Request for an Exception to the Napa County Road and Street Standards

Similar documents
Erosion & Sediment Control Plan Application Form & Checklist

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Project phasing plan (if applicable) 12 copies of site plan

PLAN SUBMITTER'S CHECKLIST

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

Gloucester County PLAN SUBMITTER'S CHECKLIST

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Chapter Six: Tree Removal and Erosion Control

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Zoning Ordinance Chapter 10

TO BE COMPLETED BY APPLICANT

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Specification and Construction Plans For: South Bethany Landscaping Improvement Plan Contract Number T

Plan Review Checklist

River Corridor Overlay Zone (RCOZ) Article 5

City of Lafayette Study Session Staff Report Design Review Commission

SITE PLAN REVIEW APPLICATION AND CHECKLIST

NAPA COUNTY PUBLIC WORKS Standards & Specifications

Public Information Centre. Welcome

Chapter 3 Site Planning and Low Impact Development

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

SECTION 5: REACH RECOMMENDATIONS/MAPS

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

City of Lafayette Study Session Staff Report Design Review Commission

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

Section 3 Non-Structural BMPs

Washington County, Maryland Division of Public Works Policy Manual

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

Florence County Small Commercial Land Disturbance Permit Application

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Title 11 Streets and Sidewalks

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

STREAM BUFFERS

Essential Skills: Reading and Interpreting Maps and Plans

Draft Rhode Island Stormwater Design and Installation Standards Manual

When planning stormwater management facilities, the following principles shall be applied where possible.

TENTATIVE MAP CHECKLIST

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist

Appendix I. Checklists

Storm Water Basics for Construction Sites Presented by Representatives from the City of Grass Valley and Nevada County

City of Lafayette Staff Report

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

PLANNING APPROVAL STAFF REPORT Date: November 17, 2011

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

STATUS OF REVIEW: ENGINEER WILL COMPLY

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Zoning Ordinance Article 3

STREAM BUFFER PROTECTION AND MANAGEMENT

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

City of Waco Stormwater Management Regulations

SITE PLAN (REVISED 8/13/18) l. Development Data Table

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

Town of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE

ARTICLE 17 SITE PLAN REVIEW

Huntington Stormwater Utility

New Development Stormwater Guidelines

CITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From:

SMALL PROJECTS SIMPLIFIED APPROACH

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Construction and Landscaping on Public Property

Major Subdivision Sketch Plan Checklist

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

Information for File # JTF

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Community LID Workgroup Issue Paper #6

Butte Creek Canyon. The New Road Built in April of 2015 by Signalized Intersection West, LLC. Presentation slides from December 2015 through June 2016

Riparian Buffer on the Bushkill Creek. Policies

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Chagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440)

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

Town of Vershire Road Erosion Inventory Report

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

A. Regional Detention Requirements

Weston s Wetlands, Stormwater, & Open Space

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

UNIVERSITY OF NORTHERN IOWA

Pavement Removal Fact Sheet

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

3. Are there any projects exempt from the definition of Regulated Projects?

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

CHECKLIST FOR PHASE II DRAINAGE REPORT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Transcription:

F Request for an Exception to the Napa County Road and Street Standards Shed Creek Winery Use Permit P16-327 and Use Permit Exception to the Conservation Regulations P17-178 Planning Commission Hearing November, 217

