NORTH, NORTH REDWOOD BOULEVARD CORRIDOR STUDY

Similar documents
DRAFT Civic Center Station Area Plan. Executive Summary

PROCESS CHECK Implementing Ordinances planned for adoption with the General Plan:

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

PROPOSED IMPROVEMENTS

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

EXECUTIVE SUMMARY. Introduction

South Davis County COMMUNITY SPOTLIGHT

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Mobility Districts and Traffic Studies

4.1 Build Alternative 1 Construction Phasing

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

SR-2 Freeway Terminus Improvement Project

REVIEW AND EVALUATION OF REGIONAL LAND USE

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Executive Summary. NY 7 / NY 2 Corridor

Southern Gateway Project and Public Green

The transportation system in a community is an

Appendix G Response to Comments

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

Isabel Neighborhood Plan: Alternatives

Community Meeting US 101/Peninsula Avenue Interchange Project JUNE 25, 2015

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

MEMORANDUM. California State University Channel Islands Evacuation Planning Analysis

4.11 TRAFFIC Existing Conditions Existing Project Site. Existing Street System

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Chapter 22. Alternatives to the Proposed Project

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

IH35 Corridor Plan Amendment to the Comprehensive Plan

TOWN COUNCIL / PLANNING COMMISSION

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

This page intentionally left blank

New Stanton Project Update July 3, 2012

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

Asbury Chapel Subdivision Sketch Plan

4 LAND USE DESIGNATIONS

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Section 4.11 Traffic and Transportation 4.11 TRAFFIC AND TRANSPORTATION

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Places29: List of Implementation Projects

Adoption of the Rosslyn Sector Plan Site Plan Review Committee (SPRC) Meeting October 26, 2015

The Lincoln Neighborhood Corridor Plan. The LiNC

SOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016

CHAPTER 7: Transportation, Mobility and Circulation

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

BeltLine Corridor Environmental Study

Chapter 1.0 Introduction

INDEPENDENCE BOULEVARD AREA PLAN

A. WHAT IS A GENERAL PLAN?

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

THE GREEN VISION WORKSHOP Friday, November 6, 2009

Rock Spring Master Plan Community Meeting #6: Land Use + Transportation Forecasts

C. Westerly Creek Village & The Montview Corridor

1.0 Circulation Element

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Implementation Guide Comprehensive Plan City of Allen

BeltLine Corridor Environmental Study

SHEFFIELD PARK Paulding County, GA DRI #588

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Memorandum CITY OF DALLAS

Mavis Road Class Environmental Assessment

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

GENERAL PLAN AND ENVIRONMENTAL IMPACT REPORT

STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

International Blvd. TOD Plan Public Workshop #1

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

City of Long Beach. creating vibrant and exciting places

[Leveraging & Improving Neighborhood Connections] Area C Lamar Levee

Ann Arbor Intermodal Station Environmental Review

Community Feedback and Recommendations. FAQ Section. 2. Will there be enough open space for the amount of new people proposed to live in the area?

ASPEN HILL Minor Master Plan Amendment

Prepared by: Casey Kempenaar, Senior Planner

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

IH35 Corridor Plan Amendment to the Comprehensive Plan

Southeast Extension to RidgeGate Parkway Scoping Booklet

12 th Street Connector Alignment Study VISIONING PUBLIC WORKSHOP - JUNE 25, :00PM TO 8:00PM

Staff Report and Recommendation

Public input has been an important part of the plan development process.

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL PRESENTATION AUGUST 22, 2017

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

MULTI-FAMILY LAND FOR SALE

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

Fairfax County Parkway (Route 286) Widening Project

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

East Corridor Final Environmental Impact Statement

On behalf of Metrolinx, in coordination with the City of Mississauga. and Presentation Materials (draft)

Transcription:

BOULEVARD CORRIDOR STUDY

Southern

Central

Northern

STUDY AREA OPPORTUNITIES AND CONSTRAINTS

BOULEVARD CORRIDOR WORKSHOP Constraints Wetlands For illustrative purposes only

BINFORD RD RUSH LANDING RD BOULEVARD CORRIDOR WORKSHOP Constraints NUNES DR Wetlands BLACK JOHN RD COBBLESTONE CT DR HAYFIELD PL WOOD BLVD HOLLOW CREST RD MEADOW DR CAMPUS DR WEST REDWOOD EAST CAMPUS For illustrative purposes only

BOULEVARD CORRIDOR WORKSHOP Constraints Gas Transmission Lines

BOULEVARD CORRIDOR WORKSHOP Opportunities Transportation: SMART Station Future Bike Path

