Interface Control Document Between: AOS Facilities And: Ancillary Calibration Devices

Similar documents
RFP Addendum 2 March 31, 2016

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

WG Buried Cable Perimeter Detection System

SAMPLE SPECIFICATIONS CONTINUOUS MONITORING SYSTEM (Insitu)

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

Technical Description. Laboratory Climate Test Chamber. System Weiss. Mat. No.: Type WKL 34/40

Vocia VACIE. Reference Guide

VACIE REFERENCE GUIDE REVISION 1.2.6

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

User Guide. Sky Muster service. Includes information about your nbn supplied equipment

SECURITY SYSTEMS. ipatrol. Unattended ground sensors. indracompany.com

Product data sheet Palas Promo 2000

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

Presented By. BEI Security

Change History Log. Rev Revision Sections Affected Description of Change /22/08 All Initial Version

SD Storage Cabinet. Outstanding performance

XRD XRD-1500 High-Temperature Oven. Innovation in Material Science...

CLOSURE OF INTERFACES FOR RAILWAY LINE HERZELYA KEFAR SABA IN CLOSURE_INTERFACES_HZL-01

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

SD Storage Cabinet. Outstanding performance

3kW 6kW, QUBE Fiber Lasers

Section PERIMETER SECURITY SYSTEMS

Lightning Warning System: LWS MK-II. User's Guide. KOREA EMI Technologies Co.,Ltd , Jangam-ri, Majang-myeon, Icheon-si, Gyeonggi-do, Korea

Model KBF 240 Constant climate chambers with large temperature / humidity range

TABLE OF CONTENTS. 1.0 INTRODUCTION Scope References Test Specimen Description Summary 1

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Product data sheet Palas Fidas 200 S

NZQA unit standard version 2 Page 1 of 6. Perform installation and maintenance of telecommunications radio systems and services

LORAIN CIP 4890/48120 DC Power System

FlexZone SIX STEPS TO AFFORDABLE PERIMETER PROTECTION EASY TO INSTALL LOW TOTAL COST OF OWNERSHIP HASSLE-FREE OPERATION & MAINTENANCE HOW-TO GUIDE

TELECOMMUNICATION. Telecommunication. Wireless Phone

Requirements for Active Safety Systems of the General Infrastructure in Secondary Beam Areas

Nardalert S3 TM Non-Ionizing Radiation Monitor

Black Body Calibration Source User Manual

STATEMENT OF WORK. Physical Protection Equipment Upgrades for Al-Tuwaitha Site in Iraq

Market Survey. Technical Description Supply of Helium Leak Detectors

Architectural and Engineering Specification for a. Flash / Flare

SAC 100 Automatic Smoke Curtain System. - Specifier Information -

English. Doro CareIP Mobile. User Guide

Section 1. Overview. The Kaleidescape Premiere System. System Components

IEC PROJETOS EM VOTAÇÃO

Architectural and Engineering Specification for a Real-Time Locating System Flare

Hemi Anechoic Chamber Number:

APS-Series 1500VDC OUTDOOR SOLAR INVERTER

The PBE Group. Industries We Serve. PBE Catalogue

Co-60 irradiator for therapy level calibrations at SSDLs

Product Specification

Pioneer-R16 Gas Monitor Operator s Manual

APS-Series 1000VDC OUTDOOR SOLAR INVERTER

SECTION Process and Immersion Turbidity and Total Suspended Solids Sensor

Industrial Fire Detection

Very High Sensitivity Multi-Zone Metal Detector for Law Enforcement and Correctional Facilities.

GARCIA GALUSKA DESOUSA Consulting Engineers

IEC/TC IEC/TC44 IEC/TC44. Amd.1DC:201. Ed.3CD:2011. Ed.2.1:2008. Amd.1CDV ED.1: 一連番号 Ed.