CMP Civil Engineering & Land Surveying 167 Capell Valley Road Napa, CA 94558 Cameron@CMPengineering.com CMPengineering.com EXCEPTION REQUEST LETTER To: Attn: Steve Lederer Date: 4/13/217 Napa County Planning, Building & Environmental Services 1195 Third Street, Suite 21 Napa, CA 94558 From: Subject: Remarks: CMP Civil Engineering & Land Surveying Cameron Pridmore PE, PLS 167 Capell Valley Road Napa, CA 94558 (77) 8 988 Exception Request Letter associated with the Grape Vine Lane Commercial Driveway Improvements for the proposed Shed Creek Winery located at 8 Grapevine Lane, APN: 33 17 2, Job# 121 Thank you for taking the time to review the submitted driveway improvement plans. With this letter I am officially requesting an exception to the Napa County Road and Street Standards. According to the Standards, under section 1, objectives: b. Strive to preserve the natural landscape and desirable aesthetic features and c. to encourage the location of roads to minimize disturbance or impacts on wetlands, critical native plant communities or other environmentally sensitive areas. Further the exception is required to minimize grading within the Gordon Valley Creek setback as required in the Napa Stream Setback Ordinance. The specific areas of exception and the associated reasons are listed below. Included at the end of this letter are numbered photographs which show the existing conditions of subject driveway and demonstrate the environmental constraints present. 1. An exception to the 22 foot minimum commercial driveway width from STA +75 to STA 1+33 and STA 2+4 TO STA 9+34. The driveway will not be widened in this area and the full 22 width cannot be achieved. The reasons for this request are as follows: a. Widening the driveway in these areas to meet the 2 foot width is not environmentally feasible. The existing driveway is surrounded by large heritage oak trees. Widening the driveway would require removing these oak trees. b. The existing driveway in this area is immediately adjacent to Gordon Valley Creek which is a blue line stream. Widening the driveway to the full 22 in this area would require extensive grading to take place within the creek setback. It would also require the destruction of large heritage oaks. All surface improvements in this area are to be constrained to the CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

edge of the existing earthen road shoulders, with the exception of the traffic signs shown on the plan. c. To avoid unnecessary erosion of the creek banks which would cause damage to the streams habitat and could cause a flood hazard to downstream residents. 2. An exception to the 22 foot minimum bridge width from STA 7+3 to 7+47. The existing 18.75 wide bridge cannot be widened to the full 22 without replacing the footings. It has clear line of site and a space wide enough for two vehicle sot pass on either side of the bridge. Thus we request an exception to the bridge width for the following reasons: a. Replacing the footings will require the complete removal of two large heritage oaks and damage to the root zones of several others. b. Replacing the footing will require extensive grading to take place within the Gordon Valley Stream bed which could damage riparian habitat. c. To avoid unnecessary erosion of the creek banks which would cause damage to the streams habitat and could cause a flood hazard to downstream residents. The Napa County Conservation Regulations support this request and granting the exception would minimize the grading near Gordon Valley Creek and would minimize the impact to the surrounding heritage oaks. The Napa County Road and Street Standards (RSS) also supports this exception given the following RSS objectives: To preserve the natural landscape and desirable aesthetic features while balancing the needs of property owners, to encourage the location of roads to minimize disturbance or impacts on wetlands, critical native plant communities, or other environmentally sensitive areas, to minimize alteration of streams. We have also proposed that a traffic control plan be utilized during large winery events in order to maintain safe passage of vehicular traffic to and from the winery while always maintaining clear passage for emergency vehicles. This traffic control plan has been included with this submittal, please review it for further details. Given the above reasons, granting this exception is the best way to balance human safety while protecting the surrounding environment. We feel the proposed improvements coupled with the traffic control plan meet the same overall practical level of safety as strictly adhering to the RSS would have. Thank you again for taking the time to review this request. Please let me know if you have any further questions or comments. Regards, Cameron Pridmore PE, PLS CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

Attachment A Driveway Photos Taken August, 216 CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

P 1 P 2 CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

P 3 P 4 CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

P 5 P 6 CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

P 7 P 8 CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

P 9 P 1 CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

P 11 P 12 CMP Civil Engineering & Land Surveying - - Cameron@CMPengineering.com - CMPengineering.com

