City of Los Angeles C ALIFORNIA

Similar documents
City of Los Angeles C ALIFORNIA

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA NOTICE OF EXTENSION

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

NOTICE OF. February 3, the Lead. by outside submitted. Project. of the Scoping ERIC MAYOR CALIFORNIA EXECUTIVE OFFICES

Notice of Preparation

September 20, 2017 ENV EIR

Notice of Preparation

Notice of Preparation

March 29, Angels Landing Project Angels Landing Partners, LLC

December 18, January 14, 2019, 5:00 P.M. 7:00 P.M. See below for additional information.

February 26, 2018 ENVIRONMENTAL CASE NO.: ENV EIR PROJECT NAME:

Proposed General Plan Amendments to the Southeast Los Angeles Community Plan, Framework Element and Circulation Element (CPC CPU)

CITY OFLOS ANGELES CALIFORNIA

PLANNING DEPARTMENT TRANSMITTAL TO THE CITY CLERK S OFFICE

CALIFORNIA ERIC GARCETTI MAYOR NOTICE OF PREPARATION. Responsible Agencies, Trustee Agencies, Stakeholders, and Interested Parties

CITY OF ALHAMBRA DEVELOPMENT SERVICES DEPARTMENT 111 S. First Street. Alhambra, CA (626) FAX (626)

City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA

DEPARTMENT OF CITY PLANNING

5.15 PUBLIC SERVICES Fire Protection and Emergency Services. 5. Environmental Analysis REGULATORY FRAMEWORK.

City of Los Angeles CALIFORNIA

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT

City of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters

MEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/

5.10 LAND USE AND PLANNING

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING: VERMONT CORRIDOR PROJECT

A 3: Scoping Meeting Materials

Food Waste Digestion in Water and Sludge. Daniel Gary, Rob Morton and Chi-Chung Tang

Inglewood Transit Connector Environmental Impact Report Scoping Meeting July 26, 2018

3.10 LAND USE PLANNING

Project facts that will help me to understand the I-710 Corridor Project and DEIR/EIS

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

CITY OF LOS ANGELES CALIFORNIA NOTICE OF PREPARATION

II. PROJECT DESCRIPTION

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

RECIRCULATED NOTICE OF PREPARATION/NOTICE OF PUBLIC SCOPING MEETING

NOTICE OF PREPARATION

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

Private On Site Fire Hydrant N/A N/A Fire Flow Requirements Private On Site Fire Sprinkler System

Public Hearing April 12, Information as of April 12, 2018

City of Del Mar. Del Mar Resort Specific Plan Environmental Impact Report Notice of Preparation

Notice of Preparation and Notice of Public Scoping Meeting. At Dublin Project

3.0 PROJECT DESCRIPTION

County of Los Angeles

Project Facts about the I-710 Corridor Project and RDEIR/SDEIS

SECTION 2.0 INTRODUCTION

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE WEST BROADWAY SPECIFIC PLAN COMMENT PERIOD

Adam R. Lid Addendum to Proposed Amendments List for Mobility Plan 2035

2 Project Description

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION

- INVITATION - COURTESY INFORMATIONAL MEETING

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

3.0 Project Description

PUBLIC EIR SCOPING MEETING

BROOKE PETERSON, AICP Associate Principal

APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS-HANDWORK

Los Angeles Department of City Planning RECOMMENDATION REPORT

RECOMMENDATION REPORT

APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS

Parts Standardization & Management Committee (PSMC)

Planning Commission Report

Crossroads Hollywood, ENV EIR 1 message

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

City of Livermore Notice of Preparation and Notice of Public Scoping Meeting Sunset Crossing Project / Catalina Crossing Project

City of Los Angeles Department of Public Works

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

I. INTRODUCTION. A. Project Location

- INVITATION - COURTESY INFORMATIONAL MEETING

IV.B. VISUAL RESOURCES

DRAFT ENVIRONMENTAL IMPACT REPORT NORTH HOLLYWOOD-VALLEY VILLAGE COMMUNITY PLAN AREA

Venice Pumping Plant Dual Force Main Project Draft EIR

II. PROJECT DESCRIPTION

AGENDA 07/14/11 PLANNING COMMISSION Meeting

ENVIRONMENTAL SETTING

Architectural Review Board Report

III. PROJECT DESCRIPTION

CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707)