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

(Notices) EUROPEAN COMMISSION

state of the art methane leak detection CHARM and GasCam 2011 October 13 th Dr. Axel Scherello

RDA. RDA - the server cabinet. Welded server cabinet, IP20, capacity 1800 kg

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

SL-3 Vibration Sensor line A&E Specifications Page 1 of 12 SL-3 AE v doc

Data Center. Cold Storage

Copying contents of this booklet or handing over to third party is strictly forbidden without written permission from Detector Oy.

SECTION PUBLIC ADDRESS SYSTEMS

Bringing Hydrocarbon to the Market Training & Certification

FRONT END ENCLOSURE (FEE) - ROOM DATA SHEET

1.03 DELIVERY, STORAGE, AND HANDLING Heater will be stored to secure against damage and handled per manufacturer s recommendations.

LOGIC CONTROLLED DEKO 25 EASE OF USE

THERMAL MANAGEMENT. Outdoor 3.13 to

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

Architectural and Engineering Specification for a Fiber Optic Perimeter Intrusion Detection System. FiberPatrol FP1100X

Informer100 Speaker Models I-IP100AC and I-IP100DC

AC THOR. Assembly Instructions

Architectural and Engineering Specification for a Fiber Optic Perimeter Intrusion Detection System. FiberPatrol FP1150

NEC 2017 Changes and Their Effect Upon the ICT Industry

AC300WR 300 WATT REDUNDANT HF-20A CHASSIS POWER SUPPLY/SYSTEM MONITOR TECHNICAL MANUAL

STATEMENT OF WORK. System Description:

Getting started with

Model MKFT 115 Dynamic climate chambers for rapid temperature changes with humidity control and extended low temperature range

Certificate of Compliance

D-TECT 3 IP. GJD260 IP Motion Detector

Heimdall Radar Traffic Detector

INTERNATIONAL STANDARD

IDOO.PENDANT POWER OVER ETHERNET (PoE) SUSPENDED LUMINAIRE

Emergency Communications Tower Applications (Solar/Wireless/Surveillance)

SMD601 Plus. The most Sensitive Multi-Zone Metal Detector for Law Enforcement and Correctional Facilities. Threat Detection through Electromagnetics

VS LD series vertical steam sterilizers

Engineering Specification

DEKO 25 washer-disinfector

ClampOn DSP Corrosion- Erosion Monitor

IBC Committee Responsibility Matrix January 2017

Fiber Optic Cable Fence Disturbance Sensor

SENSITIVE ENOUGH TO DETECT RUNOFF CHANGES IN GROUNDWATER TRITIUM PLUMES

LORAIN CSP DC Power System

Product Guide Low Voltage Switchboard & Switchgear

METAL SHARK COMBI Flat metal detector for textile and non-woven products. Metal sensitivity from Fe 0,3 mm

REPORT HOLDER: SMOKE GUARD, INC. 287 NORTH MAPLE GROVE ROAD BOISE, IDAHO EVALUATION SUBJECT:

Air Resource Specialists, Inc.

An FT-NIR Primer. NR800-A-006

TPF Series Ozone Generators

ONYX FirstVision Specification Interactive Firefighters Display

Transcription:

Between: AOS Facilities And: Ancillary Calibration Devices ALMA-20.01.04.00-90.05.13.00-A-ICD Version: A 2008-08-26 Prepared By: Organization Date Simon Radford NRAO 2007-08-28 Al Wootten NRAO IPT Leader Approvals: Organization Date Al Wootten Eduardo Donoso Koh-Ichiro Morita NRAO NRAO ALMA-J System Engineering Approvals: Organization Date Christoph Haupt ESO Configuration Control Board Approval: Organization Date Rick Murowinski ALMA Configuration Control Board Secretary, signing for the Control Board ALMA Director Release Authorization: Organization Date Thijs de Graauw Joint ALMA Office Project Director

Page: 2 of 9 Change Record Version Date Affected Change Request Reason/Initiation/Remarks Section(s) # A 2003-11-30 all First draft 2004-09-23 all Second draft 2007-08-28 all Third draft 2008-08-26 EDM comments addressed