ABBREVIATIONS GRAPE VINE LANE COMMERCIAL DRIVEWAY IMPROVEMENT PLAN KNOXVILLE RD N LINE LEGEND PROPOSED GRAVEL ROAD IMPROVEMENT PROPOSED AC ROAD IMPROVEMENT FOR THE SHED CREEK WINERY LOCATED AT 8 GRAPEVINE LANE APN: 33-17-2 CALISTOGA ANGWIN SAINT HELENA RUTHERFORD YOUNTVILLE CHILES POPE VLY RD HWY 12 SILVERADO TRAIL HWY 29 HWY 128 HWY 121 HWY 12 BERRYESSA HIGHLANDS HWY 128 CIRCLE OAKS NAPA I-8 PREPARED BY: CAMERON PRIDMORE PE, PLS 167 CAPELL VALLEY ROAD CAMERON@CMPENGINEERING.COM CMPENGINEERING.COM PROJECT #: 66 DATE: 5/28/ GORDON VALLEY ROAD SHEET R2 SHEET R3 (E) GRAPE VINE LANE TO BE IMPROVED SHEET R4 SHEET R5 (E) BUILDING TO BE CONVERTED TO (P) WINERY SHEET R6 (E) APPROXIMATE PL (E) RESIDENCE (E) VINEYARD (TYP) VICINITY MAP NTS OWNER BOB MORGAN 346 B ROCKVILLE ROAD FAIRFIELD, CA 94534 SHEET INDEX AMERICAN CANYON PROJECT LOCATION CIVIL ENGINEER CMP CIVIL ENGINEERING & LAND SURVEYING CAMERON PRIDMORE PE, PLS 167 CAPELL VALLEY ROAD CAMERON@CMPENGINEERING.COM SHT. # DESCRIPTION R1 TITLE R2 DRIVEWAY IMPROVEMENT PLAN 1 R3 DRIVEWAY IMPROVEMENT PLAN 2 R4 DRIVEWAY IMPROVEMENT PLAN 3 R5 DRIVEWAY IMPROVEMENT PLAN 4 R6 DRIVEWAY IMPROVEMENT PLAN 5 R7 NOTES & DETAILS REV. # DESCRIPTION DATE PROJECT INFO: 1 7-7- COUNTY COMMENTS 11/2/ 2 1-7-16 COUNTY COMMENTS 5/26/16 3 7-11-16 COUNTY COMMENTS 9/22/16 4 1-27-16 COUNTY COMMENTS 4/12/17 SHED CREEK WINERY 8 GRAPEVINE LANE APN: 33-17-2 TITLE SHEET UNAUTHORIZED CHANGES & USES: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE DESIGNER OF THESE PLANS. SHEET NAME: HORIZONTAL & VERTICAL DATUM: SHEET: THIS MAP IS BASED ON FIELD SURVEY INFORMATION PERFORMED BY TY HAWKINS LS IN MARCH OF 2. FIELD SURVEY CONTOURS ARE AS FOLLOWS: MAJORS = 5', MINORS = 1'. PROPERTY LINES: THE PROPERTY LINES SHOWN HEREON ARE BASED ON PRELIMINARY SURVEY DATA, AND ARE FOR REFERENCE ONLY. THIS IS NOT A BOUNDARY SURVEY MAP AND SHOULD NOT BE USED AS SUCH. SITE PLAN SCALE 1" = 25' 125 25 5 SCALE: 1"=25' Nov 7, 217 R1 OF 7

SHEET NAME: DRIVEWAY IMPROVEMENT PLAN 1 PROJECT INFO: SHED CREEK WINERY 8 GRAPEVINE LANE APN: 33-17-2 REV. # DESCRIPTION DATE 1 7-7- COUNTY COMMENTS 11/2/ 2 1-7-16 COUNTY COMMENTS 5/26/16 3 7-11-16 COUNTY COMMENTS 9/22/16 4 1-27-16 COUNTY COMMENTS 4/12/17 PREPARED BY: CAMERON PRIDMORE PE, PLS 167 CAPELL VALLEY ROAD CAMERON@CMPENGINEERING.COM CMPENGINEERING.COM PROJECT #: 66 DATE: 5/28/ NOTES: 1. GRAPE VINE LANE HAS A VARYING WIDTH AS SHOWN ON THE PLAN. 2. ENVIRONMENTAL CONSTRAINTS BETWEEN STATIONS +75 AND 1+33 AND STATIONS 2+4 AND 9+34 ARE AS FOLLOWS: 1. EXISTING DRIVEWAY FOLLOWS THE TOP OF BANK OF GORDON VALLEY CREEK. EXPANSION OF DRIVEWAY WOULD CAUSE DAMAGE TO THE CREEKS RIPARIAN VEGETATION AND HABITAT. ALSO LARGE OAK TREES LINE BOTH SIDES OF DRIVEWAY IN THIS AREA. DRIVEWAY IMPROVEMENT PLAN 1 DRIVEWAY IMPROVEMENT PROFILE 1 3 6 SCALE: 1"=3' 3 6 SCALE: 1"=3' SHEET: R2 OF 7

