Approvals and Standards:

A. This Section includes the following lighting control devices:

micromatic standard response stainless steel sprinklers

EU RO Mutual Recognition Technical Requirements

FM-200 In-Cabinet Series

OPTIBAR DP 7060 Supplementary Instructions

Oberon s NEC Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products

MEP Syllabus CAREER DEVELOPMENT CENTRE SHRISTI MEP. Trichy-26

TECHNICAL DATA. Refer to Approval Chart 1 and UL Design Criteria for culus Listing requirements that must be followed.

Model DV-5 Red-E Cabinet 1-1/2 thru 8 Inch (DN40 thru DN200), 250 psi (17,2 bar) Integrated Deluge Fire Protection Package General Description

The extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate.

Introduction to Flow Switch

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Dräger Polytron 8700 IR Detection of flammable gases and vapors

Flammable. cabinets. Corrosive. cabinets. Toxic cabinets. and multirisk. Pesticide range. Fume hoods, filtering. cabinets - Ventilation

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

TECHNICAL DATA. * Refer the Approval Chart on page 120c and Design Criteria on page 120d for culus and FM approval requirements that must be followed.

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

Engineering Specification Guide VESDA-E VEP

USER MANUAL FOR EXPLOSION PROTECTED FLUORESCENT LIGHT FITTING type PSF 236

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

Transcription:

CAESAREA SUBSTATION BATTERY ENERGY STORAGE SYSTEM PREFABRICATED EQUIPMENT CONTAINER SPECIFICATION ATTACHMENT TO ANNEXURE "B" DATE DRAWER DESIGNER APPROVER This document shall be revised in its entirety only. All sheets of this document are the same revision. DESCRIPTION Released :STATUS For Bid :DEST. DRAWER XX GENERAL P.S. תח"כ כללית XX חטיבת פרויקטים הנדסיים ופיתוח עסקי אגת"ה תכנון חשמלי Engineering Projects & Business Development Group ENG. DIV. ELECTRICAL DESIGN DESIGNER CHECKER APPROVER S Boga S Boga NAME L WORTMAN A AKRISH DATE SIGN. S BOGA S BOGA L WORTMAN A AKRISH SCALE NONE 1 SIZE A 4 SERIAL NO. UNIT 0 CONCEPTUAL DESIGN ELECTRICAL BATTERY ENERGY STORAGE SYSTEM PREFABRICATED EQUIPMENT CONTAINER DATA 3135 XX0/EN02XX יחידה 0

1. General Prefabricated equipment container (PEC) means mobile and modular construction for outdoor installation with all equipment mounted inside. It may be single container or consist of several construction parts. The equipment should be preferably factory mounted. Part of equipment may be erected on site after mobile structure transportation and installation. Prefabricated equipment container includes power and control equipment, lighting, HVAC, smoke exhaust and Fire protection systems with complete internal cabling. Transportation of PEC and it's erection on the foundation is included in the scope of work. 2. PEC content No. Content Document No. 1 Energy storage battery pack XX0/EN021XX 2 Power conversion system (PCS) XX0/EN022XX 3 Power transformer XX0/EN023XX 4 Medium voltage switchgear XX0/EN024XX 5 Control and monitoring system XX0/EN025XX Lighting & Power system According to par. 5 of this document 7 Uninterruptible Power Supply According to par. of this document (UPS) system 8 HVAC and smoke exhaust According to par. 7 of this document system 9 Fire protection system According to par. 8 of this document 3. PEC installation 3.1. PEC will be installed on raised on concrete foundation (columns), according to static calculations. Column Height is approximately 1m. 3.2. The foundation will be supplied by others. 3.3. The space under the PEC will be used for cables installation. 3.4. Contractor shall provide static calculations for the containers foundation and provide the signature of an engineer with an Israel license, with a building permit. 4. PEC structure 4.1. PEC shall be light industrial steel construction with thermal insulation. 2 XX0/EN02XX

The PEC shall be modular and include the following modules (sections): Energy Storage Power conversion system (PCS) Power transformer Medium voltage switchgear Control room Communication room For PEC schematic view see supplement 5.3.1 (ELECTRICAL & CONTROL BLOCK DIAGRAM XX0/IN1XX) 4.2. Each section must be provided with separate access and be able to maintain the module without disassembling the other sections. 4.3. Control room area should take into consideration m 2 areas for Purchaser equipment, for details see supplement 5.3. (XX0/EN025XX). 4.4. PEC area should take into consideration space for communication room (at least m 2 for 19 cabinet installation). 4.5. PEC construction fire resistance: Floor, walls, ceiling 2 hour Doors 0.5 Hour 4.. Corrosion protection of PEC shall be according to ISO 12944, for C5M corrosion category. 4.7. Openings shall be provided suitable for cables entries. 5. PEC Lighting & Power system 5.1. Contractor shall design, procure, build, supply, install, wire and operate all necessary electrical distribution, lighting fixtures, sockets and electrical installation to make a complete lighting & power system for The PEC. 5.2. Lighting & power cabinet should be designed & constructed according to SI 1439 1,2. Lighting level inside the PEC is 3 Lux minimum and according to standard SI/CIE/ISO/DIS 8995. Emergency Lighting will be designed according to EN/ SI 1838. Emergency lighting fixtures will be approved according to SI 20 part 2.22. All 230VAC sockets will be according to SI 32. 5.3. PEC lighting &power system include: 5.3.1. Lighting & Power distribution cabinet 4VAC 3 phase, 50Hz, 10kA short circuit current, protection level IP32, wall mounting. 5.3.1.1. Contractor shall indicate the calculated current of the main circuit breaker and of every circuit. There will be at least 30% spare space in the cabinet. 5.3.1.2. The Lighting & Power distribution cabinet will be located in the control room. 3 XX0/EN02XX