NOTICE OF PREPARATION

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Appendix C: Aesthetics

PRIME RESTAURANT/RETAIL SPACE FOR LEASE

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

II. PROJECT DESCRIPTION

,4Li/;{ a &a~/,2- 'Randa M. Hanna, Commission Executive Assistant South Valley Area Planning Commission

REPORT TO COUNCIL City of Sacramento

LOBBYING FIRM REGISTRATION FORM Form 31

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

4.8 LAND USE AND PLANNING

Division of Land / Environmental Review. Volume I FINAL ENVIRONMENTAL IMPACT REPORT WEST LOS ANGELES COMMUNITY PLAN AREA

7. Consultation and Coordination

City of Fontana Notice of Preparation and Notice of Public Scoping Meeting Fontana North Walmart Project

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

los Angeles City Planning Commission

Los Angeles Department of City Planning RECOMMENDATION REPORT

LOS ANGELES POLICE COMMISSION POLICE PERMIT REVIEW PANEL MINUTES OF REGULAR MEETING WEDNESDAY, JULY 19, 2006

NOTICE OF PREPARATION

Transcription:

DEPARTMENT OF CITY PLANNING - CITY PLANNING COMMISSION DAVID H. J. AMBROZ PRESIDENT RENEE DAKE WILSON VICE-PRESIDENT ROBERT L. AHN CAROLINE CHOE RICHARD KATZ JOHN W. MACK DANA M. PERLMAN MARTA SEGURA - JAMES K. WILLIAMS COMMISSION EXECUTIVE ASSISTANT II (213) 978-1300 City of Los Angeles C ALIFORNIA ERIC GARCETTI MAYOR EXECUTIVE OFFICES 200 N. SPRING STREET, ROOM 525 LOS ANGELES, CA 90012-4801 MICHAEL J. LOGRANDE DIRECTOR (213) 978-1271 LISA M. WEBBER, AICP DEPUTY DIRECTOR (213) 978-1274 JAN ZATORSKI DEPUTY DIRECTOR (213) 978-1273 FAX: (213) 978-1275 INFORMATION http://planning.lacity.org June 11, 2015 NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING CASE NO.: ENV-2013-3320-EIR PROJECT NAME: Sunset & Everett Mixed-Use Development Project and Everett Small Lot Subdivision PROJECT APPLICANT: Aragon (Sunset/Everett) Properties Corporation PROJECT LOCATION/ADDRESS: 1185, 1187, 1193, 1195, 1197, 1201, 1201 ½, 1205, 1205 ½, 1207, 1207 ½, 1211, 1215, 1221, 1225, 1229, 1233, 1239, 1243, 1245, 1247, 1247 ½ W. Sunset Boulevard and 917, 959, 959 ½, 965, 965 ½ N. Everett Street, Los Angeles, CA 90026 COMMUNITY PLANNING AREA: Silver Lake Echo Park Elysian Valley COUNCIL DISTRICT: 1, Gilbert Cedillo DUE DATE FOR PUBLIC COMMENTS: 4:00 p.m., July 13, 2015 SCOPING MEETING: Tuesday June 30, 2015 Pursuant to the California Environmental Quality Act (CEQA) Guidelines Section 15082, once the Lead Agency decides an Environmental Impact Report (EIR) is required for a project, a Notice of Preparation (NOP) describing the project and its potential environmental effects shall be prepared. You are being notified of the City of Los Angeles intent, as Lead Agency, to prepare an EIR for this Project, which is located in an area of interest to you and/or the organization or agency you represent. This EIR will be prepared by outside consultants and submitted to the Department of City Planning, Environmental Analysis Section, for independent review and certification. The Department of City Planning requests your comments as to the scope and content of the EIR. Comments must be submitted in writing pursuant to directions below. If you represent an agency, the City is seeking comments as to the scope and content of the environmental information in the document which is germane to your agency s statutory responsibilities in connection with the Proposed Project. Your agency will need to use the EIR prepared by our agency when considering your permit or other approval for the Project. A Scoping Meeting will be held to receive input from the public as to what areas the EIR should study. No decisions about the Project are made at the Scoping Meeting. The project description, location, and the potential environmental effects identified thus far are set forth in this document. Also included below are the date, time, and location of the Scoping Meeting that will be held in order to solicit input regarding the content of the Draft EIR.