SHEET NAME: DRIVEWAY IMPROVEMENT PLAN 2 PROJECT INFO: SHED CREEK WINERY 8 GRAPEVINE LANE APN: 33-17-2 REV. # DESCRIPTION DATE 1 7-7- COUNTY COMMENTS 11/2/ 2 1-7-16 COUNTY COMMENTS 5/26/16 3 7-11-16 COUNTY COMMENTS 9/22/16 4 1-27-16 COUNTY COMMENTS 4/12/17 PREPARED BY: CAMERON PRIDMORE PE, PLS 167 CAPELL VALLEY ROAD CAMERON@CMPENGINEERING.COM CMPENGINEERING.COM PROJECT #: 66 DATE: 5/28/ NOTES: 1. BEFORE IMPROVING (E) SHOULDERS, CLEAN UP SHOULDERS REMOVING DEAD VEGETATION AND OTHER DEBRIS LEAVING CLEAN GRAVEL. ADD GRAVEL OVERTOP OF EXISTING ROAD BASE WHERE NECESSARY. 2. GRAPE VINE LANE HAS A VARYING WIDTH AS SHOWN ON THE PLAN. DRIVEWAY IMPROVEMENT PLAN 2 DRIVEWAY IMPROVEMENT PROFILE 2 3 6 SCALE: 1"=3' 3 6 SCALE: 1"=3' SHEET: R3 OF 7

SHEET NAME: DRIVEWAY IMPROVEMENT PLAN 3 PROJECT INFO: SHED CREEK WINERY 8 GRAPEVINE LANE APN: 33-17-2 REV. # DESCRIPTION DATE 1 7-7- COUNTY COMMENTS 11/2/ 2 1-7-16 COUNTY COMMENTS 5/26/16 3 7-11-16 COUNTY COMMENTS 9/22/16 4 1-27-16 COUNTY COMMENTS 4/12/17 PREPARED BY: CAMERON PRIDMORE PE, PLS 167 CAPELL VALLEY ROAD CAMERON@CMPENGINEERING.COM CMPENGINEERING.COM PROJECT #: 66 DATE: 5/28/ NOTES: 1. BEFORE IMPROVING (E) SHOULDERS, CLEAN UP SHOULDERS REMOVING DEAD VEGETATION AND OTHER DEBRIS LEAVING CLEAN GRAVEL. ADD GRAVEL OVERTOP OF EXISTING ROAD BASE WHERE NECESSARY. 2. GRAPE VINE LANE HAS A VARYING WIDTH AS SHOWN ON THE PLAN. DRIVEWAY IMPROVEMENT PLAN 3 DRIVEWAY IMPROVEMENT PROFILE 3 3 6 SCALE: 1"=3' 3 6 SCALE: 1"=3' SHEET: R4 OF 7

SHEET NAME: DRIVEWAY IMPROVEMENT PLAN 4 PROJECT INFO: SHED CREEK WINERY 8 GRAPEVINE LANE APN: 33-17-2 REV. # DESCRIPTION DATE 1 7-7- COUNTY COMMENTS 11/2/ 2 1-7-16 COUNTY COMMENTS 5/26/16 3 7-11-16 COUNTY COMMENTS 9/22/16 4 1-27-16 COUNTY COMMENTS 4/12/17 PREPARED BY: CAMERON PRIDMORE PE, PLS 167 CAPELL VALLEY ROAD CAMERON@CMPENGINEERING.COM CMPENGINEERING.COM PROJECT #: 66 DATE: 5/28/ NOTES: 1. BEFORE IMPROVING (E) SHOULDERS, CLEAN UP SHOULDERS REMOVING DEAD VEGETATION AND OTHER DEBRIS LEAVING CLEAN GRAVEL. ADD GRAVEL OVERTOP OF EXISTING ROAD BASE WHERE NECESSARY. 2. GRAPE VINE LANE HAS A VARYING WIDTH AS SHOWN ON THE PLAN. DRIVEWAY IMPROVEMENT PLAN 4 DRIVEWAY IMPROVEMENT PROFILE 4 3 6 SCALE: 1"=3' 3 6 SCALE: 1"=3' SHEET: R5 OF 7