Page: 3 of 9 Table of Contents 1 Description...4 1.1 Purpose... 4 1.2 Scope...4 1.3 Responsibilities... 4 2 Related Documents and Drawings... 4 2.1 References... 4 3 Facilities... 5 3.1 Central Equipment Shelter... 5 3.1.1 Electrical Power... 7 3.1.2 Communications... 7 3.2 Meteorological towers... 7 3.3 Electronic Interface... 8 4 Software/Control Function Interface... 8 5 Safety Interface... 8 5.1 Earthquake protection... 8 5.2 Fire protection... 9

Page: 4 of 9 1 Description 1.1 Purpose To monitor observing conditions and provide information for observatory operations, the ancillary calibration devices described in Specification of Ancillary Calibration Devices (SCID-90.05.13.00-001-A-SPE) will be installed at the AOS. These devices include meteorological instruments and other site characterization equipment. This ICD defines the interfaces between this equipment and the facilities at the AOS. 1.2 Scope This ICD specifies the electrical and mechanical interfaces between the ancillary calibration devices and the AOS facilities. These facilities include: central equipment shelter, external mounting area, meteorological towers, electrical power, heating or cooling, and communications. 1.3 Responsibilities The Science IPT is responsible for the specification, purchase, and installation of the ancillary calibration devices and associated equipment. The Site IPT is responsible for providing facilities at the AOS with adequate space, electrical power, cooling, lighting, and mechanical support for the ancillary calibration devices. Communications cabling is to be provided by the appropriate ALMA IPT. Responsibilities for individual items are noted in the text. 2 Related Documents and Drawings 2.1 References ALMA-20.01.00.00-001-C-SPE, Oxygen Enrichment in AOS Buildings ALMA-80.05.02.00-001-B-SPE, ALMA Environmental Specifications Federal Standard 209D, Cleanroom and Work Station Requirements, Controlled Environments (1988) (obsolete)

Page: 5 of 9 ISO 14644-1, Cleanrooms and associated controlled environments--part 1: Classification of air cleanliness ALMA-80.05.00.00-004-D-STD, Standard for Plugs, Socket-outlets, and Couplers. SCID-90.03.00.00-101-A-SPE, ALMA Weather Instrumentation Specification SCID-90.05.13.00-001-A-SPE, Specification of Ancillary Calibration Devices Book, Chapter 14 SITE CHARACTERIZATION AND MONITORING 3 Facilities The ancillary calibration devices will be installed either in, on, or adjacent to a central equipment shelter or on meteorological towers. No ancillary calibration devices will be installed in or on the AOS Technical Building. 3.1 Central Equipment Shelter Near the center of the array, an enclosed shelter shall be provided for the equipment and for maintenance. This shelter shall meet the following requirements: Location on ALMA construction grid 7453223 N 627690 E (m) Orientation Long dimension EW parallel to prevailing wind Interior size 4.3 m 11.5 m 1 Interior height 2.2 m Door opening 1.5 m (wide) 2.0 m (high) Door location East end, with vehicle access Floor load 300 kg m -2 Interior temperature 20 ± 5 C Interior humidity 30 50 % Equipment heat load 0.5 kw Design occupancy 4 people Air quality Filtered, oxygen enrichment desirable Electric power See below Communications See below External mounting area 3 m 5 m reinforced concrete slab, on north side, 300 kg m -2 Cable feed through From interior to external area. Parking 3 vehicles 1 may be constructed from a pair of joined steel shipping containers

Page: 6 of 9 In addition to weather monitoring instruments, of which there are several, this central station will host a number of instruments unique to it. These unique instruments include: 1. Atmospheric temperature profiler 2. Infrared (10 μm all-sky camera) 3. 11.2 GHz Phase monitoring interferometer (300m E-W baseline) 4. Tipping radiometer (225 GHz or 183GHz) 5. Broadband Emission Monitor (e. g. Fourier Transform Spectrometer) 6. Ozone Monitor Of these, versions of numbers three and four are currently deployed at the site characterization containers. Numbers five and six are desirable but are not in the current budget. The central shelter may be constructed from a pair of joined steel shipping containers. Any clear area necessary for buried interferometer cables, etc., must be defined. Figure 1 Location of central weather station (green). Proposed western end of 11.2 GHz phase monitoring interferometer (300m east-west baseline, too large for this figure) is shown by small black mark just north.