The Scoping Meeting is in an open house format. THIS IS NOT THE REQUIRED PUBLIC HEARING FOR MUNICIPAL CODE ENTITLEMENT REQUESTS which will be scheduled after the completion of the EIR. The environmental file is available for review at the Department of City Planning, 200 North Spring Street, Room 750, Los Angeles, CA 90012. A copy of the Initial Study prepared for the Project is not attached but may be viewed online at http://planning.lacity.org by clicking on the Environmental tab, then Notice of Preparation & Public Scoping Meetings. PROJECT LOCATION: 1185, 1187, 1193, 1195, 1197, 1201, 1201 ½, 1205, 1205 ½, 1207, 1207 ½, 1211, 1215, 1221, 1225, 1229, 1233, 1239, 1243, 1245, 1247, 1247 ½ W. Sunset Boulevard and 917, 959, 959 ½, 965, 965 ½ N. Everett Street, Los Angeles, CA 90026 PROJECT DESCRIPTION: The Project is composed of two separate developments: 1) A mixed use residential/retail development located primarily along Sunset Boulevard and at the corner of Sunset Boulevard and Everett Street and 2) A Small Lot Subdivision located entirely along Everett Street. Sunset & Everett Mixed Use Development: The project is composed of two separate buildings (A & B) containing a total of 204 residential units, 11,334 square feet of retail, a total of 294 parking spaces, and 232 bicycle parking spaces. Building A, located along Sunset Boulevard and totaling approximately 148,345 square feet, will provide 161 residential units and 3,078 square feet of retail space on the ground floor that will be divided into four tenant spaces. Building B, located at the corner of Sunset Boulevard and Everett Street and totaling approximately 49,513 square feet, will provide 43 residential units and 8,256 square feet of retail space that will be divided into six tenant spaces on the ground floor level. Everett Small Lot Subdivision: The project will construct six single-family residences, with a combined square footage of 10,887 square feet, pursuant to the small lot subdivision ordinance and will provide a total of 12 parking spaces. REQUESTED PERMITS/APPROVALS: Sunset & Everett Mixed Use Development: 1. Pursuant to LAMC 17.15, a Vesting Tentative Tract Map comprised of a one-lot subdivision for a maximum of 204 residential condominium units and ten commercial condominiums. Although the project is proposed as an apartment project, the applicant desires a Tract Map for future flexibility to offer the residential units and commercial condominiums for sale. 2. Pursuant to LAMC 16.05.C.1(b), Site Plan Review for the development of 204 residential units. 3. Pursuant to LAMC Section 12.22.A.25(c)(1), a 25 percent Density Bonus with 7 percent reserved for Very Low Income Household units to permit the construction of a mixed-use development with 204 residential units, 11,334 square feet of ground floor commercial, utilizing Parking Option 1 and requesting one On-Menu Incentive and three Off-Menu Incentives (Waivers) that include: (a) Pursuant to LAMC 12.22.A.25.F(4), an On-Menu Incentive for a 25 percent FAR increase to permit 197,858 square feet of floor area (1.88 FAR) in lieu of 158,286 square feet of floor area (1.5 FAR) allowed in the C2-1VL zone; (b) Pursuant to LAMC 12.22.A.25.G(3), Off-Menu Incentives for: (1) a 15 foot height increase for a maximum height of 72 feet as measured from Grade (57 feet Base Height plus 15 feet) and 66 feet as measured from Plumb Height (45 feet and 21 feet) for Building A;