SHEET NAME: DRIVEWAY IMPROVEMENT PLAN 5 PROJECT INFO: SHED CREEK WINERY 8 GRAPEVINE LANE APN: 33-17-2 REV. # DESCRIPTION DATE 1 7-7- COUNTY COMMENTS 11/2/ 2 1-7-16 COUNTY COMMENTS 5/26/16 3 7-11-16 COUNTY COMMENTS 9/22/16 4 1-27-16 COUNTY COMMENTS 4/12/17 PREPARED BY: CAMERON PRIDMORE PE, PLS 167 CAPELL VALLEY ROAD CAMERON@CMPENGINEERING.COM CMPENGINEERING.COM PROJECT #: 66 DATE: 5/28/ NOTES: 1. BEFORE IMPROVING (E) SHOULDERS, CLEAN UP SHOULDERS REMOVING DEAD VEGETATION AND OTHER DEBRIS LEAVING CLEAN GRAVEL. ADD GRAVEL OVERTOP OF EXISTING ROAD BASE WHERE NECESSARY. 2. GRAPE VINE LANE HAS A VARYING WIDTH AS SHOWN ON THE PLAN. DRIVEWAY IMPROVEMENT PLAN 5 DRIVEWAY IMPROVEMENT PROFILE 5 3 6 SCALE: 1"=3' 3 6 SCALE: 1"=3' SHEET: R6 OF 7