Page: 7 of 9 3.1.1 Electrical Power All ancillary calibration devices shall operate from 230 VAC, 50 Hz single phase power and the equipment connected to the shelter shall consume not more than 0.560 kva. Although the equipment power factors are not yet known, they will exceed 0.9 (TBC). Inrush currents will be less than 120% (TBC) of the steady state currents. Although no circuit may be overloaded, there are no restrictions on how the equipment loads are distributed among circuits nor on the phases of the different circuits. Sufficient single phase power outlets shall be supplied to allow also use of normal laboratory test and maintenance equipment and laptop computers. 3.1.1.1 Electrical Connectors The plugs and outlets shall conform to Standard for Plugs, Socket-outlets, and Couplers, ALMA-80.05.00.00-004-D-STD. (Need specific connector models?). 3.1.1.2 UPS No uninterruptible power supply (UPS) shall be provided in the equipment shelter by the Site IPT; a UPS will be included with instruments delivered by the Science IPT. 3.1.2 Communications The central equipment shelter shall be connected to the AOS communications network by a fiber optic Ethernet link. This link shall have the same characteristics as the links between the AOS technical building and the antenna stations. The Computing IPT will determine if a router is necessary. 3.1.2.1 Telephones Two Voice over IP (VoIP) telephones shall be provided in the central equipment shelter by the Computing IPT. 3.2 Meteorological towers At least seven towers for eight sets of meteorological equipment (one set will be a spare) are required, one near the center of the array and others each near the end of each arm of the extended configuration. We recommend a total of at least seven towers for optimum coverage. These towers shall meet the following requirements:

Page: 8 of 9 Locations on ALMA construction grid (at least six of these locations to be chosen; one will be near the central building) Maximum equipment mounting height Capacity at maximum height Electric power Communications 1: 7453657.0 N 620125.0 E (m) (W1) 2: 7455040.0 N 623451.0 E (m) (W5) 3: 7457210.2 N 625901.9 E (m) (W8) 4: 7452986.0 N 626124.0 E (m) (A130) 5: 7447310.0 N 634062.0 E (m) (S9) 6: 7451111.2 N 632668.2 E (m) (S7) 7: 7450388.2 N 629490.2 E (m) (S1) 8: 7462869.2 N 633309.9 E (m) (P13) 9: 7458399.5 N 631556.8 E (m) (P10) 10: 7454297.0 N 628978.0 E (m) (A129) 15 m 20 kg 230 VAC, 50 Hz, single phase, 0.05kW equipment load, in weather proof, lockable junction box at tower base Optical fiber Ethernet with one VoIP telephone, in weatherproof, lockable junction box at tower base The towers will not be suitable to support personnel. Equipment installation or maintenance shall be done with a cherry picker. 3.3 Electronic Interface Any required RFI shielding of any and all instruments shall be the responsibility of the Science IPT. 4 Software/Control Function Interface There is no software or control interface between the ancillary calibration devices and the facilities. 5 Safety Interface 5.1 Earthquake protection The equipment shelter and meteorological towers shall be anchored sufficiently to withstand seismic accelerations. The equipment shelter floor shall provide adequate

Page: 9 of 9 support for the equipment racks. The rack anchors shall be strong enough to withstand seismic accelerations. (Need anchor point loads, etc.?) 5.2 Fire protection A fire alarm system shall be provided in the equipment shelter by the Site IPT. This alarm system shall be connected to the fire alarm system for the AOS TB. No fire suppression system shall be provided (TBD). In the event of fire or other emergency, the electrical power supply will be disconnected and forced air flow in the equipment shelter