(2) a 4 foot height increase for a maximum height of 61 feet as measured from Grade (57 feet Base Height plus 4 feet) and 59 as measured from Plumb Height (45 feet and 14 feet) for Building B; and (3) to permit a six-story mixed-use building in lieu of three stories for Buildings A and a five-story mixed-use building in lieu of three stories for Building B. 4. Haul route approval for the export of approximately 35,401 cubic yards of dirt. Everett Small Lot Subdivision: 1. Pursuant to LAMC 17.15 a Vesting Tentative Tract Map for the development of a small lot subdivision comprised of six lots and six single-family residences. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: Aesthetics; Air Quality; Biological Resources; Cultural Resources; Geology/Soils; Greenhouse Gas Emissions; Hazards/Hazardous Materials; Hydrology/Water Quality; Land Use/Planning; Noise; Population, Housing & Employment; Public Services (Fire, Police, Schools, Recreation & Parks, Libraries); Recreation; Transportation/Traffic; and Utilities/Service Systems (Water, Wastewater, Solid Waste, Energy Demands). PUBLIC SCOPING MEETING: A public scoping meeting in an open house format will be held to receive public comment regarding the scope and content of the environmental analysis to be included in the Draft EIR. City staff, environmental consultants and project representatives will be available, but no formal presentation is scheduled. You may stop by at any time between 5:30 pm and 7:30 pm to view materials, ask questions, and provide comments. The Department of City Planning encourages all interested individuals and organizations to attend this meeting. The location, date, and time of the public scoping meeting for this Project are as follows: Date: Tuesday June 30, 2015 Time: Location: 5:30 p.m. to 7:30 p.m. Arrive any time between 5:30 p.m. 7:30 p.m. to speak one-onone with City staff and Project consultants. Barlow Respiratory Hospital Williams Hall 2000 Stadium Way, Los Angeles, CA 90026 The enclosed materials reflect the scope of the project (subject to change). The Department of City Planning welcomes and will consider all written comments regarding potential environmental impacts of the project and issues to be addressed in the EIR. Written comments must be submitted to this office by 4:00 p.m., Monday July 13, 2015. Written comments will also be accepted at the public scoping meeting described above. Please direct your responses to: Mail: Alejandro Huerta Environmental Analysis Section Department of City Planning 200 N. Spring Street, Room 750, Los Angeles, CA 90012 Fax: (213) 978-1343 Email: Alejandro.Huerta@lacity.org (email)

Proter Ranch San Fernando Lake View Terrace 118 210 5 Angeles National Forest Northridge Van Burbank Nuys 170 North Hollywood Glendale 2 101 Pasadena Encino Toluca Lake 134 210 Sherman Oaks 101 Eagle South 5 405 Rock 110 Pasadena West Silver Irwindale PROJECT Hollywood Lake Alhambra Baldwin LOCATION Park Beverly Hills 1 Brentwood Beverly Hills 10 Los Angeles Monterey Park City of 10 60 Industry Vernon Hacienda Baldwin Heights Hills Huntington Pico Park Rivera 605 Santa Monica 90 Inglewood Marina Del Rey 710 Whittier Los Angeles 110 South Gate Culver City Montebello International Downey Airport El Segund 105 1 Hawthorne Paramount Manhattan Compton Norwalk La Mirada Beach 91 Hermosa 5 Beach Gardena Lakewood Cerritos 107 Redondo Beach Torrance 405 Carson Signal Hill Anaheim Pacific Ocean Rancho Palos Verdes Long Beach Huntington Beach 22 405 0 5 10 Miles Everett Portion Sunset Portion Legend Project Site Source: Bing Aerial and CAJA Environmental Services, LLC 2015. 0 200 400 Scale (Feet) Figure 1 Regional Map

SUNSET BOULEVARD BOULEVARD KENSINGTON ROAD Everett Portion Sunset Portion EVERETT STREET STREET MARION AVENUE MARVIEW AVENUE AVENUE Legend SUNSET BOULEVARD BOULEVARD BOYLSTON STREET WHITE KNOLL DRIVE WHITE KNOLL KNOLL DRIVE DRIVE Project Site Source: Google Aerial and CAJA Environmental Services, LLC., 2015. 0 200 400 Scale (Feet) Figure 2 Aerial Map

Source: KTGY, Architecture + Planning, 2015. Figure 3 Sunset Portion Site Plan

0 16 32 Source: KTGY, Architecture + Planning, January 31, 2014. Scale (Feet) Figure 4 Everett Portion Site Plan

Scoping Meeting Location Date: Tuesday June 30, 2015 Time: 5:30 PM 7:30 PM Arrive any time between 5:30 p.m. 7:30 p.m. to speak one-on-one with City staff and Project consultants. Location: Barlow Respiratory Hospital Williams Hall 2000 Stadium Way Los Angeles, CA 90026 PROJECT SITE 0 Source: Google Maps, 2015. 200 400 Scale (Feet) Figure 5 Scoping Meeting Location