DRIVEWAY TYPICAL SECTION NOTES - SOFT OR SLIDING AREAS SHALL BE REPAIRED PER SOILS ENGINEERS' RECOMMENDATIONS PRIOR TO CONTINUING CONSTRUCTION. - CONSULT SOILS ENGINEER FOR ADDITIONAL REQUIREMENTS AND CONSULT PROJECT ENGINEER IF EXISTING GRADES PROHIBIT DESIGN SLOPES. - MAINTAIN ' VERTICAL CLEARANCE ABOVE ENTIRE DRIVEWAY WIDTH FOR EMERGENCY VEHICLE ACCESS GENERAL NOTES (P) 1' GRAVEL SHOULDER 3" AC (TYP) 6" CL2 AB @ 95% REL. DENS. (P) AC MATCH (E) SLOPE VARIES, 22' MAX SEE PLAN VARIES, 2' MAX SEE PLAN (E) AC VARIES C (P) AC MATCH (E) SLOPE (P) 1' GRAVEL SHOULDER 3" AC (TYP) EG 6" CL2 AB @ 95% REL. DENS. 1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION AND ELEVATION OF ALL EXISTING UTILITIES, PRIOR TO STARTING CONSTRUCTION. THESE PLANS ARE BASED UPON THE BEST INFORMATION AVAILABLE, BUT CAN ONLY BE TAKEN AS APPROXIMATE. 2. ANY UTILITIES THAT MAY HAVE TO BE RELOCATED SHALL BE DONE AT THE OWNERS EXPENSE. 3. PRIOR TO EXCAVATING NEAR ANY P.G. & E., PAC BELL, CITY, COUNTY, OR PRIVATE FACILITIES IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT U.S.A. AT LEAST 2 WORKING DAYS IN ADVANCE AT (8) 642-2444. 4. DAMAGE TO ANY AND ALL UTILITIES BY CONTRACTOR WILL BE REPLACED IN KIND AT OWNERS EXPENSE, AS WELL AS ANY EXISTING PRIVATE OR PUBLIC IMPROVEMENTS OR NATURAL LANDSCAPES SPECIFICALLY DESIGNATED BY OWNER. 5. CONTRACTOR WILL MAINTAIN SAFE CONDITIONS IN THE CONSTRUCTION AREA FOR WORKMEN AND TRAVELING PUBLIC. 6. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL SECURE CONSTRUCTION PERMITS FROM THE NAPA COUNTY PUBLIC WORKS DEPARTMENT, THE NAPA COUNTY CONSERVATION, DEVELOPMENT AND PLANNING DEPARTMENT, AND ANY OTHER JURISDICTIONAL AGENCY AS REQUIRED. OWNER SHALL PAY FOR ALL FEES INCLUDING INSPECTION FEES THEREFORE. 7. ALL STATIONS (ON PLAN) ARE TAKEN ALONG CENTERLINE UNLESS OTHERWISE NOTED ON PLAN AND SHOW MEASUREMENTS IN A HORIZONTAL PLANE. 8. ALL GRADING, SITE PREPARATION, PLACING AND COMPACTING OF FILL SHALL BE DONE ACCORDING TO THESE PLANS, AND NAPA COUNTY REQUIREMENTS. 9. SLOPE PLANTING SHALL BE SPECIFIED BY THE BY OTHER AND IS NOT A PART OF THESE PLANS. 1. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR MORE GENTLE, UNLESS OTHERWISE NOTED 11. ALL ABANDONED UNDERGROUND PIPELINES EXPOSED DURING GRADING SHALL BE REMOVED OR ADEQUATELY PLUGGED. 12. ROUND CUT AND FILL SLOPES TO BLEND IN WITH THE NATURAL GROUND CONTOURS. 13. EROSION CONTROL MEASURES SHALL BE EMPLOYED DURING THE RAINY SEASON AS REQUIRED AND AS SHOWN ON THE APPROVED STORMWATER QUALITY MANAGEMENT PLANS. A PRE-GRADING MEETING MAY BE SCHEDULED AT THE CONTRACTORS REQUEST AT THE SITE 48 (FORTY-EIGHT) HOURS PRIOR TO THE START OF GRADING. THE FOLLOWING PEOPLE SHOULD BE PRESENT: OWNER, GRADING CONTRACTORS, ENGINEER, AND THE COUNTY REPRESENTATIVE. 14. CHANGES TO THIS PLAN DUE TO FIELD CONDITIONS WILL BE MADE ONLY WITH THE APPROVAL OF THE ENGINEER AND THE NAPA COUNTY CONSERVATION, DEVELOPMENT AND PLANNING DEPARTMENT.. ADJACENT PROPERTIES SHALL BE PROTECTED FROM STORM WATERS, MUD, SILT, ETC. 16. THIS PLAN MAY NOT COVER ALL THE SITUATIONS THAT ARISE DURING CONSTRUCTION DUE TO UNANTICIPATED FIELD CONDITIONS. VARIATIONS MAY BE MADE TO THE PLAN IN THE FIELD SUBJECT TO THE APPROVAL OF THE ENGINEER AND THE GOVERNING COUNTY AGENCY. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PLACEMENT OF ALL FILLS ACCORDING TO THE PLAN, AND THE PREPARATION OF GROUND TO RECEIVE FILLS, TESTING FOR REQUIRED COMPACTION, STABILITY OF ALL FINISH SLOPES, SOIL EROSION, AND REQUIRED CUT SLOPE SURFACES. PREPARED BY: CAMERON PRIDMORE PE, PLS 167 CAPELL VALLEY ROAD CAMERON@CMPENGINEERING.COM CMPENGINEERING.COM PROJECT #: 66 DATE: 5/28/ 12" SUBBASE TO BE ON COMPETENT MATERIAL APPROVED BY SOILS ENGINEER PRIOR TO PLACEMENT OF BASE MATERIAL. NOTE: PRIOR TO COMPLETION INSURE THAT NO DRAGGING OCCURS AT GRADE TRANSITIONS. 