5.3.2. Indoor regular & emergency (include "EXIT") LED lighting fixtures, Outdoor LED lighting fixtures &Lighting switches: 5.3.2.1. Outdoor lighting shall be automatically switching by photocell (will be supplied as well). There will be at least one (1) outdoor lighting fixture above every door and at least one (1) on every side of the PEC. 5.3.2.2. Emergency lighting fixtures shall have at least two (2) years warranty. 5.3.2.3. Regular lighting fixtures shall have at least five (5) years warranty. 5.3.3. Service sockets in every room (at least two (2) sockets on every wall). All service sockets circuits will be protected by Residual Current Device, 30 ma type A. 5.4. Electrical installation shall be complete include fire retardant halogen free cables, cable trays, PVC/rigid conduits, junction boxes, etc. 5.5. If there is an area the PEC which defined as a zone with explosive atmosphere, all the electrical equipment should be certified as explosion proof according to relevant standard (ATEX, etc.) suitable for this zone. 5.. Contractor shall supply a power consumptions table of the all electrical equipment in the PEC. 5.7. The whole electrical system of the PEC will be designed, constructed and checked according the Israel Electricity Law.. Uninterruptible Power Supply (UPS) system.1. UPS system shall be provided for power supply of the control circuit of the BESS..2. UPS 230 VAC specification: Capacity BESS loads +1kVA(IEC loads) INPUT Voltage Range 4VAC 3 PHASE Frequency 50 HZ Power Factor >0.92 OUTPUT Voltage 230±1% VAC Frequency 50 HZ Work Time In Battery Mode 30 min Standards IEC 20401, IEC 20402 BATTERY Battery type Maintenance free lead acid batteries 4 XX0/EN02XX

.3. UPS Distribution Cabinet 230 VAC specification: Main CB CIRCUIT BREAKERS (CB) According to UPS capacity Output CBs For BESS consumers: according to consumers + 20% spare; For IEC consumers: 1A 2POLE "C" 5pcs and 10A 2POLE "C" 5pcs. Standard IEC 1439 ENCLOSURE Material Galvanized Steel Sheet Color RAL 7035 Dimensions 8XX3mm (approximately) Ingress Protection (IP) IP42.4. UPS system should take into consideration 10 W additional power for Purchaser s control, monitoring and communication equipment. 7. PEC HVAC system 7.1. HVAC units shall be inverter type units with cooling gas R410A. 7.2. HVAC system shall be designed to ensure 2x50% redundancy for each container section. 7.3. Required temperature condition: Energy storage battery pack: temperature condition shall be defined by Contractor to provide 5 years at least energy storage life cycle, but not more 30 o C. Power conversion system +5 30 o C Power transformer +5 30 o C Medium voltage switchgear +5 30 o C Control room +20 25 o C Communication room+20 25 o C 8. PEC Fire Protection system 8.1. The fire protection system (fire detection and extinguishing) inside the prefabricated equipment container is a part of complete fire protection system of the power substation. 8.2. All fire extinguishing systems within the scope of supply shall be designed and installed according to FM, NFPA regulations, State Fire Marshal codes and Israel Local Standards (include Israel Standard 1220 Parts 1 to 10) and according to Risk assessment demand. 5 XX0/EN02XX

8.3. All basic equipment proposed and planned for used must be formally listed and/or approved by the LOCAL STANDARDS INSTITUTION and at least by one of the internationally recognized testing laboratories as follows for example: 8.3.1. USA UNDERWRITERS LABORATORIES... UL 8.3.2. USA FACTORY MUTUAL... FM 8.3.3. WEST GERMANY VERBAND DER SACCHVERISCHERE... Vds 8.3.4. GREAT BRITIAIN FIRE FICES COMMITTEE... F.O.C. 8.3.5. CANADA UNDERWRITERS LABORATORIES... ULC 8.3.. UK LOSS PREVENTION COUNCIL... LPC 8.3.7. OTHER RECOGNIZED LABORATORY in consultation with IEC 8.4. Principal and detailed design of all systems shall be checked and approved by Israel Certified Laboratory. 8.5. The NEW system (complete) shell be checked and approved by Israel Certified Laboratory. A document shall be provided by contractor. 9. Grounding & Lightning protection 9.1 The indoor grounding system includes all grounding measures inside PEC, which prevent dangerous potentials on touchable metallic surfaces. 9.2 Main grounding copper bar 50x5mm shall be provided in the PEC. All equipment grounding conductors shall be connected to the main grounding bar. 9.3 Provisions for external grounding connections shall be provided. Two (2) external connections copper cable 95 mm 2 will be provided by others. 9.4 The PEC shall be a completely shielded metal enclosure and shall be able to withstand direct lightning strikes. The enclosure will be connected (by others) to the external grounding system. At least two (2) grounding pads shall be provided. XX0/EN02XX