1 mile radius 1/2 mile radius X

BOULEVARD CORRIDOR WORKSHOP Opportunities Buck Institute for Research on Aging

BOULEVARD CORRIDOR WORKSHOP Opportunities Natural Beauty

BOULEVARD CORRIDOR WORKSHOP Opportunities Natural Beauty

BOULEVARD CORRIDOR WORKSHOP Opportunities Natural Beauty

TRAFFIC MODELING RESULTS

BOULEVARD CORRIDOR WORKSHOP Traffic Modeling 101: Existing Street Network and Volumes Predicted Future Development + + Predicted Future Network and Transit Improvements = Predicted Future Traffic Conditions

BOULEVARD CORRIDOR WORKSHOP Traffic Modeling Assumptions Future projections assume all existing development is fully occupied (no vacancy) Assumes additional traffic to the SMART Station Does not account for a reduction in vehicular travel due to SMART service Assumes connection of Redwood Boulevard to Olompali State Park

BOULEVARD CORRIDOR WORKSHOP Land Use Scenarios 1996 General Plan Build Out: Nothing at American Assets; office and hotel on Campus properties; 2 more lab buildings and employee housing at Buck; small additional office at PG&E and Birkenstock Alternative 1: 1996 GP plus: American Assets (Commons at Mount Burdell) redevelopment plan; add 100,000 sq. ft. of office at Birkenstock Alternative 2: 1996 GP plus: American Assets redevelopment plan; add 100,000 sq. ft. of office at Birkenstock; replace office and hotel on Campus Properties with 300 housing units and 100 senior assisted living units

BOULEVARD CORRIDOR WORKSHOP Land Use Scenarios Alternative 3: 1996 GP updated with City Council direction from North Redwood Blvd. Corridor Study, without a home improvement center Alternative 4: 1996 GP updated with City Council direction from North Redwood Blvd. Corridor Study, with a home improvement center

BOULEVARD CORRIDOR WORKSHOP Land Use Scenarios Alternative 5A: 1996 GP updated with City Council direction from North Redwood Blvd. Corridor Study, without a home improvement center plus: American Assets redevelopment plan (less 200,000 sq. ft. office); change from office to R&D on Campus Properties, no further development assumed for Birkenstock. Alternative 5B: Same as above, with a home improvement center.

BOULEVARD CORRIDOR WORKSHOP Land Use Scenarios Alternative 6A: 1996 GP updated with City Council direction from North Redwood Blvd. Corridor Study, without a home improvement center plus: American Assets redevelopment plan (less 200,000 sq. ft. office); change from office and hotel to 300 housing units and 100 assisted living senior units on Campus Properties, no further development assumed for Birkenstock. Alternative 6B: Same as above with a home improvement center

BOULEVARD CORRIDOR STUDY Land Use Assumptions Southern Site Existing 1996 GP Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 American Assets (Fireman s Fund) 711,000 office 0 213,000 office 41,000 retail/rest. 175 room hotel 84,000 health club 8,000 day care 10 acres rec. fields 150 hsg. units Same as Alt. 1 0 0 13,300 office 41,000 retail/rest. 175 room hotel 84,000 health club 8,000 day care 10 acres rec. fields 150 hsg. units Same as Alt. 5 7655 7665 Redwood 29,000 office 0 0 0 0 0 0 0

BOULEVARD CORRIDOR STUDY Land Use Assumptions Central Site Existing 1996 GP Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 Campus Properties (Wood Hollow) Oakview Office 24,000 office 0 39,200 office 39,200 office 100 units assisted senior housing 39,200 office 39,200 office 39,200 office 100 units assisted senior housing 0 0 0 0 0 0 0 100 Wood Hollow 124,600 office 0 0 0 0 0 0 0 Campus Properties (Black John) 0 272,800 office; 75,000 hotel 272,800 office; 75,000 hotel 300 housing units 272,800 office; 75,000 hotel 272,800 office; 75,000 hotel 347,800 R&D 300 housing units

BOULEVARD CORRIDOR WORKSHOP Land Use Assumptions Northern Site Existing 1996 GP Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 Buck Institute 249,000 office and lab 106,000 lab; 130 employee housing units Same as 1996 GP Same as 1996 GP Same as 1996 GP Same as 1996 GP Same as 1996 GP Same as 1996 GP Days Inn Motel 56 room motel 0 0 0 0 0 0 0 PG&E 0 40,000 office Same as 1996 GP Same as 1996 GP Same as 1996 GP Same as 1996 GP Same as 1996 GP Same as 1996 GP Birkenstock 37,225 office; 135,365 warehouse 27,500 office 127,500 office 127,500 office 27,500 office 27,500 office 0 0