12" SUBBASE TO BE COMPETENT MATERIAL APPROVED BY SOILS ENGINEER PRIOR TO PLACEMENT OF BASE MATERIAL. TYPICAL AC DRIVEWAY IMPROVEMENTS SECTION N.T.S. REV. # DESCRIPTION DATE 1 7-7- COUNTY COMMENTS 11/2/ 2 1-7-16 COUNTY COMMENTS 5/26/16 3 7-11-16 COUNTY COMMENTS 9/22/16 4 1-27-16 COUNTY COMMENTS 4/12/17 MAINTENANCE & LIMITATIONS (P) 1' GRAVEL SHOULDER DRIVEWAY TYPICAL SECTION NOTES - SOFT OR SLIDING AREAS SHALL BE REPAIRED PER SOILS ENGINEERS' RECOMMENDATIONS PRIOR TO CONTINUING CONSTRUCTION. - CONSULT SOILS ENGINEER FOR ADDITIONAL REQUIREMENTS AND CONSULT PROJECT ENGINEER IF EXISTING GRADES PROHIBIT DESIGN SLOPES. - MAINTAIN ' VERTICAL CLEARANCE ABOVE ENTIRE DRIVEWAY WIDTH FOR EMERGENCY VEHICLE ACCESS (P) GRAVEL MATCH (E) SLOPE VARIES, TYPICALLY 22', SEE PLAN VARIES, TYPICALLY 2', SEE PLAN (E) PAVED TRAVELED WAY VARIES C MATCH (E) SLOPE (P) 1' GRAVEL SHOULDER EG 1. THE IMPROVEMENTS SHOWN ON THIS PLAN MUST BE MAINTAINED PROPERLY IN ORDER FOR THEM TO FUNCTION PROPERLY. SUCH MAINTENANCE INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING: MAINTAIN ALL BMP'S TO AVOID EXCESS EROSION, MAINTAIN VEGETATIVE COVERAGE ON ALL DISTURBED AREAS, KEEP ALL STORM DRAIN STRUCTURES FREE OF DEBRIS & SEDIMENT. 2. THE EFFECTS OF NORMAL EROSION SUCH AS THOSE DUE TO ENVIRONMENTAL, WEATHER, AND GEOLOGIC CONDITIONS, WILL CONTINUE TO EXIST THROUGHOUT THE PROJECT SITE. THE STABILITY OF EARTH SLOPES AND METHODS OF CONTROLLING THE EFFECTS OF NORMAL EROSION ARE NOT A PART OF THIS PLAN. CONSULT A SOILS ENGINEER FOR THE STABILITY OF EARTH SLOPES AND THE EFFECTS OF NORMAL EROSION. 3. UPON COMPLETION OF ALL PROPOSED IMPROVEMENTS AND EROSION CONTROL MEASURES THE OWNER SHOULD PROVIDE FOR A DETAILED INSPECTION BY THE ENGINEER. THE INSPECTION SHOULD BE PERFORMED BOTH PRIOR TO AND DURING THE FIRST RAIN, TO CHECK THE FUNCTIONALITY OF ALL THE PROPOSED MEASURES & IMPROVEMENTS. IT MAY BE NECESSARY TO MAKE SOME MODIFICATIONS AND/OR REPAIRS TO THESE IMPROVEMENTS IN ORDER TO MAINTAIN A PROPER AND EFFICIENT WORKING SYSTEM. 4. THE PROPERTY OWNER, AND ANY SUBSEQUENT OWNER MUST CLEARLY UNDERSTAND THAT THEY HAVE CHOSEN TO BUILD ON A PROPERTY WITH A REMOTE AND LENGTHY DRIVEWAY FOR ACCESS. THE OWNER NEEDS TO VIGILANTLY REPAIR THE EROSIVE AND ADVERSE EFFECTS OF HEAVY RAINFALL TO THE PROJECT SITE AND THE IMPROVEMENTS SHOWN ON THESE PROJECT PLANS. 5. SIGNIFICANT MAINTENANCE AND UPKEEP COSTS MAY BE ASSOCIATED WITH THIS PROJECT AND SHOULD BE PLANED FOR BY THE OWNER. SEVERE STORMS CAN MOBILIZE SEDIMENTS WHICH CAN IMPAIR THE FUNCTIONALITY OF STORM DRAINAGE DEVICES. IF DRAINAGE DITCHES AND CULVERTS ARE NOT KEPT CLEAR OF SEDIMENTS, EROSIVE & FLOOD DAMAGE TO STRUCTURES AND DRIVEWAY IMPROVEMENTS MAY RESULT. 6. THE DESIGN OF FACILITIES ON THESE PLANS ARE BASED UPON STANDARD ENGINEERING PRACTICES, AND NAPA COUNTY REQUIREMENTS. CHANGES IN TRADITIONAL WEATHER PATTERNS AND RAINFALL INTENSITIES HAVE NOT BEEN PLANNED FOR AND COULD IMPACT THE INTEGRITY OF THE DRIVEWAY AND APPURTENANCES. IT IS SUGGESTED THAT EMERGENCY MEASURES BE PLANNED FOR, AS WELL AS THE COSTS FOR GENERAL MAINTENANCE OF ALL OF THE IMPROVEMENTS SHOWN ON THESE PLANS. PROJECT INFO: SHED CREEK WINERY 8 GRAPEVINE LANE APN: 33-17-2 6" CL2 AB @ 95% REL. DENS. 12" SUBBASE TO BE COMPETENT MATERIAL APPROVED BY SOILS ENGINEER PRIOR TO PLACEMENT OF BASE MATERIAL. NOTE: SUBGRADE SHALL BE DRIVEN PRIOR TO COMPLETION TO INSURE THAT NO DRAGGING OCCURS AT GRADE TRANSITIONS. (E) AC ROAD TO BE RESURFACED WITH GRAVEL TYPICAL GRAVEL DRIVEWAY IMPROVEMENTS SECTION N.T.S. SHEET NAME: NOTES & DETAILS SHEET: R7 OF 7