BOULEVARD CORRIDOR STUDY Circulation Improvement Options Alternative Network Assumptions 1996 General Plan Widen San Marin railroad overpass by 1lane; Widen/reconfigure Redwood/SM intersection: Add 1 additional lane SB, EB and WB; Widen Redwood to two SB lanes between Wood Hollow and San Marin Widen freeway NB offramp to 3 lanes Signalize Atherton/Binford; Widen SB freeway onramp and create free right turn for EB San Marin drivers onto freeway ramp Coordinate signal timing

BOULEVARD CORRIDOR STUDY Circulation Improvement Options Alternative Network Assumptions 1 1996 GP Improvements above, plus: Widen San Marin railroad overpass by 2 lanes and add second right turn lane onto SB freeway on ramp; Modify Redwood/San Marin intersection, widening EB approach for additional through lane and SB right turn pocket; Add signal or roundabout at Redwood/Rush Landing Road and extend Rush Landing Road into American Assets site; Add a Southbound US 101 off ramp ( hook ramp ) onto Redwood Blvd. near Buck Center; Add a Northbound US 101 on ramp ( hook ramp ) from Rush Creek Landing Road 2 Same as above, but no new US 101 hook ramps and no signal/roundabout accessing American Assets site at Redwood/Rush Landing Road

1996 General Plan Circulation Improvements

Hook Ramp offramp from SB 101 onto Redwood Blvd.

Hook Ramp onramp onto NB 101 from Rush Landing Road

BOULEVARD CORRIDOR WORKSHOP Circulation Improvement Options Alternative Network Assumptions 3 1996 GP Improvements above 4 1996 GP Improvements above 5 1996 GP Improvements above, plus: Connect East Campus Drive to Redwood Blvd. at Rush Creek Landing Road and close Redwood north of San Marin to all traffic except westbound right turns; Add an additional left turn lane from East Campus Drive onto San Marin 6 1996 GP Improvements above, plus: Connect East Campus Drive to Redwood Blvd. at Rush Creek, but retain Redwood Blvd. to San Marin as is

Connection of Redwood to East Campus (Limiting traffic on Redwood just north of San Marin to wetbound right turns from San Marin) DEEMED INFEASIBLE

Alternate Connection of Redwood to East Campus (Retaining Redwood between San Marin and Rush Landing)

Traffic Modeling Results Alternative Level of Service Redwood/SM Freeway Ramps Ave. Effective Speed AM PM Queuing Impacts 2013 Conditions C B 16 mph 14 mph None 1996 General Plan Build Out D C 12 mph 8 mph US 101 SB off ramp in AM and NB off ramp in PM; EB approaches to Redwood/SM 1 C C 13 mph 12 mph None 2 D D 10 mph 11 mph 3 D D 12 mph 9 mph US 101 SB off ramp in AM occasionally EB approaches to Redwood/SM nearly to E. Campus in PM 4 D D 11 mph 9 mph EB San Marin in PM 5A C C 9 mph 10 mph 5B C D 9 mph 10 mph US 101 SB off ramp in AM ; EB San Marin and SB E. Campus in PM US 101 SB off ramp in AM ; EB San Marin and SB East Campus in PM 6A D D 13 mph 9 mph EB San Marin in PM 6B D D 13 mph 9 mph EB San Marin in PM

BOULEVARD CORRIDOR STUDY Initial Conclusions from Modeling Land Use Replacing General Plan Build Out assumptions with Council s direction from North Redwood Blvd. Corridor Study significantly reduces future trip generation Eliminating new office development at American Assets (as part of Commons at Mt. Burdell type mixed use project) and at Birkenstock significantly reduces future trip generation The addition of a Friedman s like home improvement store doesn t have an appreciable effect on Redwood/San Marin intersection operations

BOULEVARD CORRIDOR STUDY Initial Conclusions from Modeling Land Use Change from office to residential on Campus Properties results in 20 30% traffic reduction All future land use scenarios can meet the General Plan intersection level of service standards (maximum LOS D)

BOULEVARD CORRIDOR STUDY Initial Conclusions from Modeling Circulation Widening the freeway overpass doesn t appear necessary for any of the future land use scenarios There are a number of needed future improvements to Redwood/San Marin intersection, freeway ramps and railroad overpass In some scenarios (including building of the 1996 General Plan) total elimination of peak hour queuing impacts would require further widening of the railroad overcrossing to 9 lanes (2 more than current vs. 1 additional lane previously planned)

BOULEVARD CORRIDOR STUDY Initial Conclusions from Modeling Circulation Rerouting Redwood Blvd. north of San Marin to East Campus Drive improves the performance of the Redwood/San Marin intersection but results in excessive queuing that would require further widening of the railroad overcrossing to address Creating a minor, low speed roadway connection between North Redwood and East Campus Drive would enhance multi modal connectivity, provide a modest amount of traffic relief and improve emergency response options Hook ramps to and from US 101 are helpful, but may not be worth the cost and time to implement through Caltrans

PANEL DISCUSSION: OFFICE AND BIOTECH MARKET

BOULEVARD CORRIDOR STUDY Office and BioTech Market Office market in Novato is likely to regain strength and refill existing space within next 3 5 years. Office rental rates will have to increase to about $3.50 (roughly a 1/3 increase over current) to justify and finance new office construction. The City is leading a regional attraction campaign for biotech firms. The Marin Economic Forum estimates increases in biotech employment in Novato ranging from 100 employees/year in 2014 to 300 annual new employees in 2016.

CAPITALIZING ON OUR SMART STATION

BOULEVARD CORRIDOR STUDY Capitalizing on our SMART Station Novato has an opportunity to capitalize on the SMART station by: Improving multi modal access (walking, bicycling) to the station for current residents and employees Ensuring that new development is such that new residents and/or employees will want to use SMART.

PUBLIC FEEDBACK

BOULEVARD CORRIDOR STUDY Public Preferences Land Use Very little support for additional housing, although some support for senior housing. Generally, support for as little new development as possible due to concerns over traffic impacts, and some support for no development (i.e., public purchase) of remaining vacant properties. American Assets: Preference for R&D replacing existing office space, some local serving retail, but generally no or minimal additional development. Campus Properties Wood Hollow: Preference for office or R&D, or for no development/public purchase. Campus Properties Black John Road: Strong preference for R&D or office.

BOULEVARD CORRIDOR STUDY Public Preferences Land Use PG&E: Preference for office, R&D or a bus yard. Birkenstock: Preference for office or R&D reutilizing the vacant warehouse square footage, or for no further development.

BOULEVARD CORRIDOR STUDY Public Preferences Land Use 70 60 50 40 30 20 10 0 American Assets Campus: Wood Hollow Oakview Office Campus: Black John PG&E Birkenstock Office R&D Retail/Pers. Recreation Hotel Apt/Condo Senior Hsg No More Dev Bus Yard

BOULEVARD CORRIDOR STUDY Public Preferences Circulation Strong support for making improvements to the San Marin/Redwood intersection and freeway ramps to improve traffic circulation. Support for widening southbound Redwood Boulevard between Wood Hollow and San Marin. Concern over potential spill over parking effects of the new SMART station. Support for a connection between Rush Landing Road and East Campus Drive, particularly to improve pedestrian and bicycle access by office employees to the SMART station.

BOULEVARD CORRIDOR STUDY Public Preferences Circulation Accept Longer Queues; Fewer Lanes Modify Redwood/San Marin and Interchange to Improve Traffic Flow Roundabout at Redwood/Rush Landing Create Bike/Ped Connection Wood Hollow to American Assets Connect Rush Landing Rd. to American Assets Hook Ramps 0 10 20 30 40 50 60 70 80 90 100

STAFF RECOMMENDATIONS

BOULEVARD CORRIDOR STUDY PROPOSED CRITERIA FOR FUTURE DEVELOPMENT: 1. Vision Statement: A concise description of the desired character of future development 2. Land Use & Design Guidelines: Desired land uses and design components for future developments. 3. Circulation Improvements: Improvements to the street network or bicycle/pedestrian facilities to improve mobility of residents and employees. 4. General Plan Land Use Designations & Development Forecasts: Preliminary land use classifications and likely development forecasts to be evaluated in the Draft EIR for the General Plan

BOULEVARD CORRIDOR STUDY 1. Vision Statement: The North, North Redwood Boulevard Corridor provides an opportunity for the City to address its economic development objective of creating new highwage jobs through development and redevelopment of properties located between the scenic slopes of Mount Burdell and U.S. 101. The corridor should generally be developed with high quality office and research and development uses and supporting uses such as local serving retail and recreational uses. New development should maximize the use of the new SMART railway station in terms of site design, on and off site bicycle and pedestrian access and through innovative employee trip reduction measures. Circulation improvements must be made to the San Marin/Redwood Boulevard intersection and freeway ramps to assure that the City s traffic level of service standards are met at all times and that new development, in conjunction with the City s traffic impact fees, pays for needed traffic improvements commensurate with their impacts and timing of development.

BOULEVARD CORRIDOR STUDY 2. Land Use & Design Guidelines: Southern Property Land Use and Design Criteria American Assets Allow conversion of existing office space to research and development. Allow addition of up to 30,000 square feet of small locally serving retail/personal service space in a location near the new SMART station. Consider a mixed use redevelopment if proposed by the property owner to benefit from proximity to the new SMART station, but do not assume such development in the EIR prepared for the new General Plan.

BOULEVARD CORRIDOR STUDY 2. Land Use & Design Guidelines: Central Property Campus Properties Wood Hollow Land Use and Design Criteria Retain existing land use designation and zoning of the site for Business/Professional Office. Take vehicular access to the site from Redwood Boulevard. Respect existing wetlands and oak trees in project design. Take into account slope stability and the presence of gas transmission pipelines in project design and siting of buildings. Oakview Office Retain existing land use designation and zoning of the site for Business/Professional Office. Campus Properties Black John Respect existing oak trees in project design. Retain existing land use designation and zoning of the site for Business/Professional Office. Respect existing wetlands and oak trees in project design. Take into account slope stability and the presence of gas transmission pipelines in project design and siting of buildings.

BOULEVARD CORRIDOR STUDY 2. Land Use & Design Guidelines: Central Property Land Use and Design Criteria Lands of Wright Redesignate and rezone the site from Light Industrial/Office to Business/Professional Office.

BOULEVARD CORRIDOR STUDY 2. Land Use & Design Guidelines: Northern Property PG&E Land Use and Design Criteria Redesignate and rezone the site from Light Industrial/Office to Business/Professional Office. Allow a bus storage facility if appropriately screened from off site views and if noise impacts on the adjacent motel are mitigated. Birkenstock Redesignate and rezone the site from Light Industrial/Office to Business/Professional Office. Allow reuse of the existing warehouse structure for office or research and development use.

BOULEVARD CORRIDOR STUDY 3. Circulation Improvements Implement identified improvements to the San Marin Drive/Redwood Boulevard intersection, freeway ramps and Atherton Avenue/Binford Road intersection to assure continued traffic operations which meet the City s level of service standards. [Note: The Draft General Plan will include a list of anticipated roadway improvements, including those listed in Alternative 2 above.] Evaluate the need for an additional southbound lane on Redwood Boulevard between Wood Hollow Drive and San Marin Drive. In conjunction with redevelopment of the American Assets site connect East Campus Drive to the Rush Creek Landing Road/Redwood Boulevard intersection, including pedestrian and bicycle facilities to promote access by office employees to the SMART station and to create a location for the retail/personal service uses described above. Respect existing wetlands in making the roadway connection. Improve bicycle, pedestrian and transit facilities along the corridor through City investments or in conjunction with private development. Require new development to prepare and implement an employee trip reduction plan. Develop a funding plan for required roadway improvements in the area, determining if an additional area impact fee is necessary for full funding.

BOULEVARD CORRIDOR STUDY 4. General Plan Designations Current General Plan Designations Draft General Plan Designations American Assets BPO BPO Campus Properties Wood Hollow BPO BPO Oakview Office BPO BPO Campus Properties Black John BPO BPO with AHO zoning BPO BPO with AHO zoning Lands of Wright LIO BPO Buck Institute LIO REI PG&E LIO BPO, with bus storage yard added as an allowable use with a Use Permit Birkenstock LIO BPO * BPO = Business and Professional Office; LIO = Light Industrial/Office; REI = Research/Education Institutional

BOULEVARD CORRIDOR STUDY 4. Development Forecasts for General Plan EIR Property American Assets Campus Properties Wood Hollow Oakview Office Campus Properties Black John + Lands of Wright Buck Institute PG&E Birkenstock TOTAL Estimated Likely Near Term Development Potential 30,000 sq. ft. neighborhood retail 40,000 sq. ft. office/r&d 24,000 sq. ft. office 350,000 sq. ft. office/r&d 120 senior living units 130,000 sq. ft. lab space 130 employee housing units 40,000 sq. ft. office/r&d Convert 135,365 sq. ft. warehouse to office 669,365 sq. ft. office/r&d 114 senior living units 130 employee housing units 30,000 sq. ft. neighborhood retail Less 135,365 sq. ft. warehouse

BOULEVARD CORRIDOR STUDY Next Steps City Council workshop on September 9 with direction to staff re: what to incorporate into the Draft General Plan for this Focus Area

QUESTIONS?

BOULEVARD CORRIDOR STUDY